This document is an Abstract of Offers - Construction Continuation Sheet for the Codorus Creek Shoal Removal project (Solicitation Number W912DR25BA001). The document details bid submissions from three offerors: Ark Construction Management LLC, Ayuda Renova JV, and A-zone ECS JV. The project involves removing shoals at two locations, including pebbles, cobbles, vegetation, wood debris, and gravel with some sediment, requiring in-water work to be completed within 60 days of the Notice to Proceed.

The bid abstracts show three line items (LS - Lump Sum) with varying bid prices: Ark Construction Management's total bid is $2,221,338.70, Ayuda Renova JV's total bid is $2,093,349.00, and A-zone ECS JV's total bid is $3,507,226.00. The solicitation is a Small Business set-aside restricted to Women-Owned Small Businesses, with a construction magnitude between $1,000,000 and $5,000,000, issued by the Department of the Army Corps of Engineers Engineering District Baltimore.

View the file

Other versions and copies of SF 1419

File Revision Posted Attached to
24B0006_Bid Abstract SF 1419 - 6.26.2024_Signed.pdf Jun 26, 2024 LARGE DEBRIS RELOCATION AT MOTCO
RFQ 19AR2026Q0028 AND SF1419.pdf Revision not stated FAC - OBC - SIP - Artwork move, storage and reinstallation
Bid Abstract- SF 1419_W912P726BA003_Suisun.pdf Revision not stated SUISUN BAY CHANNEL AND NY SOLUGH FY26 MAINTENANCE DREDGING PROJECT
Bid Abstract- SF 1419.pdf Revision not stated San Joaquin/Stockton DWSC FY26 Maintenance Dredging Project
SF 1419 Abstract of Offers Construction.pdf Revision not stated Repair Small Arms Range Bullet Trap
SF 1419_Abstract of Offers Construction Combined.pdf Revision not stated Repair Small Arms Range Bullet Trap
Bid Abstract- SF 1419_KO Signed.pdf Revision not stated Richmond Inner Harbor FY25 Maintenance Dredging
C4 - AbstractOfOffers_Construction_SF1419.pdf Revision not stated Pavement Repair Base Wide - 139th Airlift Wing, St Joseph MO
Bid Abstract SF 1419 Pajaro Reach 6.pdf Revision not stated Pajaro River Reach 6
Bid Abstract- SF 1419 FY25 RWC (1).pdf Revision not stated FY25 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT LOCATION
AbstractOfOffers_SF1419_ModernizeBLDG128.pdf Revision not stated Modernize BLDG 128
SF 1419_ABSTRACT_OF_OFFERS_W912PL25BA007_signed.pdf Revision not stated Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
SF 1419 abstract offers W912DR25BA002 Codorus Creek Shoal Removal JM signable.pdf Revision not stated Codorus Creek Shoal Removal
Bid Abstract- SF 1419_MOTCO.pdf Revision not stated Military Ocean Terminal Concord (MOTCO) Berms Construction and Dredging Project
Bid Abstract- SF 1419 FY25 Suisun.pdf Revision not stated FY25 SUISUN BAY CHANNEL NY SLOUGH MAINTENANCE DREDGING PROJECT
Bid Abstract- SF 1419.pdf Revision not stated San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project
Bid Abstract- SF 1419_KO Signed.pdf Revision not stated RICHMOND INNER HARBOR FY24 MAINTENANCE DREDGING PROJECT
Bid Abstract- SF 1419 CRESCENT CITY.pdf Revision not stated CRESCENT CITY HARBOR FY24 MAINTENANCE DREDGING
SJ Stockton Bid Abstract SF 1419 Print Preview_Signed.pdf Revision not stated San Joaquin-Port of Stockton DWSC FY 24 Maintenance Dredging Project
Bid Abstract- SF 1419_24B0002.pdf Revision not stated Oakland Inner and Outer Harbor FY 24 Maintenance Dredging
Show all 20

Who attaches SF 1419

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

1. SOLICITATION NUMBER

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: W912DR25BA001
2. PROJECT TITLE: Codorus Creek Shoal Removal
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% of bid
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% of bid
4B. OFFERS (Continued) BID SECURITY (Type and amount): Bid Bond 20% of bid
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: Yes
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: Yes
4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: Yes
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
3B. ESTIMATED QUANTITY:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:
3C. CONTRACT ITEMS. UNIT:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.: 3507226.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.: 2093349.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.: 2221338.74000000
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.:
3C. CONTRACT ITEMS. UNIT: TOTAL
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.: 2889062.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.: 1357964.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.: 1990882.84000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.:
3C. CONTRACT ITEMS. UNIT: LS
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: 3.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.: 35009.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.: 96472.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.: 38409.32000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.:
3C. CONTRACT ITEMS. UNIT: LS
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 2.00000000
3B. ESTIMATED QUANTITY: 1.00000000
3C. CONTRACT ITEMS. UNIT: LS
4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.:
4E. OFFERS (Continued) ESTIMATED.: 192046.58000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.: 638913.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.: 583155.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
PAGE OF: 2.00000000
PAGES: 2.00000000
Offeror number. Column 1 of 4.: 03
Offeror number. Column 2 of 4.: 04
Offeror number. Column 3 of 4.: 05
Offeror number. Column 4 of 4.:
A. OFFEROR: Ark Construction Management LLC
A. OFFEROR: Ayuda Renova JV
A. OFFEROR: A-zone ECS JV
A. OFFEROR: