This document is an Earthwork Review report for the OR FLAP GRANT 24(2) Granite Hill Road Reconstruction, Phase II project. The report provides detailed volume calculations for various components of the earthwork, including pavement layers, shoulders, cut, fill, and other site features. It specifies the total volumes for cut and fill, as well as the volumes for individual pavement and shoulder layers. The report does not provide any information about the overall federal contract opportunity, such as the solicitation number, agency involved, response dates, or pricing terms. It appears to be a technical document providing earthwork details for the construction project.

View the file

Other files

File Type Posted
Bid Tabs_OR FLAP GRANT 24(2).pdf PDF
BidSum_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Earthwork

Review report for MAIN 01

Boundary Creek

OR FLAP GRANT 24(2)

Granite Hill Road reconstruc on, phase II

Volumes Report

Report Created: Tuesday, May 9, 2023 Time: 3:45:59 PM

Cross Section Set Name:

<None>

Alignment Name:

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

Page 1 of 3Volumes Report

5/9/2023

Station Type Area Volume Factor Adjusted Volume

Included in Mass Ordinate?

Mass Ordinate

All -513.355

Pavement Layer 1: 166.393 1.000 166.393 No

Pavement Layer 2: 2.627 1.000 2.627 No

Shoulder Layer 1: 14.816 1.000 14.816 No

Pavement Layer 4: 788.840 1.000 788.840 No

Shoulder Layer 4: 59.258 1.000 59.258 No

Volumes_Cut: 333.259 1.000 333.259 Yes

Volumes_Fill: 846.614 1.000 846.614 Yes

Totals:

Total Cut: 0.000 0.000

Total Fill: 0.000 0.000

Total Turf Establishment: 0.000 0.000

Total Foreslope: 0.000 0.000

Total DNC: 0.000 0.000

Pavement Layer 1: 166.393 166.393 No

Total Pavement Layer 1: 166.393 166.393

Pavement Layer 2: 2.627 2.627 No

Total Pavement Layer 2: 2.627 2.627

Shoulder Layer 1: 14.816 14.816 No

Total Shoulder Layer 1: 14.816 14.816

Pavement Layer 4: 788.840 788.840 No

Total Pavement Layer 4: 788.840 788.840

Shoulder Layer 4: 59.258 59.258 No

Total Shoulder Layer 4: 59.258 59.258

Volumes_Cut: 333.259 333.259 Yes

Total Volumes_Cut: 333.259 333.259

Volumes_Fill: 846.614 846.614 Yes

Total Volumes_Fill: 846.614 846.614

Total Baseline: 0.000 0.000

Total Volumes_Topsoil Stripping Limits: 0.000 0.000

Total Centerline 1: 0.000 0.000

Total Centerline: 0.000 0.000

Total Centerline 4: 0.000 0.000

Total Prop Clearing: 0.000 0.000

Total DNC: 0.000 0.000

Total Ditch: 0.000 0.000

Page 2 of 3Volumes Report

Total Edge of Widen 1: 0.000 0.000

Total Edge of Widen: 0.000 0.000

Total Edge of Widen 4: 0.000 0.000

Total Edge of Pavt 1: 0.000 0.000

Total Edge of Pavt: 0.000 0.000

Total Edge of Pavt 4: 0.000 0.000

Total Edge of Shld 1: 0.000 0.000

Total Edge of Shld: 0.000 0.000

Total Edge of Shld 4: 0.000 0.000

Total Centerline Exist: 0.000 0.000

Total Cut: 0.000 0.000

Total Fill: 0.000 0.000

Total Exist Right of Way: 0.000 0.000

Page 3 of 3Volumes Report