Amendment 0006 - Drawing CK-502 (Revised).pdf
PDF 723 KB Posted
- Attached to
- Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
- Solicitation number
- W912WJ26RA008
About this file
This document is a set of civil construction details for the Chilled Water Plant Replacement and Site Utility Improvements Phase A2 project located at 950 Campbell Avenue, West Haven, Connecticut 06516. The project is being developed by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with Mabbett & Associates, Inc. (105 Central Street, Stoneham, MA 02180-1248) serving as the Designer of Record and A/E consultant, and LEDA DMV Perkins&Will as the Consultant. The U.S. Army Corps of Engineers, New England District, is designated as the Construction Agent. The project drawing is labeled CK502 and includes construction details for various site features and utilities.
The drawing details encompass multiple construction elements including sediment and erosion control devices (fiber roll catch basin inlets, filter socks, straw bales, erosion control blankets), security features (8-foot high swing gates with spear-pointed pickets, 8-foot perimeter security fencing), guiderails (R-B 350 metal beam rail specifications with standard post spacing of 6'-3" and maximum design deflection of 4'-3"), underground utility conduit details with specified concrete and soil bearing requirements, concrete washout stations, and drainage swales with filter sock protection. All exterior concrete paving shall include solar reflective concrete admixture for LEED heat island reduction credits. The document is marked "READY TO ADVERTISE" with a bidding request for information (RFI) date of 09/23/2026 and an issue date of 2026-07-31. The project is noted as "FULLY SPRINKLERED."
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NTS
NTS
FIBER ROLL AROUND
TYPE "C" OR "C-L" CATCH BASIN TOP
INLET SEDIMENT CONTROL DEVICE
AT TYPE "C" OR "C-L" CATCH BASIN
CATCH BASIN
SAND BAG
9" FIBER
ROLL
SAND BAG
LIFT STRAPS
CATCH BASIN GRATE
CURB DEFLECTOR
PLAN SECTION
SILT SACK
DUMPING STRAPS
NTS
" TOP RAIL
POST SIZE VARIES
WITH HEIGHT
VARIES
WITH
HEIGHT
2"
8'
HEIGHT
1"
54"
MIN.
FOOTING DEPTH
3 3/4"
TYPICAL
20"
VARIES - SEE SITE PLAN
8' HIGH
"INVINCIBLE/SPEAR
POINTED" STYLE 3
RAIL SWING GATE
FACE CURVED
"INVINCIBLE/SPEAR
POINTED" STYLE
PICKETS OUTWARD
FROM PROTECTED SITE
EMBED POSTS IN
CONCRETE BASE,
MIN. 36"
12" 12"
REINFORCE WITH
6"x6"xW4 10
GAUGE MESH, 2"
CLEARANCE ALL
SIDES (TYP)
4000 PSI CONCRETE
@ 28 DAYS (TYP)
NTS
" TOP RAIL
POST SIZE VARIES
WITH HEIGHT
TM
8' O.C.
VARIES
WITH
HEIGHT
2"
8'
HEIGHT
54"
MIN.
FOOTING DEPTH
3 3/4"
TYPICAL
20"
FACE CURVED
"INVINCIBLE/SPEAR
POINTED" STYLE
PICKETS OUTWARD
FROM PROTECTED
SITE
EMBED POSTS IN
CONCRETE BASE,
MIN. 36"
12" 12"
REINFORCE WITH
6"x6"xW4 10
GAUGE MESH, 2"
CLEARANCE ALL
SIDES (TYP)
4000 PSI CONCRETE
@ 28 DAYS (TYP)
NTS
SEE FILTER SOCK DETAIL F8
FOR SEDIMENT CONTROL
STAKE, CONCRETE BLOCK, OR
SANDBAG
SEE DETAIL F8 FOR
FILTER SOCK FOR
SEDIMENT CONTROL
SEE DETAIL F8 FOR
FILTER SOCK FOR
SEDIMENT CONTROL
SOIL/SEDIMENT
STOCKPILE AREA
SOIL/SEDIMENT
STOCKPILE AREA
NOTE: SOIL STOCKPILE SHALL BE COVERED WITH A SECURED TARPAULIN WHEN NOT IN USE.
2" X 2" WOODEN STAKES PLACED 10.0' O.C.
FILTER SOCK (8", 9" OR 12")
WORK AREA PROTECTION AREA
SECTION - NATURAL GROUND AREAS
WORK AREA
FILTER SOCK (8", 12" OR 18")
CONCRETE BLOCK OR SANDBAG PLACED 10.0' O.C.
PAVEMENT SURFACE
PROTECTION AREA
SECTION - PAVEMENT AREAS
NOTES:
1. SOCK SIZE TO BE PER MANUFACTURER'S RECOMMENDATION FOR THE APPLICATION.
2. FILTER MATERIAL TO BE PER MANUFACTURER'S RECOMMENDATION FOR THE
APPLICATION.
3. COMPOST MATERIAL SHALL BE REMOVED AND DISPERSED OFF OF VA PROPERTY.
WORK AREA
WORK AREA
PROTECTION AREA
PROTECTION AREA
FILTER SOCK (SEE
NOTES 1 AND 2)
FILTER SOCK (SEE NOTES 1 AND 2)
CONCRETE BLOCK OR SANDBANG PLACED 10.0' O.C. (TYP.)
2" X 2" WOODEN STAKES PLACED 10.0' O.C. (TYP.)
WATER FLO
W
FLO
W
PLAN - PAVEMENT AREASPLAN - NATURAL GROUND AREA
NTS
NOTES:
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING EROSION CONTROL BLANKETS NOT SEED PREPARED AREA. EROSION CONTROL BLANKET
MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND
COMPACT THE TRENCH AFTER STAPLING.
3. ROLL THE BLANKETS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" OVERLAP. REFER TO MANUFACTURER'S GUIDE FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR SLOPE INSTALLATIONS.
5. WHEN BLANKETS MUST BE SPLICED DOWN THE SLOPE, PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH APPROXIMATELY 4" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12' APART.
6. EROSION CONTROL BLANKET FOR USE ON SLOPES SHALL BE A BIODEGRADABLE DOUBLE NET WOVEN
BLANKET WITH JUTE NETTING AND COCONUT FIBER MATRIX.
7. ONCE PERMANENT STABALIZATION IS ACHIEVED, REMOVE ANY NON -BIODEGRADABLE MESH, IF USED.
3B
3A
12'-6" TYPICAL RAIL SECTION
POST SPACING
POST
BLOCKOUT
DIRECTION OF TRAFFIC
PAY LIMIT METAL BEAM RAIL
(TYPE R-B 350) GUIDERAIL
PLAN
TYPICAL RAIL MOUNTING SEE DETAIL A
RAIL HEIGHT MEASURED
FROM TOP OF SHOULDER
GRASS
ELEVATION
METAL BEAM RAIL (TYPE R-B 350)
W-BEAM RAIL ELEMENT
PAY LIMIT R-B END
ANCHORAGE OR
IMPACT
ATTENUATION
SYSTEM
LAWNLAWN
CURB
POST
TOP OF
PAVEMENT
RAIL HEIGHT:
(MATCH EXISTING)
CURB
LAWN
6' STEEL POST
BLOCKOUT
RAIL ELEMENT
" POST BOLT
DETAIL A
RAIL MOUNTING
S H
O U
L D
E R
L I N
E
S H
O U
L D
E R
L I N
E
GENERAL NOTES:
1. MAXIMUM DESIGN DEFLECTION FOR R-B 350 GUIDERAIL AT THE STANDARD POST
SPACING OF 6'-3" IS 4'-3". DEFLECTION REQUIREMENTS IS MEASURED FROM THE
BACK OF POST TO THE FACE OF OBJECT.
2. FOR CURVES WITH RADII OF 150' OR LESS, ALL RAIL ELEMENTS SHALL BE SHOP
FABRICATED TO THE PROPER RADIUS AND GALVANIZED AFTER FABRICATION.
RADIUS RAIL WHEN REQUIRED AND NOTED ON THE PLANS, IS INCLUDED IN THE PAY
ITEM FOR GUIDERAIL.
3. RAIL HEIGHT WITH CURBING SHALL BE MEASURED FROM THE TOP OF PAVEMENT.
ON LOW SPEED ROADWAYS (<45mph, 6" CURBING MAY BE USED IN CONJUCTION
WITH GUIDERAIL AND THE RAIL ELEMENT SHALL BE PLACED A MAXIMUM OF 9"
BEHIND THE FACE OF CURB.
4. THREE BLOCKOUTS MAY BE USED FOR ONE POST ONLY. TWO BLOCKOUTS MAY BE
USED FOR A SERIES OF POSTS. THE COST OF ADDITIONAL BLOCKOUTS AND
LONGER BOLTS SHALL BE INCLUDED IN THE BID PRICE PER FOOT OF GUIDERAIL.
EXTRA BLOCKOUTS AT TRANSITION TO BRIDGE PARAPETS SHOULD BE AVOIDED.
5. W-BEAM GUIDERAIL MAY BE PLACED 1' OR MORE FROM THE EDGE OF PAVEMENT
ONLY ON SLOPES 10:1 OR FLATTER AND WITHOUT CURBING. IF THE RAIL IS
INSTALLED WITHIN 2' OF THE EDGE OF PAVEMENT, THE RAIL HEIGHT IS MEASURED
FROM THE SHOULDER SLOPE EXTENDED TO THE RAIL. IF THE RAIL IS INSTALLED
BEYOND 2' FROM THE EDGE OF PAVEMENT, THE RAIL HEIGHT IS MEASURED FROM
THE GROUND DIRECTLY BELOW THE RAIL.
6. 20" DIA. EXCAVATED HOLE SHALL BE BACKFILLED WITH SUITABLE MATERIAL, OR
GRANULAR FILL COMPACTED IN 6" LIFTS BEFORE DRIVING POST OR POSTS MAY BE
SET IN EXCAVATED HOLE AND BACKFILLED WITH CONTROLLED LOW STRENGTH
MATERIAL (CLSM). 8" DIA. HOLE SHALL BE BACKFILLED WITH SUITABLE MATERIAL.
7. WHERE PAVEMENT FOR RAILING IS NOT BEING INSTALLED, A MIN. 6" DEPTH OF
PROCESSED AGGREGATE SHALL BE INSTALLED FROM THE PAVEMENT EDGE OR
BACK OF CURB TO A MINIMUM OF 2' BEHIND THE GUIDERAIL POST AND COMPACTED
IN 6" LIFTS.
8. MINIMUM RAIL HEIGHT FOR NEW CONSTRUCTION SHALL BE 29" ± 1".
FRONT FACE OF RAIL ELEMENT
SECTION
CURB APPLICATION
DRILLING IN ROCK FOR GUIDERAIL POSTS
PLAN
CONDITION 1
(SEE NOTE 6)
PLAN
CONDITION 2
(SEE NOTE 6)
FRONT FACE OF
RAIL ELEMENT
20" DIA. HOLE WITH
POST SET AT EDGE
CLOSEST TO
ROADWAY
8" DIA. HOLE, WITH POST SET AT
EDGE CLOSEST TO ROADWAY.
ELEVATION
(SEE NOTE 6)
R-B 350 GUIDERAIL
NTS
NOTES:
1. ASSUMED WORKING PRESSURE = 200 LB/IN^2
2. ASSUMED ALLOWABLE SOIL BEARING PRESSURE = 1,875 LB/FT^2
3. ALL BEARING SURFACES TO BE CARRIED TO UNDISTURBED GROUND
4. CONCRETE TO BE 3000 PSI MIN.
5. BLOCKS THICKNESS SHALL EQUAL PIPE DIAMETER PLUS 4" (A VALUE)
X
X
X
X
BENDS
TEES
SECTION X-X CAPS
6"
W
W
6"
W/2 W/2
L
L
L
W
A
I N
L
PIPE SIZE 22.5° 45° 90°
TEE, WYE, DEAD END
L W
AREA
(SF)
L W
AREA
(SF)
L W
AREA
(SF)
L W
AREA
(SF)
8" 24" 13" 2.1 24" 25" 4.1 24" 46" 7.6 24" 33" 5.4
10" 26" 19" 3.3 26" 36" 6.4 26" 66" 11.8 26" 47" 8.4
SOIL TYPE: REFER TO GEOTECHNICAL REPORT
NTS
8"
12"
2'-0"
4"
1.4 x 1.4 10 GUAGE WOVEN WIRE
MESH
4" 4" 4" 4"
C.I.P. CONCRETE
(4,000 PSI MIN.) (TYP.)
CONDITION 1:
IF SOIL DEPTH IS ≤ 18"
DEEP (A) DRILL 20" DIA.
HOLE; 24" INTO LEDGE (B)
CONDITION 2:
IF SOIL DEPTH IS > 18"
DEEP (A) DRILL 8" DIA.
HOLE; 12" INTO LEDGE (B)
OR TO THE DEPTH OF
FULL EMBEDMENT OF
(WHICHEVER IS LESS)
NOTES:
1. ALL EXTERIOR CONCRETE PAVING SHALL HAVE SOLAR REFLECTIVE CONCRETE
ADMIXTURE FOR LEED CREDITS TOWARDS HEAT ISLAND REDUCTION
3" (TYP)
FINISHED GRADE FINISHED GRADE
6" THICK MIN. COMPACTED GRANULAR BASE
4" 20" 10"
1.3
20" 10"
1.3 20"
14" 1.9
20" 10"
1.3
10 MIL PLASTIC LINING
2-STAKES PER BALE
STRAW BALE
10-MIL PLASTIC LINING
BACKFILL AGAINST
STRAW BALE
2-STAPLES PER BALE
PLAN VIEW
SECTION A
10'.
STRAW BALE
2-STAKES PER BALE.
NOTES:
1. INSTALL CONCRETE WASHOUT SIGN WITHIN 30 FT. OF CONC. WASHOUT.
2. THE CONTRACTOR SHALL REPLACE CONCRETE WASHOUT WHEN IT HAS BEEN
DEGRADED OVER TIME OR AT THE REQUEST OF THE CONTRACTING OFFICER
AND/OR SWPPP INSPECTOR DURING CONSTRUCTION. CONCRETE WASHOUT
STATIONS SHOULD BE EMPTIED, CLEANED, OR REPLACED ONCE IT HAS
REACHED 75% CAPACITY TO PREVENT OVERFLOW FROM WASH WATER OR RAIN.
CK502
CIVIL DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10
US Army Corps of Engineers ®
CONSTRUCTION AGENT
321 4 5 6
A u t o d e s k
D o c s P h a s e A
B
L D
G A
R C
H I n t e r i o r r v t
New England District
CHILLED WATER PLANT
REPLACEMENT AND SITE UTILITY
IMPROVEMENTS PHASE A2
950 CAMPBELL AVENUE
WEST HAVEN, CT 06516
689-040
Revisions: Date:
Scientists I Engineers I Program Managers
Mabbett & Associates, Inc.
105 Central Street Stoneham, MA 02180-1248
T. 781-275-6050 www.mabbett.com
Mabbett
R
2026-07-31 RBB KRS
READY TO ADVERTISE
BIDDING RFIS 09/23/2026 2
| Sheets and Views |
| 502 20260206 |
File details come from the government source that posted it. Updated .