This is a Questions and Answers document for contract W912P726BA001, a San Joaquin/Stockton Deep Water Ship Channel (DWSC) FY26 Maintenance Dredging project, with a revision date of 21 April 2026.

The document addresses two inquiries from potential bidders. The first question concerns the applicability of the Department of War 2026 Class Deviations incorporating the Revolutionary FAR Overhaul (RFO) to this solicitation. The Government confirmed that RFO provisions and clauses are applicable, with links provided under FAR clauses 52.252-1 and 52.252-2. The second question addresses site inspection requirements for dredged material placement sites and associated dikes. The Government clarified that the requirement for contractors to conduct pre-bid site inspections has been deleted from the solicitation via amendment 0002. Due to resource constraints, no pre-bid site visit will be provided, and no bid allowance will be included for this inspection effort. Bidders must factor site condition assessment into their proposals without Government-provided site visit opportunities or financial accommodation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question Response 1 For the project referenced above, we have reviewed the contract documents and do not see reference to the Department of War 2026 Class Deviations incorporating the Revolutionary FAR Overhaul. Please advise whether the RFO is applicable to this contract.

Yes, RFO provisions and clauses are used for this solicitation. Link to the RFO are provided under FAR 52.252- 1 and 52.252-2.

2 Section 35 20 23 3.5.1 states: "The Contractor is to satisfy itself as to conditions of the dredged material placement sites, including all dikes, during a site inspection. After NTP, the contractor shall coordinate with the Government about the inspection dates. "

Please specify whether the contractor can expect this site visit prior to the bid to determine level of effort, or consider a bid allowance for this effort.

The first sentence of Specification Section 35 20 23, Paragraph 3.5.1—“The Contractor is to satisfy itself as to conditions of the dredged material placement sites, including all dikes, during a site inspection.”—has been deleted from the Solicitation with amendment 0002.

Due to resource constraints, a pre-bid site visit will not be provided, nor will a bid allowance be included.