This document is an Earthwork Review report for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II federal contract opportunity. The report provides a detailed volume analysis, including cut and fill volumes, for various pavement and shoulder layers. The key details are:
The project is for the reconstruction of Granite Hill Road, Phase II, under the OR FLAP GRANT 24(2) contract. The report analyzes the earthwork volumes, including 307.070 cubic yards of cut and 1,068.214 cubic yards of fill. It breaks down the volumes by pavement layers, shoulder layers, and other areas. This earthwork information is relevant to the overall construction requirements for this road reconstruction project.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Review report for MAIN 01
Bull Run Creek Crossing #3
OR FLAP GRANT 24(2)
Granite Hill Road reconstruc on, phase II
Volumes Report
Report Created: Tuesday, May 9, 2023 Time: 3:56:19 PM
Cross Section Set Name:
<None>
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Page 1 of 3Volumes Report
5/9/2023
Station Type Area Volume Factor Adjusted Volume
Included in Mass
Ordinate?
Mass
Ordinate
All -761.145
Pavement Layer 5: 171.170 1.000 171.170 No
Pavement Layer 1: 133.114 1.000 133.114 No
Shoulder Layer 1: 11.971 1.000 11.971 No
Shoulder Layer 4: 47.886 1.000 47.886 No
Pavement Layer 4: 592.004 1.000 592.004 No
Pavement Layer 2: 6.508 1.000 6.508 No
Volumes_Cut: 307.070 1.000 307.070 Yes
Volumes_Fill: 1068.214 1.000 1068.214 Yes
Totals:
Total Cut: 0.000 0.000
Total Foreslope: 0.000 0.000
Total DNC: 0.000 0.000
Pavement Layer 5: 171.170 171.170 No
Total Pavement Layer 5: 171.170 171.170
Total Fill: 0.000 0.000
Total Turf Establishment: 0.000 0.000
Pavement Layer 1: 133.114 133.114 No
Total Pavement Layer 1: 133.114 133.114
Shoulder Layer 1: 11.971 11.971 No
Total Shoulder Layer 1: 11.971 11.971
Shoulder Layer 4: 47.886 47.886 No
Total Shoulder Layer 4: 47.886 47.886
Pavement Layer 4: 592.004 592.004 No
Total Pavement Layer 4: 592.004 592.004
Pavement Layer 2: 6.508 6.508 No
Total Pavement Layer 2: 6.508 6.508
Volumes_Cut: 307.070 307.070 Yes
Total Volumes_Cut: 307.070 307.070
Volumes_Fill: 1068.214 1068.214 Yes
Total Volumes_Fill: 1068.214 1068.214
Total Baseline: 0.000 0.000
Total Baseline - Alt 1: 0.000 0.000
Total Centerline: 0.000 0.000
Total Edge of Shld 1: 0.000 0.000
Total Edge of Pavt 1: 0.000 0.000
Page 2 of 3Volumes Report
Total DNC: 0.000 0.000
Total Edge of Shld: 0.000 0.000
Total Edge of Widen 1: 0.000 0.000
Total Centerline 1: 0.000 0.000
Total Centerline Exist: 0.000 0.000
Total Ditch: 0.000 0.000
Total Cut: 0.000 0.000
Total Edge of Pavt: 0.000 0.000
Total Fill: 0.000 0.000
Total Guardrail_Single_Sided_L: 0.000 0.000
Total Guardrail_Single_Sided_R: 0.000 0.000
Total Centerline 4: 0.000 0.000
Total Volumes_Topsoil Stripping Limits:
0.000 0.000
Total Edge of Widen: 0.000 0.000
Total Edge of Pavt 2: 0.000 0.000
Total Edge of Pavt 4: 0.000 0.000
Total Edge of Widen 2: 0.000 0.000
Total Edge of Widen 4: 0.000 0.000
Total Edge of Shld 4: 0.000 0.000
Total Prop Clearing: 0.000 0.000
Total Exist Right of Way: 0.000 0.000
Page 3 of 3Volumes Report