ora-grant24-2_Bull Run 1_Earthwork.pdf
PDF 382 KB Posted
- Solicitation number
- 69056723B000021
About this file
This document is an Earthwork Review report for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II federal contract opportunity. The report provides detailed volume calculations for various pavement, shoulder, and earthwork elements of the project, including cut and fill volumes.
The federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for the OR FLAP GRANT 24(2), Granite Hill Road Reconstruction, Phase II project. The solicitation includes the Invitation for Bids (IFB), plans, physical data, and the Construction Contract Administration Document per FAR 36.211. No additional details on response dates, award dates, pricing terms, set asides, incumbents, or key objectives are provided in the documents reviewed.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Review report for MAIN 01
Bull Run Creek Crossing #1
OR FLAP GRANT 24(2)
Granite Hill Road reconstruc on, phase II
Volumes Report
Report Created: Tuesday, May 9, 2023 Time: 3:21:54 PM
Cross Section Set Name:
<None>
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Page 1 of 3Volumes Report
5/9/2023
Station Type Area Volume Factor Adjusted Volume
Included in Mass Ordinate?
Mass Ordinate
All 82.351
Pavement Layer 4: 493.240 1.000 493.240 No
Pavement Layer 2: 1.640 1.000 1.640 No
Shoulder Layer 4: 37.041 1.000 37.041 No
Shoulder Layer 1: 9.263 1.000 9.263 No
Pavement Layer 1: 104.268 1.000 104.268 No
Volumes_Cut: 225.606 1.000 225.606 Yes
Volumes_Fill: 143.255 1.000 143.255 Yes
Totals:
Total Fill: 0.000 0.000
Total Cut: 0.000 0.000
Total DNC: 0.000 0.000
Total Turf Establishment: 0.000 0.000
Pavement Layer 4: 493.240 493.240 No
Total Pavement Layer 4: 493.240 493.240
Total Foreslope: 0.000 0.000
Pavement Layer 2: 1.640 1.640 No
Total Pavement Layer 2: 1.640 1.640
Shoulder Layer 4: 37.041 37.041 No
Total Shoulder Layer 4: 37.041 37.041
Shoulder Layer 1: 9.263 9.263 No
Total Shoulder Layer 1: 9.263 9.263
Pavement Layer 1: 104.268 104.268 No
Total Pavement Layer 1: 104.268 104.268
Volumes_Cut: 225.606 225.606 Yes
Total Volumes_Cut: 225.606 225.606
Volumes_Fill: 143.255 143.255 Yes
Total Volumes_Fill: 143.255 143.255
Total Baseline: 0.000 0.000
Total Volumes_Topsoil Stripping Limits: 0.000 0.000
Total Centerline 1: 0.000 0.000
Total Centerline: 0.000 0.000
Total Centerline 4: 0.000 0.000
Total Prop Clearing: 0.000 0.000
Total DNC: 0.000 0.000
Total Ditch: 0.000 0.000
Page 2 of 3Volumes Report
Total Edge of Widen 1: 0.000 0.000
Total Edge of Widen: 0.000 0.000
Total Edge of Widen 4: 0.000 0.000
Total Edge of Pavt 1: 0.000 0.000
Total Edge of Pavt: 0.000 0.000
Total Edge of Pavt 4: 0.000 0.000
Total Edge of Shld 1: 0.000 0.000
Total Edge of Shld: 0.000 0.000
Total Edge of Shld 4: 0.000 0.000
Total Centerline Exist: 0.000 0.000
Total Cut: 0.000 0.000
Total Fill: 0.000 0.000
Page 3 of 3Volumes Report
File details come from the government source that posted it. Updated .