Amendment 0004 - VA Hospital New Customer Load Report - 7_28_26.pdf
PDF 2 MB Posted
- Attached to
- Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
- Solicitation number
- W912WJ26RA008
About this file
This is a New Customer Load Report prepared by The United Illuminating Company (UI) for the VA Hospital in West Haven, Connecticut, analyzing electrical infrastructure upgrades required to support the hospital's expansion project.
The VA Hospital is adding approximately 3.5 MW of new electrical demand through two construction projects: a new surgical and clinical tower (2.3 MW connected load) and upgraded boiler and chiller plant facilities (1.2 MW connected load). The hospital's existing demand is 5 MW, bringing the total to approximately 8.5 MW, which equates to 7.92 MW (327 Amps) after applying a 90% diversification factor for capacity planning. The new loads will be supplied through Elmwest Substation Feeders 626 and 627 at 13.8 kV. The analysis reveals that Circuit 626 currently has only 85 Amps of available capacity under normal conditions (391 Amps rating with 267 Amps peak load), creating a capacity deficiency of 53 Amps when the new load is added. The report evaluates five primary options plus variations to accommodate the new load while meeting the customer's resiliency requirements for circuit separation and alternate substation supplies. Option 4B is recommended as the most feasible approach, involving offloading Circuit 626 to Circuit 623, establishing Circuit 1433 from Allings Crossing Substation as the backup source via overhead wire, performing cable upgrades to Circuit 632 (upgrading 850 feet from 500 PL/EPR to 750 EPR), and load balancing at pole 1382 on Derby Turnpike. Option 5, burying Circuit 626 as underground cable along West Spring Street, is recommended as a supplementary enhancement to meet federal resiliency requirements. Total upgrade costs for Option 4B are estimated at $417.2K (UI) and $256K (customer), with Option 4B plus Option 5 totaling $1.332M (UI) and $1.170.8M (customer). The Elmwest Substation, rated at 92 MVA, has sufficient capacity to accommodate the new load addition. Voltage analysis confirms no violations will occur after implementation. The study is valid for six months and may require revision due to system changes or company policy updates.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The United Illuminating Company 100 Marsh Hill Road
Orange, CT 06477
DISTRIBUTION PLANNING
Prepared By: T. Testone
Revisited By: M. Rouholamini 07/28/2026
VA Hospital 1 West Spring St, West Haven
New Customer Load Report
07/028/2026
VA Hospital, West Haven New Customer Load Report
Table of Contents
Background Feeder Loading Analysis – Existing Conditions (See Appendix 3 for One-line diagrams)4 Evaluating various options (See Appendix 3 for one-line diagrams) Substation Loading Analysis Voltage Change Analysis Protection Analysis Customer Threshold Analysis Assumptions Conclusion Appendix 1: Customer Load Form (New Surgical and Clinical Tower) Appendix 1: Customer Load Form Cont’d. (Boiler and Chiller Upgrades) Appendix 2: Elmwest Substation One-line Appendix 3: VA Hospital Customer One-line Appendix 4: Elmwest Substation Area One-lines for VA Hospital Study Appendix 5: Upgrade Summary
Background
The US Department of Veterans Affairs West Haven Medical Center (“VA Hospital”) is adding a new surgical tower and will be upgrading boiler and chiller plant facilities at 1 West Spring Street, West Haven adding additional commercial space to this property. The customer is requesting to add this new load to the UI distribution system through the same 13.8 kV distribution feeders that are currently supplying the VA Hospital facilities. These feeders are Elmwest Substation Feeders 626 and 627. In addition, the customer is requesting load study considering campus electrical service alterations so that one UI circuit is from a different substation, relocation of one of the existing service feeders off campus with 50 feet of separation between feeders while maintaining the same Vista switch terminations, and to consider burying feeder 626 along West Spring Street so it is underground for its entire run and is not co-located on a utility pole with the alternate hospital supply. This project will be located on West Spring Street between Stevens Avenue and Campbell as shown in Figure 1.
The two new customer construction projects will be connected to the existing utility service at CHP plant. One is for the new surgical tower approximately 2.3 MW connected load and the other is for new boiler and chiller plants with 1.2 MW connected load. The customer’s existing demand is assumed to be 5 MW, and the highest peak during past three years was around 4.4 MW (189 Amp) since temporary generation was operating. The total new demand is 8.5 MW, which after applying a diversifying factor of 90% brings about a new total load around 7.92 MW (327 Amp) for capacity planning purposes by UI.
Figure 1: Customer Location
Feeder Loading Analysis – Existing Conditions (See Appendix 3 for One-line diagrams)
First UI inspected if it would be possible to supply the new load via circuits 626 and 627 of Elmwest Substation, which are also supplying the existing load. In this case, circuit 626 will be the normal supply and 627 will be the backup supply. Both circuits 626 and 627 operate normally closed at the Vista switch (under UI’s control), followed by the customer’s switchgear with the incoming circuit breaker 52- L1 normally closed for Circuit 626 and circuit breaker 52-L2 normally opened for Circuit 627 and customer bus tie normally closed (See appendix 3 one-line). For the loss of service to either one of the circuits, the remaining circuit will continue to be in service.
The previous three-year peak load on circuit 626 was 267 Amp at 13.8 kV and the normal rating for this circuit is 391 Amps at 13.8 kV. The table below summarizes the peak load, rating, and remaining capacity for this feeder. The available capacity is calculated after applying a 90% threshold to the normal rating.
Table 1: Existing conditions of Circuit 626
Loading (Amps)
Feeder Normal Contingency Peak Load Normal Available Capacity (Amps) *
626 391 521 267 85
* Per Avangrid Distribution Planning Criteria, the thermal loading of the wire and cable portions of a circuit should not exceed the ratings as documented in UI’s Distribution Engineering Guide (DEG) 10.3 under normal conditions.
Table 2 summarizes the peak load, rating and remaining contingency capacity for circuits 623, 625 and 627, which are the backups to circuit 626. If circuit 626 faults, the VA Hospital (327 Amps) is automatically thrown over to Circuit 627 at hospital switchgear while the Campbell Avenue overhead load (83 Amps) is manually shifted to either circuit 623 or 625.
Table 2: Available emergency capacity on Circuits 623, 625, and 627
Rating (Amps) Loading (Amps)
Feeder Normal Contingency Peak Load Queued Load Available Contingency Capacity
623 391 521 108 5 408
625 487 599 113 0 486
627 487 599 370 5 224
Evaluating various options (See Appendix 3 for one-line diagrams)
Circuit 626 loading table shows that the circuit cannot accommodate an additional 138 Amps of new load at 13.8 kV before the feeder reaches its rating. After the new customer load addition, circuit 626 will have a total projected load of 396 Amps at 13.8 kV with a capacity deficiency of 36 Amps.
Table 3: Available normal capacity on Circuits 626 for the new load
Rating (Amps) Loading (Amps)
Feeder Normal Contingency Peak Load VA Hospital New Load
Total Projected
Load
Projected Available Capacity*
626 391 521 267 138 405 -53
* This ignores UI’s Distribution Planning practice to maintain a circuit’s peak load at or less than 90% of its normal rating to allow for background load growth.
Table 4 summarizes the peak load, rating and remaining contingency capacity for circuits 623, 625 and 627, which are the backups to circuit 626. If circuit 626 faults, the VA Hospital (327 Amps) is automatically thrown over to circuit 627 at hospital switchgear while the Campbell Avenue overhead load (83 Amps) is manually shifted to either circuit 623 or 625. The 138 Amp new load increase at hospital results in circuit 627 having a 103 Amp contingency capacity deficiency.
Table 4: Available emergency capacity on Circuits 623, 625, and 627
Rating (Amps) Loading (Amps)
Feeder Normal Contingency Peak Load Queued Load
Projected Available Contingency Capacity
623 391 521 108 5 408
625 487 599 113 0 486
627 487 599 370 5 224
The following options have been developed to increase available capacity of circuit 626 so there is enough capacity to supply the proposed load increase of 138 Amps as well as increase available capacity on the hospital backup circuit for contingency coverage. The customer has also requested additional options be included to help the hospital in meeting or exceeding specific resiliency requirements regarding circuit separation and having separate substation supplies. As stipulated in the conclusion section, any option other than 4B must be further studied by Distribution Planning should the customer opt out of Option 4B.
Option 1
It is recommended to shift circuit 626 Campbell Avenue overhead distribution load (83 Amps) to circuit 625, thus making the normal feeder to hospital express. It is recommended to reconfigure circuits so that the hospital backup source is from circuit 623 overhead on West Spring Road by installing one span of 3-397 AL wire on West Spring Street between pole 5931 and pole 5932 extending circuit 623 and installing riser air-break switch and terminators on pole 5932 replacing 627 source with 623 for the hospital and eliminate circuit 627 aerial cable and aerial Y-splice. In this option, circuits 626 and 623 will be from two different buses at Elmwest Substation. The overhead portion of circuit 626 can be shifted to circuit 625 by closing air-break switch on pole 5302 Dana Street and opening riser air-break switch on pole 4448 on Campbell Ave. Circuit 626 riser air-break switch and underground cable back to SC 1068 (Y-splice) should be removed to eliminate unnecessary mainline exposure. However, this option will not meet the requirement of having the back-up feeder from a different substation, and therefore, is abandoned.
Option 2
In this option, it is recommended to shift circuit 626 Campbell Avenue overhead distribution load (83 Amps) to circuit 623 and thus making the normal feeder to hospital express. It is recommended to reconfigure circuits so that the hospital backup source is from circuit 625 by breaking down circuit 627 aerial Y-splice and making up aerial Y-splice on Campbell Avenue with circuit 625, thus replacing backup to the hospital. It would also be necessary to swap feeder 625 and 632 feeder positions at Elmwest Substation to have both hospital normal and backup sources on separate buses. The overhead portion of circuit 626 can be shifted by closing air-break switch on pole 1727 Campbell Ave and opening riser air-break switch on pole 4448 Campbell Ave. Circuit 626 riser air-break switch and underground cable back to SC 1068 (Y-splice) should be removed to eliminate unnecessary mainline exposure. However, similar to Option 1, this option will not meet the requirement of having the back-up feeder from a different substation, and therefore, is abandoned.
Option 3
Like option 2 it is recommended to shift circuit 626 Campbell Avenue overhead distribution load (83 Amps) to circuit 623 thus making the normal feeder to the hospital an express feed. It is recommended to reconfigure circuits so that the hospital backup source is from circuit 632 by installing 5,300 ft. of 500
AL preassembled aerial cable on West Spring Street between Meloy Road pole 2597 (Y-splicing new cable with Circuit 632) and pole 5931 West Spring Street and tying into circuit 627 aerial cable to the hospital. This option provides fifty-foot aerial clearance between hospital feeders although these feeders would still share common underground duct-line just outside Elmwest substation. Circuit 626 riser air-break switch and underground cable back to SC 1068 (Y-splice) should be removed to eliminate unnecessary mainline exposure. However, the numerical results for this option are skipped because after considering pole guying/loading and existing field conditions it was determined by Distribution Engineering that this option is not feasible to construct.
Option 3B
Like option 2 it is recommended to shift circuit 626 Campbell Avenue overhead distribution load (83 Amps) to circuit 623 thus making the normal feeder to hospital express. It is recommended to reconfigure circuits so that the hospital backup source is from circuit 632 by installing air-break switch on Meloy Road south of West Spring Street on a new pole between P2597 and P1176 and closing tie recloser pole 5508 on Meloy Road and opening newly installed air-break switch on Meloy Road transferring (15 Amps) from circuit 633 to circuit 632. Then by installing air-break switch on West Spring Street just west of Campbell Ave on pole 5968 and closing tie air-break switch on West Spring Street pole 2638 and opening new air-break pole 5968 transferring 98 Amps of circuit 623 to circuit
632. It is then recommended to extend circuit 632 overhead on West Spring Road by installing one span of 3-397 AL wire on West Spring Street between pole 5931 and pole 5932 and installing riser air-break switch and terminators on pole 5932 replacing 627 source with 632 for the hospital and eliminate circuit 627 aerial cable and aerial Y-splice. This option provides greater than fifty-foot aerial clearance between hospital feeders, but these feeders would still share common underground duct-line just outside Elmwest substation. Hospital feeders would be on alternate buses for future bus splitting project. Circuit 626 riser air-break switch and underground cable back to SC 1068 (Y-splice) should be removed to eliminate unnecessary mainline exposure. This option will be used as a constituent to Option 4B, which will be discussed later on.
Option 4
Like option 2 it is recommended to shift circuit 626 Campbell Avenue overhead distribution load (83 Amps) to circuit 623 thus making the normal feeder to the hospital express. It is then recommended to reconfigure circuits so that the hospital backup source is from Allings Crossing Circuit 1433. Like option 3 by installing 5,300 ft. of 500 AL preassembled aerial cable on West Spring Street between Meloy Road near pole 2597 (Y-splicing new cable with Circuit 1433) and pole 5931 West Spring Street and tying into Circuit 627 aerial cable to the hospital.
It is then necessary to cut and swap circuit 632 and circuit 1433 aerial cables on Meloy Road c/o Sawmill Road pole 5748 or between West Spring Street and pole 5045 (existing circuit 632 riser) to facilitate hospital having alternate substation utility source. This option also provides greater than fifty-foot aerial and underground clearances between hospital feeders. Circuit 626 riser air-break switch and underground cable back to SC 1068 (Y-splice) should be removed to eliminate unnecessary mainline exposure. However, the numerical results for this option are skipped since this option is a slight variation of option 3, which was determined by Distribution Engineering to be infeasible to construct.
Option 4B
Like option 2 it is recommended to shift circuit 626 Campbell Avenue overhead distribution load (83 Amps) to circuit 623 thus making the normal feeder to the hospital express. It is then recommended to reconfigure circuits so that the hospital backup source is from circuit 1433 off Allings Crossing substation. Option 4B recommends implementing option 3B then cutting and swapping circuit 632 and circuit 1433 aerial cables on Meloy Road c/o Sawmill Road pole 5748 or between West Spring Street and pole 5045 (existing circuit 632 riser) to facilitate hospital having alternate substation utility source.
This option also provides greater than fifty-foot underground clearance between hospital feeders but leaves 275 ft of aerial exposure that can be eliminated by completing Option 5. Circuit 626 riser air-break switch and underground cable back to SC 1068 (Y-splice) should be removed to eliminate unnecessary mainline exposure. Due to the adverse thermal impact of the new load on neighboring underground cables, the thermal ratings of affected circuits must be re-calculated, which have been shown in Table 5 for the main circuit (Circuit 626) and Circuit 632. As seen from the table, there will be significant capacity deficiency on Circuit 632 once VA Hospital’s new load is in service and hospital alternate source is swapped.
Table 5: Before and after conditions for Circuits 626 and 632
Before New Load Added After New Load Added
Circuit Normal Rating (Amps)
Emergency Rating (Amps)
Peak Load
(A)
Normal Rating (Amps)
Emergency Rating (Amps)
New Peak
Load (A)
Queued Load
(A)
New Peak Load Plus
Queued (A)
Remaining Normal
Capacity (A)
626 391 521 267 364 521 327 0 327 1 632 391 521 68 329 498 305 84 385 -89
To mitigate the aforesaid capacity deficiency, the three underground segments from SC68 to SC71 on Circuit 632, as shown in Figure 2, must be upgraded from 500 PL/EPR to 750 EPR (approximately 850 ft). Having done so, the conditions for Circuit 632 will change as shown in Table 6. It is noted that this cable upgrade will not improve the ratings of any circuits other than Circuit 632 itself.
Figure 2: Circuit 632 underground segments for upgrade
Table 6: Conditions for Circuits 632 before and after the cable upgrade
After New Load Added & Before Upgrade to 750 EPR
After New Load Added & After Upgrade to 750 EPR
Circuit Normal Rating (Amps)
Emergency Rating (Amps)
Normal Rating (Amps)
Emergency Rating (Amps)
Peak Load (A)
Remaining Normal
Capacity (A)
632 329 498 429 599 385 1
During contingency conditions (when circuit 626 fails), the VA Hospital (327 Amps) would automatically be thrown over to Circuit 1433 at the hospital switchgear and the addition of 138 Amps of new customer load will not have any adverse effects on contingency scenario as shown in table below.
Table 7: Available emergency capacity on Circuit 1433 after Option 4B implemented
Rating (Amps) Loading (Amps)
Feeder Normal Contingency Peak Load
(Before Option 4B)
Peak Load (Option 4B
Implemented) Queued Load
Available Contingency
Capacity (Amps)
1433 429 599 305 189 0 410
Voltage analysis in CYME has revealed that swapping circuit 632 and circuit 1433 aerial cables would cause the voltage of customers along Beechwood Rd, Indian Hill Rd, Tall Timber Rd, and N Lakeview Dr to drift out of allowed range. However, the voltage issue is addressed if some of those customers are transferred from phase C to phase B. Therefore, as part of Option 4B, it is needed to perform load balancing at pole #1382 (located on Derby Turnpike) by moving the single-phase network downstream of that pole (#1382) from phase C to phase B (Road Phase to Middle Phase), as indicated in Figure 3.
Figure 3: Load balancing at pole #1382 on Derby Turnpike
Option 5 Note this option is not a standalone option to resolve capacity issue. This option recommends extending the existing underground electric duct-line facilities by approximately 350 ft. onto West Spring Street from Campbell Avenue to Vista switch riser conduits to replace circuit 626 aerial cable to the hospital with 3-500 Cu EPR underground cable in splicing chamber and duct-line system and remove all circuit 626 aerial cable and both underground cable risers.
Note there will still be one tie point remaining on circuit 626 with circuit 631. This option is a supplementary option to be combined with options 1, 2, and 4B to help the hospital with meeting or exceeding federal resiliency requirements. This option does not affect the normal or contingency circuit ratings for this area.
Substation Loading Analysis
As mentioned before, the primary circuit for this new load is supplied by Elmwest Substation. The rating for Elmwest Substation is 92 MVA. Due to all the reconfigurations suggested in Option 4B, there will be around 2.5 MW new load transferred from Allings Crossing substation to Elmwest substation. The figure below shows the 10-year forecasted load versus the rating for Elmwest Substation, including the proposed 3.5 MW load addition for VA Hospital. The new customer load is assumed to go online for the 2027 peak. The load forecast depicted in Figure 2 below represents a normalized extreme weather scenario (90/10), which is only expected to occur once every ten years. As can be seen from the figure below, Elmwest Substation has enough capacity to supply this load increase even when considering an extreme weather forecast scenario.
Figure 4: Elmwest Substation 10-Year 90/10 Load versus Rating
Voltage Change Analysis
In this section the voltage profiles of the circuits reconfigured to accommodate the new load are displayed under both initial and final conditions. As seen from Figures 5 to 14, there won’t exist any voltage violation after Option 4B is implemented. It is notable that all the voltage values located below the lower threshold bar (117V) are secondary nodes, and thus, the primary voltage bound (117V to 126V) does not apply to them.
Figure 5: The voltage profile of circuit 623 in existing configuration
Figure 6: The voltage profile of circuit 626 in existing configuration
Figure 7: The voltage profile of circuit 632 in existing configuration
Figure 8: The voltage profile of circuit 633 in existing configuration
Figure 9: The voltage profile of circuit 1433 in existing configuration
Figure 10: The voltage profile of circuit 623 after Option 4B implemented
Figure 11: The voltage profile of circuit 626 after Option 4B implemented
Figure 12: The voltage profile of circuit 632 after Option 4B implemented
Figure 13: The voltage profile of circuit 633 after Option 4B implemented
Figure 14: The voltage profile of circuit 1433 after Option 4B implemented
Protection Analysis
The load addition may impact the circuit overcurrent protection settings. Protection & Control’s review and verification is required for the existing reclosers, and circuit breakers.
Customer Threshold Analysis
To reduce or maintain SAIFI across the system, circuits shall not have customer counts greater than 2,500. The customer load addition does not include adding additional meters to serve the new load.
Also, customer count on all the circuits involved in the project shows that neither of the options will compromise the customer threshold. Table 1 lists the number of customers for circuits that are reconfigured in Option 4B.
Table 8: Customer count for circuits impacted in Option 4B
Circuit Substation Existing number of customers
Number of customers after Option 4B executed
623 Elmwest 1030 1143 626 Elmwest 1134 1 (dedicated) 632 Elmwest 410 1911 633 Elmwest 1452 1273
1433 Allings Crossing 1911 1609
Assumptions
Previous year peak loads were used for the loading analysis. The duct-line rating analysis was updated for Elmwest Substation and subsequently the circuit ratings changed. As such, the new ratings were used for this analysis. This study does not include any customer’s Distributed Generation (DG) application. Any DG application would require a separate study request.
Conclusion
The analysis shows that the new hospital load addition of 3.5 MW on Elmwest substation is feasible provided the load is supplied via Option 4B so that the new load will not adversely affect the circuit’s voltage performance or thermal rating, and the decrease in ratings of other circuits in the same duct bank system is mitigated. Furthermore, the substation will not approach its firm rating of 92 MVA with this new customer load addition. It is noted that Options 3 and 4 have been deemed non-constructable and Options 1 and 2 do not meet the requirement of having the back-up feeder from a different substation. Implementing option 4B and option 5 provides alternate substation supplies for the hospital and therefore is the recommended approach for supplying power to the new load. This study and associated analyses are valid for six (6) months and may need to be reviewed and revised due to, but not limited to, changes in UI system changes, customer load additions, or changes to UI company policies. A summary of the upgrades considered to enable new load addition are in appendix 5. As noted in UI Guidebook of Requirements for Electric Service; when the estimated expenditures of the company to provide service to a customer’s premises exceed the estimated income to be derived from that service, additional payments by the customer may be required. The company may require the customer to pay, in advance, the estimated cost difference to provide such service or to guarantee a minimum annual payment for a term of years as stated in UI’s Terms and Conditions (CPUCA No. 647, Item 4).
Appendix 1: Customer Load Form (New Surgical and Clinical Tower)
Appendix 1: Customer Load Form Cont’d. (Boiler and Chiller Upgrades)
Appendix 2: Elmwest Substation One-line
Existing
Proposed (Preliminary design for split bus project)
Appendix 3: VA Hospital Customer One-line
Appendix 4: Elmwest Substation Area One-lines for VA Hospital Study
Derby Ave
Front Ave
Boston Post Rd
R
Spring St
Terrace Ave
VA
Hospital
W Spring St
M eloy R d
R
R
R
Cir. 1907R R
R
Cir. 1531
R
R
ElmwestCir. 1440
Cir. 1431
P5045
P5508
P1180
P2638
P6078
P1176
P1727
P4448
P5968
Allings Crossing
R
Cir. 1441
Cir. 1431
Derby Ave
R R
Russell Ave
Cir. 1531
Richard St
R
P2961
P2309
P787
P1088
P132 P108
P94 P69
P954
P839P882
P2288
P5497
P2400
P1218 P1191
P3532 P2185
P1376
P6111 P2617
P947
P3858
P1048
P3066 P141
P1821
P5298
P985 P1039
P1031
P5190 P5766P5302
P803
P5954
P3156
P4681 P1732
P1729
P1754
P803
P1760
P3144
P1194
P1160 P3223
P4264
P4678 P5282
Cir. 631
P5874
P1791
P182 Cir. 631
Cir. 644
Cir. 644
Cir. 622
SC
SC
SC 70
SC 71
SC 1064
SC 1065
SC 1066
SC 1067
SC 1068
SC 1069
P5317
Elmwest Substation Area
13.8 kV Feeders Existing
Rev: 1
Dana St.
P5748
P2597
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Derby Ave
Front Ave
Boston Post Rd
R
Spring St
Terrace Ave
VA
Hospital
W Spring St
M eloy R d R
R
R
Cir. 1907R R
R
Cir. 1531
R
R
ElmwestCir. 1440
Cir. 1431
P5045
P5508
P1180
P2638
P6078
P1176
P1727
P4448
P5968
Allings Crossing
R
Cir. 1441
Cir. 1431
Derby Ave
R R
Russell Ave
Cir. 1531
Richard St
R
P2961
P2309
P787
P1088
P132 P108
P94 P69
P954
P839P882
P2288
P5497
P2400
P1218 P1191
P3532 P2185
P1376
P6111 P2617
P947
P3858
P1048
P3066 P141
P1821
P5298
P985 P1039
P1031
P5190 P5766P5302
P803
P5954
P3156
P4681 P1732
P1729
P1754
P803
P1760
P1194
P1160 P3223
P4264
P4678 P5282
Cir. 631
P3144
P5874
P1791
P182 Cir. 631
Cir. 644
Cir. 622
SC
SC
SC 70
SC 71
SC 1064
SC 1065
SC 1066
SC 1067
SC 1068
SC 1069
P5317
Elmwest Substation Area
13.8 kV Feeders Option 1
Rev: 1
Dana St.
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Derby Ave
Front Ave
Boston Post Rd
R
Spring St
Terrace Ave
VA
Hospital
W Spring St
M eloy R d R
R
R
Cir. 1907R R
R
Cir. 1531
R
R
ElmwestCir. 1440
Cir. 1431
P5045
P5508
P1180
P2638
P6078
P1176
P1727
P4448
P5968
Allings Crossing
R
Cir. 1441
Cir. 1431
Derby Ave
R R
Russell Ave
Cir. 1531
Richard St
R
P2961
P2309
P787
P1088
P132 P108
P94 P69
P954
P839P882
P2288
P5497
P2400
P1218 P1191
P3532 P2185
P1376
P6111 P2617
P947
P3858
P1048
P3066 P141
P1821
P5298
P985 P1039
P1031
P5190 P5766P5302
P803
P5954
P3156
P4681 P1732
P1729
P1754
P803 P1194
P1160 P3223
P4264
P4678 P5282
624P1760
P3144
Cir. 631
P5874
P1791
P182 Cir. 631
Cir. 644
Cir. 644
Cir. 622
SC
SC
SC 70
SC 71
SC 1064
SC 1065
SC 1066
SC 1067
SC 1068
SC 1069
P5317
Elmwest Substation Area
13.8 kV Feeders Option 2
Rev: 1
Dana St.
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Derby Ave
Front Ave
Boston Post Rd
R
Spring St
Terrace Ave
W Spring St
M eloy R d
R
R
Cir. 1907R R
R
Cir. 1531
R
R
ElmwestCir. 1440
Cir. 1431
P5045
P5508
P1180
P2638
P6078
P1176
P1727
P4448
P5968
R
Cir. 1441
Cir. 1431
Allings Crossing
Derby Ave
R R
Russell Ave
Cir. 1531
R
Richard St
R
P2961
P2309
P787
P1088
P132 P108
P94 P69
P954
P839P882
P2288
P5497
P2400
P1218 P1191
P3532 P2185
P1376
P6111 P2617
P947
P3858
P1048
P3066 P141
P1821
P5298
P985 P1039
P1031
P5190 P5766P5302
P803
P5954
P3156
P4681 P1732
P1729
P1754
P803
P1760
VA
Hospital
Cir. 631
P3144
P5874
P1791
P182 Cir. 631
Cir. 644
Cir. 622
SC
SC
SC 70
SC 71
SC 1064
SC 1065
SC 1066
SC 1067
SC 1068
SC 1069
P5317
Elmwest Substation Area
13.8 kV Feeders Option 3
Rev: 1
Dana St.
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Derby Ave
Front Ave
Boston Post Rd
R
Spring St
Terrace Ave
W Spring St
M eloy R d
R
R
Cir. 1907R R
R
Cir. 1531
R
ElmwestCir. 1440
Cir. 1431
P5045
P5508
P1180
P2638
P6078
P1176
P1727
P4448
P5968
R
Cir. 1441
Cir. 1431
Allings Crossing
Derby Ave
R R
Russell Ave
Cir. 1531
R
Richard St
R
P2961
P2309
P787
P1088
P132 P108
P94 P69
P954
P839P882
P2288
P5497
P2400
P1218 P1191
P3532 P2185
P1376
P6111 P2617
P947
P3858
P1048
P3066 P141
P1821
P5298
P985 P1039
P1031
P5190 P5766P5302
P803
P5954
P3156
P4681 P1732
P1729
P1754
P803
P1760
VA
Hospital
Cir. 631
P3144
P5874
P1791
P182 Cir. 631
Cir. 644
Cir. 622
SC
SC
SC 70
SC 71
SC 1064
SC 1065
SC 1066
SC 1067
SC 1068
SC 1069
P5317
Elmwest Substation Area
13.8 kV Feeders Option 4
Rev: 1
Dana St.
R P5748
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Appendix 4: Elmwest Substation Area One lines for VA Hospital Study Cont’d.
Derby Ave
Front Ave
Boston Post Rd
R
Spring St
Terrace Ave
VA
Hospital
W Spring St
M eloy R d
R
R
R
Cir. 1907R R
R
Cir. 1531
R
R
ElmwestCir. 1440
Cir. 1431
P5045
P5508
P1180
P2638
P6078
P1176
P1727
P4448
P5968
Allings Crossing
R
Cir. 1441
Cir. 1431
Derby Ave
R R
Russell Ave
Cir. 1531
Richard St
R
P2961
P2309
P787
P1088
P132 P108
P94 P69
P954
P839P882
P2288
P5497
P2400
P1218 P1191
P3532 P2185
P1376
P6111 P2617
P947
P3858
P1048
P3066 P141
P1821
P5298
P985 P1039
P1031
P5190 P5766P5302
P803
P5954
P3156
P4681 P1732
P1729
P1754
P803
P1760
P3144
P1194
P1160 P3223
P4264
P4678 P5282
Cir. 631
P5874
P1791
P182 Cir. 631
Cir. 644
Cir. 644
Cir. 622
SC
SC
SC 70
SC 71
SC 1064
SC 1065
SC 1066
SC 1067
SC 1068
SC 1069
P5317
Elmwest Substation Area
13.8 kV Feeders Option 5
Rev: 1
Dana St.
07/02/2026
Appendix 5: Upgrade Summary
VA Hospital New Load Option Summary Different Substation Sources
Ckts < 50 ft. apart (ft) Upgrade
Cost Customer
Cost
BuildableOption Description OH UG
OH +
UG
($ K) ($ K)
Adding new load to existing Ckt configuration without any upgrades NO 2,375 610 2,985 NA NA NO
Offload Ckt 626 to Ckt 625 & make Ckt 623 alternative source via O.W. NO 275 2,297 2,572 214.3 53.1 YES
Offload Ckt 626 to Ckt 623 & make Ckt 625 alternative source via A. Cable NO 275 610 885
176.7 15.5
YES
Offload Ckt 626 to Ckt 623 & make Ckt 632 alternative source via A. Cable NO 0 610 610
879.4 718.2
NO
3B Offload Ckt 626 to Ckt 623 & make Ckt 632 alternative source via O.W. NO 275 610 885 161.2 0 * YES
Offload Ckt 626 to Ckt 623 & make Ckt 1433 alternative source via A. Cable YES 0 0 0
839.6 678.4
NO
4B Offload Ckt 626 to Ckt 623 & make Ckt 1433 alternative source via O.W. YES 275 0 275 417.2 256 YES
5 Underground Ckt 626 aerial cable NO 0 NA NA 914.8 914.8 YES
4B+5 1,332 1,170.8 * 275’ values marked in red drop to zero if Option 5 is completed Assuming upgrades are completed in 2027, * - customer cost subject to minimum bill calculation for service upgrade
Upgrade costs include overheads, CIAC, & 25 % contingency, but do not include environmental remediation or ledge removal costs
File details come from the government source that posted it. Updated .