ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf

PDF 164 KB Posted

Attached to
OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
Solicitation number
69056723B000021
Issued by

About this file

This document is a Horizontal Alignment Review Report for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project. The report provides details on the horizontal alignment of the roadway design, including the alignment name, description, station coordinates, tangential directions and lengths, curve radii, delta angles, degrees of curvature, and other geometric specifications.

The related federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project. The solicitation includes the Invitation for Bids (IFB), plans, physical data, and the Construction Contract Administration Document per FAR 36.211. No additional details on response dates, award dates, pricing terms, set asides, incumbents, or key objectives are provided in the given materials.

View the file

Other files

File Type Posted
Bid Tabs_OR FLAP GRANT 24(2).pdf PDF
BidSum_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
ora-grant24-2_boundary creek_Earthwork.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment

Review report for MAIN 01

Boundary Creek

OR FLAP GRANT 24(2)

Granite Hill Road reconstruc on, phase II

Horizontal Alignment Review Report Report Created: Friday, June 21, 2024

Time: 9:42:07 AM

Project: Design IntlFt Description:

File Name: c:\pw-work\d0501462\ora-grant24-2_ALI_COR_Boundary.dgn Last Revised: 6/17/2024 16:52:57

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: BL Alignment Description:

Alignment Style: Alignment\Baseline Station Northing Easting

Element: Linear

START ( START ) 33710.460 415897.042 8754385.908

PC ( PC ) 33929.167 415815.532 8754182.958

Tangential Direction: S68.118°W

Tangential Length: 218.707

Element: Circular

PC ( PC ) 33929.167 415815.532 8754182.958

HPI ( HPI ) 34067.681 415763.910 8754054.423

CC ( CC ) 416205.274 8754026.428

PT ( PT ) 34196.759 415798.879 8753920.396

Radius: 420.000 Delta: 36.505° Right

Degree of Curvature (Arc): 13.642° Length: 267.593

Tangent: 138.514 Chord: 263.089

Middle Ordinate: 21.132 External: 22.251

Back Tangent Direction: S68.118°W Back Radial Direction: N21.882°W

Chord Direction: S86.371°W Ahead Radial Direction: N14.623°E

Ahead Tangent Direction: N75.377°W

Element: Linear

PT ( PT ) 34196.759 415798.879 8753920.396

PC ( PC ) 34417.148 415854.517 8753707.146

Tangential Direction: N75.377°W Tangential Length: 220.388

Page 1 of 2Horizontal Alignment Review Report

6/21/2024

Element: Circular

PC ( PC ) 34417.148 415854.517 8753707.146

HPI ( HPI ) 34514.435 415879.078 8753613.011

CC ( CC ) 415322.333 8753568.295

PT ( PT ) 34609.730 415869.857 8753516.162

Radius: 550.000 Delta: 20.062° Left

Degree of Curvature (Arc): 10.417° Length: 192.582

Tangent: 97.287 Chord: 191.600

Middle Ordinate: 8.408 External: 8.538

Back Tangent Direction: N75.377°W Back Radial Direction: N14.623°E

Chord Direction: N85.408°W Ahead Radial Direction: N5.439°W

Ahead Tangent Direction: S84.561°W

Element: Linear

PT ( PT ) 34609.730 415869.857 8753516.162

END ( END ) 34933.380 415839.179 8753193.969

Tangential Direction: S84.561°W

Tangential Length: 323.650

Page 2 of 2Horizontal Alignment Review Report

6/21/2024

File details come from the government source that posted it. Updated .