ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf

PDF 166 KB Posted

Attached to
OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
Solicitation number
69056723B000021
Issued by

About this file

This document is a Vertical Alignment Review Report for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project. It provides detailed technical specifications for the vertical alignment of the roadway construction, including station elevations, tangent grades, parabolic curve lengths and parameters, and total project length. The related federal contract opportunity is a Solicitation for the Granite Hill Road Reconstruction, Phase II project, issued by the Department of Transportation Federal Highway Administration. The Solicitation includes the Invitation for Bids, Plans, Physical Data, and Construction Contract Administration Document. No further details about required products/services, response dates, pricing, or set asides are provided in the given information.

View the file

Other files

File Type Posted
Bid Tabs_OR FLAP GRANT 24(2).pdf PDF
BidSum_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
ora-grant24-2_boundary creek_Earthwork.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver cal Alignment

Review report for MAIN 01

Bull Run Creek Crossing #1

OR FLAP GRANT 24(2)

Granite Hill Road reconstruc on, phase II

Vertical Alignment Review Report Report Created: Friday, June 21, 2024

Time: 8:51:38 AM

Project: Design IntlFt Description:

File Name: c:\pw-work\d0501462\ora-grant24-2_ALI_COR_BullRun01.dgn Last Revised: 6/21/2024 07:32:57

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: BL Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: BL1 Vertical Description:

Vertical Style: Alignment\Baseline Station Elevation

Element: Linear

START 24200.002 4933.742

VPC 24262.500 4931.560

Tangent Grade: -0.035 Tangent Length: 62.498

Element: Symmetrical Parabola

VPC 24262.500 4931.560

VPI 24300.000 4930.250

VPT 24337.500 4929.086

Length: 75.000

Entrance Grade: -0.035 Exit Grade: -0.031 r = 100 * (g2 - g1) / L: 0.516 K = l / (g2 - g1): 193.642

Middle Ordinate: 0.036

Element: Linear

VPT 24337.500 4929.086

VPC 24364.405 4928.250

Tangent Grade: -0.031 Tangent Length: 26.905

Element: Symmetrical Parabola

VPC 24364.405 4928.250

VPI 24401.905 4927.086

Page 1 of 3Vertical Alignment Review Report

6/21/2024

Horizontal Alignment: BL Horizontal Description:

Horizontal Style: Alignment\Baseline

VPT 24439.405 4925.736

Length: 75.000 Entrance Grade: -0.031

Exit Grade: -0.036 r = 100 * (g2 - g1) / L: -0.660

K = l / (g2 - g1): 151.524 Middle Ordinate: -0.046

Element: Linear

VPT 24439.405 4925.736

VPC 24479.420 4924.295

Tangent Grade: -0.036 Tangent Length: 40.015

Element: Symmetrical Parabola

VPC 24479.420 4924.295

VPI 24504.420 4923.395

VPT 24529.420 4922.392

Length: 50.000

Entrance Grade: -0.036 Exit Grade: -0.040 r = 100 * (g2 - g1) / L: -0.824 K = l / (g2 - g1): 121.324

Middle Ordinate: -0.026

Element: Linear

VPT 24529.420 4922.392

VPC 24590.418 4919.945

Tangent Grade: -0.040 Tangent Length: 60.998

Element: Symmetrical Parabola

VPC 24590.418 4919.945

VPI 24640.418 4917.939

VPT 24690.418 4916.311

Length: 100.000

Entrance Grade: -0.040 Exit Grade: -0.033 r = 100 * (g2 - g1) / L: 0.757 K = l / (g2 - g1): 132.065

Middle Ordinate: 0.095

Element: Linear

VPT 24690.418 4916.311

Page 2 of 3Vertical Alignment Review Report

Horizontal Alignment: BL Horizontal Description:

Horizontal Style: Alignment\Baseline

END 24700.000 4916.000

Tangent Grade: -0.033 Tangent Length: 9.582

Page 3 of 3Vertical Alignment Review Report

File details come from the government source that posted it. Updated .