This is a bid opening summary document for Solicitation No. 69056723B000021, detailing the results of bids received for the OR FLAP GRANT 24(2) Granite Hill Road Reconstruction Phase II project administered by the Federal Highway Administration.

Seven contractors submitted bids with both Schedule A and Schedule B pricing components. Cascade Civil Corp. submitted the lowest combined bid ($4,789,336.90 for Schedule A and $5,968,786.70 for Schedule B), followed closely by HP Civil and Marcum & Sons LLC. The Engineer's Estimate was $5,653,130.00 for Schedule A and $7,378,500.00 for Schedule B. West Coast Contractors submitted the highest bid at $7,352,661.76 for Schedule A and $9,114,442.42 for Schedule B. The bid opening occurred on December 10, 2024, at 2:00 p.m., with 22 total attendees (12 online and 10 in-person). All bids were received between December 6-10, 2024, with some contractors submitting modifications to their original bids.

View the file

Other files

File Type Posted
Bid Tabs_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
ora-grant24-2_boundary creek_Earthwork.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING SUMMARY

Solicitation No. 69056723B000021 Bid Opening Date 12/10/2024 Time 2:00 p.m.

Project Name/Number: OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II

OFFER RECEIVED

REC'D

BY

CONTRACTOR

DATE

TIME

Schedule A Schedule B

1.

12/06/2024 Mod

12/10/2024

10:00am 1:49pm

AL

MC

West Coast Contractors $7,352,661.76 $9,114,442.42

2.

12/09/2024 Mod

12/10/2024

9:27am 12:56pm

RW

MC

Marcum & Sons LLC $4,929,458.74 $6,452,519.50

3.

12/10/2024 Mod

12/10/2024

11:56am 12:11pm

MC

MC

Cascade Civil Corp. $4,789,336.90 $5,968,786.70

4. 12/10/2024 12:59pm MC The Saunders Company $7,048,309.90 $8,874,745.37

5. 12/10/2024 1:37pm MC Nelson Construction Corp $5,078,621.40 $6,319,377.10

6. 12/10/2024 1:46pm MC JAL Construction $6,304,397.00 $7,999,522.00

7. 12/10/2024 1:49pm MC HP Civil $4,817,592.22 $6,302,908.88

8.

Engineer’s Estimate

$5,653,130.00 $7,378,500.00

LOW BIDDER'S

PHONE NUMBER: 541.527.1400

Attendance: 12 (On-line) 10 (In-Person)

Bid Opening Officer: Marino Chea Assistant: Robert Kolln

File details come from the government source that posted it. Updated .