This is a mechanical piping design drawing for a federal construction project at a Veterans Affairs facility. The drawing depicts Building 1 sub-ground level piping for Option Bid 0005 of the Chilled Water Plant Replacement and Site Utility Improvements Phase A2 project located at 950 Campbell Avenue, West Haven, CT 06516. The project is under the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with the New England District of the U.S. Army Corps of Engineers serving as the construction agent.
The scope of work shown includes installation of new steam pressure reducing valve (PRV) stations configured in 1/3 and 2/3 ratios to match existing equipment loads (9,600 lbs/hr at 60 psi inlet/15 psi outlet for the primary station and 1,500 lbs/hr at 60 psi inlet/8 psi outlet for secondary station), routing of chilled water lines approximately 6 inches above finish floor, routing of steam, condensate, and chilled water piping through the building with multiple pipe sizes ranging from 2 inches to 20 inches in diameter, installation of double gate valves with globe valve bypass for steam and condensate piping, and piping anchoring to existing concrete structures. Sheet notes specify that all work is part of Option Bid 0005, system tie-in work must be coordinated with the owner during off-season periods, chilled water work shall occur during winter months, and steam/condensate work shall occur during summer months. The drawing was issued July 31, 2026, marked as "Ready to Advertise," and fully sprinklered. Bidding RFIs were dated September 23, 2026.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T T
6 7 9 13 14 18 21 22 24 30 33 38
AA
BB
CC
DD
EE
EE'
FF
GG
HH
JJ
CC'
"C
H S
"C
H R
"P
C
PROVIDE NEW STEAM PRV STATION TO THIS LOCATION TO
ALLOW FOR PATH OF NEW STEAM, CONDENSATE, AND
CHILLED WATER LINES THROUGH BUILDING 1. NEW UNIT
TO BE IN 1/3 AND 2/3 CONFIGURATION AND MATCH
EXISTING EQUIPMENT LOAD OF 9,600 LBS/HR, 60PSI INLET,
15 PSI OUTLET.
PROVIDE NEW STEAM
PRESSURE REDUCING
STATION IN 1/3 AND 2/3
CONFIGURATION. MATCH
EXISTING EQUIPMENT
LOAD OF 1500 LBS/HR,
60PSI INLET, 8 PSI
OUTLET.
10"CHR
CHS, CHR AND LPS
PIPES FROM BLDG-6.
3" LPS SERVES
BUILDING 5
3"LPS
"H
P S
"P
C
"H
P S
10" LPS DN
8" MPS DN
10" LPS DN
REFER TO MS-201 SHEET MECHANICAL
SITE PLAN FOR CONTINUATION.
PENETRATIONS SHALL BE SEALED
WITH MODULAR OR LINK RUBBER SEAL
OR AS RECOMMENDED PER DIRECT
BURIED PIPING MANUFACTURER.
(TYPICAL)
"H
P S
"P
C
10"CHR
3"LPS
16"CHS
6"MPS
3"HPC
3"HPC
4"LPS
10"LPS
4"MPS
8"MPS
"M
P S
4"HWS
4"HWR
8"SV
8"SV
4"SV
4"MPS
2"LPC
4"MPS
8"SV
"S
V
6"MPS
2"MPS
4"MPS
6"MPS8"SV
6"MPS
6"MPS
3"HPC
CAP FOR FUTURE CONNECTION TO
SURGICAL TOWER PIPING SYSTEM.
CONNECT TO EXISTING PIPING AT THIS
LOCATION. PROVIDE DOUBLE VALVES
ON STEAM MAIN AS INDICATED.
ROUTE CHILLED WATER LINES
APPROXIMATELY 6" ABOVE FINISH
FLOOR ALONG PATH INDICATED.
ANCHOR PIPING TO EXISTING
CONCRETE STRUCTURE AT THIS
LOCATION. REFER TO F8/M404 FOR
ANCHOR DETAIL.
PIPE GUIDE
PIPE GUIDE
PIPE GUIDE
2"MPS
20"CHS
20"CHR
6"MPS
6"LPS
6"MPS
2" MPS
RELIEF VENT
PRV-2E
6"HPS
5"MPS
PRV-1E
10"MPS (MANIFOLD)
PRV-6E
2"MPS
01-PRV-2
01-PRV-1
5"LPS UP
2 1/2"PC
6"HPS
5"MPS
4"MPS
12"MPS
6"SV
12"MPS 10"SV RISER UP
PRV-E
HPS
HWR
HWS
8"SV
10"MPS
5"MPS
5"MPS
5"MPS
4"LPS
2"LPC
C9
01-MP101
5"LPS
5"LPS
10"SV 8"SV
20"CHR
6"PC
20"CHS
14"HPS
6"CHS
6"CHR
6"MPS
"H
P S
"P
C
"C
H S
"C
H R
6"SV
6"HPS
6"PC
14"HPS
6"CHR
6"CHS
4"HWS
4"HWR
"C
H R
20" CHR BELOW AND
20" CHS ABOVE.
20"CHR
20"CHS
REFER TO MS201 FOR
CONTINUATION.
WATER HEATER
16"CHS
5" HPS & 2 1/2" PC
UNDERGROUND
PIPING TO BUILDING 2
PROVIDE DOUBLE GATE VALVES WITH
GLOBE VALVE BYPASS WITH 1" TAP
AND BLEED VALVE BETWEEN GATE
VALVES. TYPICAL FOR ALL DOUBLE
VALVES SHOWN ON STEAM AND
CONDENSATE PIPING.
3"NHW
20"CHS
14"HPS
20"CHR
6"PC
6"SAN
4"SAN
2"MA
6"SAN
10"FP
10"FP
6"FP
6"FP
6"CHR
6"FP
3"CW
3/4"CW
6"CHS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #22000669.04
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
READY TO ADVERTISE
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANT
7 8 9 10
US Army Corps of Engineers ®
CONSTRUCTION AGENT
321 4 5 6
A u to d e s k D o c s /0
-1
-0
P h a s e
A
/6
V
A W
H -B
L D
G -0
M P
.r v t
/2 /2
:5
:0
P
M
01-MP101
BUILDING 1 - SUB-GROUND LEVEL -
MECHANICAL PIPING - OPTION BID 0005
New England District
CHILLED WATER PLANT
REPLACEMENT AND SITE UTILITY
IMPROVEMENTS PHASE A2
950 Campbell Avenue, West Haven, CT 06516
689-040
2026-07-31 RUSARN BHAACH
N O R
HT
1/8" = 1'-0"
BUILDING 1 - SUB-GROUND LEVEL - MECHANICAL PIPING - OPTION BID 0005
E4
SHEET NOTES:
1. ALL WORK SHOWN ON SHEET IS PART OF
OPTION BID 0005.
2. REFER TO CIVIL PLANS FOR PROJECT OPTIONS
AND PHASING PLANS.
3. COORDINATE SYSTEM SHUT DOWNS WITH
OWNER. SYSTEM TIE-IN WORK SHALL BE DONE
DURING THE OFF SEASON RELATED TO THE
SYSTEM. CHILLED WATER WORK SHALL BE
DONE DURING WINTER MONTHS AND STEAM
AND CONDENSATE WORK SHALL BE DONE
DURING SUMMER MONTHS.
NO SCALE
ENTRANCE VIEW – BUILDING 01 -
MECH SG182
C9
Revisions: Date:
BIDDING RFIS 09/23/2026
File details come from the government source that posted it. Updated .