revised ora-grant24-2_plans.pdf
PDF 30 MB Posted
- Solicitation number
- 69056723B000021
About this file
This document appears to be an Invitation for Bids (IFB) for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project. The project is being solicited by the Department of Transportation Federal Highway Administration. The IFB, plans, physical data, and construction contract administration documents are provided as attachments. The solicitation number is 69056723B000021. This project involves the reconstruction of Granite Hill Road, Phase II. No other details about the specific products, services, or scope of work are provided in the summary information given.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
D E F G H S
PLAN & PROFILE EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(BULL RUN 03) LPSM ALL
A0140 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(BULL RUN 04) LPSM ALL
A0160 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(Boundary Creek) LPSM ALL
A0180 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 2,610 190 2,800
A0200 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,324 76 1,400
A0220 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 9 1 10
A0240 20101-0000 CLEARING AND GRUBBING ACRE 2.61 2.61
A0260 20301-1900 REMOVAL OF PIPE CULVERT EACH 3 3
A0280 20401-0000 ROADWAY EXCAVATION CUYD 861 139 1,000
A0300 20403-0000 UNCLASSIFIED BORROW CUYD 2,422 278 2,700
A0320 20803-0000 STRUCTURAL BACKFILL CUYD 200 200 Contract Quantity
A0340 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 2 2
A0360 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 70 70
A0380 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 2,200 2,200
A0400 25125-0000 BOULDER EACH 4 4
A0420 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 2,635 65 2,700
A0440 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 973 27 1,000
A0460 41201-0000 TACK COAT TON 1.7 0.3 2.0
A0480 55101-1600 STEEL H-PILE, 12 X 74, IN PLACE LNFT 205 205 Contract Quantity
A0500 55101-2100 STEEL H-PILE, 14X 117, IN PLACE LNFT 310 310 Contract Quantity
A0520 55102-2400 UNTREATED TIMBER PILE, IN PLACE EACH 28 28
A0540 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 117 117 Contract Quantity
A0560 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH Contract Quantity
SLABS, TYPE 2 SQYD 30 30
A0580 55235-0000 EXPANSION JOINTS LNFT 71 71 Contract Quantity
A0600 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS, 48-INCH Contract Quantity
VOIDED LNFT 378 378
A0620 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE Contract Quantity
GIRDER (47 INCH) LNFT 517 517
A0640 55401-1000 REINFORCING STEEL LB 15,300 15,300 Contract Quantity
MileStone: 100% Date Completed: 09/12/24 Report Date: 09/12/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-S ep
-2
2:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0
O
R a-gr an t2 4-
2_ S O
Q .x ls m
]S he et
STATE PROJECT
B.1FLAP GRANT 24(2)OR
SHEET
NUMBER
PLAN & PROFILE EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE Bid Schedule
A0660 55401-2000 REINFORCING STEEL, EPOXY COATED LB 12,400 12,400 Contract Quantity
A0680 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL (2-TUBE MASH) LNFT 364 364 Contract Quantity
A0700 56401-1000 BEARING DEVICE, ELASTOMERIC (BULL RUN CREEK Contract Quantity
CROSSING #3) EACH 28 28
A0720 56401-1000 BEARING DEVICE, ELASTOMERIC (BULL RUN CREEK Contract Quantity
CROSSING #4) EACH 10 10
A0740 57502-0000 TEMPORARY BRIDGE (Bull Run 03) LPSM All ALL Contract Quantity
A0760 57502-0000 TEMPORARY BRIDGE (Bull Run 04) LPSM All ALL Contract Quantity
A0780 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE (JOINTS) CUYD 13 13 Contract Quantity
A0800 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (13 FEET
SPAN, 12 FEET RISE) LNFT 34 34
A0820 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS LNFT 952 952
A0840 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL3) EACH 8 8
A0860 61707-0000 STRUCTURE TRANSITION RAILING LNFT 168 168
A0880 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0900 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 30-INCH WIDTH HOUR 40 40
A0920 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 40 40
A0940 62301-0000 GENERAL LABOR HOUR 40 40
A0960 62501-0000 TURF ESTABLISHMENT ACRE 2.6 2.6
A0980 62635-1000 CUTTINGS, COTTONWOOD POLE (COTTONWOOD BOLE) EACH 12 12
A1000 62635-3000 CUTTINGS, WILLOW POLE (WILLOW POLE TRIPOD) EACH 38 38
A1020 62635-3000 CUTTINGS, WILLOW POLE EACH 1,500 1,500
A1040 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (CONSERVED
WILLOW BUSH) EACH 30 30
A1060 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A1080 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4-INCH, YELLOW) LNFT 9,666 134 9,800
A1100 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4-INCH, WHITE) LNFT 9,664 136 9,800
A1120 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
(BULL RUN 03) LPSM All ALL
A1140 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
(BULL RUN 04) LPSM All ALL
A1160 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 12 12
A1180 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 90 90
A1200 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN EACH 2 2
A1220 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 9 9
A1240 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,186 214 1,400
-S ep -2
2:
P M
MileStone: 100% Date Completed: 09/12/24 Report Date: 09/12/24 c:
\p w -w or k\ d0
O
R a-gr an t2 4-
2_ S O
Q .x ls m
]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2FLAP GRANT 24(2)OR
PLAN & PROFILE EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE Bid Schedule
A1260 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 146 146
A1280 64703-5000 MITIGATION, ROOT WAD EACH 22 22
A1300 64703-6000 MITIGATION, FISH PASSAGE BOULDER EACH 48 48
A1320 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 94 94
A1340 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 03) LPSM All ALL
A1360 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 04) LPSM All ALL
-S ep -2
2:
P M
MileStone: 100% Date Completed: 09/12/24 Report Date: 09/12/24 c:
\p w -w or k\ d0
O
R a-gr an t2 4-
2_ S O
Q .x ls m
]S he et
3)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3FLAP GRANT 24(2)OR
PLAN & PROFILE EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(BULL RUN 03) LPSM ALL
B0140 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(BULL RUN 04) LPSM ALL
B0160 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(Bull Run 01) LPSM ALL
B0180 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(Boundary Creek) LPSM ALL
B0200 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
(Bull Run 02) LPSM ALL
B0220 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 3,940 260 4,200
B0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,324 76 1,400
B0260 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 17 3 20
B0280 20101-0000 CLEARING AND GRUBBING ACRE 3.19 3.19
B0300 20301-1900 REMOVAL OF PIPE CULVERT EACH 5 5
B0320 20401-0000 ROADWAY EXCAVATION CUYD 1,414 86 1,500
B0340 20403-0000 UNCLASSIFIED BORROW CUYD 2,159 241 2,400
B0360 20803-0000 STRUCTURAL BACKFILL CUYD 200 200 Contract Quantity
B0380 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 2 2
B0400 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 210 210
B0420 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 2,200 2,200
B0440 25125-0000 BOULDER EACH 4 4
B0460 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 3,657 143 3,800
B0480 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,400 100 1,500
B0500 41201-0000 TACK COAT TON 2.7 0.3 3.0
B0520 55101-1600 STEEL H-PILE, 12 X 74, IN PLACE LNFT 205 205 Contract Quantity
B0540 55101-2100 STEEL H-PILE, 14X 117, IN PLACE LNFT 310 310 Contract Quantity
B0560 55102-2400 UNTREATED TIMBER PILE, IN PLACE EACH 28 28
B0580 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 117 117 Contract Quantity
B0600 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH Contract Quantity
SLABS, TYPE 2 SQYD 30 30
B0620 55235-0000 EXPANSION JOINTS LNFT 71 71 Contract Quantity
B0640 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS, 48-INCH Contract Quantity
VOIDED LNFT 378 378
-S ep -2
2:
P M
MileStone: 100% Date Completed: 09/12/24 Report Date: 09/12/24 c:
\p w -w or k\ d0
O
R a-gr an t2 4-
2_ S O
Q .x ls m
]S he et
4)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.4FLAP GRANT 24(2)OR
PLAN & PROFILE EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE Bid Schedule
B0660 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE Contract Quantity
GIRDER (47 INCH) LNFT 517 517
B0680 55401-1000 REINFORCING STEEL LB 15,300 15,300 Contract Quantity
B0700 55401-2000 REINFORCING STEEL, EPOXY COATED LB 12,400 12,400 Contract Quantity
B0720 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL (2-TUBE MASH) LNFT 364 364 Contract Quantity
B0740 56401-1000 BEARING DEVICE, ELASTOMERIC (BULL RUN CREEK Contract Quantity
CROSSING #4) EACH 10 10
B0760 56401-1000 BEARING DEVICE, ELASTOMERIC (BULL RUN CREEK Contract Quantity
CROSSING #3) EACH 28 28
B0780 57502-0000 TEMPORARY BRIDGE (Bull Run 03) LPSM All ALL Contract Quantity
B0800 57502-0000 TEMPORARY BRIDGE (Bull Run 04) LPSM All ALL Contract Quantity
B0820 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE (JOINTS) CUYD 13 13 Contract Quantity
B0840 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (15 FEET
SPAN, 9 FEET RISE) LNFT 66 66
B0860 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (22 FEET
SPAN, 9 FEET RISE) LNFT 56 56
B0880 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (13 FEET
SPAN, 12 FEET RISE) LNFT 34 34
B0900 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS LNFT 952 952
B0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL3) EACH 8 8
B0940 61707-0000 STRUCTURE TRANSITION RAILING LNFT 168 168
B0960 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
B0980 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 30-INCH WIDTH HOUR 40 40
B1000 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 40 40
B1020 62301-0000 GENERAL LABOR HOUR 40 40
B1040 62501-0000 TURF ESTABLISHMENT ACRE 3.2 3.2
B1060 62635-1000 CUTTINGS, COTTONWOOD POLE (COTTONWOOD BOLE) EACH 12 12
B1080 62635-3000 CUTTINGS, WILLOW POLE (WILLOW POLE TRIPOD) EACH 38 38
B1100 62635-3000 CUTTINGS, WILLOW POLE EACH 1,500 1,500
B1120 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (CONSERVED
WILLOW BUSH) EACH 30 30
B1140 63308-3000 OBJECT MARKER, TYPE 3 EACH 12 12
B1160 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4-INCH, WHITE) LNFT 13,508 192 13,700
B1180 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4-INCH, YELLOW) LNFT 13,510 190 13,700
B1200 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
(BULL RUN 03) LPSM All ALL
B1220 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
(BULL RUN 04) LPSM All ALL
B1240 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 20 20
-S ep -2
2:
P M
MileStone: 100% Date Completed: 09/12/24 Report Date: 09/12/24 c:
\p w -w or k\ d0
O
R a-gr an t2 4-
2_ S O
Q .x ls m
]S he et
5)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.5FLAP GRANT 24(2)OR
PLAN & PROFILE EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE Bid Schedule
B1260 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 150 150
B1280 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN EACH 2 2
B1300 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 9 9
B1320 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,976 224 2,200
B1340 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR DAY 146 146
B1360 64703-5000 MITIGATION, ROOT WAD EACH 22 22
B1380 64703-6000 MITIGATION, FISH PASSAGE BOULDER EACH 48 48
B1400 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 393 393
B1420 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 03) LPSM All ALL
B1440 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 04) LPSM All ALL
-S ep -2
2:
P M
MileStone: 100% Date Completed: 09/12/24 Report Date: 09/12/24 c:
\p w -w or k\ d0
O
R a-gr an t2 4-
2_ S O
Q .x ls m
]S he et
6)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.6FLAP GRANT 24(2)OR
Profile grade tack coat between lifts
3-inch compacted depth, placed in two equal lifts with
Asphalt concrete pavement, type 1, 12-inch compacted depth
Roadway Aggregate, Method 2, LC
Existing ground Existing ground
10'
0.25 D
C o n s tr u c ti o n l im it
DD
C o n s tr u c ti o n l im it
0.25 D
Edge of pavement
Aggregate base course
First lift of asphalt
Second lift of asphalt
Existing ground C o n s tr u c ti o n l im it
See Fill Slope Rounding
Existing groundC o n s tr u c ti o n l im it
See Fill Slope Rounding
See Fill Slope Rounding
C o n s tr u c ti o n l im it Tur f es tabl ishment limi ts
See Safety Edge
1:3 1:3
See Fill Slope Rounding
C o n s tr u c ti o n l im it
Turf establishment limits
SAFETY EDGE
376+98 to 379+32, RT
379+87 to 381+32, RT
492+16 to 494+35, RT
495+39 to 496+47, RT
Varies (0' to 2')
1'
Varies(1:20 to 1:2)
377+61 to 379+20, LT
379+73 to 383+07, LT
493+54 to 494+48, LT
495+53 to 497+75, LT
Varies (0' to 2')
1'
Va rie s
(1 :2 to
1:
2)
2% Crown
242+00 to 247+00
268+40 to 273+00
339+00 to 347+00
376+50 to 379+26
379+80 to 383+55
489+65 to 494+41
495+46 to 498+75
"MAIN 01"
2% Crown
Existing ground
5' 5'
CUT SLOPE ROUNDING
Existing ground
5'5'
FILL SLOPE ROUNDING
limits Turf establishment limits Turf establishment
CONNECTION DETAIL
Existing ground
Asphalt concrete pavement
Roadway aggregate
Saw-cut vertically and tack
Slope stake limitSlope stake limit
:2
P
M
S e p te m b e r
T y p ic a l
S e c ti o n c p w w o r k
\d
\o r a g r a n t2 p ln ty p
.d g n
TYPICAL SECTION
PROJECT
C.1
OR FLAP GRANT 24(2)
Var iabl e (1 :20 to
1:3
Shoulder
1'
Traveled lane
11'
Traveled lane
11'
Shoulder
1'
Variable (1:20 to 1:3)
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
19101 411063.041 8762239.436 4952.423 44°46'25.225932"N 118°20'33.708639"W 4896.8887 0.999684269 5/8 IR W/FHWA ALUM CAP 1.
19102 411427.357 8761980.811 4934.568 44°46'28.890400"N 118°20'37.157964"W 4879.0313 0.999685 5/8 IR W/FHWA ALUM CAP
19103 411664.235 8761854.422 4924.350 44°46'31.262013"N 118°20'38.821915"W 4868.8122 0.99968541 5/8 IR W/FHWA ALUM CAP
19201 413263.290 8760343.866 4844.977 44°46'47.444361"N 118°20'59.166408"W 4789.4094 0.999688671 5/8 IR W/FHWA ALUM CAP
19202 413483.832 8760168.182 4840.029 44°46'49.667576"N 118°21'01.520015"W 4784.4588 0.999688835 5/8 IR W/FHWA ALUM CAP
19203 413641.076 8760054.654 4838.528 44°46'51.249614"N 118°21'03.035524"W 4782.9561 0.999688855 5/8 IR W/FHWA ALUM CAP
19301 415807.651 8754202.579 4724.178 44°47'14.165889"N 118°22'23.355795"W 4668.502 0.999693581 5/8" IR W/FHWA ALUM CAP
19302 415778.314 8753947.999 4721.096 44°47'13.942448"N 118°22'26.895422"W 4665.4158 0.999693736 5/8" IR W/FHWA ALUM CAP
19303 415851.373 8753652.755 4717.564 44°47'14.740334"N 118°22'30.961377"W 4661.8787 0.999693879 5/8" IR W/FHWA ALUM CAP
19401 416393.798 8750845.151 4689.957 44°47'20.822079"N 118°23'09.683142"W 4634.2222 0.999695006 5/8" IR W/FHWA ALUM CAP
19402 416392.851 8750554.396 4677.940 44°47'20.887829"N 118°23'13.714005"W 4622.2011 0.999695578 FND RPC
19403 416423.079 8750266.282 4674.242 44°47'21.260602"N 118°23'17.696960"W 4618.4989 0.999695743 5/8" IR W/FHWA ALUM CAP
19501 422748.097 8741413.566 4578.468 44°48'25.964984"N 118°25'18.161147"W 4522.545 0.999698312 5/8" IR W/FHWA ALUM CAP
19502 423080.469 8741099.233 4572.923 44°48'29.325844"N 118°25'22.401410"W 4516.9931 0.999698475 5/8" IR W/FHWA ALUM CAP
19503 423303.976 8740933.418 4572.497 44°48'31.574302"N 118°25'24.621089"W 4516.5632 0.999698428 5/8" IR W/FHWA ALUM CAP
PROJECT :Granite Hill Phase 2 DATE OF FIELD WORK : August 2019
PROJECT UNITS : International foot COORDINATE SYSTEM : Orgeon North SPCS NAD83 2011
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
3\ O re go n\ G ra ni te _H ill
G ra ni te
_H ill
_2
9_ co nt ro ls he et .x ls x]
Sh ee t 2-
Fe b-
:4
PM
W
FL
H D
S ur ve y
W
FL
H D
_S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.1
SHEET
NUMBER
FLAP GRANT 24(2)OR
SURVEY CONTROL
:1
A
A u g u s t
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
IE
p w w o r k \d
\O
R a G r a n t2 p ln q ta b .d g n
TABULATION OF QUANTITIES
PROJECT
D.3
N39°15'56"W
PI 243+51.78
Δ = 05°00'00" (LT)
R = 2,000.00' T = 87.32' L = 174.53' e = 2.8%
PI 247+84.61
Δ = 46°17'09" (LT)
R = 250.00' T = 106.86' L = 201.96' e = 5.4%
P C
.4
P T
.9
P C
.7
Y T I L I T
U D
E I R
U B G
N I N
R A W
N
BEGIN SCHEDULE B
BEGIN CONSTRUCTION
BEGIN PROJECT
SUSPEND CONSTRUCTION
to be Constructed "MAIN 01" Line
Construction limit
Slope stake limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
See Section F for details reinforced concrete box culvert 15 feet span, 9 feet rise, precast 244+66.4
Existing Ground
Crossing #1 Bull Run Creek
See note 1
See note 1
N34°15'57"W
241+50 242+00 242+50 243+00 243+50 244+00 244+50 245+00 245+50 246+00 246+50
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
4,926 4,926
4,928 4,928
4,930 4,930
4,932 4,932
4,934 4,934
241+50 242+00 242+50 243+00 243+50 244+00 244+50 245+00 245+50 246+00 246+50
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
4,926 4,926
4,928 4,928
4,930 4,930
4,932 4,932
4,934 4,934
-3.49%
-3.11%
-3.60%
-4.01%
.9
.0
.4
.4
.0
.2
246+40.42 4917.94
SSD = 2218'
K = 152
75' VC
SSD = 2644'
K = 121
50' VC
HLSD = INF'
K = 194
75' VC
HLSD = INF'
K = 132
100' VC
,9
.7
247+00
4,908 4,908
4,910 4,910
4,912 4,912
4,914 4,914
4,916 4,916
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
247+00
4,908 4,908
4,910 4,910
4,912 4,912
4,914 4,914
4,916 4,916
4,918 4,918
4,920 4,920
4,922 4,922
4,924 4,924
-3.25%
"MAIN 01" 242+00
E= 540105.0424
N= 938002.4670 "MAIN 01" 247+00
Notes prior to 3 inch overlay project
1. Existing ground survey collected
UTILITY OWNER CONTACT(S):
541-786-9600 Renn Morris (rennm@rallynet.us) 541-932-7408 Chris Sterling (chriss@rallynet.us) Rally Networks (Commnication)
541-524-2829 selms@otec.coop Stephanie Elms (Electric) Oregon Trail Electric Cooperative
:4
A u g u s t
B u ll R u n
S h e e t] p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.4
N29°37'18"W
N40°01'14"W
PI 268+96.85
Δ = 47°52'28" (RT)
R = 430.00' T = 190.88' L = 359.29' e = 6.0%
PI 272+28.51
Δ = 10°23'56" (LT)
R = 850.00' T = 77.35' L = 154.27' e = 4.6%
P C
.1
P T
.4
P T
.2
2 2
N
RESUME CONSTRUCTION
See Section H for details type B, solid (4-inch, white) Pavement markings, to be Constructed "MAIN 01" Line
See Section H for details type B, solid (4-inch, yellow) Pavement markings, CONSTRUCTION
SUSPEND
Slope stake limit
Construction limit
Profile grade
Existing Ground
See Section F for details reinforced concrete box culvert 22 feet span, 9 feet rise, precast 270+08.8
Crossing #2 Bull Run Creek
See note 1
See note 1
268+00 268+50 269+00 269+50 270+00 270+50 271+00 271+50 272+00 272+50 273+00 273+50
4,834 4,834
4,836 4,836
4,838 4,838
4,840 4,840
4,842 4,842
4,844 4,844
4,846 4,846
4,848 4,848
4,850 4,850
268+00 268+50 269+00 269+50 270+00 270+50 271+00 271+50 272+00 272+50 273+00 273+50
4,834 4,834
4,836 4,836
4,838 4,838
4,840 4,840
4,842 4,842
4,844 4,844
4,846 4,846
4,848 4,848
4,850 4,850
-2.16%
-1.50%
-0.73%
.0
.7
.2
.4
HLSD = INF'
K = 114
75' VC
HLSD = INF'
K = 257
200' VC
,8
.6
"MAIN 01" 268+40
"MAIN 01" 273+00
prior to 3 inch overlay project
1. Existing ground survey collected
Notes
:4
A u g u s t
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.5
S6 8°0
7'0 6"W
N75°22'37"W e = 6.0%
'267.59L =
'138.51T =
'420.00R =
(RT)36°30'16"Δ =
340+67.68PI
.1
C
C 3
.7
T
1 3
N
BEGIN SCHEDULE A
RESUME CONSTRUCTION
See Section H for details type B, solid (4-inch, white) Pavement markings, See Section H for details type B, solid (4-inch, yellow) Pavement markings, Slope stake limit
Construction limit to be Constructed "MAIN 01" Line
Profile grade
Existing Ground
See Section F for details reinforced concrete box culvert 13 feet span, 12 feet rise, precast 343+55.3
Crossing Boundary Creek
See note 1
337+00 337+50 338+00 338+50 339+00 339+50 340+00 340+50 341+00 341+50 342+00 342+50 343+00 343+50 344+00 344+50
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
337+00 337+50 338+00 338+50 339+00 339+50 340+00 340+50 341+00 341+50 342+00 342+50 343+00 343+50 344+00 344+50
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
-1.34%
-0.31% 3
.9
.2
.0
.5
SSD = 597'
K = 73
150' VC
HLSD = INF'
K = 146
150' VC
,7
.8
"MAIN 01" 339+00
prior to 3 inch overlay project
1. Existing ground survey collected
Notes
:4
A u g u s t
B o u n d a ry
C re e k
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.6
S84°33'39"W e = 5.4%
'192.58L =
'97.29T =
'550.00R =
(LT)20°03'43"Δ =
345+14.43PI
.7
.3
P
O E
5 3
9 N
See Section H for details type B, solid (4-inch, white) Pavement markings, See Section H for details type B, solid (4-inch, yellow) Pavement markings, Slope stake limit
Construction limit to be Constructed "MAIN 01" Line
CONSTRUCTION
SUSPEND
Profile grade
Existing Ground
See note 1
345+00 345+50 346+00 346+50 347+00 347+50 348+00 348+50 349+00
4,708 4,708
4,710 4,710
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
345+00 345+50 346+00 346+50 347+00 347+50 348+00 348+50 349+00
4,708 4,708
4,710 4,710
4,712 4,712
4,714 4,714
4,716 4,716
4,718 4,718
4,720 4,720
4,722 4,722
4,724 4,724
4,726 4,726
4,728 4,728
-2.38%
-1.43%
.3
.4
HLSD = INF'
K = 132
125' VC
"MAIN 01" 347+00
prior to 3 inch overlay project
1. Existing ground survey collected
Notes
:5
A u g u s t
B o u n d a ry
C re e k S h e e t2 p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.7
N87°0 1'38"
W
N55°29'06"W e = 5.4%
L = 319.30'
T = 163.81'
R = 580.00'
Δ = 31°32'32" (RT)
PI 381+45.76
e = 4.2% L = 309.94' T = 156.22' R = 1,000.00'
Δ = 17°45'29" (LT)
PI 375+58.03
P T
.7
P C
.9
P T
.2
1 3
Y T I L I
U
D
I R
B
G N I N R A
W
N
RESUME CONSTRUCTION CONSTRUCTION
SUSPEND
to be Constructed "MAIN 01" Line
Slope stake limit
Construction limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
Existing Ground
G
T
S
T
G
S
T G S
T G S TGS
See section S for details Bull Run Creek Crossing #3, See note 1
See note 1
Bull Run Creek Crossing #3
376+50 377+00 377+50 378+00 378+50 379+00 379+50 380+00 380+50 381+00 381+50 382+00 382+50 383+00 383+50
4,668 4,668
4,670 4,670
4,672 4,672
4,674 4,674
4,676 4,676
4,678 4,678
4,680 4,680
4,682 4,682
4,684 4,684
4,686 4,686
4,688 4,688
376+50 377+00 377+50 378+00 378+50 379+00 379+50 380+00 380+50 381+00 381+50 382+00 382+50 383+00 383+50
4,668 4,668
4,670 4,670
4,672 4,672
4,674 4,674
4,676 4,676
4,678 4,678
4,680 4,680
4,682 4,682
4,684 4,684
4,686 4,686
4,688 4,688
-4.49%
-1.00%
-2.45%
-1.13%
.4
.2
.6
.5
.0
.0
SSD = 797'
K = 69
100' VC
HLSD = 265'
K = 43
150' VC
HLSD = INF'
K = 114
150' VC
,6
.7
"MAIN 01" 376+50 "MAIN 01" 383+55
LEGEND:
Guardrail System MGS, Type 2, Class A Wood Posts
Terminal Section, Type MGS Tangent
Structure Railing Transition Section
4377+50 to 379+13 RT
378+13 to 379+01 LT
380+04 to 380+79 RT
379+92 to 382+55 LT prior to 3 inch overlay project
1. Existing ground survey collected
Notes
:3
S e p te m b e r
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.8
N37° 47'
11" W
N10°57'43"W e = ___
'196.63L =
'100.15T =
'420.00R =
(RT)26°49'28"Δ =
499+38.64PI
.4
.6
P
0 N
END SCHEDULE A & B
END CONSTRUCTION
END PROJECT
to be Constructed "MAIN 01" Line
Slope stake limit
Construction limit
See Section H for details type B, solid (4-inch, yellow) Pavement markings, See Section H for details type B, solid (4-inch, white) Pavement markings, Profile grade
Existing Ground
TG
G
T
S
See note 1
497+00 497+50 498+00 498+50 499+00 499+50 500+00 500+50
4,562 4,562
4,564 4,564
4,566 4,566
4,568 4,568
4,570 4,570
4,572 4,572
4,574 4,574
4,576 4,576
4,578 4,578
4,580 4,580
4,582 4,582
4,584 4,584
4,586 4,586
497+00 497+50 498+00 498+50 499+00 499+50 500+00 500+50
4,562 4,562
4,564 4,564
4,566 4,566
4,568 4,568
4,570 4,570
4,572 4,572
4,574 4,574
4,576 4,576
4,578 4,578
4,580 4,580
4,582 4,582
4,584 4,584
4,586 4,586
-2.42%
+0.73%
.0
.2
L P
.9
HLSD = 340'
K = 56
175' VC
"MAIN 01" 498+75
Structure Railing Transition Section
Terminal Section, Type MGS Tangent
Guardrail System MGS, Type 2, Class A Wood Posts
LEGEND:
prior to 3 inch overlay project
1. Existing ground survey collected
Notes
:3
A u g u s t
B u ll R u n
B u ll R u n
S h e p w
-w o rk \d
\o ra -g ra n t2
-2 p ln p p -r e d o n e .d g n
PROJECT
D.10
"8
Outside margin =
"8
Border radius = 1
"8
Border thickness =
3'-6"
2" C
2"
2" C
3"
" B2
"2
4" C
3"
14" specific project information background. Adjust text to match
Black border and text on white
Refer to Subsection 107.01A
ESCP Sign
:1 u g u s t
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
IE
p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
TABULATION OF QUANTITIES
PROJECT
E.1
120"X84"
84"X120"
JH
N
RESUME CONSTRUCTION
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
Bull Run Creek
Existing wetland
Existing wetland
"MAIN 01" 489+65
:5 e p te m b e r
E r o s io n C o n tr o l B u ll
R u n
S h e p w w o r k \d
\o r a g r a n t2 p ln e c .d g n
CONTROL
SOIL EROSION AND SEDIMENT
PROJECT
E.10
10.4 x 16 20301 -1900
25101 -0100
25101 -0300
25101 -2400
25125 -0000
55102 -2400
60220 -0000
60220 -0000
60220 -0000
62635 -1000
62635 -3000
62635 -3000
62650 -1000
64703 -5000
64703 -6000
64704 -1000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D B
C
LA
S S
B O
U
LD
ER
U N
TR
EA
TE
D
T
IM
B
ER
P
IL
E, I
PL
C E
PR
EC
A S T
R
EI
N
FO
R
ED
N C R
ET
E B O
X C
U
LV
ER
T(
FE
ET
S
PA
N
F
EE
T
R
IS
E)
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
S
PA
N
FE
ET
R
IS
E)
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
S
PA
N
FE
ET
R
IS
E)
C U
TT
IN
G S
C O
TT
O
N W
O
PO
LE
(C O
TT
O
N W
O O
D B
O
LE
C U
TT
IN
G S
W
IL
LO
W
P O
LE
C U
TT
IN
G S
W
IL
LO
W
PO
LE
(W
IL
LO
W
PO
LE
T
R
IP
O D
R
EM
O V E
A N
D R
EP
LA
N T
TR
EE
D S
H R U
B (C
O N
S
ER
V
W
IL
LO
W B
U S H
M
IT
IG
A
TI
O N
R O
O T
W A D
M
IT
IG
A
TI
O N
FI
S H
P A S S A G
E B O
U
LD
ER
M
IT
IG
A
TI
O N
S
TR
EA
M
TE
R
IA
L REMARKS
See below for numbered notes
FEET CUYD EACH CUYD CUYD CUYD EACH EACH LNFT LNFT LNFT EACH EACH EACH EACH EACH EACH CUYD
SCHEDULE A
Boundary Creek Crossing 300 1 70 4 20 34 6 1500 38 30 14 94 Bull Run Creek Crossing #3 450 1 2 1000 24 Bull Run Creek Crossing #4 400 1 2 1200 8 6 8 24
SCHEDULE A TOTAL 3 4 70 2200 4 28 34 12 1500 38 30 22 48 94
SCHEDULE B
Boundary Creek Crossing 300 1 70 4 20 34 6 1500 38 30 14 94 Bull Run Creek Crossing #1 400 1 70 66 136 Bull Run Creek Crossing #2 500 1 70 56 163 Bull Run Creek Crossing #3 450 1 2 1000 24 Bull Run Creek Crossing #4 400 1 2 1200 8 6 8 24
SCHEDULE B TOTAL 5 4 210 2200 4 28 34 66 56 12 1500 38 30 22 48 393
NOTE:
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for required by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class.
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the 5. See Std. 602-7 for acceptable concrete cell class.
thickness required by the Std. 602-1 fill height table (steel). 6. Structural excavation quantity based on material excavated inside the vertical planes located
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the 18 inches outside and parallel to the limits of footings or foundations.
thickness required by the Std. 602-1 fill height table.
PAY ITEM NUMBER
-A ug -2
2:
P M c:
\p w
-w or k\ d0
D ra in ag e (4 xl sx ]S he et
TABULATION OF DRAINAGE QUANTITIES
PROJECT
F.1OR FLAP GRANT 24(2)
SHEET
NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.
CULVERT INLET
CULVERT OUTLET
TYPICAL INFILL CHANNEL
Placed riprap, method A, class 3
(13 feet span, 12 feet rise)
Precast reinforced concrete box culvert
Mitigation, streambed material
2-yr Water surface
100-yr Water surface
Profile grade
New precast wingwall (L-12')
Precast cutoff wall
Channel bank top
Flowline
Top of wall, elev 4722.8'
Elev 4720.8'
Floor elev 4708.8' Elev 4704.8'
Elev 4716.8'
36x60" CMP arch culvert
Culvert removal, Existing grade, downstream
ELEVATIONS
CROSSING
BOUNDARY CREEK
Elev 4717.5'
Mitigation, streambed material
Precast cutoff wall existing 36x60" CMP arch culvert
Culvert removal, Floor elev 4709.5 Elev 4705.5'
New precast wingwall (L-12')
Placed riprap, method A, class 3
Profile grade
Top of Wall, elev 4723.5'
100-yr Water surface
2-yr Water surface
Elev 4721.5'
(13 feet span, 12 feet rise)
Precast reinforced concrete box culvert
Channel bank top
Flowline
Existing grade, upstream
Existing grade road LC
Existing grade road LC
F.7
STATE PROJECT
NUMBER
SHEET
In t_ ft p w w o r k \d
\B o u n d a r y C r e e k C u lv e r t_
L O
F
I n t_ f t2
D .d g n
OR FLAP GRANT 24(2)
:5
N o v e m b e r
C h e c k e d b y
D e s ig n e d b y
S v e n L e o n
5'-0" 5'-0"
5'-0"5'-0"
Separation-stabilization geotextile, class 1, type C
Separation-stabilization geotextile, class 1, type C
Match new channel bottom elevation
Match new channel bottom elevation
8'18"12" 18" 12"
Concrete, headwall
Concrete, headwall
Elev 4717.5'
Elev 4716.8'
Not to scale.
Not to scale.
"O
OJ
u
OJ
.c u
.D
"O
OJ
C:
en "iii
OJ
o
C: "'
I
I
'ii 1:' "'5 x'
I
I
I
·c: � S!
:!l :!l u
Inside of box culvert
Non-shrink grout
WATERTIGHT BOX .JOINT SECTION
1 '-5" (max.)
1 '-3" (min.)
1¼"0 Hole for 1 "0 joint tie
I>
I.
Do not install fastener over pipe joint
I> I>
6 6
2'-9½" (max.)
2'-6½" (min.)
.I
SUPPLEMENTAL CONCRETE PIPE TIE
6"x6"xW¼" 2 wire mesh (typ.)
(per manufacturer)
Precast footing
Install tie rods or connector plates per manufacturer between precast sections (typ.)
and cast-in-place sections as applicable
2½" x 2½" Bevel along both sides (typ.)
Embedded connection plates (typ.)
Weep holes per manufacturer
(See sheet F.3 for continuous cast-in-place cutoff wall placed beneath footing) WINGWALL DETAIL
Headwall (according to precast culvert manufacturer)
Interlocking top section
I>
Corbel
3" dia. holes with No. 8 dowels spaced 2'-6" max.
Span
Cutoff wall - per precast culvert manufacturer (Continuous cast-in-place called for on sheet F.3)
Tapered holes permitted when precast
SECTION
HEADWALL AND CUTOFF WALL
DETAIL
Headed Stud
Closed cell foam gasket
Non-shrink grout
Welded connection plate assembly
1 ¼" Mastic rope
CONNECTION PLATE DETAIL
Span Thickness
10" i r, PROFILE
(I) -!!1 0::
Soil compacted in 6" lifts
Bedding material o�?:·O�t��-· 9.- .. � �i:/ ::_>.:·O�t-��--9 ::_·:
I. Span+ 4' . I
BOX CULVERT BEDDING DETAIL
STATE PROJECT
SHEET
NUMBER
Headwall (per precast culvert manufacturer)
Interlocking top section
3" dia. holes with No. 8 dowels spaced 2'-6" max.
Bedding material, 12" depth
Cutoff wall - per precast culvert manufacturer (Continuous cast-in-place called for on sheet F.3)
GENERAL NOTES:
CONSTRUCTION:
Detail is for general information only.
OR FLAP GRANT 24(2)
Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 (U.S. Customary).
Provide precast concrete culverts.
Provide precast concrete elements per ASTM-C1577, as applicable.
Provide concrete culverts, headwalls, wingwalls, and cut-offwalls conforming to the grades shown in the plans, and provide shop drawings for review by the CO according to Section 104.
Install tie rods or connector plates per manufacturer between precast sections.
DESIGN:
Design precast culverts in accordance with Section 602.
Design cast-in-place components in accordance with Section 552.
Design cut -off walls, headwalls, wingwalls, and footings in accordance with AASHTO LRFD Bridge Design Specifications, latest edition.
DEAD LOAD:
Concrete: 150 lb per cubic foot.
Soil: 125 lb per cubic foot.
LIVE LOAD:
HL-93.
CONCRETE:
F.13
Furnish structural concrete, class A(AE) with minimum 28-day design compressive strength f'c=5000 psi.
Chamfer all exposed edges 3/4-inch.
REINFORCING STEEL:
Furnish reinforcing steel bars conforming to AASHTO M31, deformed (ASTM, A615) grade 60, or welded wire reinforcing conforming to
ASTM A1064.
Provide 2-inch minimum concrete cover to the face of any bar.
SOIL:
Unit weight: 125 lb per cubic foot.
Factored bearing resistance: 6 kips per square foot.
Friction angle: 36 degrees .
BOX CULVERT
STRUCTURAL DETAILS
PROJECT
NUMBER
OR FLAP GRANT 24(2) G.1
TABULAITONOFQUANTITIES
ITEM NO. DESCRIPTION UNIT SCHEDULE A SCHEDULE B NOTE
63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (Bull Run 03) LPSM ALL ALL
63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (Bull Run 04) LPSM ALL ALL
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 12 20
63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 90 150
63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABABLE CHANGEABLE MESSAGE SIGN EACH 2 2
63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 9 9
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HR 1186 1976
63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 146 146
65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 03) LPSM ALL ALL *See For information Only quantities
65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 04) LPSM ALL ALL *See For information Only quantities
65001-1000 65001-1000
CONSTRUCT AND MAINTAIN DIVERSION CONSTRUCT AND MAINTAIN DIVERSION
(BULL RUN03) (BULL RUN04)
(For Information Only) (For Information Only)
I
I ITEMS
QUANTITY
ITEMS
QUANTITY
I
(CUYD) (CUYD)
Unclassified Borrow 415 Unclassified Borrow 507
Aggregate Surface Course 318 Aggregate Surface Course 337
TABULATION OF QUANTITIES
Y T I L I
I R
I N R A
W
N
(BULL RUN 03)
CONSTRUCT AND MAINTAIN DIVERSION
TEMPORARY BRIDGE (Bull Run 03) traffic signal system (bull Run 03) temporary traffic control, traffic signal system (bull Run 03) temporary traffic control, Stop bar
Stop bar typical lane layout
Diversion (Bull Run 03)
12' travelled wayshldr.
1'
1' shldr.
14' min.
:4
S e p te m b e r
T
E M
P O
R A
R Y
T R
A F
F
IC
D
IV
E R
S
IO
N
B U
L L
R U
N p w w o r k
\d
\o r a g r a n t2 p ln
T T
C
.d g n
(BULL RUN 03)
TEMPORARY TRAFFIC DIVERSION
PROJECT
G.2 ra n ite
B u ll
Run
C re e k
GRANITE
h Gulc yt BosLo
S n u m p
C r e e k
C u tr id g e
C h a n n e l
Beagle
C re e k
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
ENDROAD WORK
NEXT 5 MILES
ROAD WORK
NEXT 5 MILES
portable changeable message sign temporary traffic control, portable changeable message sign temporary traffic control, Bull Run 01
Bull Run 02
Boundary Creek
Bull Run 03
Bull Run 04
:2
S e p te m b e r
C
O N
S T
R U
C T
IO
N
S
IG
p w
-w o rk
\d \O
R a -g ra n t2
-2
P
L N s ig n s .d g n
CONSTRUCTION SIGNS
PROJECT
G.4
SIGN SPACING TABLE
ROAD TYPE
Urban and Rural 30 MPH and less Urban and Rural 35 MPH to 50 MPH Rural greater than 50 MPH Expressway/ Freeway
G20-2
END
ROAD WORK
ROAD WORK
NEXT xx MILES
G20-1 See Note 11
DISTANCE BETWEEN
SIGNS IN FEET
A B 100 100 350 350 500 500
1000 1500
W20-1 over W16-8P
C
G20-2
END
ROAD WORK
END
ROAD WORK
G20-2
� W13-1P (optional)
1)-
END
G20-1 See Note 11
ROAD WORK
NEXT xx MILES
ROAD WORK
G20-2
W20-1 over W16-8P See Note 9
STATE PROJECT
OR FLAP GRANT 24(2)
NOTE:
1. Erect all project advance warning signs before starting construction work.
2. Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
3. Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
4.
5.
6.
7.
8.
9.
10.
11.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 sign when approach speeds exceed 50 MPH. When used place the two W20-1 signs "B" feet apart according to the Sign Spacing Table.
For work zones that are 2 miles or more in length, install G20-1 signs at each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
12. If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
13. State standards may be used as an alternative if approved by the CO.
14. Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FEDERAL LANDS HIGHWAY
SHEET
NUMBER
G.5
U.S. CUSTOMARY STANDARD
TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
NO SCALE
STANDARD APPROVED FOR USE 6/2005
REVISED:
DRAFT: 6/2014
STANDARD
635-1
500'
500'
Bi-directional yellow vehicle positioning guides
500'
PASS
WITH
CARE
R4-2 See Note 6
40' cycle length See Note 2
Bi-directional yellow vehicle positioning guides
PROJECT LIMITS
DETAIL A
Passing zone both directions
Two-way traffic
Bi-directional yellow
40' vehicle positioning guides
Passing Allowed c y c I e length See Note 2
PROJECT LIMITS
DETAIL B
No Passing zone one direction
Two-way traffic
DO
NOT
PASS
R4-1
DETAIL C
PASS
WITH
CARE
No Passing zone both directions Two-way traffic
R4-2
DO
NOT R4-1
PASS
II==
PROJECT LIMITS
See Note 6
No Passing Zone
500'
... <e----- Traffic flow
Traffic flow -->-
500'
... <�-- Traffic flow
Traffic flow-->---
PASS
WITH
CARE
R4-2
DO
NOT R4-1
PASS
See Note 6
40' cycle length See Note 2
Passing Allowed
PROJECT
OR FLAP GRANT 24(2)
NOTE:
1. The pavement on two- or three-lane roads may remain unmarked up to 14 days when providing signs according to this drawing. Optionally use the vehicle positioning guides to provide additional delineation.
SHEET
NUMBER
G.6
2. On curves with radius less than 500 ft, reduce cycle length to 20 ft.
3. Use permanent markings plan to determine no passing zones for each direction of travel.
4. Repeat R4-1 at 1 mile intervals.
5. Repeat WB-12 after each major intersection and every 2 miles for temporary traffic control zones greater than 3 miles long.
6. Use the PASS WITH CARE (R4-2) sign at the downstream end of a no-passing zone only if a DO NOT PASS (R4-1) sign has been installed at the upstream end of the zone.
500'
... <e----- Traffic flow
Traffic flow -->-
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
FLH STANDARD
635-3
SPECIFICATION
FP-24, FP-14
NO SCALE
DELINEATION AND SIGNING
FOR UNMARKED PAVEMENTS
APPROVED FOR USE
2/2024
:2
J u n e
T a b u la ti o n o f P e r m a n e n t
T r a f f ic
C o n tr o l
Q u a n ti ti s p w w o r k \d
\o r a g r a n t2 p ln
P
T C
.d g n
TRAFFIC CONTROL QUANTITIES
TABULATION OF PERMANENT
PROJECT
NUMBER
H.1
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
B. OLTMANN JULY 2024
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRANITE HILL ROAD RECONSTRUCTION
BULL RUN CREEK CROSSING #3
OREGON
GRANT COUNTY
WALLOWA WHITMAN NATIONAL FOREST
DRAWING NO.
A C
T U
A L
F
IL
E
X X
X
S.01
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
UNLESS NOTED
1"=7'-0"
1 RG3246-A
PLAN AND ELEVATION
:1 a y
D e f a u lt
I:
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D G
N
PLAN
ELEVATION
PROFILE GRADE DIAGRAM
NO SCALE
N
MASH transition rail (typ.)
utility Overhead
CL
Bridge length = 54'-0"
C Bridge C Roadway
CL
Elev.=4678.97 Sta.=379+25.85 Begin Bridge
Elev.=4678.43 Sta.=379+79.85 End Bridge
L ChannelCL
1.00% bridge rail
MASH 2-tube
HP 12x74 pile (typ.)
Elev.=4668.8
Channel
Elev.=4676.68
Low chord rail (typ.)
transition
MASH
ground
Proposed
Gutterline
Gutterline
@ C roadway
Existing ground
@ C roadway
Proposed ground
CL
CL
18" Voided slab
EXP.
FIX
C u r b
OHW ELEV. = 4672.0
c u r b to c u r b o u t-to o u t)
(Bridge length)
(typ.) (typ.)
F. QUINONEZS. LOFTUSS. LOFTUS
See Hydraulics Sheets for riprap details.1.
Notes:
377+00 378+00 379+00 380+00 381+00
-1.00%
.2
.4
.5
.6
100' VC
K = 69
SSD = 797'
150' VC
K = 43
HLSD = 265'
B u ll R u n C re e k
54'-0"
Ch an ne l
0' -0
Bridge
T y p
54'-0"
25.5
12'-1" 11'-0"
O<)
GENERAL NOTES:
SPECIFICATIONS:
Design:
AASHTO LRFD Bridge Design Specifications, Ninth Edition, 2020.
Construction:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
DESIGN LOADS:
Dead Load:
Concrete: 150 lbs. per cubic foot (c.i.p.),160 lbs. per cubic foot (precast) Other Concrete: 150 lbs. per cubic foot.
Soil: 130 lbs. per cubic foot.
Structural Steel: 490 lbs. per cubic foot.
Future Wearing Allowance: 25 lbs. per square foot, applied to clear roadway width.
Bridge Railing (Each): 218 lbs. per cubic foot.
Live Loads:
HL-93. Maximum Dynamic Load Allowance (Impact), IM=33%, applied to design truck only.
Seismic:
Peak Ground Acceleration (PGA = 0.10 g), modified by the Site Coefficient (FPGA = 1.60g) to give a spectrum acceleration, AS = 0.160 g.
Short period acceleration at 0.2 seconds (SS = 0.227 g) modified by the Site Coefficient (Fa = 1.60) to give the short period spectrum acceleration, SDS = 0.363 g.
Long period acceleration at 1.0 seconds (Sl = 0.073 g) modified by the Site Coefficient (FV = 2.40) to give the long period spectrum acceleration, SD1 = 0.175 g.
Site Class = D. Seismic Zone = 2.
Wind:
In accordance with current AASHTO LRFD Bridge Design Specifications. Category C: 3 second gust = 110 mph
MATERIALS:
Cast-in-place Concrete:
For all cast in place concrete, except closure joints between girder flanges, use structural concrete Class A(AE) with a minimum 28-day compressive strength fc=4500 psi. For closure joints between girder flanges, use ultra-high performance concrete with a minimum 4-day strength of 14,000 psi. For approach slabs place structural concrete Class D (AE) with a minimum 28-day compressive strength f'c=5000 psi.
Chamfer exposed edges of all concrete ¾ inch, unless noted otherwise on the plans. Provide Type 1L of Type II cement for all concrete.
Joint Fillers:
Furnish preformed expansion joint filler meeting the requirements of AASHTO M 213. Furnish flexible cellular rubber conforming to ASTM D1056, Type 2 Grade 4 or 5.
Reinforcing Steel:
Furnish reinforcing steel conforming to AASHTO M 31, or M 322, Grade 60 deformed. Use minimum concrete cover to the face of any bar of 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes are shown on the plans. Provide epoxy coated superstructure reinforcing steel, as noted on the bar list.
Prestressing Steel:
Furnish Grade 270, 0.5" 0, seven-wire, uncoated, low-relaxation, prestressing strand conforming to AASHTO M 203. Pretensioned each strand to a total load of 33,982 lbs. at which load fpbt = 0.75(fpu) = 202,500 psi.
The final estimated effective prestress force is 26,088 lbs. per strand.
Prestressed Concrete Girders:
For prestressed concrete girders, use Class P or Class P(AE) concrete, with a minimum 28-day strength, fc =
7000 psi and an initial release strength f'ci = 5,500 psi. Ensure the stability of the girders during all phases of construction.
Structural Steel:
Furnish steel piles conforming to ASTM A572, A588, or A690, grade 50.
Miscellaneous Structural Steel:
Furnish diaphragm anchor bolts conforming to ASTM A307.
Bearings:
Furnish steel reinforced elastomeric bearing pad that conform to AASHTO M 251 with 60 Durometer hardness, elastomer Grade 3 or higher. Furnish steel shim plates that conform to ASTM A36. AASHTO LRFD Design method "A" used for elastomeric pad design.
:,._ NO. DATE BY REVISIONS NO. DATE BY REVISIONS
O<)
GEOTECHNICAL REPORT:
For boring logs and other geotechnical information, See Geotechnical Report No. GM14-23 , dated 03-2024, prepared by the U.S. Department of Transportation, Federal Highway Administration, Western Federal Lands Division.
Item No.
20803-0000
55101-1600
55201-0200
55302-0500
55401-1000
55601-1100
56401-1000
57502-0000
58501-0000
Item
Structural Backfil
Steel H-Pile, 12x74 , In Place
Structural Concrete, Class A (AE)
Precast, Prestressed Concrete Slab, 48" Voided
Reinforcing Steel
Bridge Railing, Steel, Two Rail (2-Tube MASH)
Bearing Device, Elastomeric (Bull Run Creek Crossing # 3}
Temporary Bridge (44 feet by 14 feet)
Ultra H igh Performance Concrete (Joints)
(1) Contract quantity
(2) Curb con crete and reinforcing steel included in bridge railing.
Quantity
ALL
Unit
CUYD
LNFT
CUYD
LNFT
LBS
LNFT
EACH
LPSM
CUYD
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
S. LOFTUS S. LOFTUS Y. QI NO SCALE B. OLTMANN
STATE PROJECT
OR FLAP GRANT 24(2)
INDEX OF BRIDGE PLAN SHEETS
SHEET NO. SHEET TITLE
Notes
(1)
(1)
(1)
(1)
(1)
(1)(2)
(1)
(1)
(1)
Plan and Elevation General Notes Foundation Layout Abutment Layout Abutment Detail Wingwall 1 Wingwall 2 Typical Section Deck Girder Details 1 Girder Details 2
Girder Details 3 Bridge Rail 1 Bridge Rail 2
Rebar List
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRANITE HILL ROAD RECONSTRUCTION
WALLOWA WHITMAN NATIONAL FOREST
GRANT COUNTY
OREGON
BULL RUN CREEK CROSSING #3
GENERAL NOTES
SHEET
NO.
S.02
BRIDGE DRAWING DATE DRAWING NO.
2 of 15 JULY 2024 RG3246-B
T U
A L
F
IL
E
X X
S.03
3 RG3246-C
FOUNDATION LAYOUT
:1
J u ly
D e f a
\T e c h S e rv ic e s \B ri d g e \B rd g D g n \C
A D
D \S e e d F il e s \P ro je c t\
R
X S
H T
.D
Notes:
Orient piles with strong axis parallel to abutment centerline.2.
Fit piles with driving shoes before pile driving operation.1.
" = 1'-0"4
N
Begin bridge Roadway
StructureCL
CL
CL
CL Piles
Abutment 1 & CL
CL Piles
Abutment 2 &
A A B B
End bridge
ABUTMENT 1
ABUTMENT 2
FOUNDATION PLAN
SECTION A-A SECTION B-B
Min. Tip Elev. 4656.00 Min. Tip Elev. 4655.00
Elev. 4673.95
T y p
Elev. 4673.41 (Typ.)
HP12x74
CL
CL Piles
Abutment 1 & CL
CL Piles
Abutment 2 &
S. INGNAM
K. COX
S. LOFTUS
Y. QI
S. LOFTUS
RESISTANCE (K)
NOMINAL
ABUT. 1
ABUT. 2
LOCATION
PILE DATA TABLE
FACTOR, Φ
RESISTANCE
167 0.65
0.65
LOAD (K)
FACTORED
STRENGTH I
RESISTANCE (K)
DRIVING
ELEVATION (FT)
ESTIMATED PILE TIP
DRIVING CRITERIA DESIGN DATA
Wingwall B Wingwall D
Wingwall B Wingwall D
Wingwall A Wingwall C
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRANITE HILL ROAD RECONSTRUCTION
BULL RUN CREEK CROSSING #3
OREGON
GRANT COUNTY
WALLOWA WHITMAN NATIONAL FOREST
DRAWING NO.
50'-8" m in
12'-1" (typ.)
(t y p
11'-0" (typ.)
'-6
'-6
'-6
'-6
'-0
1'-8" 1'-8"
25.5°
T U
A L
F
IL
E
X X
S.04
AS SHOWN 4 RG3246-D
ABUTMENT LAYOUT
:1 a y
D e f a p w
-w o rk
\d \S
.0 O
R F
L A
P G
R A
N T
(2
A B
U T
.D G
N
ABUT. 1 ABUT. 2
BEARING SEAT ELEVATIONS
A
B
C
D
POINT
4677.10
4677.10
4677.53
4677.53 4676.56
4676.55
4676.99
4676.99
See "ABUTMENT DETAIL" sheet for additional drainage details.4.
See "GIRDER DETAILS 3" sheet for slab bearing details.3.
through weep holes at face of abutment.
perforated wingwall pipes to perforated abutment pipe and daylight drain pipe behind wingwalls and abutment. Cap ends of pipe. Tie
Install continuous geocomposite sheet drain and 3" dia. perforated 2.
and elevations.
See "WINGWALL 1" and "WINGWALL 2" sheet for wingwall details 1.
" = 1'-0"4
Scale:
PLAN
ELEVATION
" = 1'-0"4
Scale:
SECTION A-A
" = 1'-0"2
Scale:
(See Note 2)
1" Geocomposite sheet drain drain pipe
3" Ø Perforated
A
B
CL
CL
D
C
Begin/End Bridge
CLC Girder G CLC Girder F CLGirder E
L Structure L Roadway L Girder D CLC Girder C CLC Girder B CLC Girder ACL
Abut. 2 Elev. 4673.41
Abut. 1 Elev. 4673.95
Pile (typ.)
HP 12x74 CL
2.00%
HP 12x74 Pile (typ.)
L Cap
L PileCL
(Abutment 1 shown, Abutment 2 similar)
(Abutment 1 shown, Abutment 2 similar)
A
A
(Typ.)
weephole
3" Dia.
See Note 3
#8 Dowel (typ.)
Bearing pad (typ.)
N
(Along C Abutment)CL
Wingwall A
Wingwall B
Weephole
L 3" Ø CL
1%
L Structure
L Roadway
CL
CL
L Bearings
L Abutment &
CL
CL
(Measured along L cap)CL
(Measured along L cap)CL ty p
CL
S. INGNAM
K. COX
S. LOFTUS
Y. QI
S. LOFTUS
sheet drain
1" Geocomposite
(See Note 4) drain pipe
3" Φ Perforated
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GRANITE HILL ROAD RECONSTRUCTION
BULL RUN CREEK CROSSING #3
OREGON
GRANT COUNTY
WALLOWA WHITMAN NATIONAL FOREST
DRAWING NO.
1'-0" (typ.)
V a ri e s
3'-0"
"4
6 eq. spa. = 26'-8
"4
31'-5
"4
14'-2
(t y p
"4
14'-2
"2 13'-5"16
3'-5
4 spa. @ 6'-6" = 26'-0"
3'-3" 3'-3"3 spa. @ 6'-6" = 19'-6"
"4 11'-1
(t y p
"8 733'-7
T U
A L
F
IL
E
X X
S.05
AS SHOWN 5 RG3246-E
ABUTMENT DETAIL
:2
M a y
D e f a p w
-w o rk
\d \S
.0 O
R F
L A
P G
R A
N T
(2
A B
U T
D E
T A
IL
.D
G N
Key:
n.f. = near face f.f. = fill face e.f. = each face
ELEVATION
" = 1'-0"4
Scale:
" = 1'-0"4
Scale:
PLAN
SECTION A-A
" = 1'-0"2
Scale:
(Abutment 1 shown, Abutment 2 similar)
(Abutment 1 shown, Abutment 2 similar)
Begin/End Bridge
HP 12x74 Pile (typ.)
L Roadway L StructureCL
CL
Lap #10A2(a) and #10A2(b) at every pile location.4.
locations.
Provide #5A4(b) stirrups along top of cap at intersection of pile 3.
Abutment 1 shown. Abutment 2 similar but mirrored.2.
sheets for wingwall details and elevations.
See "WINGWALL 1" and "WINGWALL 2" 1.
f.f.n.f.
#10A1 (6 tot.)
(See Note 4)
#10A2(a) btwn. piles
(See Note 3)
2 #5A4(a) (typ.)
#5A6
#6A5(b)
A A
#10A1 or #5A3 2- #10A2(b)
L Abutment
L BearingCL
CL
#6A5(a) piles (typ.)
#10A2(a) btwn.
#10A2(d) #10A2(c)Pile (typ.)
HP 12x74
(See Note 3)
#5A4(b)
#10A2(b) at piles
#8W3
#8W8
S. LOFTUSY. QI S. INGNAM
#10A2(d)
#10A2(c)
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .