Bid Abstract- SF 1419.pdf
PDF 2 MB Posted
- Solicitation number
- W912P726BA001
About this file
This is an Abstract of Offers – Construction (Optional Form 1419), a federal contracting document that summarizes all bids received in response to a construction solicitation.
The solicitation, numbered W912P726BA001, was issued by the U.S. Army Corps of Engineers (USACE), San Francisco District on April 10, 2026, and opened on May 11, 2026. The project is the San Joaquin/Port of Stockton FY26 Maintenance Dredging Project, comprising 14 contract line items (CLINs) including mobilization/demobilization and 13 dredging reaches. The government estimate totals $5,449,180.97 and was calculated using a reasonable contract methodology including profit. Four responsive bids were received: Curtin Maritime Corp. ($7,753,067.87), The Dutra Group ($5,969,485.00), Manson Construction Co. ($8,338,056.00), and one additional offeror. All bids include SF24 and 20% bid security, and all offerors acknowledged four amendments to the solicitation. Contract items are priced on a unit basis (cubic yards for dredging activities) ranging from $20.12 to $87.61 per cubic yard in the government estimate, with quantities estimated between 1,354 and 49,169 cubic yards per reach. The contracting officer is Mary Fronck. The government's estimate was based on a reasonable contract including profit methodology.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 5ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
USACE, SAN FRANCISCO DISTRICT
450 GOLDEN GATE
SAN FRANCISCO CA 94102
San Joaquin/ Port of Stockton FY26 Maintenance Dredging Project
Mobilization & Demobilization
Reach 1 Dredging
Reach 2 Dredging
Reach 3 Dredging
Reach 4 Dredging
Reach 5 Dredging
Reach 6 Dredging
Reach 7 Dredging
Reach 8 Dredging
Reach 9 Dredging
Reach 10 Dredging
Reach 11 Dredging
Reach 12 Dredging
JOB
CY
CY
CY
CY
CY
CY
CY
CY
CY
CY
CY
CY
10,044
7,136
3,779
14,498
1,354
6,587
9,442
8,665
7,282
3,392
13,722
10,932
2,115,851.00
26.16
21.92
20.12
20.68
24.75
28.11
26.25
22.36
21.01
20.27
20.69
21.73
2,115,851.00
262,751.04
156,421.12
76,033.48
299,818.64
33,511.50
185,160.57
247,852.50
193,749.40
152,994.82
68,755.84
283,908.18
237,552.36
1,217,946.00
803,419.56
347,237.76
160,229.60
707,067.46
118,623.94
389,357.57
541,121.02
407,861.55
328,345.38
143,108.48
599,514.18
472,371.72
1,217,946.00
79.99
48.66
42.40
48.77
87.61
59.11
57.31
47.07
45.09
42.19
43.69
43.21
1,067,000.00
39.00
39.00
39.00
30.00
39.00
39.00
39.00
39.00
39.00
39.00
39.00
28.00
1,067,000.00
391,716.00
278,304.00
147,381.00
434,940.00
52,806.00
256,893.00
368,238.00
337,935.00
283,998.00
132,288.00
535,158.00
306,096.00
W912P726BA001
Mary Fronck - Contracting Officer
Curtin Maritime Corp. The Dutra Group
SF24 and 20% SF24 and 20%
YES YES
05/11/202604/10/2026
7A.
ITEM
NO.
2 Bids 13 CLINs 3-6 Bids 13 CLINs39 CLINs26 CLINs 39 CLINs26 CLINsReset Form
Page 2 of 5ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
USACE, SAN FRANCISCO DISTRICT
450 GOLDEN GATE
SAN FRANCISCO CA 94102
San Joaquin/ Port of Stockton FY26 Maintenance Dredging Project
0014 Reach 13 Dredging CY49,169 23.08 1,134,820.52 1,516,863.6530.85 28.00 1,376,732.00
W912P726BA001
Mary Fronck - Contracting Officer
Curtin Maritime Corp. The Dutra Group
SF24 and 20% SF24 and 20%
YES YES
05/11/202604/10/2026
7A.
ITEM
NO.
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W912P726BA001
San Joaquin/ Port of Stockton FY26 Maintenance Dredging Project
SF24 and 20%
YES
306,096.0028.00CY10,9320013
384,216.0028.00CY13,7220012
94,976.0028.00CY3,3920011
203,896.0028.00CY7,2820010
242,620.0028.00CY8,6650009
264,376.0028.00CY9,4420008
184,436.0028.00CY6,5870007
37,912.0028.00CY1,3540006
405,944.0028.00CY14,4980005
105,812.0028.00CY3,7790004
199,808.0028.00CY7,1360003
281,232.0028.00CY10,0440002
1 JOB 4,250,000.00 4,250,000.00
3 4
Manson Construction Co.
CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W912P726BA001
San Joaquin/ Port of Stockton FY26 Maintenance Dredging Project
SF24 and 20%
YES
0014 49,169 CY 28.00 1,376,732.00
3 4
Manson Construction Co.
TOTALS
5,449,180.97GOVERNMENT ESTIMATE
7,753,067.87Curtin Maritime Corp.
5,969,485The Dutra Group
8,338,056Manson Construction Co.
Page of
1. SOLICITATION NUMBER
2. DATE ISSUED
3. DATE OPENED
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE
DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST. QUANTITY
D. UNIT
E. UNIT
PRICE
F. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT (Without Profit) C. REASONABLE CONTRACT (Including Profit)
9. OFFERS
NO. 1
NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable NOTE: If more than two offers are received, continue on OF 1419A.
OPTIONAL FORM 1419 (11-88)
\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg
7A. ITEM NO.
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
2. DATE ISSUED
3. DATE OPENED
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE
DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST. QUANTITY
D. UNIT
E. UNIT
PRICE
F. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT (Without Profit) C. REASONABLE CONTRACT (Including Profit)
9. OFFERS
NO. 1
NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable NOTE: If more than two offers are received, continue on OF 1419A.
OPTIONAL FORM 1419 (11-88)
\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg
7A. ITEM NO.
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
2. DATE ISSUED
3. DATE OPENED
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE
DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST. QUANTITY
D. UNIT
E. UNIT
PRICE
F. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT (Without Profit) C. REASONABLE CONTRACT (Including Profit)
9. OFFERS
NO. 1
NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable NOTE: If more than two offers are received, continue on OF 1419A.
OPTIONAL FORM 1419 (11-88)
\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg
7A. ITEM NO.
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
2. PROJECT TITLE
NO.:
NO.:
NO.:
NO.:
A. OFFEROR
A. OFFEROR
A. OFFEROR
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
2. PROJECT TITLE
NO.:
NO.:
NO.:
NO.:
A. OFFEROR
A. OFFEROR
A. OFFEROR
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
2. PROJECT TITLE
NO.:
NO.:
NO.:
NO.:
A. OFFEROR
A. OFFEROR
A. OFFEROR
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
TOTALS
8.2.1.3144.1.471865.466429
| CurrentPage: |
| PageCount: |
| SignatureField1: |
| 4. ISSUING OFFICE: USACE, SAN FRANCISCO DISTRICT |
450 GOLDEN GATE
SAN FRANCISCO CA 94102
| 2. PROJECT TITLE: San Joaquin/ Port of Stockton FY26 Maintenance Dredging Project |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 0001 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 0002 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: 0003 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: 0004 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: 0005 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: 0006 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: 0007 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: 0008 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: 0009 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: 0010 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.: 0011 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.: 0012 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.: 0013 |
| 7B. DESCRIPTION OF OFFERED ITEM: Mobilization & Demobilization |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 1 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 2 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 3 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 4 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 5 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 6 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 7 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 8 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 9 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 10 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 11 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 12 Dredging |
| 3C. CONTRACT ITEMS. UNIT: JOB |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3B. ESTIMATED QUANTITY: 1.00000000 |
| 3B. ESTIMATED QUANTITY: 10044.00000000 |
| 3B. ESTIMATED QUANTITY: 7136.00000000 |
| 3B. ESTIMATED QUANTITY: 3779.00000000 |
| 3B. ESTIMATED QUANTITY: 14498.00000000 |
| 3B. ESTIMATED QUANTITY: 1354.00000000 |
| 3B. ESTIMATED QUANTITY: 6587.00000000 |
| 3B. ESTIMATED QUANTITY: 9442.00000000 |
| 3B. ESTIMATED QUANTITY: 8665.00000000 |
| 3B. ESTIMATED QUANTITY: 7282.00000000 |
| 3B. ESTIMATED QUANTITY: 3392.00000000 |
| 3B. ESTIMATED QUANTITY: 13722.00000000 |
| 3B. ESTIMATED QUANTITY: 10932.00000000 |
| E. UNIT PRICE: 2115851.00000000 |
| E. UNIT PRICE: 23.08000000 |
| E. UNIT PRICE: 26.16000000 |
| E. UNIT PRICE: 21.92000000 |
| E. UNIT PRICE: 20.12000000 |
| E. UNIT PRICE: 20.68000000 |
| E. UNIT PRICE: 24.75000000 |
| E. UNIT PRICE: 28.11000000 |
| E. UNIT PRICE: 26.25000000 |
| E. UNIT PRICE: 22.36000000 |
| E. UNIT PRICE: 21.01000000 |
| E. UNIT PRICE: 20.27000000 |
| E. UNIT PRICE: 20.69000000 |
| E. UNIT PRICE: 21.73000000 |
| F. ESTIMATED AMOUNT: 2115851.00000000 |
| F. ESTIMATED AMOUNT: 262751.04000000 |
| F. ESTIMATED AMOUNT: 156421.12000000 |
| F. ESTIMATED AMOUNT: 76033.48000000 |
| F. ESTIMATED AMOUNT: 299818.64000000 |
| F. ESTIMATED AMOUNT: 33511.50000000 |
| F. ESTIMATED AMOUNT: 185160.57000000 |
| F. ESTIMATED AMOUNT: 247852.50000000 |
| F. ESTIMATED AMOUNT: 193749.40000000 |
| F. ESTIMATED AMOUNT: 152994.82000000 |
| F. ESTIMATED AMOUNT: 68755.84000000 |
| F. ESTIMATED AMOUNT: 283908.18000000 |
| F. ESTIMATED AMOUNT: 237552.36000000 |
| F. ESTIMATED AMOUNT: 1134820.52000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 1217946.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 803419.56000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 347237.76000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 160229.60000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 707067.46000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 118623.94000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 389357.57000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 541121.02000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 407861.55000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 328345.38000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 143108.48000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 599514.18000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 472371.72000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 1516863.65000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 1217946.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 30.85000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 79.99000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 48.66000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 42.40000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 48.77000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 87.61000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 59.11000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 57.31000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 47.07000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 45.09000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 42.19000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 43.69000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 43.21000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 1067000.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 28.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 30.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 39.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 28.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 1067000.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 391716.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 278304.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 147381.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 434940.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 52806.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 256893.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 368238.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 337935.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 283998.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 132288.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 535158.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 306096.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 1376732.00000000 |
| 6. NUMBER OF AMENDMENTS ISSUED: 4 |
| 1. SOLICITATION NUMBER: W912P726BA001 |
| NAME AND TITLE OF CERTIFYING OFFICIAL (Type): Mary Fronck - Contracting Officer |
| OFFEROR1: Curtin Maritime Corp. |
| OFFEROR2: The Dutra Group |
| 9. OFFERS. NUMBER. 1. B. BID SECURITY (Type and amount): SF24 and 20% |
| 9. OFFERS. NUMBER. 2. B. BID SECURITY (Type and amount): SF24 and 20% |
| 9. OFFERS. NUMBER. 1. C. AMENDMENTS ACKNOWLEDGED: YES |
| 9. OFFERS. NUMBER. 2. C. AMENDMENTS ACKNOWLEDGED: YES |
| 3. DATE OPENED. Enter 2 digit month, 2 digit day and 4 digit year.: 2026-05-11 |
| 2. DATE ISSUED. Enter 2 digit month, 2 digit day and 4 digit year.: 2026-04-10 |
| Enter 2 digit month, 2 digit day and 4 digit year.: |
| 8. GOVERNMENT ESTIMATE |
(Check A, B or C and complete D, E, and F). A. HIRED LABOR: 0
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F). B. REASONABLE CONTRACT (Without Profit): 0
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F). C. REASONABLE CONTRACT (Including Profit): 1
| : |
| ResetButton1: |
| IGE: 4314360.45000000 |
| IGE: 1134820.52000000 |
| IGE: 0.00000000 |
| Offer1: 6236204.22000000 |
| Offer1: 1516863.65000000 |
| Offer1: 0.00000000 |
| Offer2: 4592753.00000000 |
| Offer2: 1376732.00000000 |
| Offer2: 0.00000000 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 0014 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.: |
| 7B. DESCRIPTION OF OFFERED ITEM: Reach 13 Dredging |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 3C. CONTRACT ITEMS. UNIT: CY |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: 49169.00000000 |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| SIGNATURE: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 3B. ESTIMATED QUANTITY: |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): SF24 and 20% |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 0.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: 306096.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 384216.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 94976.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 203896.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 242620.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 264376.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 184436.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 37912.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 405944.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 105812.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 199808.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 281232.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 4250000.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 1376732.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 4250000.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 28.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: |
| Offeror number. Column 1 of 4.: 3 |
| Offeror number. Column 2 of 4.: 4 |
| Offeror number. Column 3 of 4.: |
| Offeror number. Column 4 of 4.: |
| OFFEROR3: Manson Construction Co. |
| OFFEROR4: |
| OFFEROR5: |
| OFFEROR6: |
| Offer3: 6961324.00000000 |
| Offer3: 1376732.00000000 |
| Offer3: 0.00000000 |
| Offer4: 0.00000000 |
| Offer4: 0.00000000 |
| Offer4: 0.00000000 |
| Offer5: 0.00000000 |
| Offer5: 0.00000000 |
| Offer5: 0.00000000 |
| Offer6: 0.00000000 |
| Offer6: 0.00000000 |
| Offer6: 0.00000000 |
| NumericField1: |
| TextField1: |
File details come from the government source that posted it. Updated .