San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912P725BA003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Stockton, California 95203, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District San Francisco is seeking bids for the San Joaquin/Port of Stockton Deep Water Ship Channel (DWSC) FY25 Maintenance Dredging Project, with solicitation number W912P725BA003. The project requires annual maintenance dredging of the San Joaquin River shipping channel, with most reaches to be dredged to -35 feet mean lower low water (MLLW) plus 1 foot of paid over-depth, and the Sediment Trap to be dredged to -38.5 feet MLLW plus 1 foot of paid over-depth. Bidders must be registered in the System for Award Management (SAM) and the Procurement Integrated Enterprise Environment (PIEE), and submit comprehensive bid packages including financial statements and representations. Electronic bid submissions will be accepted from May 13 to May 19, 2025, with a public bid opening via Microsoft Teams scheduled for May 19, 2025, at 1:00 PM PDT. Evaluation criteria will include bid price, technical capability, and compliance with solicitation requirements.

The solicitation does not include any specific set-aside designations, and the government encourages small business participation with recommended subcontracting goals. The total estimated dredging volume is 169,800 cubic yards across 23 different reaches, with dredged material to be disposed of at government-furnished upland sites or contractor-furnished beneficial reuse sites. The project has a firm-fixed-price contract structure with an estimated cost range between $5,000,000 and $10,000,000 and a 127-day performance period. Five companies submitted bids, with prices ranging from $5,924,354.60 (Curtin Maritime Corp.) to $8,792,795 (J.F. Brennan Company), compared to the government estimate of $6,014,556.31. The place of performance is located in Stockton, California 95203, covering approximately 42 miles of the San Joaquin River shipping channel.

Notice text

7 versions

Update #7 · Latest ·

BID ABSTRACT POSTED 19-MAY-2025

_________________________________________________________________________________

AMENDMENT 0003- 

THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO ADDITIONAL RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED AFTER AMENDMENT 0002 WAS ISSUED; B) INCORPORATE SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS.

FOR EMPHASIS, PLEASE NOTE PARAGRAPH 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID.  CHANGE IN CONTRACT SPECIALIST FROM SUNTOK MCGUINNESS TO LISA IP EMAIL:  LISA.I.IP@USACE.ARMY.MIL

NOTE: BID DUE DATE REMAIN UNCHANGED (19 MAY 2025).

----------------------

**UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID:

PLEASE SEE ATTACHED.

-----------------------------------

**SPECIAL ANNOUNCEMENT:  CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE.  THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED.  MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED.

---------

Amendment 0002 - 

A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED

B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT"

C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment 0001  - Updated Pricing (Bid) Schedule

___________________________________________________________________________________________________

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Update #6 ·

AMENDMENT 0003- 

THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO ADDITIONAL RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED AFTER AMENDMENT 0002 WAS ISSUED; B) INCORPORATE SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS.

FOR EMPHASIS, PLEASE NOTE PARAGRAPH 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID.  CHANGE IN CONTRACT SPECIALIST FROM SUNTOK MCGUINNESS TO LISA IP EMAIL:  LISA.I.IP@USACE.ARMY.MIL

NOTE: BID DUE DATE REMAIN UNCHANGED (19 MAY 2025).

----------------------

**UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID:

PLEASE SEE ATTACHED.

-----------------------------------

**SPECIAL ANNOUNCEMENT:  CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE.  THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED.  MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED.

---------

Amendment 0002 - 

A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED

B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT"

C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment 0001  - Updated Pricing (Bid) Schedule

___________________________________________________________________________________________________

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Update #5 ·

**UPDATES ON 1.7 SPECIAL INSTRUCTIONS FOR SUBMITTING YOUR BID:

PLEASE SEE ATTACHED.

-----------------------------------

**SPECIAL ANNOUNCEMENT:  CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE.  THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED.  MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED.

---------

Amendment 0002 - 

A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED

B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT"

C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment 0001  - Updated Pricing (Bid) Schedule

___________________________________________________________________________________________________

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Update #4 ·

**SPECIAL ANNOUNCEMENT:  CONTRACT SPECIALIST POINT OF CONTACT DESIGNATION CHANGE.  THE CONTRACT SPECIALIST ASSIGNED TO THIS SOLICITATION IS CHANGED FROM SUNTOK MCGUINNESS TO LISA IP (Lisa.I.Ip@usace.army.mil) WHERE FUTURE INQUIRIES OR CORRESPONDENCES CAN BE TRANSMITTED.  MARY FRONK AS CONTRACTING OFFICER REMAIN UNCHANGED.

---------

Amendment 0002 - 

A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED

B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT"

C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment 0001  - Updated Pricing (Bid) Schedule

___________________________________________________________________________________________________

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Update #3 ·

Amendment 0002 - 

A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED

B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT"

C) DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment 0001  - Updated Pricing (Bid) Schedule

___________________________________________________________________________________________________

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Update #2 ·

Amendment 0001  - Updated Pricing (Bid) Schedule

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Update #1 ·

The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth.  All dredge material is suitable for the upland sites shown on plan sheets. Dredge material may be suitable for beneficial reuses at Contractor furnished sites in accordance with the permit requirements of the specific reuse sites and per the requirements in specification Section 01 11 00 SUMMARY OF WORK.

Files

Show all 14

Notice history

Notice Type Posted
San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project Award Award Notice
This notice Latest solicitation Solicitation
San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors