This is a bid tabulation document for the Granite Hill Road Reconstruction Phase II project (OR FLAP GRANT 24(2)) opened on December 10, 2024 at Western Federal Lands Highway Division. The project consists of two schedules - Schedule A (Base) and Schedule B (Alternate), with detailed line item pricing for road reconstruction work including mobilization, erosion control, excavation, concrete structures, guardrails, traffic control, and environmental mitigation.

Cascade Civil CORP submitted the lowest bid for both schedules with $4,789,336.90 for Schedule A and $5,973,031.70 for Schedule B, compared to the Engineer's Estimate of $5,653,130.00 and $7,378,500.00 respectively. Seven contractors submitted bids: Cascade Civil CORP, HP Civil Inc, JAL Construction Inc, Marcum & Son LLC, Nelson Construction Company, The Saunders Co Inc, and West Coast Contractors Inc. The project involves significant structural work including steel piles, concrete box culverts, bridge components, and stream diversion systems at multiple Bull Run Creek crossings. The detailed bid tabs include unit pricing for over 60 line items per schedule covering all aspects of the reconstruction work.

View the file

Other files

File Type Posted
BidSum_OR FLAP GRANT 24(2).pdf PDF
QA_12-09-2024.pdf PDF
QA_12-04-2024.pdf PDF
Amendment A003.pdf PDF
QA_12-03-2024.pdf PDF
QA_11-27-2024-2.pdf PDF
QA_11-27-2024.pdf PDF
Amendment A002.pdf PDF
QA_11-26-2024.pdf PDF
Amendment A001.pdf PDF
ora-grant24-2-Bull Run 03_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 02_proposed-horizontal-alignment.pdf PDF
revised ora-grant24-2_plans.pdf PDF
ora-grant24-2_boundary creek_Earthwork.pdf PDF
AOP_Boundary_Creek_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Bull Run 4_489-65 to 495-00_Earthwork.pdf PDF
ora-grant24-2_superelevation.pdf PDF
ora-grant24-2_Bull Run 01_proposed-vertical-alignment.pdf PDF
GR 04-21 Granite Hill Road Final Geotechnical Recommendations_FINAL.pdf PDF
Bull Run Creek_No-4_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 03_Earthwork.pdf PDF
Bull Run Creek_No-2_AOP_Hydraulics_Memo_Final.pdf PDF
ora-grant24-2_Boundary creek_proposed-horizontal-alignment.pdf PDF
ora-grant24-2_Bull Run 1_Earthwork.pdf PDF
ora-grant24-2_Bull Run 02_proposed-vertical-alignment.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056723B000021_OR FLAP GRANT 24(2).pdf PDF
Bull Run Creek_No-1_AOP_Hydraulics_Memo_Final.pdf PDF
Physical Data.zip ZIP file
ora-grant24-2_Bull Run 4_495-00 to 498-75_Earthwork.pdf PDF
ora-grant24-2_control-points.xlsx XLSX spreadsheet
ora-grant24-2_Bull Run 04_proposed-horizontal-alignment.pdf PDF
Bull Run Creek_No-3_Bridge_HydraulicsTSL_Report_Final.pdf PDF
ora-grant24-2_Bull Run 04_proposed-vertical-alignment.pdf PDF
ora-grant24-2_ESCP_Granite 2_2024.pdf PDF
ora-grant24-2_Bull Run 03_proposed-vertical-alignment.pdf PDF
ora-grant24-2_XS.dgn.pdf PDF
ora-grant24-2_Bull Run 2_Earthwork.pdf PDF
ora-grant24-2_boundary creek_proposed-vertical-alignment.pdf PDF
ora-grant24-2_Bull Run 01_proposed-horizontal-alignment.pdf PDF
GM14-23 Granite Hill Final Foundation Memorandum.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 12/11/24

1 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Contractor Responsive?

Engineer's Estimate

Cascade Civil CORP

HP Civil Inc

JAL CONSTRUCTION, INC.

Marcum & Son LLC

Nelson Construction Company

The Saunders Co., Inc.

West Coast Contractors, Inc.

Alternate Schedule B

$7,378,500.00

$5,973,031.70

$6,302,908.88

$7,959,522.00

$6,431,659.50

$6,319,377.10

$8,875,386.14

$9,114,442.41

Base Schedule A

$5,653,130.00

$4,789,336.90

$4,817,592.22

$6,304,397.00

$4,973,216.02

$5,078,621.40

$7,048,309.90

$7,352,661.76

2 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Solcitation No: 69056723B000021

Division: Western Federal Lands

State: OR County: Grant

Federal Land: Wallowa-Whitman National Forest Opened at: WFLHD

Opened by: Marino Chea

Date: 12/10/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Cascade Civil CORP $5,973,031.70 255 SE Black Butte Blvd Redmond, OR 97756

HP Civil Inc $6,302,908.88 8795 Aumsville HWY SE Salem, OR 97317

Nelson Construction Company $6,319,377.10

Marcum & Son LLC $6,431,659.50 336 SW Black Butte Blvd Redmond, OR 97756

JAL CONSTRUCTION, INC. $7,959,522.00

PO Box 6269 Bend, OR 97708

The Saunders Co., Inc. $8,875,386.14 701 E 3rd Street Newberg, Yamhill County, OR 97132

West Coast Contractors, Inc. $9,114,442.42 61050 Highway 101 Coos Bay, OR 97420

Engineer's Estimate $7,378,500.00

3 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

Cascade Civil CORP Lump Sum $486,500.00 HP Civil Inc Lump Sum $630,290.88 Nelson Construction Company Lump Sum $506,770.00 Marcum & Son LLC Lump Sum $533,421.00 JAL CONSTRUCTION, INC. Lump Sum $600,000.00 The Saunders Co., Inc. Lump Sum $926,983.80 West Coast Contractors, Inc. Lump Sum $900,000.00 Engineer's Estimate ALL LPSM Lump Sum $848,000.00

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Cascade Civil CORP Lump Sum $130,000.00 HP Civil Inc Lump Sum $197,000.00 Nelson Construction Company Lump Sum $50,310.00 Marcum & Son LLC Lump Sum $135,000.00 JAL CONSTRUCTION, INC. Lump Sum $140,000.00 The Saunders Co., Inc. Lump Sum $103,500.00 West Coast Contractors, Inc. Lump Sum $150,148.37 Engineer's Estimate ALL LPSM Lump Sum $174,300.00

B0060 15301-0000 CONTRACTOR QUALITY CONTROL

Cascade Civil CORP Lump Sum $100,000.00 HP Civil Inc Lump Sum $175,000.00 Nelson Construction Company Lump Sum $60,000.00 Marcum & Son LLC Lump Sum $80,000.00 JAL CONSTRUCTION, INC. Lump Sum $150,000.00 The Saunders Co., Inc. Lump Sum $94,300.00 West Coast Contractors, Inc. Lump Sum $120,118.69 Engineer's Estimate ALL LPSM Lump Sum $130,000.00

B0080 15401-0000 CONTRACTOR TESTING

Cascade Civil CORP Lump Sum $163,000.00 HP Civil Inc Lump Sum $115,000.00 Nelson Construction Company Lump Sum $65,000.00 Marcum & Son LLC Lump Sum $45,000.00 JAL CONSTRUCTION, INC. Lump Sum $45,000.00 The Saunders Co., Inc. Lump Sum $25,415.00 West Coast Contractors, Inc. Lump Sum $60,059.36 Engineer's Estimate ALL LPSM Lump Sum $116,200.00

4 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0100 15501-0000 CONSTRUCTION SCHEDULE

Cascade Civil CORP Lump Sum $10,000.00 HP Civil Inc Lump Sum $45,000.00 Nelson Construction Company Lump Sum $2,500.00 Marcum & Son LLC Lump Sum $20,000.00 JAL CONSTRUCTION, INC. Lump Sum $45,000.00 The Saunders Co., Inc. Lump Sum $5,353.08 West Coast Contractors, Inc. Lump Sum $14,325.30 Engineer's Estimate ALL LPSM Lump Sum $29,100.00

B0120 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (BULL RUN 03)

Cascade Civil CORP Lump Sum $30,000.00 HP Civil Inc Lump Sum $55,000.00 Nelson Construction Company Lump Sum $27,500.00 Marcum & Son LLC Lump Sum $80,000.00 JAL CONSTRUCTION, INC. Lump Sum $50,000.00 The Saunders Co., Inc. Lump Sum $63,614.92 West Coast Contractors, Inc. Lump Sum $201,491.60 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

B0140 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (BULL RUN 04)

Cascade Civil CORP Lump Sum $31,000.00 HP Civil Inc Lump Sum $55,000.00 Nelson Construction Company Lump Sum $27,500.00 Marcum & Son LLC Lump Sum $100,000.00 JAL CONSTRUCTION, INC. Lump Sum $60,000.00 The Saunders Co., Inc. Lump Sum $63,614.92 West Coast Contractors, Inc. Lump Sum $215,431.97 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

B0160 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (Bull Run 01)

Cascade Civil CORP Lump Sum $31,000.00 HP Civil Inc Lump Sum $55,000.00 Nelson Construction Company Lump Sum $27,500.00 Marcum & Son LLC Lump Sum $57,600.00 JAL CONSTRUCTION, INC. Lump Sum $45,000.00 The Saunders Co., Inc. Lump Sum $60,164.92 West Coast Contractors, Inc. Lump Sum $175,774.43 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

5 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0180 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (Boundary Creek)

Cascade Civil CORP Lump Sum $28,000.00 HP Civil Inc Lump Sum $55,000.00 Nelson Construction Company Lump Sum $27,500.00 Marcum & Son LLC Lump Sum $75,000.00 JAL CONSTRUCTION, INC. Lump Sum $50,000.00 The Saunders Co., Inc. Lump Sum $60,164.92 West Coast Contractors, Inc. Lump Sum $195,199.24 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

B0200 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (Bull Run 02)

Cascade Civil CORP Lump Sum $31,000.00 HP Civil Inc Lump Sum $55,000.00 Nelson Construction Company Lump Sum $27,500.00 Marcum & Son LLC Lump Sum $42,500.00 JAL CONSTRUCTION, INC. Lump Sum $60,000.00 The Saunders Co., Inc. Lump Sum $60,164.92 West Coast Contractors, Inc. Lump Sum $166,448.98 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

B0220 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Cascade Civil CORP $5.00 $21,000.00 HP Civil Inc $5.00 $21,000.00 Nelson Construction Company $12.00 $50,400.00 Marcum & Son LLC $4.00 $16,800.00

JAL CONSTRUCTION, INC. $7.00 $29,400.00

The Saunders Co., Inc. $4.28 $17,976.00 West Coast Contractors, Inc. $11.28 $47,376.00 Engineer's Estimate 4,200 LNFT $7.00 $29,400.00

B0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Cascade Civil CORP $6.00 $8,400.00 HP Civil Inc $6.00 $8,400.00 Nelson Construction Company $22.00 $30,800.00 Marcum & Son LLC $6.00 $8,400.00

JAL CONSTRUCTION, INC. $8.00 $11,200.00

The Saunders Co., Inc. $9.31 $13,034.00 West Coast Contractors, Inc. $11.51 $16,114.00 Engineer's Estimate 1,400 LNFT $7.00 $9,800.00

6 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0260 15706-0200 SOIL EROSION CONTROL, CHECK DAM

Cascade Civil CORP $100.00 $2,000.00 HP Civil Inc $110.00 $2,200.00 Nelson Construction Company $1,700.00 $34,000.00 Marcum & Son LLC $250.00 $5,000.00

JAL CONSTRUCTION, INC. $150.00 $3,000.00

The Saunders Co., Inc. $292.92 $5,858.40 West Coast Contractors, Inc. $702.52 $14,050.40 Engineer's Estimate 20 EACH $500.00 $10,000.00

B0280 20101-0000 CLEARING AND GRUBBING

Cascade Civil CORP $38,870.00 $123,995.30 HP Civil Inc $6,600.00 $21,054.00 Nelson Construction Company $7,290.00 $23,255.10 Marcum & Son LLC $9,000.00 $28,710.00

JAL CONSTRUCTION, INC. $35,000.00 $111,650.00

The Saunders Co., Inc. $24,669.69 $78,696.31 West Coast Contractors, Inc. $14,329.22 $45,710.21 Engineer's Estimate 3.19 ACRE $15,000.00 $47,850.00

B0300 20301-1900 REMOVAL OF PIPE CULVERT

Cascade Civil CORP $4,920.00 $24,600.00 HP Civil Inc $10,000.00 $50,000.00 Nelson Construction Company $4,360.00 $21,800.00 Marcum & Son LLC $1,750.00 $8,750.00

JAL CONSTRUCTION, INC. $25,000.00 $125,000.00

The Saunders Co., Inc. $16,145.85 $80,729.25 West Coast Contractors, Inc. $3,693.46 $18,467.30 Engineer's Estimate 5 EACH $5,000.00 $25,000.00

B0320 20401-0000 ROADWAY EXCAVATION

Cascade Civil CORP $66.00 $99,000.00 HP Civil Inc $9.00 $13,500.00 Nelson Construction Company $10.00 $15,000.00 Marcum & Son LLC $47.00 $70,500.00

JAL CONSTRUCTION, INC. $100.00 $150,000.00

The Saunders Co., Inc. $67.75 $101,625.00 West Coast Contractors, Inc. $46.28 $69,420.00 Engineer's Estimate 1,500 CUYD $65.00 $97,500.00

7 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0340 20403-0000 UNCLASSIFIED BORROW

Cascade Civil CORP $51.00 $122,400.00 HP Civil Inc $20.25 $48,600.00 Nelson Construction Company $23.00 $55,200.00 Marcum & Son LLC $52.50 $126,000.00

JAL CONSTRUCTION, INC. $60.00 $144,000.00

The Saunders Co., Inc. $108.93 $261,432.00 West Coast Contractors, Inc. $66.61 $159,864.00 Engineer's Estimate 2,400 CUYD $35.00 $84,000.00

B0360 20803-0000 STRUCTURAL BACKFILL

Cascade Civil CORP $127.00 $25,400.00 HP Civil Inc $111.00 $22,200.00 Nelson Construction Company $123.00 $24,600.00 Marcum & Son LLC $140.00 $28,000.00

JAL CONSTRUCTION, INC. $130.00 $26,000.00

The Saunders Co., Inc. $132.45 $26,490.00 West Coast Contractors, Inc. $210.00 $42,000.00 Engineer's Estimate 200 CUYD $115.00 $23,000.00

B0380 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

Cascade Civil CORP $300.00 $600.00 HP Civil Inc $500.00 $1,000.00 Nelson Construction Company $560.00 $1,120.00 Marcum & Son LLC $160.00 $320.00

JAL CONSTRUCTION, INC. $615.00 $1,230.00

The Saunders Co., Inc. $254.74 $509.48 West Coast Contractors, Inc. $2,188.60 $4,377.20 Engineer's Estimate 2 CUYD $105.00 $210.00

B0400 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

Cascade Civil CORP $80.00 $16,800.00 HP Civil Inc $103.50 $21,735.00 Nelson Construction Company $116.00 $24,360.00 Marcum & Son LLC $160.00 $33,600.00

JAL CONSTRUCTION, INC. $215.00 $45,150.00

The Saunders Co., Inc. $190.57 $40,019.70 West Coast Contractors, Inc. $1,135.67 $238,490.70 Engineer's Estimate 210 CUYD $300.00 $63,000.00

8 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0420 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4

Cascade Civil CORP $135.00 $297,000.00 HP Civil Inc $126.00 $277,200.00 Nelson Construction Company $141.00 $310,200.00 Marcum & Son LLC $115.00 $253,000.00

JAL CONSTRUCTION, INC. $190.00 $418,000.00

The Saunders Co., Inc. $132.73 $292,006.00 West Coast Contractors, Inc. $267.39 $588,258.00 Engineer's Estimate 2,200 CUYD $140.00 $308,000.00

B0440 25125-0000 BOULDER

Cascade Civil CORP $500.00 $2,000.00 HP Civil Inc $275.00 $1,100.00 Nelson Construction Company $840.00 $3,360.00 Marcum & Son LLC $1,500.00 $6,000.00

JAL CONSTRUCTION, INC. $400.00 $1,600.00

The Saunders Co., Inc. $519.90 $2,079.60 West Coast Contractors, Inc. $1,862.44 $7,449.76 Engineer's Estimate 4 EACH $2,000.00 $8,000.00

B0460 30201-2000 ROADWAY AGGREGATE, METHOD 2

Cascade Civil CORP $80.00 $304,000.00 HP Civil Inc $72.00 $273,600.00 Nelson Construction Company $80.00 $304,000.00 Marcum & Son LLC $95.00 $361,000.00

JAL CONSTRUCTION, INC. $110.00 $418,000.00

The Saunders Co., Inc. $96.88 $368,144.00 West Coast Contractors, Inc. $108.97 $414,086.00 Engineer's Estimate 3,800 CUYD $55.00 $209,000.00

B0480 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Cascade Civil CORP $182.00 $273,000.00 HP Civil Inc $160.00 $240,000.00 Nelson Construction Company $200.00 $300,000.00 Marcum & Son LLC $158.50 $237,750.00

JAL CONSTRUCTION, INC. $200.00 $300,000.00

The Saunders Co., Inc. $185.53 $278,295.00 West Coast Contractors, Inc. $215.01 $322,515.00 Engineer's Estimate 1,500 TON $200.00 $300,000.00

9 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0500 41201-0000 TACK COAT

Cascade Civil CORP $3,000.00 $9,000.00 HP Civil Inc $800.00 $2,400.00 Nelson Construction Company $3,350.00 $10,050.00 Marcum & Son LLC $750.00 $2,250.00

JAL CONSTRUCTION, INC. $950.00 $2,850.00

The Saunders Co., Inc. $828.00 $2,484.00 West Coast Contractors, Inc. $3,603.56 $10,810.68 Engineer's Estimate 3.0 TON $1,500.00 $4,500.00

B0520 55101-1600 STEEL H-PILE, 12 X 74, IN PLACE

Cascade Civil CORP $212.00 $43,460.00 HP Civil Inc $170.00 $34,850.00 Nelson Construction Company $1,420.00 $291,100.00 Marcum & Son LLC $138.00 $28,290.00

JAL CONSTRUCTION, INC. $235.00 $48,175.00

The Saunders Co., Inc. $224.25 $45,971.25 West Coast Contractors, Inc. $198.52 $40,696.60 Engineer's Estimate 205 LNFT $500.00 $102,500.00

B0540 55101-2100 STEEL H-PILE, 14X 117, IN PLACE

Cascade Civil CORP $273.00 $84,630.00 HP Civil Inc $185.00 $57,350.00 Nelson Construction Company $630.00 $195,300.00 Marcum & Son LLC $156.00 $48,360.00

JAL CONSTRUCTION, INC. $330.00 $102,300.00

The Saunders Co., Inc. $287.50 $89,125.00 West Coast Contractors, Inc. $205.99 $63,856.90 Engineer's Estimate 310 LNFT $700.00 $217,000.00

B0560 55102-2400 UNTREATED TIMBER PILE, IN PLACE

Cascade Civil CORP $917.00 $25,676.00 HP Civil Inc $1,200.00 $33,600.00 Nelson Construction Company $700.00 $19,600.00 Marcum & Son LLC $1,000.00 $28,000.00

JAL CONSTRUCTION, INC. $1,000.00 $28,000.00

The Saunders Co., Inc. $1,112.20 $31,141.60 West Coast Contractors, Inc. $1,068.07 $29,905.96 Engineer's Estimate 28 EACH $1,200.00 $33,600.00

10 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0580 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

Cascade Civil CORP $2,200.00 $257,400.00 HP Civil Inc $3,000.00 $351,000.00 Nelson Construction Company $2,060.00 $241,020.00 Marcum & Son LLC $2,643.00 $309,231.00

JAL CONSTRUCTION, INC. $2,680.00 $313,560.00

The Saunders Co., Inc. $4,025.00 $470,925.00 West Coast Contractors, Inc. $2,755.48 $322,391.16 Engineer's Estimate 117 CUYD $2,500.00 $292,500.00

B0600 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2

Cascade Civil CORP $2,050.50 $61,515.00 HP Civil Inc $2,100.00 $63,000.00 Nelson Construction Company $2,060.00 $61,800.00 Marcum & Son LLC $1,650.00 $49,500.00

JAL CONSTRUCTION, INC. $2,740.00 $82,200.00

The Saunders Co., Inc. $2,012.50 $60,375.00 West Coast Contractors, Inc. $5,593.43 $167,802.90 Engineer's Estimate 30 SQYD $800.00 $24,000.00

B0620 55235-0000 EXPANSION JOINTS

Cascade Civil CORP $100.00 $7,100.00 HP Civil Inc $70.00 $4,970.00 Nelson Construction Company $74.00 $5,254.00 Marcum & Son LLC $215.00 $15,265.00

JAL CONSTRUCTION, INC. $100.00 $7,100.00

The Saunders Co., Inc. $74.75 $5,307.25 West Coast Contractors, Inc. $120.12 $8,528.52 Engineer's Estimate 71 LNFT $300.00 $21,300.00

B0640 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS, 48-INCH VOIDED

Cascade Civil CORP $845.00 $319,410.00 HP Civil Inc $900.00 $340,200.00 Nelson Construction Company $950.00 $359,100.00 Marcum & Son LLC $681.13 $257,467.14

JAL CONSTRUCTION, INC. $1,035.00 $391,230.00

The Saunders Co., Inc. $1,150.00 $434,700.00 West Coast Contractors, Inc. $893.90 $337,894.20 Engineer's Estimate 378 LNFT $1,000.00 $378,000.00

11 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0660 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER (47 INCH)

Cascade Civil CORP $1,100.00 $568,700.00 HP Civil Inc $1,100.00 $568,700.00 Nelson Construction Company $1,150.00 $594,550.00 Marcum & Son LLC $1,544.00 $798,248.00

JAL CONSTRUCTION, INC. $1,200.00 $620,400.00

The Saunders Co., Inc. $1,380.00 $713,460.00 West Coast Contractors, Inc. $1,006.27 $520,241.59 Engineer's Estimate 517 LNFT $1,200.00 $620,400.00

B0680 55401-1000 REINFORCING STEEL

Cascade Civil CORP $3.00 $45,900.00 HP Civil Inc $2.50 $38,250.00 Nelson Construction Company $2.75 $42,075.00 Marcum & Son LLC $2.50 $38,250.00

JAL CONSTRUCTION, INC. $2.00 $30,600.00

The Saunders Co., Inc. $3.45 $52,785.00 West Coast Contractors, Inc. $2.75 $42,075.00 Engineer's Estimate 15,300 LB $4.00 $61,200.00

B0700 55401-2000 REINFORCING STEEL, EPOXY COATED

Cascade Civil CORP $3.00 $37,200.00 HP Civil Inc $3.30 $40,920.00 Nelson Construction Company $2.75 $34,100.00 Marcum & Son LLC $3.50 $43,400.00

JAL CONSTRUCTION, INC. $3.50 $43,400.00

The Saunders Co., Inc. $3.45 $42,780.00 West Coast Contractors, Inc. $2.75 $34,100.00 Engineer's Estimate 12,400 LB $5.00 $62,000.00

B0720 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL (2-TUBE MASH)

Cascade Civil CORP $313.00 $113,932.00 HP Civil Inc $207.00 $75,348.00 Nelson Construction Company $330.00 $120,120.00 Marcum & Son LLC $344.74 $125,485.36

JAL CONSTRUCTION, INC. $330.00 $120,120.00

The Saunders Co., Inc. $316.25 $115,115.00 West Coast Contractors, Inc. $359.09 $130,708.76 Engineer's Estimate 364 LNFT $300.00 $109,200.00

12 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0740 56401-1000 BEARING DEVICE, ELASTOMERIC (BULL RUN CREEK CROSSING #4)

Cascade Civil CORP $185.00 $1,850.00 HP Civil Inc $700.00 $7,000.00 Nelson Construction Company $690.00 $6,900.00 Marcum & Son LLC $435.00 $4,350.00

JAL CONSTRUCTION, INC. $880.00 $8,800.00

The Saunders Co., Inc. $1,380.00 $13,800.00 West Coast Contractors, Inc. $570.77 $5,707.70 Engineer's Estimate 10 EACH $2,500.00 $25,000.00

B0760 56401-1000 BEARING DEVICE, ELASTOMERIC (BULL RUN CREEK CROSSING #3)

Cascade Civil CORP $420.00 $11,760.00 HP Civil Inc $300.00 $8,400.00 Nelson Construction Company $240.00 $6,720.00 Marcum & Son LLC $155.00 $4,340.00

JAL CONSTRUCTION, INC. $300.00 $8,400.00

The Saunders Co., Inc. $575.00 $16,100.00 West Coast Contractors, Inc. $314.76 $8,813.28 Engineer's Estimate 28 EACH $1,000.00 $28,000.00

B0780 57502-0000 TEMPORARY BRIDGE (Bull Run 03)

Cascade Civil CORP Lump Sum $107,925.00 HP Civil Inc Lump Sum $95,000.00 Nelson Construction Company Lump Sum $129,350.00 Marcum & Son LLC Lump Sum $102,330.00 JAL CONSTRUCTION, INC. Lump Sum $230,000.00 The Saunders Co., Inc. Lump Sum $218,579.86 West Coast Contractors, Inc. Lump Sum $135,775.10 Engineer's Estimate ALL LPSM Lump Sum $157,800.00

B0800 57502-0000 TEMPORARY BRIDGE (Bull Run 04)

Cascade Civil CORP Lump Sum $174,690.00 HP Civil Inc Lump Sum $95,000.00 Nelson Construction Company Lump Sum $122,080.00 Marcum & Son LLC Lump Sum $120,660.00 JAL CONSTRUCTION, INC. Lump Sum $280,000.00 The Saunders Co., Inc. Lump Sum $295,629.86 West Coast Contractors, Inc. Lump Sum $155,143.19 Engineer's Estimate ALL LPSM Lump Sum $233,750.00

13 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0820 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE (JOINTS)

Cascade Civil CORP $7,810.00 $101,530.00 HP Civil Inc $8,000.00 $104,000.00 Nelson Construction Company $7,930.00 $103,090.00 Marcum & Son LLC $9,500.00 $123,500.00

JAL CONSTRUCTION, INC. $10,000.00 $130,000.00

The Saunders Co., Inc. $17,250.00 $224,250.00 West Coast Contractors, Inc. $14,919.76 $193,956.88 Engineer's Estimate 13 CUYD $12,000.00 $156,000.00

B0840 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (15 FEET SPAN, 9 FEET RISE)

Cascade Civil CORP $6,000.00 $396,000.00 HP Civil Inc $6,300.00 $415,800.00 Nelson Construction Company $5,590.00 $368,940.00 Marcum & Son LLC $6,950.00 $458,700.00

JAL CONSTRUCTION, INC. $7,700.00 $508,200.00

The Saunders Co., Inc. $10,309.92 $680,454.72 West Coast Contractors, Inc. $5,941.62 $392,146.92 Engineer's Estimate 66 LNFT $7,500.00 $495,000.00

B0860 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (22 FEET SPAN, 9 FEET RISE)

Cascade Civil CORP $7,200.00 $403,200.00 HP Civil Inc $8,000.00 $448,000.00 Nelson Construction Company $7,620.00 $426,720.00 Marcum & Son LLC $8,725.00 $488,600.00

JAL CONSTRUCTION, INC. $10,300.00 $576,800.00

The Saunders Co., Inc. $13,230.89 $740,929.84 West Coast Contractors, Inc. $7,887.05 $441,674.80 Engineer's Estimate 56 LNFT $8,000.00 $448,000.00

B0880 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT (13 FEET SPAN, 12 FEET RISE)

Cascade Civil CORP $8,000.00 $272,000.00 HP Civil Inc $8,000.00 $272,000.00 Nelson Construction Company $7,470.00 $253,980.00 Marcum & Son LLC $8,850.00 $300,900.00

JAL CONSTRUCTION, INC. $11,000.00 $374,000.00

The Saunders Co., Inc. $12,870.64 $437,601.76 West Coast Contractors, Inc. $7,376.48 $250,800.32 Engineer's Estimate 34 LNFT $9,000.00 $306,000.00

14 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0900 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS

Cascade Civil CORP $34.00 $32,368.00 HP Civil Inc $36.00 $34,272.00 Nelson Construction Company $42.00 $39,984.00 Marcum & Son LLC $35.00 $33,320.00

JAL CONSTRUCTION, INC. $46.00 $43,792.00

The Saunders Co., Inc. $40.25 $38,318.00 West Coast Contractors, Inc. $42.99 $40,926.48 Engineer's Estimate 952 LNFT $40.00 $38,080.00

B0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL3)

Cascade Civil CORP $3,700.00 $29,600.00 HP Civil Inc $3,500.00 $28,000.00 Nelson Construction Company $4,250.00 $34,000.00 Marcum & Son LLC $3,450.00 $27,600.00

JAL CONSTRUCTION, INC. $4,500.00 $36,000.00

The Saunders Co., Inc. $3,967.50 $31,740.00 West Coast Contractors, Inc. $4,176.48 $33,411.84 Engineer's Estimate 8 EACH $4,000.00 $32,000.00

B0940 61707-0000 STRUCTURE TRANSITION RAILING

Cascade Civil CORP $185.00 $31,080.00 HP Civil Inc $210.00 $35,280.00 Nelson Construction Company $230.00 $38,640.00 Marcum & Son LLC $205.00 $34,440.00

JAL CONSTRUCTION, INC. $270.00 $45,360.00

The Saunders Co., Inc. $235.75 $39,606.00 West Coast Contractors, Inc. $247.45 $41,571.60 Engineer's Estimate 168 LNFT $200.00 $33,600.00

B0960 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Cascade Civil CORP $153.00 $6,120.00 HP Civil Inc $175.00 $7,000.00 Nelson Construction Company $310.00 $12,400.00 Marcum & Son LLC $150.00 $6,000.00

JAL CONSTRUCTION, INC. $230.00 $9,200.00

The Saunders Co., Inc. $195.50 $7,820.00 West Coast Contractors, Inc. $198.20 $7,928.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

15 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0980 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 30-INCH WIDTH

Cascade Civil CORP $110.00 $4,400.00 HP Civil Inc $270.00 $10,800.00 Nelson Construction Company $197.00 $7,880.00 Marcum & Son LLC $130.00 $5,200.00

JAL CONSTRUCTION, INC. $220.00 $8,800.00

The Saunders Co., Inc. $140.91 $5,636.40 West Coast Contractors, Inc. $168.17 $6,726.80 Engineer's Estimate 40 HOUR $165.00 $6,600.00

B1000 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Cascade Civil CORP $204.00 $8,160.00 HP Civil Inc $270.00 $10,800.00 Nelson Construction Company $350.00 $14,000.00 Marcum & Son LLC $150.00 $6,000.00

JAL CONSTRUCTION, INC. $250.00 $10,000.00

The Saunders Co., Inc. $203.28 $8,131.20 West Coast Contractors, Inc. $168.17 $6,726.80 Engineer's Estimate 40 HOUR $185.00 $7,400.00

B1020 62301-0000 GENERAL LABOR

Cascade Civil CORP $104.00 $4,160.00 HP Civil Inc $80.00 $3,200.00 Nelson Construction Company $93.00 $3,720.00 Marcum & Son LLC $100.00 $4,000.00

JAL CONSTRUCTION, INC. $125.00 $5,000.00

The Saunders Co., Inc. $84.66 $3,386.40 West Coast Contractors, Inc. $96.41 $3,856.40 Engineer's Estimate 40 HOUR $125.00 $5,000.00

B1040 62501-0000 TURF ESTABLISHMENT

Cascade Civil CORP $7,212.00 $23,078.40 HP Civil Inc $7,500.00 $24,000.00 Nelson Construction Company $8,380.00 $26,816.00 Marcum & Son LLC $7,500.00 $24,000.00

JAL CONSTRUCTION, INC. $10,000.00 $32,000.00

The Saunders Co., Inc. $12,190.00 $39,008.00 West Coast Contractors, Inc. $13,133.77 $42,028.06 Engineer's Estimate 3.2 ACRE $15,000.00 $48,000.00

16 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1060 62635-1000 CUTTINGS, COTTONWOOD POLE (COTTONWOOD BOLE)

Cascade Civil CORP $5,000.00 $60,000.00 HP Civil Inc $2,100.00 $25,200.00 Nelson Construction Company $61.00 $732.00 Marcum & Son LLC $150.00 $1,800.00

JAL CONSTRUCTION, INC. $815.00 $9,780.00

The Saunders Co., Inc. $1,112.11 $13,345.32 West Coast Contractors, Inc. $285.66 $3,427.92 Engineer's Estimate 12 EACH $150.00 $1,800.00

B1080 62635-3000 CUTTINGS, WILLOW POLE (WILLOW POLE TRIPOD)

Cascade Civil CORP $55.00 $2,090.00 HP Civil Inc $55.00 $2,090.00 Nelson Construction Company $61.00 $2,318.00 Marcum & Son LLC $55.00 $2,090.00

JAL CONSTRUCTION, INC. $75.00 $2,850.00

The Saunders Co., Inc. $276.00 $10,488.00 West Coast Contractors, Inc. $285.78 $10,859.64 Engineer's Estimate 38 EACH $300.00 $11,400.00

B1100 62635-3000 CUTTINGS, WILLOW POLE

Cascade Civil CORP $10.00 $15,000.00 HP Civil Inc $9.50 $14,250.00 Nelson Construction Company $11.00 $16,500.00 Marcum & Son LLC $9.50 $14,250.00

JAL CONSTRUCTION, INC. $12.50 $18,750.00

The Saunders Co., Inc. $36.80 $55,200.00 West Coast Contractors, Inc. $38.22 $57,330.00 Engineer's Estimate 1,500 EACH $9.00 $13,500.00

B1120 62650-1000 REMOVE AND REPLANT TREE AND SHRUB (CONSERVED WILLOW BUSH)

Cascade Civil CORP $375.00 $11,250.00 HP Civil Inc $380.00 $11,400.00 Nelson Construction Company $420.00 $12,600.00 Marcum & Son LLC $375.00 $11,250.00

JAL CONSTRUCTION, INC. $500.00 $15,000.00

The Saunders Co., Inc. $230.00 $6,900.00 West Coast Contractors, Inc. $931.15 $27,934.50 Engineer's Estimate 30 EACH $350.00 $10,500.00

17 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1140 63308-3000 OBJECT MARKER, TYPE 3

Cascade Civil CORP $500.00 $6,000.00 HP Civil Inc $400.00 $4,800.00 Nelson Construction Company $280.00 $3,360.00 Marcum & Son LLC $150.00 $1,800.00

JAL CONSTRUCTION, INC. $250.00 $3,000.00

The Saunders Co., Inc. $287.00 $3,444.00 West Coast Contractors, Inc. $102.10 $1,225.20 Engineer's Estimate 12 EACH $200.00 $2,400.00

B1160 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4-INCH, WHITE)

Cascade Civil CORP $0.36 $4,932.00 HP Civil Inc $0.36 $4,932.00 Nelson Construction Company $0.28 $3,836.00 Marcum & Son LLC $0.43 $5,891.00

JAL CONSTRUCTION, INC. $0.50 $6,850.00

The Saunders Co., Inc. $0.41 $5,617.00 West Coast Contractors, Inc. $0.44 $6,028.00 Engineer's Estimate 13,700 LNFT $0.40 $5,480.00

B1180 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4-INCH, YELLOW)

Cascade Civil CORP $0.36 $4,932.00 HP Civil Inc $0.36 $4,932.00 Nelson Construction Company $0.28 $3,836.00 Marcum & Son LLC $0.43 $5,891.00

JAL CONSTRUCTION, INC. $0.50 $6,850.00

The Saunders Co., Inc. $0.41 $5,617.00 West Coast Contractors, Inc. $0.44 $6,028.00 Engineer's Estimate 13,700 LNFT $0.40 $5,480.00

B1200 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (BULL RUN 03)

Cascade Civil CORP Lump Sum $18,000.00 HP Civil Inc Lump Sum $30,000.00 Nelson Construction Company Lump Sum $45,280.00 Marcum & Son LLC Lump Sum $22,500.00 JAL CONSTRUCTION, INC. Lump Sum $70,000.00 The Saunders Co., Inc. Lump Sum $29,946.00 West Coast Contractors, Inc. Lump Sum $60,059.36 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

18 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1220 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (BULL RUN 04)

Cascade Civil CORP Lump Sum $18,000.00 HP Civil Inc Lump Sum $30,000.00 Nelson Construction Company Lump Sum $45,280.00 Marcum & Son LLC Lump Sum $22,500.00 JAL CONSTRUCTION, INC. Lump Sum $70,000.00 The Saunders Co., Inc. Lump Sum $29,946.00 West Coast Contractors, Inc. Lump Sum $60,059.36 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

B1240 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Cascade Civil CORP $150.00 $3,000.00 HP Civil Inc $200.00 $4,000.00 Nelson Construction Company $196.00 $3,920.00 Marcum & Son LLC $200.00 $4,000.00

JAL CONSTRUCTION, INC. $150.00 $3,000.00

The Saunders Co., Inc. $258.18 $5,163.60 West Coast Contractors, Inc. $120.12 $2,402.40 Engineer's Estimate 20 EACH $200.00 $4,000.00

B1260 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

Cascade Civil CORP $50.00 $7,500.00 HP Civil Inc $28.00 $4,200.00 Nelson Construction Company $24.00 $3,600.00 Marcum & Son LLC $20.00 $3,000.00

JAL CONSTRUCTION, INC. $40.00 $6,000.00

The Saunders Co., Inc. $23.58 $3,537.00 West Coast Contractors, Inc. $90.09 $13,513.50 Engineer's Estimate 150 EACH $25.00 $3,750.00

B1280 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Cascade Civil CORP $22,000.00 $44,000.00 HP Civil Inc $6,000.00 $12,000.00 Nelson Construction Company $8,050.00 $16,100.00 Marcum & Son LLC $7,500.00 $15,000.00

JAL CONSTRUCTION, INC. $9,000.00 $18,000.00

The Saunders Co., Inc. $5,175.00 $10,350.00 West Coast Contractors, Inc. $12,011.87 $24,023.74 Engineer's Estimate 2 EACH $10,000.00 $20,000.00

19 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1300 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Cascade Civil CORP $750.00 $6,750.00 HP Civil Inc $400.00 $3,600.00 Nelson Construction Company $1,060.00 $9,540.00 Marcum & Son LLC $450.00 $4,050.00

JAL CONSTRUCTION, INC. $500.00 $4,500.00

The Saunders Co., Inc. $287.50 $2,587.50 West Coast Contractors, Inc. $449.49 $4,045.41 Engineer's Estimate 9 EACH $1,000.00 $9,000.00

B1320 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Cascade Civil CORP $1.00 $2,200.00 HP Civil Inc $60.00 $132,000.00 Nelson Construction Company $86.00 $189,200.00 Marcum & Son LLC $72.00 $158,400.00

JAL CONSTRUCTION, INC. $110.00 $242,000.00

The Saunders Co., Inc. $88.55 $194,810.00 West Coast Contractors, Inc. $96.40 $212,080.00 Engineer's Estimate 2,200 HOUR $100.00 $220,000.00

B1340 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Cascade Civil CORP $85.00 $12,410.00 HP Civil Inc $92.00 $13,432.00 Nelson Construction Company $1,020.00 $148,920.00 Marcum & Son LLC $250.00 $36,500.00

JAL CONSTRUCTION, INC. $250.00 $36,500.00

The Saunders Co., Inc. $1,007.75 $147,131.50 West Coast Contractors, Inc. $1,441.42 $210,447.32 Engineer's Estimate 146 DAY $900.00 $131,400.00

B1360 64703-5000 MITIGATION, ROOT WAD

Cascade Civil CORP $731.00 $16,082.00 HP Civil Inc $825.00 $18,150.00 Nelson Construction Company $920.00 $20,240.00 Marcum & Son LLC $2,000.00 $44,000.00

JAL CONSTRUCTION, INC. $1,500.00 $33,000.00

The Saunders Co., Inc. $2,876.34 $63,279.48 West Coast Contractors, Inc. $2,612.02 $57,464.44 Engineer's Estimate 22 EACH $175.00 $3,850.00

20 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1380 64703-6000 MITIGATION, FISH PASSAGE BOULDER

Cascade Civil CORP $217.00 $10,416.00 HP Civil Inc $250.00 $12,000.00 Nelson Construction Company $280.00 $13,440.00 Marcum & Son LLC $300.00 $14,400.00

JAL CONSTRUCTION, INC. $600.00 $28,800.00

The Saunders Co., Inc. $511.24 $24,539.52 West Coast Contractors, Inc. $300.30 $14,414.40 Engineer's Estimate 48 EACH $150.00 $7,200.00

B1400 64704-1000 MITIGATION, STREAMBED MATERIAL

Cascade Civil CORP $170.00 $66,810.00 HP Civil Inc $71.00 $27,903.00 Nelson Construction Company $77.00 $30,261.00 Marcum & Son LLC $100.00 $39,300.00

JAL CONSTRUCTION, INC. $125.00 $49,125.00

The Saunders Co., Inc. $161.69 $63,544.17 West Coast Contractors, Inc. $193.04 $75,864.72 Engineer's Estimate 393 CUYD $150.00 $58,950.00

B1420 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 03)

Cascade Civil CORP Lump Sum $58,810.00 HP Civil Inc Lump Sum $150,000.00 Nelson Construction Company Lump Sum $77,220.00 Marcum & Son LLC Lump Sum $90,000.00 JAL CONSTRUCTION, INC. Lump Sum $100,000.00 The Saunders Co., Inc. Lump Sum $146,187.00 West Coast Contractors, Inc. Lump Sum $288,703.55 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

B1440 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (BULL RUN 04)

Cascade Civil CORP Lump Sum $62,310.00 HP Civil Inc Lump Sum $150,000.00 Nelson Construction Company Lump Sum $83,730.00 Marcum & Son LLC Lump Sum $95,000.00 JAL CONSTRUCTION, INC. Lump Sum $110,000.00 The Saunders Co., Inc. Lump Sum $158,420.69 West Coast Contractors, Inc. Lump Sum $315,148.00 Engineer's Estimate ALL LPSM Lump Sum $65,000.00

21 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Cascade Civil CORP $5,973,031.70 HP Civil Inc $6,302,908.88 Nelson Construction Company $6,319,377.10 Marcum & Son LLC $6,431,659.50

JAL CONSTRUCTION, INC. $7,959,522.00

The Saunders Co., Inc. $8,875,386.14 West Coast Contractors, Inc. $9,114,442.42 Engineer's Estimate $7,378,500.00

22 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Solcitation No: 69056723B000021

Division: Western Federal Lands

State: OR County: Grant

Federal Land: Wallowa-Whitman National Forest Opened at: WFLHD

Opened by: Marino Chea

Date: 12/10/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Cascade Civil CORP $4,789,336.90 255 SE Black Butte Blvd Redmond, OR 97756

HP Civil Inc $4,817,592.22 8795 Aumsville HWY SE Salem, OR 97317

Marcum & Son LLC $4,973,216.02 336 SW Black Butte Blvd Redmond, OR 97756

Nelson Construction Company $5,078,621.40

JAL CONSTRUCTION, INC. $6,304,397.00

PO Box 6269 Bend, OR 97708

The Saunders Co., Inc. $7,048,309.90 701 E 3rd Street Newberg, Yamhill County, OR 97132

West Coast Contractors, Inc. $7,352,661.76 61050 Highway 101 Coos Bay, OR 97420

Engineer's Estimate $5,653,130.00

23 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Cascade Civil CORP Lump Sum $486,500.00 HP Civil Inc Lump Sum $481,759.22 Marcum & Son LLC Lump Sum $435,000.00 Nelson Construction Company Lump Sum $458,795.00 JAL CONSTRUCTION, INC. Lump Sum $600,000.00 The Saunders Co., Inc. Lump Sum $833,465.80 West Coast Contractors, Inc. Lump Sum $900,000.00 Engineer's Estimate ALL LPSM Lump Sum $650,000.00

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Cascade Civil CORP Lump Sum $130,000.00 HP Civil Inc Lump Sum $165,000.00 Marcum & Son LLC Lump Sum $115,000.00 Nelson Construction Company Lump Sum $39,380.00 JAL CONSTRUCTION, INC. Lump Sum $115,000.00 The Saunders Co., Inc. Lump Sum $80,500.00 West Coast Contractors, Inc. Lump Sum $150,148.00 Engineer's Estimate ALL LPSM Lump Sum $129,100.00

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

Cascade Civil CORP Lump Sum $100,000.00 HP Civil Inc Lump Sum $150,000.00 Marcum & Son LLC Lump Sum $75,000.00 Nelson Construction Company Lump Sum $60,000.00 JAL CONSTRUCTION, INC. Lump Sum $150,000.00 The Saunders Co., Inc. Lump Sum $92,000.00 West Coast Contractors, Inc. Lump Sum $120,188.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00

A0080 15401-0000 CONTRACTOR TESTING

Cascade Civil CORP Lump Sum $163,000.00 HP Civil Inc Lump Sum $92,000.00 Marcum & Son LLC Lump Sum $22,000.00 Nelson Construction Company Lump Sum $61,875.00 JAL CONSTRUCTION, INC. Lump Sum $70,000.00 The Saunders Co., Inc. Lump Sum $21,965.00 West Coast Contractors, Inc. Lump Sum $60,059.00 Engineer's Estimate ALL LPSM Lump Sum $86,000.00

24 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15501-0000 CONSTRUCTION SCHEDULE

Cascade Civil CORP Lump Sum $10,000.00 HP Civil Inc Lump Sum $60,000.00 Marcum & Son LLC Lump Sum $15,000.00 Nelson Construction Company Lump Sum $2,500.00 JAL CONSTRUCTION, INC. Lump Sum $45,000.00 The Saunders Co., Inc. Lump Sum $5,353.08 West Coast Contractors, Inc. Lump Sum $14,325.00 Engineer's Estimate ALL LPSM Lump Sum $21,500.00

A0120 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (BULL RUN 03)

Cascade Civil CORP Lump Sum $30,000.00 HP Civil Inc Lump Sum $55,000.00 Marcum & Son LLC Lump Sum $80,000.00 Nelson Construction Company Lump Sum $27,680.00 JAL CONSTRUCTION, INC. Lump Sum $50,000.00 The Saunders Co., Inc. Lump Sum $63,614.92 West Coast Contractors, Inc. Lump Sum $201,492.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0140 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (BULL RUN 04)

Cascade Civil CORP Lump Sum $31,000.00 HP Civil Inc Lump Sum $55,000.00 Marcum & Son LLC Lump Sum $100,000.00 Nelson Construction Company Lump Sum $27,680.00 JAL CONSTRUCTION, INC. Lump Sum $60,000.00 The Saunders Co., Inc. Lump Sum $63,614.92 West Coast Contractors, Inc. Lump Sum $215,432.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0160 15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION (Boundary Creek)

Cascade Civil CORP Lump Sum $28,000.00 HP Civil Inc Lump Sum $55,000.00 Marcum & Son LLC Lump Sum $80,000.00 Nelson Construction Company Lump Sum $27,680.00 JAL CONSTRUCTION, INC. Lump Sum $50,000.00 The Saunders Co., Inc. Lump Sum $60,164.92 West Coast Contractors, Inc. Lump Sum $195,199.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

25 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Cascade Civil CORP $5.00 $14,000.00 HP Civil Inc $5.00 $14,000.00 Marcum & Son LLC $4.00 $11,200.00 Nelson Construction Company $12.00 $33,600.00

JAL CONSTRUCTION, INC. $7.00 $19,600.00

The Saunders Co., Inc. $4.28 $11,984.00 West Coast Contractors, Inc. $11.30 $31,640.00 Engineer's Estimate 2,800 LNFT $7.00 $19,600.00

A0200 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Cascade Civil CORP $6.00 $8,400.00 HP Civil Inc $6.00 $8,400.00 Marcum & Son LLC $6.00 $8,400.00 Nelson Construction Company $23.00 $32,200.00

JAL CONSTRUCTION, INC. $8.00 $11,200.00

The Saunders Co., Inc. $9.31 $13,034.00 West Coast Contractors, Inc. $11.30 $15,820.00 Engineer's Estimate 1,400 LNFT $7.00 $9,800.00

A0220 15706-0200 SOIL EROSION CONTROL, CHECK DAM

Cascade Civil CORP $100.00 $1,000.00 HP Civil Inc $110.00 $1,100.00 Marcum & Son LLC $150.00 $1,500.00 Nelson Construction Company $1,370.00 $13,700.00

JAL CONSTRUCTION, INC. $150.00 $1,500.00

The Saunders Co., Inc. $292.92 $2,929.20 West Coast Contractors, Inc. $702.52 $7,025.20 Engineer's Estimate 10 EACH $500.00 $5,000.00

A0240 20101-0000 CLEARING AND GRUBBING

Cascade Civil CORP $38,870.00 $101,450.70 HP Civil Inc $6,600.00 $17,226.00 Marcum & Son LLC $9,000.00 $23,490.00 Nelson Construction Company $7,340.00 $19,157.40

JAL CONSTRUCTION, INC. $45,000.00 $117,450.00

The Saunders Co., Inc. $24,466.78 $63,858.30 West Coast Contractors, Inc. $14,329.00 $37,398.69 Engineer's Estimate 2.61 ACRE $15,000.00 $39,150.00

26 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 20301-1900 REMOVAL OF PIPE CULVERT

Cascade Civil CORP $4,920.00 $14,760.00 HP Civil Inc $10,000.00 $30,000.00 Marcum & Son LLC $1,750.00 $5,250.00 Nelson Construction Company $4,390.00 $13,170.00

JAL CONSTRUCTION, INC. $25,000.00 $75,000.00

The Saunders Co., Inc. $16,145.85 $48,437.55 West Coast Contractors, Inc. $3,694.00 $11,082.00 Engineer's Estimate 3 EACH $5,000.00 $15,000.00

A0280 20401-0000 ROADWAY EXCAVATION

Cascade Civil CORP $66.00 $66,000.00 HP Civil Inc $9.00 $9,000.00 Marcum & Son LLC $47.00 $47,000.00 Nelson Construction Company $10.00 $10,000.00

JAL CONSTRUCTION, INC. $100.00 $100,000.00

The Saunders Co., Inc. $61.25 $61,250.00 West Coast Contractors, Inc. $46.28 $46,280.00 Engineer's Estimate 1,000 CUYD $65.00 $65,000.00

A0300 20403-0000 UNCLASSIFIED BORROW

Cascade Civil CORP $51.00 $137,700.00 HP Civil Inc $20.25 $54,675.00 Marcum & Son LLC $52.50 $141,750.00 Nelson Construction Company $23.00 $62,100.00

JAL CONSTRUCTION, INC. $60.00 $162,000.00

The Saunders Co., Inc. $108.93 $294,111.00 West Coast Contractors, Inc. $67.00 $180,900.00 Engineer's Estimate 2,700 CUYD $35.00 $94,500.00

A0320 20803-0000 STRUCTURAL BACKFILL

Cascade Civil CORP $127.00 $25,400.00 HP Civil Inc $111.00 $22,200.00 Marcum & Son LLC $140.00 $28,000.00 Nelson Construction Company $124.00 $24,800.00

JAL CONSTRUCTION, INC. $130.00 $26,000.00

The Saunders Co., Inc. $132.45 $26,490.00 West Coast Contractors, Inc. $210.00 $42,000.00 Engineer's Estimate 200 CUYD $115.00 $23,000.00

27 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

Cascade Civil CORP $300.00 $600.00 HP Civil Inc $500.00 $1,000.00 Marcum & Son LLC $160.00 $320.00 Nelson Construction Company $560.00 $1,120.00

JAL CONSTRUCTION, INC. $615.00 $1,230.00

The Saunders Co., Inc. $254.74 $509.48 West Coast Contractors, Inc. $2,188.60 $4,377.20 Engineer's Estimate 2 CUYD $105.00 $210.00

A0360 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

Cascade Civil CORP $80.00 $5,600.00 HP Civil Inc $104.00 $7,280.00 Marcum & Son LLC $160.00 $11,200.00 Nelson Construction Company $116.00 $8,120.00

JAL CONSTRUCTION, INC. $215.00 $15,050.00

The Saunders Co., Inc. $190.57 $13,339.90 West Coast Contractors, Inc. $1,136.00 $79,520.00 Engineer's Estimate 70 CUYD $300.00 $21,000.00

A0380 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4

Cascade Civil CORP $135.00 $297,000.00 HP Civil Inc $126.00 $277,200.00 Marcum & Son LLC $115.00 $253,000.00 Nelson Construction Company $142.00 $312,400.00

JAL CONSTRUCTION, INC. $190.00 $418,000.00

The Saunders Co., Inc. $132.73 $292,006.00 West Coast Contractors, Inc. $267.39 $588,258.00 Engineer's Estimate 2,200 CUYD $140.00 $308,000.00

A0400 25125-0000 BOULDER

Cascade Civil CORP $500.00 $2,000.00 HP Civil Inc $275.00 $1,100.00 Marcum & Son LLC $1,500.00 $6,000.00 Nelson Construction Company $840.00 $3,360.00

JAL CONSTRUCTION, INC. $400.00 $1,600.00

The Saunders Co., Inc. $519.90 $2,079.60 West Coast Contractors, Inc. $1,862.00 $7,448.00 Engineer's Estimate 4 EACH $2,000.00 $8,000.00

28 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 30201-2000 ROADWAY AGGREGATE, METHOD 2

Cascade Civil CORP $80.00 $216,000.00 HP Civil Inc $72.00 $194,400.00 Marcum & Son LLC $95.00 $256,500.00 Nelson Construction Company $80.00 $216,000.00

JAL CONSTRUCTION, INC. $110.00 $297,000.00

The Saunders Co., Inc. $96.88 $261,576.00 West Coast Contractors, Inc. $109.00 $294,300.00 Engineer's Estimate 2,700 CUYD $55.00 $148,500.00

A0440 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Cascade Civil CORP $182.00 $182,000.00 HP Civil Inc $160.00 $160,000.00 Marcum & Son LLC $158.50 $158,500.00 Nelson Construction Company $200.00 $200,000.00

JAL CONSTRUCTION, INC. $200.00 $200,000.00

The Saunders Co., Inc. $185.53 $185,530.00 West Coast Contractors, Inc. $215.00 $215,000.00 Engineer's Estimate 1,000 TON $200.00 $200,000.00

A0460 41201-0000 TACK COAT

Cascade Civil CORP $3,000.00 $6,000.00 HP Civil Inc $720.00 $1,440.00 Marcum & Son LLC $650.00 $1,300.00 Nelson Construction Company $3,380.00 $6,760.00

JAL CONSTRUCTION, INC. $950.00 $1,900.00

The Saunders Co., Inc. $828.00 $1,656.00 West Coast Contractors, Inc. $3,604.00 $7,208.00 Engineer's Estimate 2.0 TON $1,500.00 $3,000.00

A0480 55101-1600 STEEL H-PILE, 12 X 74, IN PLACE

Cascade Civil CORP $212.00 $43,460.00 HP Civil Inc $170.00 $34,850.00 Marcum & Son LLC $138.00 $28,290.00 Nelson Construction Company $1,430.00 $293,150.00

JAL CONSTRUCTION, INC. $235.00 $48,175.00

The Saunders Co., Inc. $224.25 $45,971.25 West Coast Contractors, Inc. $199.00 $40,795.00 Engineer's Estimate 205 LNFT $500.00 $102,500.00

29 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 55101-2100 STEEL H-PILE, 14X 117, IN PLACE

Cascade Civil CORP $273.00 $84,630.00 HP Civil Inc $185.00 $57,350.00 Marcum & Son LLC $156.00 $48,360.00 Nelson Construction Company $640.00 $198,400.00

JAL CONSTRUCTION, INC. $330.00 $102,300.00

The Saunders Co., Inc. $287.50 $89,125.00 West Coast Contractors, Inc. $203.00 $62,930.00 Engineer's Estimate 310 LNFT $700.00 $217,000.00

A0520 55102-2400 UNTREATED TIMBER PILE, IN PLACE

Cascade Civil CORP $917.00 $25,676.00 HP Civil Inc $1,200.00 $33,600.00 Marcum & Son LLC $1,000.00 $28,000.00 Nelson Construction Company $700.00 $19,600.00

JAL CONSTRUCTION, INC. $1,000.00 $28,000.00

The Saunders Co., Inc. $1,112.20 $31,141.60 West Coast Contractors, Inc. $1,068.00 $29,904.00 Engineer's Estimate 28 EACH $1,200.00 $33,600.00

A0540 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

Cascade Civil CORP $2,200.00 $257,400.00 HP Civil Inc $3,000.00 $351,000.00 Marcum & Son LLC $2,643.00 $309,231.00 Nelson Construction Company $2,080.00 $243,360.00

JAL CONSTRUCTION, INC. $2,680.00 $313,560.00

The Saunders Co., Inc. $4,025.00 $470,925.00 West Coast Contractors, Inc. $2,755.48 $322,391.16 Engineer's Estimate 117 CUYD $2,500.00 $292,500.00

A0560 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2

Cascade Civil CORP $2,050.00 $61,500.00 HP Civil Inc $2,100.00 $63,000.00 Marcum & Son LLC $1,650.00 $49,500.00 Nelson Construction Company $2,090.00 $62,700.00

JAL CONSTRUCTION, INC. $2,740.00 $82,200.00

The Saunders Co., Inc. $2,012.50 $60,375.00 West Coast Contractors, Inc. $5,593.00 $167,790.00 Engineer's Estimate 30 SQYD $800.00 $24,000.00

30 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 55235-0000 EXPANSION JOINTS

Cascade Civil CORP $100.00 $7,100.00 HP Civil Inc $70.00 $4,970.00 Marcum & Son LLC $215.00 $15,265.00 Nelson Construction Company $75.00 $5,325.00

JAL CONSTRUCTION, INC. $100.00 $7,100.00

The Saunders Co., Inc. $74.75 $5,307.25 West Coast Contractors, Inc. $120.00 $8,520.00 Engineer's Estimate 71 LNFT $300.00 $21,300.00

A0600 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS, 48-INCH VOIDED

Cascade Civil CORP $845.00 $319,410.00 HP Civil Inc $900.00 $340,200.00 Marcum & Son LLC $681.13 $257,467.14 Nelson Construction Company $950.00 $359,100.00

JAL CONSTRUCTION, INC. $1,035.00 $391,230.00

The Saunders Co., Inc. $1,351.25 $510,772.50 West Coast Contractors, Inc. $893.90 $337,894.20 Engineer's Estimate 378 LNFT $1,000.00 $378,000.00

A0620 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER (47 INCH)

Cascade Civil CORP $1,100.00 $568,700.00 HP Civil Inc $1,100.00 $568,700.00 Marcum & Son LLC $1,544.72 $798,620.24 Nelson Construction Company $1,150.00 $594,550.00

JAL CONSTRUCTION, INC. $1,200.00 $620,400.00

The Saunders Co., Inc. $1,552.50 $802,642.50 West Coast Contractors, Inc. $1,003.27 $518,690.59 Engineer's Estimate 517 LNFT $1,200.00 $620,400.00

A0640 55401-1000 REINFORCING STEEL

Cascade Civil CORP $3.00 $45,900.00 HP Civil Inc $2.50 $38,250.00 Marcum & Son LLC $2.50 $38,250.00 Nelson Construction Company $2.75 $42,075.00

JAL CONSTRUCTION, INC. $3.00 $45,900.00

The Saunders Co., Inc. $3.45 $52,785.00 West Coast Contractors, Inc. $2.75 $42,075.00 Engineer's Estimate 15,300 LB $4.00 $61,200.00

31 out of 40

Project No: OR FLAP GRANT 24(2)

Project Name: Granite Hill Road Reconstruction, Phase II

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0660 55401-2000 REINFORCING STEEL, EPOXY COATED

Cascade Civil CORP $3.00 $37,200.00 HP Civil Inc $3.30 $40,920.00 Marcum & Son LLC $3.50 $43,400.00 Nelson Construction Company $3.00 $37,200.00

JAL CONSTRUCTION, INC. $3.50 $43,400.00

The Saunders Co., Inc. $3.45 $42,780.00 West Coast Contractors, Inc. $2.75 $34,100.00 Engineer's Estimate 12,400 LB $5.00 $62,000.00

A0680 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL (2-TUBE MASH)

Cascade Civil CORP $313.00 $113,932.00 HP Civil Inc $207.00 $75,348.00 Marcum & Son LLC $344.76 $125,492.64 Nelson Construction Company $330.00 $120,120.00

JAL CONSTRUCTION, INC. $330.00 $120,120.00

The Saunders Co., Inc. $316.25 $115,115.00 West Coast Contractors, Inc. $359.00 $130,676.00 Engineer's Estimate 364 LNFT $300.00 $109,200.00

A0700 56401-1000 BEARING DEVICE,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .