ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf

PDF 163 KB Posted

Attached to
OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II
Solicitation number
69056723B000021
Issued by

About this file

The document is a Horizontal Alignment Review Report for the OR FLAP GRANT 24(2) Granite Hill Road Reconstruction, Phase II project. The report provides details on the proposed horizontal alignment for the reconstruction of the Main 01 Bull Run Creek Crossing #3. Key details include the station locations, tangential directions, curve radii, delta angles, and lengths for the linear and circular alignment elements. The related federal contract opportunity is for the OR FLAP GRANT 24(2) Granite Hill Road Reconstruction, Phase II project, with a Solicitation Number of 69056723B000021. The Invitation for Bids (IFB), plans, physical data, and construction contract administration documents are available as attachments for this opportunity, which is being solicited by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Tabs_OR FLAP GRANT 24(2).pdf PDF
BidSum_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
ora-grant24-2_boundary creek_Earthwork.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment

Review report for MAIN 01

Bull Run Creek Crossing #3

OR FLAP GRANT 24(2)

Granite Hill Road reconstruc on, phase II

Horizontal Alignment Review Report Report Created: Friday, June 21, 2024

Time: 9:46:14 AM

Project: Design IntlFt Description:

File Name: c:\pw-work\d0501462\ora-grant24-2_ALI_COR_BullRun03.dgn Last Revised: 6/20/2024 11:12:52

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: BL Alignment Description:

Alignment Style: Alignment\Baseline Station Northing Easting

Element: Linear

START ( START ) 37329.320 416318.807 8751015.354

PC ( PC ) 37401.807 416344.466 8750947.560

Tangential Direction: N69.269°W

Tangential Length: 72.487

Element: Circular

PC ( PC ) 37401.807 416344.466 8750947.560

HPI ( HPI ) 37558.028 416399.765 8750801.454

CC ( CC ) 415409.213 8750593.581

PT ( PT ) 37711.744 416407.867 8750645.443

Radius: 1000.000 Delta: 17.758° Left

Degree of Curvature (Arc): 5.730° Length: 309.936

Tangent: 156.221 Chord: 308.697

Middle Ordinate: 11.984 External: 12.129

Back Tangent Direction: N69.269°W Back Radial Direction: N20.731°E

Chord Direction: N78.148°W Ahead Radial Direction: N2.973°E

Ahead Tangent Direction: N87.027°W

Element: Linear

PT ( PT ) 37711.744 416407.867 8750645.443

PC ( PC ) 37981.956 416421.881 8750375.595

Tangential Direction: N87.027°W Tangential Length: 270.212

Page 1 of 2Horizontal Alignment Review Report

6/21/2024

Element: Circular

PC ( PC ) 37981.956 416421.881 8750375.595

HPI ( HPI ) 38145.763 416430.376 8750212.008

CC ( CC ) 417001.100 8750405.675

PT ( PT ) 38301.255 416523.193 8750077.034

Radius: 580.000 Delta: 31.542° Right

Degree of Curvature (Arc): 9.879° Length: 319.299

Tangent: 163.807 Chord: 315.282

Middle Ordinate: 21.834 External: 22.688

Back Tangent Direction: N87.027°W Back Radial Direction: N2.973°E

Chord Direction: N71.256°W Ahead Radial Direction: N34.515°E

Ahead Tangent Direction: N55.485°W

Element: Linear

PT ( PT ) 38301.255 416523.193 8750077.034

END ( END ) 38550.009 416664.143 8749872.066

Tangential Direction: N55.485°W

Tangential Length: 248.755

Page 2 of 2Horizontal Alignment Review Report

6/21/2024

File details come from the government source that posted it. Updated .