Time Sensitive - Access Instructions - Cutler Site Walk.pdf

PDF 107 KB Posted

Attached to
Results - Demolish Bulk Fuel Facility Cutler Federal contract opportunity
Solicitation number
N4008524B2507
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains instructions for contractors to gain access to the NSA Cutler site in order to participate in the federal contract opportunity for the demolition and replacement of bulk fuel tanks and associated infrastructure at the NSA Cutler facility in Cutler, Maine.

The federal contract opportunity is solicitation N4008524B2507, which includes demolishing three existing bulk fuel tanks and four transient fuel tanks, and installing four new 50,000 gallon bulk tanks and four new 20,000 gallon transient tanks. The work also includes 11 bid options for additional tasks such as demolishing a berm oil water separator, providing concrete slabs and repairs, painting support pipes, roadway mill and overlay, fuel delivery and storage, and installing bollards. The contract is being issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Results - Demolish Bulk Fuel Facility Cutler, newest first.
File Type Posted
1419 - Abstract of Offers - Cutler Demo Fuel Facility.pdf PDF
AMD 02 CU-103-AST-01.pdf PDF
AMD 02 Procedures for Excavating in Areas of Grounding Grid-11Jan2023.pdf PDF
AMD 02 CU-127-AST-01.pdf PDF
AMD 02 CU-103-AST-03.pdf PDF
AMD 02 CU-126-AST-01.pdf PDF
AMD 02 CU-125-AST-01.pdf PDF
AMD 02 02 82 00.00 22.pdf PDF
AMD 02 31 23 00.00 22.pdf PDF
AMD 02 CU-103-AST-02.pdf PDF
AMD 02 02 83 00.00 22.pdf PDF
AMD 02 Existing Transient Tank Foundation Drawing.pdf PDF
AMD 02 Gov Responses to Remaining PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
Amendment 02 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 02 CU-103-AST-04.pdf PDF
AMD 01 Cutler Fuel Tank - Natural Resource Report.pdf PDF
AMD 01 Cutler Fuel Tank Repl - Geotech Data Report.pdf PDF
AMD 01 NAVFAC Cutler AST Replacement Env Investigation Ltr_11.8.2023.pdf PDF
AMD 01 Sign in Sheet - Bulk Fuel Cutler.pdf PDF
Amendment 01 N4008524B2507 Demo Bulk Fuel Facility.pdf PDF
AMD 01 Weston Sampson_NCTCS Cutler Fuel Tanks_RBM Survey Report.pdf PDF
AMD 01 Existing Bulk Fuel Tank Foundation Drawings.pdf PDF
AMD 01 Cutler Fuel Tank - Wetlands.pdf PDF
AMD 01 Gov Responses to PPIs - Demo Fuel Cutler - 24B2507.pdf PDF
Drawings - Demolish Bulk Fuel Facility Cutler.pdf PDF
Specifications - Demolish Bulk Fuel Facility Cutler.pdf PDF
Released N4008524B2507 Demolish Bulk Fuel Facilities Cutler.pdf PDF
SECNAV 5512.pdf PDF
Time Sensitive - Access List - Cutler Site Walk.xlsx XLSX spreadsheet
Bid Form - Bulk Fuel Cutler.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSA CUTLER ACCESS INSTRUCTIONS for CONTRACTORS If any changes to this process are needed, please notify William Harke, PWD-Maine at

William. t. harke. civ@us. nary. mil

The following instructions are for contractors wishing to gain access to NSA Cutler and NCT AMS <let

Cutler facilities for the Demolish Bulk Fuel Facilities Cutler Project. They are intended for those that: 1) do not have an active CAC, or 2) a non-government employee with a CAC AND a need to visit the Restricted Area. The Restricted Area is any land area or buildings South of Hudson Blvd and the New Entry Control Point (planned 2025).

Note that the NCT AMS badge is picked up upon arrival and dropped off at the conclusion of that visit, which may span multiple days.

1. Prime Contractors should fill in the "To Be Completed by Contractor" section of the Access

Request List. This should include all their personnel and their subcontractors no later than 6/18/2024. Any questions should be directed to the NA VF AC host. Generally, the hosts are:

a. FSC Contractor:

b. A/E (including Pre-Award):

c. Construction Bidding:

d. Post Award Contractors:

FSC

D&C (FMS, cc: PM) D&C (FMS, cc: CS and PM)

CM

2. After submitting the completed Access Request List, all attendees shall submit the SECNAV 5512. This shall be subitted no later than 6/19/2024. Please note:

a. Each individual is required to read, understand, and complete Form SECNAV 5512.

b. The Sponsor section on SECNA V 5512 (Block 25) should be the FMS.

c. SECNA V Form 5512 includes Personally Identifiable Information (PII) and is to be submitted ONLY to Cutler Security. PII should be treated appropriately.

d. Forms need to be submitted a minimum of 12 days prior to badge pickup

e. If the planned site visit is more than 30 days after 5512 submission, the contractor should bring this to the attention of the NA VF AC host.

f. Incomplete or missing Information will delay the vetting process. If information is incomplete or missing, Cutler Security will contact the individual.

g. If an individual is denied access a denial package will be sent to the NA VF AC Sponsor

3. The FMS for the Northern Sites is:

a. FMS (as of 12 Jul 2023):

4. SECNAV 5512 is to be submitted to:

a. Security (as of 12 Jul 2023):

Lauren Gilpatrick lauren.r.gilpatrick.civ@us.navy.mil

CPL Michael R. Fullmer michael.r.fullrner.civ@us.navy.mil

5. NOTE: Badge pickup generally will take a minimum of20 minutes per person. Ensure you have all identification required or access will not be granted. See SECNA V 5512.