This document is an Earthwork Review report for the OR FLAP GRANT 24(2) Granite Hill Road Reconstruction, Phase II project. The report provides detailed volume calculations for various components of the earthwork, including pavement layers, shoulders, cut, fill, and other site features. It specifies the total volumes for cut and fill, as well as the volumes for individual pavement and shoulder layers. The report does not provide any information about the overall federal contract opportunity, such as the solicitation number, agency involved, response dates, or pricing terms. It appears to be a technical document providing earthwork details for the construction project.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Review report for MAIN 01
Boundary Creek
OR FLAP GRANT 24(2)
Granite Hill Road reconstruc on, phase II
Volumes Report
Report Created: Tuesday, May 9, 2023 Time: 3:45:59 PM
Cross Section Set Name:
<None>
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Page 1 of 3Volumes Report
5/9/2023
Station Type Area Volume Factor Adjusted Volume
Included in Mass Ordinate?
Mass Ordinate
All -513.355
Pavement Layer 1: 166.393 1.000 166.393 No
Pavement Layer 2: 2.627 1.000 2.627 No
Shoulder Layer 1: 14.816 1.000 14.816 No
Pavement Layer 4: 788.840 1.000 788.840 No
Shoulder Layer 4: 59.258 1.000 59.258 No
Volumes_Cut: 333.259 1.000 333.259 Yes
Volumes_Fill: 846.614 1.000 846.614 Yes
Totals:
Total Cut: 0.000 0.000
Total Fill: 0.000 0.000
Total Turf Establishment: 0.000 0.000
Total Foreslope: 0.000 0.000
Total DNC: 0.000 0.000
Pavement Layer 1: 166.393 166.393 No
Total Pavement Layer 1: 166.393 166.393
Pavement Layer 2: 2.627 2.627 No
Total Pavement Layer 2: 2.627 2.627
Shoulder Layer 1: 14.816 14.816 No
Total Shoulder Layer 1: 14.816 14.816
Pavement Layer 4: 788.840 788.840 No
Total Pavement Layer 4: 788.840 788.840
Shoulder Layer 4: 59.258 59.258 No
Total Shoulder Layer 4: 59.258 59.258
Volumes_Cut: 333.259 333.259 Yes
Total Volumes_Cut: 333.259 333.259
Volumes_Fill: 846.614 846.614 Yes
Total Volumes_Fill: 846.614 846.614
Total Baseline: 0.000 0.000
Total Volumes_Topsoil Stripping Limits: 0.000 0.000
Total Centerline 1: 0.000 0.000
Total Centerline: 0.000 0.000
Total Centerline 4: 0.000 0.000
Total Prop Clearing: 0.000 0.000
Total DNC: 0.000 0.000
Total Ditch: 0.000 0.000
Page 2 of 3Volumes Report
Total Edge of Widen 1: 0.000 0.000
Total Edge of Widen: 0.000 0.000
Total Edge of Widen 4: 0.000 0.000
Total Edge of Pavt 1: 0.000 0.000
Total Edge of Pavt: 0.000 0.000
Total Edge of Pavt 4: 0.000 0.000
Total Edge of Shld 1: 0.000 0.000
Total Edge of Shld: 0.000 0.000
Total Edge of Shld 4: 0.000 0.000
Total Centerline Exist: 0.000 0.000
Total Cut: 0.000 0.000
Total Fill: 0.000 0.000
Total Exist Right of Way: 0.000 0.000