This document is an Earthwork Review report for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II federal contract opportunity. The report provides detailed volume calculations for various pavement layers, shoulders, fill, and cut areas along the project alignment. The federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for the reconstruction of Granite Hill Road, Phase II. The solicitation, plans, and construction contract administration documents are posted as attachments. The report summarizes the earthwork volumes required for the project, including 74.805 cubic yards of fill and 327.367 cubic yards of cut, but does not provide any additional details about the solicitation requirements, response dates, pricing terms, set asides, or other salient contract information.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Review report for MAIN 01
Bull Run Creek Crossing #2
OR FLAP GRANT 24(2)
Granite Hill Road reconstruc on, phase II
Volumes Report
Report Created: Tuesday, May 9, 2023 Time: 3:33:46 PM
Cross Section Set Name:
<None>
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Page 1 of 3Volumes Report
5/9/2023
Station Type Area Volume Factor Adjusted Volume
Included in Mass Ordinate?
Mass Ordinate
All 252.562
Pavement Layer 1: 97.067 1.000 97.067 No
Pavement Layer 2: 1.504 1.000 1.504 No
Pavement Layer 4: 454.772 1.000 454.772 No
Shoulder Layer 4: 34.085 1.000 34.085 No
Shoulder Layer 1: 8.531 1.000 8.531 No
Volumes_Fill: 74.805 1.000 74.805 Yes
Volumes_Cut: 327.367 1.000 327.367 Yes
Totals:
Total Cut: 0.000 0.000
Total Fill: 0.000 0.000
Total DNC: 0.000 0.000
Total Turf Establishment: 0.000 0.000
Total Foreslope: 0.000 0.000
Pavement Layer 1: 97.067 97.067 No
Total Pavement Layer 1: 97.067 97.067
Pavement Layer 2: 1.504 1.504 No
Total Pavement Layer 2: 1.504 1.504
Pavement Layer 4: 454.772 454.772 No
Total Pavement Layer 4: 454.772 454.772
Shoulder Layer 4: 34.085 34.085 No
Total Shoulder Layer 4: 34.085 34.085
Shoulder Layer 1: 8.531 8.531 No
Total Shoulder Layer 1: 8.531 8.531
Volumes_Fill: 74.805 74.805 Yes
Total Volumes_Fill: 74.805 74.805
Volumes_Cut: 327.367 327.367 Yes
Total Volumes_Cut: 327.367 327.367
Total Baseline: 0.000 0.000
Total Volumes_Topsoil Stripping Limits: 0.000 0.000
Total Centerline 1: 0.000 0.000
Total Centerline: 0.000 0.000
Total Centerline 4: 0.000 0.000
Total Prop Clearing: 0.000 0.000
Total DNC: 0.000 0.000
Total Ditch: 0.000 0.000
Page 2 of 3Volumes Report
Total Edge of Widen 1: 0.000 0.000
Total Edge of Widen: 0.000 0.000
Total Edge of Widen 4: 0.000 0.000
Total Edge of Pavt 1: 0.000 0.000
Total Edge of Pavt: 0.000 0.000
Total Edge of Pavt 4: 0.000 0.000
Total Edge of Shld 1: 0.000 0.000
Total Edge of Shld: 0.000 0.000
Total Edge of Shld 4: 0.000 0.000
Total Centerline Exist: 0.000 0.000
Total Cut: 0.000 0.000
Total Fill: 0.000 0.000
Page 3 of 3Volumes Report