ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf
PDF 386 KB Posted
- Solicitation number
- 69056723B000021
About this file
This document is an Earthwork Review report for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project. The report provides a detailed breakdown of the earthwork volumes, including pavement layers, shoulders, cut/fill quantities, and other construction elements across various stations along the project alignment. Key details include:
The project is part of the Federal Lands Access Program (FLAP) Grant 24(2) and involves the reconstruction of Granite Hill Road, Phase II. The invitation for bids (IFB), plans, physical data, and the construction contract administration documents are available as attachments to the solicitation. The project is being managed by the Department of Transportation Federal Highway Administration. The earthwork report covers the earthwork quantities and volumes from station 495+00 to 498+75 along the Bull Run Creek Crossing #4 alignment.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Review report for MAIN 01
Bull Run Creek Crossing #4
495+00 to 498+75
OR FLAP GRANT 24(2)
Granite Hill Road reconstruc on, phase II
Volumes Report
Report Created: Tuesday, May 9, 2023 Time: 4:09:32 PM
Cross Section Set Name:
Eearthwork
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Page 1 of 3Volumes Report
5/9/2023
Station Type Area Volume Factor Adjusted Volume
Included in Mass Ordinate?
Mass Ordinate
All -463.467
Pavement Layer 4: 307.415 1.000 307.415 No
Pavement Layer 5: 69.964 1.000 69.964 No
Pavement Layer 1: 67.602 1.000 67.602 No
Pavement Layer 2: 3.373 1.000 3.373 No
Shoulder Layer 4: 25.470 1.000 25.470 No
Shoulder Layer 1: 6.368 1.000 6.368 No
Volumes_Cut: 82.548 1.000 82.548 Yes
Volumes_Fill: 546.015 1.000 546.015 Yes
Totals:
Total Fill: 0.000 0.000
Total Cut: 0.000 0.000
Total Foreslope: 0.000 0.000
Total DNC: 0.000 0.000
Pavement Layer 4: 307.415 307.415 No
Total Pavement Layer 4: 307.415 307.415
Total Turf Establishment: 0.000 0.000
Pavement Layer 5: 69.964 69.964 No
Total Pavement Layer 5: 69.964 69.964
Pavement Layer 1: 67.602 67.602 No
Total Pavement Layer 1: 67.602 67.602
Pavement Layer 2: 3.373 3.373 No
Total Pavement Layer 2: 3.373 3.373
Shoulder Layer 4: 25.470 25.470 No
Total Shoulder Layer 4: 25.470 25.470
Shoulder Layer 1: 6.368 6.368 No
Total Shoulder Layer 1: 6.368 6.368
Volumes_Cut: 82.548 82.548 Yes
Total Volumes_Cut: 82.548 82.548
Volumes_Fill: 546.015 546.015 Yes
Total Volumes_Fill: 546.015 546.015
Total Baseline: 0.000 0.000
Total Baseline - Alt 1: 0.000 0.000
Total Fill: 0.000 0.000
Total Cut: 0.000 0.000
Total Edge of Pavt: 0.000 0.000
Page 2 of 3Volumes Report
Total Edge of Widen: 0.000 0.000
Total Edge of Pavt 1: 0.000 0.000
Total DNC: 0.000 0.000
Total Centerline 1: 0.000 0.000
Total Guardrail_Single_Sided_L: 0.000 0.000
Total Guardrail_Single_Sided_R: 0.000 0.000
Total Centerline Exist: 0.000 0.000
Total Prop Clearing: 0.000 0.000
Total Edge of Widen 4: 0.000 0.000
Total Edge of Pavt 2: 0.000 0.000
Total Edge of Shld 4: 0.000 0.000
Total Edge of Pavt 4: 0.000 0.000
Total Edge of Widen 1: 0.000 0.000
Total Edge of Shld: 0.000 0.000
Total Centerline: 0.000 0.000
Total Edge of Shld 1: 0.000 0.000
Total Edge of Widen 2: 0.000 0.000
Total Ditch: 0.000 0.000
Total Centerline 4: 0.000 0.000
Total Volumes_Topsoil Stripping Limits: 0.000 0.000
Page 3 of 3Volumes Report
File details come from the government source that posted it. Updated .