This is Amendment 0002 to a federal construction solicitation issued by the U.S. Army Corps of Engineers, New England District for the Chilled Water Plant Replacement & Site Utility Improvements (Phase A2) project at VA Connecticut Healthcare System in West Haven, Connecticut. The solicitation number is W912WJ26RA008, with an effective date of 23 September 2026.

The amendment updates the Submission Requirements and Evaluation Criteria, Bid Schedule, and Specifications Section 01 22 00, and responds to ten Requests for Information. The bid schedule includes nine line items: five base items (Chilled Water Plant Replacement, Site Electrical Utilities Campus Redundant Feed, Removal of Asbestos Containing Material, Rock Excavation, and Underground ACM Pipe Removal) and four optional items (Campbell Avenue Domestic Water and Fire Protection Service Piping, Water Storage Tanks and Piping, Site Utilities Backfeeds to Building 1, and United Illuminated Electrical Service Allowance). Base work items are priced at a total estimated amount of $1,400,000.00, with optional items available for Government exercise. All work must be completed within timeframes specified in the contract conditions. An organized site visit is scheduled for 1000 AM ET on 29 September 2026 at Building 15, VA West Haven, 950 Campbell Avenue. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline and must price all items, with awards made as a whole to one contractor based on total estimated amounts for all base and option items combined.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 10

0002 23 SEP 2026 689-040

W912WJ

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

TYLER MARYAK, EMAIL: TYLER.S.MARYAK@USACE.ARMY.MIL TELEPHONE: 978-

318-8049

SCD: PAS:

W912WJ26RA008

24 AUG 2026

SEE SECTION G - CONTRACT ADMINISTRATION DATA

This amendment is necessary to update the Submission Requirements and Evaluation Criteria, Bid Schedule, Specifications Section 01 22 00, and to respond to RFIs. All other aspects remain unchanged.

ERIN E. BRADLEY

30 SEP 2026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

Miscellaneous text in this section has been modified from:

Bidding Schedule

Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.

Removal of Asbestos Containing Material as part of the Existing Building Demolition

Underground Asbestos Containing Material (ACM) Pipe Removal

1 J o b

1 J o b

1 J o b

Job $1, ,00 0.0

Note 1: Offerors must price all items. The work will be awarded as a whole to one offeror. Offers will be evaluated and the low proposal determined by the Total Estimated Amount for Line Items 0001 through 0009, including the Base Items and all of the Option Items. The minimum work awarded will be the Base work.

Note 2: Base Items and Option Items are not listed in sequential order. Base Item Numbers are listed as 0001, 0002, 0007, 0008, and 0009. Option Item numbers are listed as 0003, 0004, 0005, and 0006.

Note 3: Item Numbers 0008 and 0009 are subdivided into two estimated quantities and shall be separately priced. The Government will evaluate this item on the basis of the total price of their sub-items.

Note 4: Line Item Numbers 0003 through 0006 above are Option Items that may, at the option of the Government, be exercised at any time up to the effective date of the Notice to Proceed. If one or more Option Items is/are awarded, the project duration will remain unchanged.

Note 5: All work shall be completed within the time period specified in Section 00 70 00 CONDITIONS OF THE CONTRACT, Subpart COMMENCEMENT, PROSECUTION AND

COMPLETION OF WORK.

Note 6: In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended offer. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

To:

Bidding Schedule

Refer the attached bidding schedule dated 23 September 2026.

Section 00 21 00 - Instructions

Miscellaneous text in this section has been modified from:

SUBMISSION INSTRUCTIONS AND EVALUATION CRITERIA

Offerors shall reference the attached document titled "Chilled Water Plant Replacement & Site Utility Improvements (Phase A2), VA Connecticut Healthcare System, 950 Campbell Ave., West Haven, Connecticut, W912WJ26RA008, Submission Requirements and Evaluation Criteria" and dated 04 September 2026 for the submission requirements and evaluation criteria for this solicitation.

SITE VISIT (CONSTRUCTION)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this

Accordingly, or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for: 1000 AM ET on . 29 September 2026

(c) Participants will meet at: Building 15, VA West Haven, 950 Campbell Avenue, West Haven, CT 06516.

To:

SUBMISSION INSTRUCTIONS AND EVALUATION CRITERIA

Offerors shall reference the attached document titled "Chilled Water Plant Replacement & Site Utility Improvements (Phase A2), VA Connecticut Healthcare System, 950 Campbell Ave., West Haven, Connecticut, W912WJ26RA008, Submission Requirements and Evaluation Criteria" and dated for the submission requirements and evaluation criteria for this 22 September 2026 solicitation.

SITE VISIT (CONSTRUCTION)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this

Accordingly, or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for: 1000 AM ET on 29 September 2026.

(c) Participants will meet at: Building 15, VA West Haven, 950 Campbell Avenue, West Haven, CT 06516.

Section 00 21 16 - Instructions to Proposers

Miscellaneous text in this section has been added to:

Amendment 0002

Please see revised Submission Requirements and Evaluation Criteria, dated 22 September 2026, and note that some submission requirements and evaluation criteria have changed.

Specifications Section 01 22 00, revised 21 September 2026, is hereby incorporated into the solicitation.

Requests for Information

1. Inquiry ID 11996078 Threshold for projects performed in a subcontractor role. Ref: Prime relevancy criterion 1; Past Performance Narratives item 5. Narrative item 5 directs offerors to state "the final cost of construction portions completed for project (if Sub)." For a project where the submitting entity served as a subcontractor, must the entity's own scope have equaled or exceeded $50,000,000, or is the total project construction cost the measure?

Please see revised Submission Requirements and Evaluation Criteria, dated 22 September 2026, included with Amendment 0002. If the Offeror served as a subcontractor on a project submitted to fulfill the requirements of Factor 1 - Past Performance, the value of the scope of work completed by the Offeror, as a subcontractor on the submitted project, should equal or exceed $40,000,000.

2. Inquiry ID 11996090 DUNS versus UEI. Ref: Past Performance Reports/Questionnaires item 1. Item 1 requests the DUNS number for each project. DUNS numbers were replaced by the Unique Entity Identifier for Federal awards. Request confirmation that offerors should provide the UEI, and how to identify projects predating UEI assignment.

Please see revised Submission Requirements and Evaluation Criteria, dated 22 September 2026, included with Amendment 0002. Offerors should use UEI when available and DUNS for projects predating UEI.

3. Inquiry ID 11996080 Effect of the higher-relevancy criteria on ratings. Ref: "Projects... may be more highly rated for relevancy if..." Five additional characteristics are listed. Does satisfying one or more of these move a project from Somewhat Relevant to Relevant, and from Relevant to Very Relevant? If so, how many are required at each level? Is any single characteristic weighted more heavily than the others?

There is not a requisite number of characteristics that will move a project from Somewhat Relevant, Relevant, or Very Relevant. Projects may be more highly rated for relevancy if any of the five characteristics are listed. No single characteristic is weighted more heavily than the others and there is no defined number of additional characteristics that will change the relevancy rating.

4. Inquiry ID 11996085 When the key subcontractor requirement is triggered. Ref: "Key subcontractors." If the prime contractor will self-perform one or more of the four listed activities, is the two-project key subcontractor submission still required as to the self-performed scopes? If the prime self-performs all four, are any key subcontractor projects required?

The two project key subcontractor submission is required if a subcontractor will perform any of the following activities: installation of chilled water system, installation of fuel oil system, installation of underground site utilities, and/or installation of medium voltage system. If the Prime Offeror will self-perform all listed activities and no subcontractor will be primarily responsible for those activities, no key subcontractor projects will be required.

5. Inquiry ID 11996097 Whether key subcontractor performance affects the overall confidence rating. Ref: same. Will a single overall Performance Confidence rating be assigned to the offeror based on prime and key subcontractor projects combined, or will key subcontractor past performance be assessed separately? If combined, how are the two weighted?

A single performance confidence rating will be assigned to the Offeror. The rating will be based on the relevancy and quality of performance on past contracts. No greater weight will be applied to the Prime Offeror or the key subcontractor project(s). It is the responsibility of the Offeror to submit a technical proposal consisting of teaming and approach that meets all the terms and conditions of the solicitation and demonstrates capability of performing the work of this project.

6. Inquiry ID 11996111 Tab dividers and appendix separators. Ref: Proposal Structure table. Dividers count against the page limit. Do divider pages placed between the page-limited portion of Volume I and the unlimited Volume I Appendix count against the 35 pages?

Please see "Proposal Structure Requirements" of the Submission Requirements and Evaluation Criteria.

7. Inquiry ID 11996104 Headers, footers, and page numbering. Ref: Section C.4. Does the 12-point minimum apply to headers and footers containing the company name, date, and solicitation number?

The 12-point minimum font does not apply to headers and footers containing the company name, date, and solicitation number.

8. Inquiry ID 11996088 Partial scope and key subcontractor status. Ref: same. A subcontractor is "key" if responsible for "installation of" a listed system. Does a subcontractor performing only a portion of one of those systems -- for example, excavation and backfill for underground utilities, or duct bank only for medium voltage -- meet the definition?

If the subcontractor will conduct a portion of the work on one of the listed systems for the project, the subcontractor will be considered a "key" subcontractor.

9. Inquiry ID 11996101 Reduced font on 11"x17" graphics. Ref: Section C.4. Tables and illustrations may use no less than 11-point font. Does this allowance apply to the organizational chart and summary schedule? For a summary schedule, an 11-point minimum may be impracticable -- request the Government state the minimum.

Please see revised Submission Requirements and Evaluation Criteria, dated 22 September 2026, included with Amendment 0002.

10. Inquiry ID 11996115 Whether the heavy utility parenthetical is exhaustive. Ref: Volume I - Factor 1, Prime Contractor relevancy criteria, item 2: "Project scope included heavy utility (campus distribution or utility plant) construction." Is the parenthetical "(campus distribution or utility plant)" intended as an exhaustive definition of "heavy utility construction," or as examples of it? The key subcontractor relevancy criteria in the same section describe the specialty systems on this project as "chilled water, fuel oil, underground site utilities, or medium voltage system." Offerors request the Government confirm whether a prime contractor project satisfies Relevancy Criterion 2 where the project scope included one or more of the following:

o Installation or replacement of underground site utility distribution -- domestic water, fire service, sanitary sewer, storm drainage, and/or natural gas -- including new or upgraded services extended from public mains in the adjacent right-of-way to serve the facility;

o Installation of medium voltage primary service, including duct bank, manholes, switchgear, and /or pad-mounted transformers;

o Installation or replacement of chilled water, hot water, or steam distribution piping serving a facility or group of facilities;

o Utility construction executed on an occupied, operational site requiring phased utility shutdowns, temporary services, and maintenance of continuous facility operations throughout construction;

o Utility construction requiring work within a public right-of-way under municipal permit, including street excavation, utility tie-ins, traffic management, and restoration.

The listed examples may qualify. The parenthetical is an example of "heavy utility construction" that is similar in scope to the solicitation project. It is the responsibility of the Offeror to submit a technical proposal consisting of teaming and approach that meets all the terms and conditions of the solicitation and demonstrates capability of performing the work of this project.