Amendment 0006 - Drawing M-503 (Revised).pdf
PDF 308 KB Posted
- Attached to
- Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
- Solicitation number
- W912WJ26RA008
About this file
This is a mechanical diagrams document for a federal construction project issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, in partnership with the U.S. Army Corps of Engineers as construction agent.
The document provides detailed technical specifications and flow diagrams for a Chilled Water Plant Replacement and Site Utility Improvements project at VA Medical Center, West Haven, Connecticut (950 Campbell Avenue, West Haven, CT 06516). The project includes design and installation of a 49,500-gallon insulated aboveground fuel oil storage tank system (typical of 5 tanks), electric oil heater systems, and fuel oil polisher equipment. Key components specified include double-wall insulated fuel oil piping with heat tracing routed through concrete trenches, primary and secondary fine filters, magnetic conditioner, coalescing water separator, pressure and vacuum monitoring systems, level switches and transmitters for tank control, 125 PSI safety valves, and control panels with LED indicator lights for system status. All fuel oil piping within the containment basin must be single-wall with 1-inch insulation and aluminum or stainless steel jacketing. The document contains detailed flow diagrams for tank yard fuel oil piping, electric oil heater systems, and fuel oil polisher operations, along with comprehensive symbols legend and installation requirements. The drawing is dated July 31, 2026, marked "Ready to Advertise" and "Fully Sprinklered," with bidding RFIs issued September 23, 2026. Project number is 689-040, and the designer of record is IMED Perkins&Will.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"F
O F
"F
O R
"F
O F
"F
O R
"F
O R
"F
O F
"F
O F
"F
O R
"F
O R
"F
O F
TK-1
TK-2 TK-3
TK-4 TK-5
"F
O F
"F
O F
"F
O R
"F
O R
"F
O R
"F
O S
"F
O S
"F
O S
"F
O R
OPEN DIKE FUEL
OIL CONTAINMENT
49,500 GALLON INSULATED,
ABOVEGROUND FUEL OIL
STORAGE TANK, TYPICAL OF 5.
"F
O F
"F
O R
"F
O R
3"FOS
3"FOS
3"FOS
3"FOS
3"FOR
2"FOS
FP-1
2"FOR
ILD
HL
WL
HH
FL
ILD
HL
WL
HH
FL
WL
FL
HL
HH
ILD
WL
FL
HL
HH
ILD
WL
FL
HL
HH
ILD
TO/FROM DEDICATED ELECTRIC FUEL
OIL HEATING SYSTEM (1 SYSTEM PER
TANK), TYPICAL. REFER TO C1/M503.
/4 "F
O R
/4 "F
O S
/4 "F
O R
/4 "F
O R
/4 "F
O R
FUEL OIL OVERFILL PREVENTION
VALVE, TYPICAL.
2" FLANGED DRAIN VALVE WITH
BLIND FLANGE, TYPICAL.
"F
O S
"F
O R
2"FOS
"F
O S
"F
O R
2"FOR
"F
O R
"F
O F
"F
O R
2"FOS
2"FOR
2"FOS
2"FOR
"F
O F
2"FOR
2"FOS
3"FOS
REMOTE FUEL
TANK FILL PORT
TWO-POSITION CONTROL VALVE WITH
POSITION INDICATOR. LOCATE VALVE
WHERE VISIBLE FROM AUTOMATIC
CONTROL PANEL, TYPICAL.
"F
O F
3"FOF
3"FOF
3"FOF
3"FOF
1"SV
ILD
HL
WL
HH
FL
INTERSTITIAL LEAK DETECTOR
WATER LEVEL TRANSMITTER
HIGH LEVEL SWITCH
HIGH-HIGH LEVEL ALARM SWITCH
FLUID LEVEL TRANSMITTER
TANK CONTROLLER LIST
SYMBOL: DESCRIPTION:
AUTOMATIC FUEL
OIL POLISHER.
REFER TO 2/MP-605.
3"FOS
3"FOR
3"FOS
CONCRETE SUPPORT BASE FOR SUPPORTING
FUEL OIL TANKS AND PIPING.
FUEL OIL PIPING THAT CIRCULATES THROUGH FUEL OIL
HEATER CABINET SHALL BE INSULATED BUT NOT HEAT
TRACED, TYPICAL. (REPRESENTED BY DASHED LINES.)
FUEL OIL PIPING THAT DOES NOT CIRCULATE THROUGH FUEL
OIL HEATER CABINETS SHALL BE INSULATED AND HEAT
TRACED, TYPICAL. (REPRESENTED BY DOUBLE-DASHED LINES.)
FOS & FOR PIPING TO ROUTE ACROSS SITE WITHIN SHALLOW PRECAST OR POURED-IN-PLACE CONCRETE TRENCHES WITH REMOVABLE LIDS. REFER TO SECTION 33 63 00 FOR PRECAST TRENCH REQUIREMENTS. REFER TO STRUCTURAL DRAWINGS FOR POURED-IN-PLACE CONCRETE TRENCH REQUIREMENTS. PRECAST TRENCH BUTTS UP AGAINST CONCRETE TANK SUPPORT BASE. PROVIDE EXCAVATION OF SITE MATERIALS AS REQUIRED TO INSTALL PRECAST TRENCH WITH LID FLUSH WITH GRADE. REFER TO F5/M406 FOR PRECAST TRENCH DETAIL.
/4 "F
O R
ROUTE FOS & FOR PIPING ABOVE CONCRETE
CONTAINMENT WALL, BEHIND SCREEN WALL AND INTO
PRECAST CONCRETE TRENCH. NO PIPING SHALL BE
VISIBLE OUTSIDE OF SCREEN WALL. PLACE REMOVABLE
COVERS ON PRECAST TRENCH FOR PIPE CONCEALMENT.
SCREEN WALL INSTALLED
OUTSIDE OF CONTAINMENT
BASIN.
3"FOS
2"FOS
2"FOR
3"FOS
3"FOR
2-1/2"FOS
2-1/2"FOR
EXTEND 2-1/2" FOS&R PIPING
THROUGH WEST SIDE OF
MANHOLE FOR FUTURE
EXTENSION. REFER TO MS201.
MANHOLE LOCATED AT GRADE LEVEL OF
EXISTING BOILER PLANT. REFER TO E6/M302
& E5/M406 FOR ADDITIONAL REQUIREMENTS.
EXISTING BOILER
ROOM FLOOR
TRANSITION SUMP WITH REMOVABLE
COVER AND LEAK DETECTION
MONITORING CABLE.
EXTEND 2-1/2" FOS&R UNINSULATED
PIPING TO CONNECT WITH PIPING
SERVING EXISTING BOILERS.
SEAL WALL PENETRATION
PER F2/M406, TYPICAL.
TRANSITION TO SINGLE WALL PIPE
WITHIN TRANSITION SUMP WITH 1" THICK
INSULATION AND ALUMINUM OR SS
JACKETING.
ALL DIRECT BURIED PIPING SHALL
BE DOUBLE WALL WITH INSULATED
CARRIER PIPE, TYPICAL.
DOUBLE WALL FUEL OIL PIPING SHALL
CONTINUOUSLY SLOPE TO DRAIN AT
LOW POINTS IN TRANSITION SUMPS OR
MANHOLES, TYPICAL.
ALL FUEL OIL PIPING INSTALLED WITHIN PRECAST SHALLOW CONCRETE
TRENCH AND VERTICAL CMU SHAFT SHALL BE DOUBLE WALL WITH
INSULATED CARRIER PIPE. ALL DOUBLE WALL FUEL OIL PIPING SHALL
CONTINUOUSLY SLOPE TO LOW POINTS IN MONITORING SUMPS, TRANSITION
SUMPS, AND MANHOLES WHERE LEAK DETECTION MONITORING IS
INSTALLED. REFER TO SECTION 23 10 00 FOR REQUIREMENTS.
ALL FUEL OIL PIPING WITHIN CONTAINMENT BASIN
SHALL BE SINGLE WALL WITH 1" THICK INSULATION
AND ALUMINUM OR SS JACKETING, TYPICAL.
3/4" NORMALLY CLOSED MANUAL DRAIN
VALVE TO ALLOW FOR SERVICING PIPE
COMPONENTS, TYPICAL.
125 PSI SAFETY
VALVE.
125 PSI SAFETY
VALVE, TYPICAL.
FOR & FOF PIPING LOCATED
ABOVE STRIKER PLATES, TYPICAL.
REFER TO SECTION 23 10 00.
90% & 95% LEVEL
SWITCHES
FUEL LEVEL
TRANSMITTER
WATER LEVEL
TRANSMITTER
ELECTRIC OIL
HEATER
1 1/4"FOR
INSULATED FOS&R PIPING TO/FROM ABOVEGROUND
FUEL OIL STORAGE TANK, TYPICAL OF 5.
1 1/4"FOS
1 1/4"FOR
1 1/4"FOR
DASHED LINES REPRESENT A UL LISTED TYPE 304
STAINLESS STEEL NEMA 4 ENCLOSURE WITH ALL
INTERIOR COMPONENTS FACTORY ASSEMBLED.
/4 "F
O R
FOP-#
(10 GPM)
FOH-#
INDICATORS AND SWITCHES MOUNTED
ON FUEL OIL HEATER PANEL FACE
PANEL LAMPS SHALL BE:
• 18mm LED WITH PUSH-TO-TEST FUNCTION.
• G - GREEN
• R - RED
HIGH
VACUUM
HIGH
PRESSURE
BASIN
LEAK
E-STOP SYSTEM
POWER
PUMP
RUNNING
ALARM
RESET
HAND-OFF-
AUTO
H. O. A.
G G
R R R460V/3Ø
POWER
THERMOSTAT PROVIDE BY OIL
HEATER MANUFACTURER.
INSULATE ALL FUEL OIL PIPING
WITHIN CABINET, TYPICAL.
HEATER
ENERGIZED
G
30"HG-0-
60 PSI
0-100
PSI
COMPRESSED AIRA
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
HIGH-PRESSURE CONDENSATEHPC
HIGH-PRESSURE STEAMHPS
PITCH PIPE IN DIRECTION
DIRECTION OF FLOW IN PIPE
UNION/FLANGE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
BALANCING VALVE (NO. INDICATES GPM)
0.5
CONTROL VALVE (THREE-WAY)
CONTROL VALVE (TWO-WAY)
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE
AND HOSE CONNECTION WITH CAP
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
METER
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT W/ BALL VALVE
DRAIN WITH HOSE CONNECTION, CAP &
BALL VALVE
TEMPERATURE SENSOR WITH WELL
THERMOMETER WITH WELL (FILLED TYPE)
FLOW METER
FLOW DIAGRAM SYMBOLS LIST
SYMBOL: DESCRIPTION:
SOLENOID/TWO POSITION VALVE
AUTOMATIC BALANCING VALVE (NO. INDICATES GPM)
0.5
FUEL OIL FILLFOF
DRAIND
EXTERNAL EMERGENCY VALVE
VACUUM SWITCH
PRESSURE TRANSMITTER
FUEL OIL
POLISHER
CONTROLLER
VACUUM GAUGE ON
SUCTION SIDE OF
PUMP, TYPICAL.
0-160 PSI GAUGE ON
DISCHARGE SIDE OF
PUMP, TYPICAL
FUEL OIL PUMP
(FOP-6)
PRIMARY FINE FILTERS,
TYPICAL OF 2.
SECONDARY FINE FILTERS,
TYPICAL OF 2.
MAGNETIC
CONDITIONER
COALESCING WATER
SEPARATOR
AUTOMATIC WATER
DRAIN OUTLET.
2" OUTLET TO
FUEL OIL TANKS
FLOW METER
PRESSURE TRANSDUCER,
TYPICAL.
VACUUM
SWITCH
HIGH
VACUUM
R
INDICATORS AND SWITCHES MOUNTED
ON FUEL OIL POLISHER PANEL FACE
R R R R
GG
HIGH
PRESSURE
LOW
FLOW
BASIN
LEAK
HIGH
WATER
PUMP
RUNNING
SYSTEM
POWER
ALARM
RESET
E-STOP HAND-OFF-
AUTO
H. A.O.
PANEL LAMPS SHALL BE:
• 18mm LED WITH PUSH-TO-TEST FUNCTION.
• G - GREEN
• R - RED
2" FOS FROM
FUEL OIL TANKS
30"HG-0-
60 PSI
30"HG-0-
60 PSI
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #22000669.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
READY TO ADVERTISE
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANT
7 8 9 10
US Army Corps of Engineers ®
CONSTRUCTION AGENT
321 4 5 6
A u to d e s k D o c s /0
-1
-0
P h a s e
A
/6
-0
V
A W
H B
L D
G -1
M P
.r v t
/2 /2
:4
:2
P
M
M503
MECHANICAL DIAGRAMS
New England District
CHILLED WATER PLANT
REPLACEMENT AND SITE UTILITY
IMPROVEMENTS PHASE A2
950 CAMPBELL AVENUE
WEST HAVEN, CT 06516
689-040
2026-07-31 RUSARN BHAACH
NO SCALEF5 TANK YARD FUEL OIL PIPING FLOW DIAGRAM
NO SCALEC1 ELECTRIC OIL HEATER FLOW DIAGRAM
NO SCALEE2 FUEL OIL POLISHER
Revisions: Date:
BIDDING RFIS 09/23/2026
File details come from the government source that posted it. Updated .