WFLHD Construction Contract Administration_FY 23 V2.pdf

PDF 162 KB Posted

Attached to
OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
Solicitation number
69056723B000021
Issued by

About this file

This document is a Construction Contract Administration document that provides information about the Federal Highway Administration's (FHWA) procedures for definitizing equitable adjustments for change orders under construction contracts.

The document outlines the FHWA's past performance data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders. The data shows the number of change order proposals definitized within various timeframes, including 0-30 days, 31-60 days, 61-90 days, 91-180 days, 181-365 days, and 366 or more days. There are no agency-specific additional policies and procedures that exist at this time.

The document is related to a federal contract opportunity for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project, which is being solicited by the Department of Transportation Federal Highway Administration. The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are provided as attachments to the solicitation.

View the file

Other files

File Type Posted
Bid Tabs_OR FLAP GRANT 24(2).pdf PDF
BidSum_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
ora-grant24-2_boundary creek_Earthwork.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WFLHD Construction Contract Administration

FAR 36.211 requires a description of the Federal Highway Administration’s (FHWA) procedures that apply to definitization of equitable adjustments for change orders under construction contracts. It also requires that FWHA furnish data on the agency’s past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts.

Change orders as defined in FAR 2.101 are changes to the contract work pursuant to FAR 52.243-4, Changes.

There are no agency-specific additional policies and procedures that exist at this time.

The table below contains data regarding the definitization of equitable adjustments for change orders under construction contracts by fiscal year (FY).

Time to definitize after receipt of an adequate change order definitization proposal under construction contracts

Number of change order proposals definitized under construction contracts

FY 2021 FY 2022 FY 2023

0 to 30 days 1 1 0 31 to 60 days 1 0 3 61 to 90 days 0 0 3 91 to 180 days 5 1 4 181 to 365 days 0 0 3 366 or more days 2 0 0 After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance

0 0 0 https://www.acquisition.gov/far/part-52#FAR_52_243_4

File details come from the government source that posted it. Updated .