Amendment 0006 - Drawing CK-502 (Revised).pdf

PDF 723 KB Posted

Attached to
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
Solicitation number
W912WJ26RA008
Issued by

About this file

This document is a set of civil construction details for the Chilled Water Plant Replacement and Site Utility Improvements Phase A2 project located at 950 Campbell Avenue, West Haven, Connecticut 06516. The project is being developed by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with Mabbett & Associates, Inc. (105 Central Street, Stoneham, MA 02180-1248) serving as the Designer of Record and A/E consultant, and LEDA DMV Perkins&Will as the Consultant. The U.S. Army Corps of Engineers, New England District, is designated as the Construction Agent. The project drawing is labeled CK502 and includes construction details for various site features and utilities.

The drawing details encompass multiple construction elements including sediment and erosion control devices (fiber roll catch basin inlets, filter socks, straw bales, erosion control blankets), security features (8-foot high swing gates with spear-pointed pickets, 8-foot perimeter security fencing), guiderails (R-B 350 metal beam rail specifications with standard post spacing of 6'-3" and maximum design deflection of 4'-3"), underground utility conduit details with specified concrete and soil bearing requirements, concrete washout stations, and drainage swales with filter sock protection. All exterior concrete paving shall include solar reflective concrete admixture for LEED heat island reduction credits. The document is marked "READY TO ADVERTISE" with a bidding request for information (RFI) date of 09/23/2026 and an issue date of 2026-07-31. The project is noted as "FULLY SPRINKLERED."

View the file

Other files

File Type Posted
Amendment 0006 - Drawing CK-505 (Revised).pdf PDF
Amendment 0006 - Drawing M-503 (Revised).pdf PDF
Amendment 0006 - 01 32 01.00 10 (Revised).pdf PDF
Amendment 0006.pdf PDF
Amendment 0006 - Drawing 01-MP101 (Revised).pdf PDF
Amendment 0005.pdf PDF
Amendment 0005 - Submission Requirements and Evaluation Criteria (Clean).pdf PDF
Amendment 0005 - Submission Requirements and Evaluation Criteria (Track Changes).pdf PDF
Amendment 0004 - VA Hospital New Customer Load Report - 7_28_26.pdf PDF
Amendment 0004 - 12018711_Spec013000_Response.pdf PDF
Amendment 0004 - 12018255_01-ED101_01-EP101-Response.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004 - 12018718_12018724_Spec013000_Response.pdf PDF
Amendment 0003 - Submission Requirements and Evaluation Criteria (Track Changes).pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Plan T600.pdf PDF
Amendment 0003 - Submission Requirements and Evaluation Criteria (Clean).pdf PDF
Solicitation - W912WJ26RA008.pdf PDF
Amendment 0003 - JA 03 (JCI ESS_Redacted).pdf PDF
Amendment 0003 - Revisions to Specification Sections 270511-280500-281300-282300.pdf PDF
Amendment 0002 - Specs Section 01 22 00.pdf PDF
Amendment 0002 - Submission Requirements and Evaluation Criteria (Clean).pdf PDF
Amendment 0002 - Submission Requirements and Evaluation Criteria (Track Changes).pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Bidding Schedule.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Submission Requirements and Evaluation Criteria.pdf PDF
Specifications - Volume I.pdf PDF
Contractor Appendix Binder.pdf PDF
Specifications - Volume II.pdf PDF
JA 05 - AMAZ_Redacted.pdf PDF
JA 02 - JCI Fire_Redacted.pdf PDF
JA 03 - JCI ESS_Redacted.pdf PDF
JA 04 - Assa Abloy_Redacted.pdf PDF
JA (Class) - Interior Finishes_Redacted.pdf PDF
JA 01 - Siemens_or_JCI HVAC BAS_Redacted.pdf PDF
Submission Requirements and Evaluation Criteria.pdf PDF
Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NTS

NTS

FIBER ROLL AROUND

TYPE "C" OR "C-L" CATCH BASIN TOP

INLET SEDIMENT CONTROL DEVICE

AT TYPE "C" OR "C-L" CATCH BASIN

CATCH BASIN

SAND BAG

9" FIBER

ROLL

SAND BAG

LIFT STRAPS

CATCH BASIN GRATE

CURB DEFLECTOR

PLAN SECTION

SILT SACK

DUMPING STRAPS

NTS

" TOP RAIL

POST SIZE VARIES

WITH HEIGHT

VARIES

WITH

HEIGHT

2"

8'

HEIGHT

1"

54"

MIN.

FOOTING DEPTH

3 3/4"

TYPICAL

20"

VARIES - SEE SITE PLAN

8' HIGH

"INVINCIBLE/SPEAR

POINTED" STYLE 3

RAIL SWING GATE

FACE CURVED

"INVINCIBLE/SPEAR

POINTED" STYLE

PICKETS OUTWARD

FROM PROTECTED SITE

EMBED POSTS IN

CONCRETE BASE,

MIN. 36"

12" 12"

REINFORCE WITH

6"x6"xW4 10

GAUGE MESH, 2"

CLEARANCE ALL

SIDES (TYP)

4000 PSI CONCRETE

@ 28 DAYS (TYP)

NTS

" TOP RAIL

POST SIZE VARIES

WITH HEIGHT

TM

8' O.C.

VARIES

WITH

HEIGHT

2"

8'

HEIGHT

54"

MIN.

FOOTING DEPTH

3 3/4"

TYPICAL

20"

FACE CURVED

"INVINCIBLE/SPEAR

POINTED" STYLE

PICKETS OUTWARD

FROM PROTECTED

SITE

EMBED POSTS IN

CONCRETE BASE,

MIN. 36"

12" 12"

REINFORCE WITH

6"x6"xW4 10

GAUGE MESH, 2"

CLEARANCE ALL

SIDES (TYP)

4000 PSI CONCRETE

@ 28 DAYS (TYP)

NTS

SEE FILTER SOCK DETAIL F8

FOR SEDIMENT CONTROL

STAKE, CONCRETE BLOCK, OR

SANDBAG

SEE DETAIL F8 FOR

FILTER SOCK FOR

SEDIMENT CONTROL

SEE DETAIL F8 FOR

FILTER SOCK FOR

SEDIMENT CONTROL

SOIL/SEDIMENT

STOCKPILE AREA

SOIL/SEDIMENT

STOCKPILE AREA

NOTE: SOIL STOCKPILE SHALL BE COVERED WITH A SECURED TARPAULIN WHEN NOT IN USE.

2" X 2" WOODEN STAKES PLACED 10.0' O.C.

FILTER SOCK (8", 9" OR 12")

WORK AREA PROTECTION AREA

SECTION - NATURAL GROUND AREAS

WORK AREA

FILTER SOCK (8", 12" OR 18")

CONCRETE BLOCK OR SANDBAG PLACED 10.0' O.C.

PAVEMENT SURFACE

PROTECTION AREA

SECTION - PAVEMENT AREAS

NOTES:

1. SOCK SIZE TO BE PER MANUFACTURER'S RECOMMENDATION FOR THE APPLICATION.

2. FILTER MATERIAL TO BE PER MANUFACTURER'S RECOMMENDATION FOR THE

APPLICATION.

3. COMPOST MATERIAL SHALL BE REMOVED AND DISPERSED OFF OF VA PROPERTY.

WORK AREA

WORK AREA

PROTECTION AREA

PROTECTION AREA

FILTER SOCK (SEE

NOTES 1 AND 2)

FILTER SOCK (SEE NOTES 1 AND 2)

CONCRETE BLOCK OR SANDBANG PLACED 10.0' O.C. (TYP.)

2" X 2" WOODEN STAKES PLACED 10.0' O.C. (TYP.)

WATER FLO

W

FLO

W

PLAN - PAVEMENT AREASPLAN - NATURAL GROUND AREA

NTS

NOTES:

1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED.

NOTE: WHEN USING EROSION CONTROL BLANKETS NOT SEED PREPARED AREA. EROSION CONTROL BLANKET

MUST BE INSTALLED WITH PAPER SIDE DOWN.

2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND

COMPACT THE TRENCH AFTER STAPLING.

3. ROLL THE BLANKETS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE.

4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. REFER TO MANUFACTURER'S GUIDE FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS.

5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12' APART.

6. EROSION CONTROL BLANKET FOR USE ON SLOPES SHALL BE A BIODEGRADABLE DOUBLE NET WOVEN

BLANKET WITH JUTE NETTING AND COCONUT FIBER MATRIX.

7. ONCE PERMANENT STABALIZATION IS ACHIEVED, REMOVE ANY NON -BIODEGRADABLE MESH, IF USED.

3B

3A

12'-6" TYPICAL RAIL SECTION

POST SPACING

POST

BLOCKOUT

DIRECTION OF TRAFFIC

PAY LIMIT METAL BEAM RAIL

(TYPE R-B 350) GUIDERAIL

PLAN

TYPICAL RAIL MOUNTING SEE DETAIL A

RAIL HEIGHT MEASURED

FROM TOP OF SHOULDER

GRASS

ELEVATION

METAL BEAM RAIL (TYPE R-B 350)

W-BEAM RAIL ELEMENT

PAY LIMIT R-B END

ANCHORAGE OR

IMPACT

ATTENUATION

SYSTEM

LAWNLAWN

CURB

POST

TOP OF

PAVEMENT

RAIL HEIGHT:

(MATCH EXISTING)

CURB

LAWN

6' STEEL POST

BLOCKOUT

RAIL ELEMENT

" POST BOLT

DETAIL A

RAIL MOUNTING

S H

O U

L D

E R

L I N

E

S H

O U

L D

E R

L I N

E

GENERAL NOTES:

1. MAXIMUM DESIGN DEFLECTION FOR R-B 350 GUIDERAIL AT THE STANDARD POST

SPACING OF 6'-3" IS 4'-3". DEFLECTION REQUIREMENTS IS MEASURED FROM THE

BACK OF POST TO THE FACE OF OBJECT.

2. FOR CURVES WITH RADII OF 150' OR LESS, ALL RAIL ELEMENTS SHALL BE SHOP

FABRICATED TO THE PROPER RADIUS AND GALVANIZED AFTER FABRICATION.

RADIUS RAIL WHEN REQUIRED AND NOTED ON THE PLANS, IS INCLUDED IN THE PAY

ITEM FOR GUIDERAIL.

3. RAIL HEIGHT WITH CURBING SHALL BE MEASURED FROM THE TOP OF PAVEMENT.

ON LOW SPEED ROADWAYS (<45mph, 6" CURBING MAY BE USED IN CONJUCTION

WITH GUIDERAIL AND THE RAIL ELEMENT SHALL BE PLACED A MAXIMUM OF 9"

BEHIND THE FACE OF CURB.

4. THREE BLOCKOUTS MAY BE USED FOR ONE POST ONLY. TWO BLOCKOUTS MAY BE

USED FOR A SERIES OF POSTS. THE COST OF ADDITIONAL BLOCKOUTS AND

LONGER BOLTS SHALL BE INCLUDED IN THE BID PRICE PER FOOT OF GUIDERAIL.

EXTRA BLOCKOUTS AT TRANSITION TO BRIDGE PARAPETS SHOULD BE AVOIDED.

5. W-BEAM GUIDERAIL MAY BE PLACED 1' OR MORE FROM THE EDGE OF PAVEMENT

ONLY ON SLOPES 10:1 OR FLATTER AND WITHOUT CURBING. IF THE RAIL IS

INSTALLED WITHIN 2' OF THE EDGE OF PAVEMENT, THE RAIL HEIGHT IS MEASURED

FROM THE SHOULDER SLOPE EXTENDED TO THE RAIL. IF THE RAIL IS INSTALLED

BEYOND 2' FROM THE EDGE OF PAVEMENT, THE RAIL HEIGHT IS MEASURED FROM

THE GROUND DIRECTLY BELOW THE RAIL.

6. 20" DIA. EXCAVATED HOLE SHALL BE BACKFILLED WITH SUITABLE MATERIAL, OR

GRANULAR FILL COMPACTED IN 6" LIFTS BEFORE DRIVING POST OR POSTS MAY BE

SET IN EXCAVATED HOLE AND BACKFILLED WITH CONTROLLED LOW STRENGTH

MATERIAL (CLSM). 8" DIA. HOLE SHALL BE BACKFILLED WITH SUITABLE MATERIAL.

7. WHERE PAVEMENT FOR RAILING IS NOT BEING INSTALLED, A MIN. 6" DEPTH OF

PROCESSED AGGREGATE SHALL BE INSTALLED FROM THE PAVEMENT EDGE OR

BACK OF CURB TO A MINIMUM OF 2' BEHIND THE GUIDERAIL POST AND COMPACTED

IN 6" LIFTS.

8. MINIMUM RAIL HEIGHT FOR NEW CONSTRUCTION SHALL BE 29" ± 1".

FRONT FACE OF RAIL ELEMENT

SECTION

CURB APPLICATION

DRILLING IN ROCK FOR GUIDERAIL POSTS

PLAN

CONDITION 1

(SEE NOTE 6)

PLAN

CONDITION 2

(SEE NOTE 6)

FRONT FACE OF

RAIL ELEMENT

20" DIA. HOLE WITH

POST SET AT EDGE

CLOSEST TO

ROADWAY

8" DIA. HOLE, WITH POST SET AT

EDGE CLOSEST TO ROADWAY.

ELEVATION

(SEE NOTE 6)

R-B 350 GUIDERAIL

NTS

NOTES:

1. ASSUMED WORKING PRESSURE = 200 LB/IN^2

2. ASSUMED ALLOWABLE SOIL BEARING PRESSURE = 1,875 LB/FT^2

3. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND

4. CONCRETE TO BE 3000 PSI MIN.

5. BLOCKS THICKNESS SHALL EQUAL PIPE DIAMETER PLUS 4" (A VALUE)

X

X

X

X

BENDS

TEES

SECTION X-X CAPS

6"

W

W

6"

W/2 W/2

L

L

L

W

A

I N

L

PIPE SIZE 22.5° 45° 90°

TEE, WYE, DEAD END

L W

AREA

(SF)

L W

AREA

(SF)

L W

AREA

(SF)

L W

AREA

(SF)

8" 24" 13" 2.1 24" 25" 4.1 24" 46" 7.6 24" 33" 5.4

10" 26" 19" 3.3 26" 36" 6.4 26" 66" 11.8 26" 47" 8.4

SOIL TYPE: REFER TO GEOTECHNICAL REPORT

NTS

8"

12"

2'-0"

4"

1.4 x 1.4 10 GUAGE WOVEN WIRE

MESH

4" 4" 4" 4"

C.I.P. CONCRETE

(4,000 PSI MIN.) (TYP.)

CONDITION 1:

IF SOIL DEPTH IS ≤ 18"

DEEP (A) DRILL 20" DIA.

HOLE; 24" INTO LEDGE (B)

CONDITION 2:

IF SOIL DEPTH IS > 18"

DEEP (A) DRILL 8" DIA.

HOLE; 12" INTO LEDGE (B)

OR TO THE DEPTH OF

FULL EMBEDMENT OF

(WHICHEVER IS LESS)

NOTES:

1. ALL EXTERIOR CONCRETE PAVING SHALL HAVE SOLAR REFLECTIVE CONCRETE

ADMIXTURE FOR LEED CREDITS TOWARDS HEAT ISLAND REDUCTION

3" (TYP)

FINISHED GRADE FINISHED GRADE

6" THICK MIN. COMPACTED GRANULAR BASE

4" 20" 10"

1.3

20" 10"

1.3 20"

14" 1.9

20" 10"

1.3

10 MIL PLASTIC LINING

2-STAKES PER BALE

STRAW BALE

10-MIL PLASTIC LINING

BACKFILL AGAINST

STRAW BALE

2-STAPLES PER BALE

PLAN VIEW

SECTION A

10'.

STRAW BALE

2-STAKES PER BALE.

NOTES:

1. INSTALL CONCRETE WASHOUT SIGN WITHIN 30 FT. OF CONC. WASHOUT.

2. THE CONTRACTOR SHALL REPLACE CONCRETE WASHOUT WHEN IT HAS BEEN

DEGRADED OVER TIME OR AT THE REQUEST OF THE CONTRACTING OFFICER

AND/OR SWPPP INSPECTOR DURING CONSTRUCTION. CONCRETE WASHOUT

STATIONS SHOULD BE EMPTIED, CLEANED, OR REPLACED ONCE IT HAS

REACHED 75% CAPACITY TO PREVENT OVERFLOW FROM WASH WATER OR RAIN.

CK502

CIVIL DETAILS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD A/E:

STAMPCONSULTANT

7 8 9 10

US Army Corps of Engineers ®

CONSTRUCTION AGENT

321 4 5 6

A u t o d e s k

D o c s P h a s e A

B

L D

G A

R C

H I n t e r i o r r v t

New England District

CHILLED WATER PLANT

REPLACEMENT AND SITE UTILITY

IMPROVEMENTS PHASE A2

950 CAMPBELL AVENUE

WEST HAVEN, CT 06516

689-040

Revisions: Date:

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

105 Central Street Stoneham, MA 02180-1248

T. 781-275-6050 www.mabbett.com

Mabbett

R

2026-07-31 RBB KRS

READY TO ADVERTISE

BIDDING RFIS 09/23/2026 2

Sheets and Views
502 20260206

File details come from the government source that posted it. Updated .