WVA B120 - COMBINED DRAWING - RTA part 3.pdf
PDF 27 MB Posted
- Solicitation number
- W912DS24R0020
About this file
This document appears to be related to a Request for Proposals (RFP) for the Repair of Building 120, a multi-use building at Watervliet Arsenal in New York. The project will consolidate a wood shop and general facility maintenance work into a centralized ground-level space, construct a new modern lab facility on the second level, and provide new office space on the third level. The solicitation is a single-step "Best Value Trade Off" procurement valued between $25M-$100M, with the government evaluating proposals in accordance with the Source Selection Criteria and awarding a firm fixed price contract to the responsible offeror providing the best overall value. This acquisition will involve a Project Labor Agreement. The procuring agency is the Department of the Army Corps of Engineers, Engineering District New York.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C
D
E
B
F
G
A
AD-201
AD-201
AD-2021AD-202 2
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
FREIGHT ELEVATOR PIT
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
0"
0"
0"
0"
0"
7"
D01 TYP.
D02 TYP.
D09
D08
D06
D18D05
TYP.
UNEXCAVATED
SUPPORTS FOR CANOPY ABOVE
D48
D49
D50
D08
D12 D12
D63
REFER TO STRUCTURAL
REFER TO STRUCTURAL
RE
FE
R
TO
S
TR
UC
TU
RA
L
3"
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1.
2.
3.
4.
5.
REMOVE EXISTING FLOORING AND ADHESIVES UNLESS NOTED OTHERWISE - LEAVE
SUBSTRATE READY FOR FINISHED FLOOR. PROVIDE SELF LEVELING COMPOUND AS
REQUIRED AND CRACK CONTROL MEMBRANE WHERE NECESSARY.
PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY. WHERE EXISTING TO REMAIN
WORK IS DAMAGED, RETURN TO LIKE NEW CONDITION.
DEMOLISH ALL EXISTING RESTROOMS FIXTURES AND ACCESSORIES.
COORDINATE DIMENSION FOR EXISTING WALLS TO REMAIN WITH NEW CONSTRUCTION
WORK.
EXISTING FIRST FLOOR SHOP EQUIPMENT TO PROTECT & RELOCATE AS NEEDED FOR
STAGING IN NEW PLAN.
6. REMOVE ALL WALL BASES EXCEPT AT LOBBY VESTIBULE
7. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
8. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
9. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF DAMAGE AT
ALL OPENINGS CREATED BY SELECTIVE DEMOLITION AND NEW CONSTRUCTION WORK.
REPAIR AND REPLACE DAMAGED AREAS AT NO ADDITIONAL COST TO THE OWNER.
10. FOR ALL STRUCTURAL SUPPORT POSTS INCLUSIVE OF DUCT AND COOLING TOWER
SUPPORTS, COORDINATE REMOVAL OF ROOF ASSEMBLY
GENERAL DEMOLITION NOTES
11. ALL PENETRATIONS OF EXISTING FLOORS AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE
PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ETC. SHALL BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO MAINTAIN THE REQUIRED CODE
COMPLIANT FIRE RATING.
12. EXISTING FLOOR PENETRATIONS, WHERE PIPING, DUCTWORK, CONDUIT, OR OTHER ITEMS HAVE BEEN
REMOVED DURING DEMOLITION ARE TO BE FILLED WITH CONCRETE TO MATCH THE EXISTING
SURROUNDING FLOOR AND REQUIRED FIRE RATINGS.
13. PROTECT EXISTING INTERIOR WALLS TO REMAIN DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC.; CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS TO BE CONSISTENT WITH THE SPECIFICATIONS SECTION AND
DIVISION 1, GENERAL REQUIREMENTS.
14. PLANS ARE DIAGRAMMATIC AND PROVIDED TO SHOW INTENT ONLY, UNLESS SPECIFICALLY NOTED.
OTHERWISE, ALL PARTITION ASSEMBLIES INDICATED TO BE DEMOLISHED SHALL BE DEMOLISHED COMPLETELY, INCLUDING PLASTER, MASONRY, GWB, STUDS, TRACKS FASTENING DEVICES, AND ALL
RELATED PARTS.
15. SALVAGED MATERIALS INDICATED ARE PROPERTY OF THE OWNER. TEMPORARILY STORE MATERIALS ON SITE AS DIRECTED BY THE OWNER. PROVIDE ALL NECESSARY PROTECTION AGAINST MOISTURE, IMPACT, AND ANY OTHER TYPE OF POTENTIAL DAMAGE. WALK EXISTING CONDITIONS WITH OWNER TO
IDENTIFY ITEMS.
16. REMOVE EXISTING FURNITURE AND/OR WORKSTATIONS; OWNER TO DETERMINE WHAT TO SALVAGE.
17. ALL WALLS TO BE DEMOED ARE FULL HEIGHT METAL STUD AND GYP BD UNLESS OTHERWISE NOTED.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
7:
P M
AD100
EN
TR
Y D
EM
O
LI
TI
O N
P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"1 ENTRANCE FLOOR DEMO PLAN
KEY VALUE DEMOLISHED ELEMENT(S)
D01 DEMOLISH WINDOW UNIT; REFER TO SHEET A-502 FOR SILL, HEAD & JAMB EXISTING
TO REMAIN CONDITIONS
D02 DEMOLISH INTERIOR FURRING WALL AT EXTERIOR WALL AT ALL EXISTING LOCATIONS;
GC TO VIF
D05 REFER TO A-703 FOR CENTER STAIR DEMOLITION SCOPE
D06 DEMOLISH STAIR & ASSOCIATED HANDRAIL/GUARDRAIL
D08 DEMOLISH ALL EXISTING RESTROOM AND/OR JANITOR FIXTURES & ACCESSORIES -
CAP/FILL SLAB PENETRATIONS
D09 DEMOLISH SLAB AND BEAM FOR PASSENGER ELEVATOR, REFER TO STRUCTURAL
D12 REMOVE EXISTING RECESS SCALE, FILL IN PIT FLUSH WITH SLAB
D18 DEMOLISH RUBBER TREADS AND HANDRAIL/GUARDRAIL; EXISTING STAIRS TO
REMAIN; PREP FOR FUTURE FINISH
D48 REMOVE EXISTING FURNITURE AND/OR WORKSTATIONS; OWNER TO DETERMINE
WHAT TO SALVAGE
D49 REMOVE EXISTING GRILLE
D50 DEMOLISH WATERFOUNTAIN AND/OR SINK BASIN AND ASSOCIATED PIPING
D63 DEMOLISH STOREFRONT ENTRANCE
KEY VALUE EXISTING ELEMENT(S)
09 EXISTING FENCE TO REMAIN
10 EXISTING TERAZZO FLOORING TO REMAIN
11 EXISTING TO REMAIN AT INTERIOR SIDES OF VESTIBULE; REMOVE AND STORE
STOREFRONT ENTRANCE FOR FUTURE REINSTALLATION
28 EXISTING WALL GRILLES TO PROTECT IN PLACE
KEYNOTE LEGEND
PLAN NORTH
8'4' 16'0
1/8" = 1' - 0" SCALE OF FEET
KEYNOTE LEGEND
UP
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C
D
E
B
F
G
A
AD-201
AD-201
AD-2021AD-202 2
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
0"
0"
0"
0"
0"
7"
FREIGHT
ELEVATOR
ELEV1
AD-201
D08
D06
D06
D30
D10
D30 D06
D12
D03
D30
D30
D01
D02
D09 D18 D15
D13
D12
D30 04
D16
D06 D06
D16
D06
D16
03 D10
D29
D08
D11
D08
D06
D01
D02 D08
TYP.
TYP.
TYP.
TYP.
5' - 11 1/2"
+/- AFF
0"
+/- AFF
D29
D08
PLYWOOD STORAGE RACKS
STO
PLYWOOD STORAGE RACKS
PLYWOOD
STORAGE
RACKS
PL
YW
OO
D
ST
OR
AG
E
RA
CK
S
WOOD SHEETS
STO RACK
W
OO
D
SH
EE
TS
ST
O
RA
CK
LADDER
D30 D30
D30
1' - 0" 9' - 8"
12' - 0"
SEE GENERAL NOTE #4
D30
WOOD STORAGE
BS-6
BS-2
BS-1B
BS-1A
BS-3A
BS-3B
BS-4A BS-4B
BS-9
BS-7
BS-8B
BS-5
WS-1
BS-8A
BOX SHOP
BS-10
BS-10
BS-10
BS-10
D43
D44
STO
DRAWER
STO
DRAWER
BS-10
STEREO
COPIER
KITCHENETTECABINETFRIDGE
SH
EL
VI
NG
STO
DRAWERS
WORK BENCHES
STO CABINETS
SH
EL
VI
NG
SH
EL
VI
NG
RM123 RM121B RM121A RM121 RM142B
RM142
RM142A
RM144
RM144A
RM146A
RM146
RM148
RM136
RM134
RM138
RM150
RM109
RM119
RM132
RM113
RM115
RM117
RM117ARM107
RM109A
RM130
RM128RM126RM124RM122
RM120
RM120A
RM120B
RM118BRM118A
RM118
RM114
RM116
RM112
RM110
RM108
RM100
RM102A
RM102 RM104
RM106
RM105RM103
D13
D45
1' - 4"4"
EXISTING BOX
SHOP OFFICE
OTHERS TO MOVE PW SHOP OPERATION TO A
NEW SITE (INCLUDING FURNITURE); NIC
5" 9'
- 3
D50
29 D51
D51
D51
D52
V.I.F.
11' - 1 3/4"
V.I.F.
2' - 6 1/4"
D27D08
D59 TYP.
D03 16
ST
RU
CT
UR
AL
RE
FE
R
TO
STRUCTURAL
REFER TO
REFER TO STRUCTURAL STRUCTURAL
REFER TO
STRUCTURAL
REFER TO
REFER TO STRUCTURAL STRUCTURAL
REFER TO
STRUCTURAL
REFER TO
REFER TO STRUCTURAL STRUCTURAL
REFER TO
ST
RU
CT
UR
AL
RE
FE
R
TO
ST
RU
CT
UR
AL
RE
FE
R
TO
12' - 10 3/4"
8' - 0"
2' - 10" 6' - 0"
9'
- 9
9'
- 9
2'
- 1 3/ 4"
7'
- 0 1/ 2"
1' - 5"
2'
- 1 3/ 4"
7'
- 0 1/ 2"
8' - 0"
1' - 0"
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1.
2.
3.
4.
5.
REMOVE EXISTING FLOORING AND ADHESIVES UNLESS NOTED OTHERWISE - LEAVE
SUBSTRATE READY FOR FINISHED FLOOR. PROVIDE SELF LEVELING COMPOUND AS
REQUIRED AND CRACK CONTROL MEMBRANE WHERE NECESSARY.
PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY. WHERE EXISTING TO REMAIN
WORK IS DAMAGED, RETURN TO LIKE NEW CONDITION.
DEMOLISH ALL EXISTING RESTROOMS FIXTURES AND ACCESSORIES.
COORDINATE DIMENSION FOR EXISTING WALLS TO REMAIN WITH NEW CONSTRUCTION
WORK.
EXISTING FIRST FLOOR SHOP EQUIPMENT TO PROTECT & RELOCATE AS NEEDED FOR
STAGING IN NEW PLAN.
6. REMOVE ALL WALL BASES EXCEPT AT LOBBY VESTIBULE
7. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
8. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
9. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF DAMAGE AT
ALL OPENINGS CREATED BY SELECTIVE DEMOLITION AND NEW CONSTRUCTION WORK.
REPAIR AND REPLACE DAMAGED AREAS AT NO ADDITIONAL COST TO THE OWNER.
10. FOR ALL STRUCTURAL SUPPORT POSTS INCLUSIVE OF DUCT AND COOLING TOWER
SUPPORTS, COORDINATE REMOVAL OF ROOF ASSEMBLY
GENERAL DEMOLITION NOTES
11. ALL PENETRATIONS OF EXISTING FLOORS AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE
PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ETC. SHALL BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO MAINTAIN THE REQUIRED CODE
COMPLIANT FIRE RATING.
12. EXISTING FLOOR PENETRATIONS, WHERE PIPING, DUCTWORK, CONDUIT, OR OTHER ITEMS HAVE BEEN
REMOVED DURING DEMOLITION ARE TO BE FILLED WITH CONCRETE TO MATCH THE EXISTING
SURROUNDING FLOOR AND REQUIRED FIRE RATINGS.
13. PROTECT EXISTING INTERIOR WALLS TO REMAIN DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC.; CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS TO BE CONSISTENT WITH THE SPECIFICATIONS SECTION AND
DIVISION 1, GENERAL REQUIREMENTS.
14. PLANS ARE DIAGRAMMATIC AND PROVIDED TO SHOW INTENT ONLY, UNLESS SPECIFICALLY NOTED.
OTHERWISE, ALL PARTITION ASSEMBLIES INDICATED TO BE DEMOLISHED SHALL BE DEMOLISHED COMPLETELY, INCLUDING PLASTER, MASONRY, GWB, STUDS, TRACKS FASTENING DEVICES, AND ALL
RELATED PARTS.
15. SALVAGED MATERIALS INDICATED ARE PROPERTY OF THE OWNER. TEMPORARILY STORE MATERIALS ON SITE AS DIRECTED BY THE OWNER. PROVIDE ALL NECESSARY PROTECTION AGAINST MOISTURE, IMPACT, AND ANY OTHER TYPE OF POTENTIAL DAMAGE. WALK EXISTING CONDITIONS WITH OWNER TO
IDENTIFY ITEMS.
16. REMOVE EXISTING FURNITURE AND/OR WORKSTATIONS; OWNER TO DETERMINE WHAT TO SALVAGE.
17. ALL WALLS TO BE DEMOED ARE FULL HEIGHT METAL STUD AND GYP BD UNLESS OTHERWISE NOTED.
EQUIPMENT TYPE
BS-1A RADIAL ARM SAW 1
BS-1B RADIAL ARM SAW 2
BS-2 TABLE SAW
BS-3A BAND SAW 1
BS-3B BAND SAW 2
BS-4A BELT SANDER 1
BS-4B BELT SANDER 2
BS-6 PLANER
BS-7 PANEL SAW
BS-8A ASSEMBLY TABLE 1
BS-8B ASSEMBLY TABLE 2
BS-9 SCALE
BS-10 WORK BENCH
WS-1 BAND SAW 3
BS-5 ROUTER TABLE
BO
X
SH
OP
EQ. # SHOP #
WV 2322
WV 11257
WV 11686
WV 9293
WV 9265
WV 11711
WV 12157
WV 9358
WV 12932
N/A
N/A
N/A
N/A
WV 9358
WV 1052
EQUIPMENT TYPE
PW-1A HYDRAULIC BREAK
PW-2
HYDRAULIC SHEAR
PW-3
TABLE SAW W/ TABLE
PW-4A
SLIDE MITER SAW
PW-4B
BAND SAW 1
PW-5
BAND SAW 2
PW-6
WOOD DISC/BELT SANDER
PW-8A L. FLAMMABLE STORAGE
PW-8B S. FLAMMABLE STORAGE
PW-8C M. FLAMMABLE STORAGE
PW-10 CNC MACHINE W/ COLLECTOR
PW-13 PIPE THREADER
PW-14 PARTS WASHER
PUNCH (X3)
PW-16
PW-17
PW-18
PW-1B
SAND BLASTER
METAL DRILL PRESS
ELECTRIC HYDRAULIC PRESS
PU
BL
IC
W
OR
KS
PW-23 LARGE PAINT STORAGE CONTAINER
EQ. # SHOP #
A9118
WV 12965
WV 13008
WV 09364
G 2792
IMI052
IMP075
WV 12147
IMP076
N/A
N/A
N/A
H7220
N/A
N/A
IMP031
IMP039
E1281
PW-20 METAL DISC/BELT SANDERTBD
PW-26 FUME EXTRACTOR & SNORKEL
PW-27 (X2) WELDERSPW 5667
N/A
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
7:
P M
AD101
FI
R
ST
A
N D
M
EZ
ZA
N
IN
E
FL
O
O R
D
EM
O
LI
TI
O
N P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"1
FIRST AND MEZANNINE FLOOR DEMO
PLAN
PLAN NORTH
8'4' 16'0
1/8" = 1' - 0" SCALE OF FEET
KEY VALUE DEMOLISHED ELEMENT(S)
D01 DEMOLISH WINDOW UNIT; REFER TO SHEET A-502 FOR SILL, HEAD & JAMB EXISTING
TO REMAIN CONDITIONS
D02 DEMOLISH INTERIOR FURRING WALL AT EXTERIOR WALL AT ALL EXISTING LOCATIONS;
GC TO VIF
D03 DEMOLISH DOOR, FRAMING, AND ACCESSORIES
D06 DEMOLISH STAIR & ASSOCIATED HANDRAIL/GUARDRAIL
D08 DEMOLISH ALL EXISTING RESTROOM AND/OR JANITOR FIXTURES & ACCESSORIES -
CAP/FILL SLAB PENETRATIONS
D09 DEMOLISH SLAB AND BEAM FOR PASSENGER ELEVATOR, REFER TO STRUCTURAL
D10 DEMOLISH RAILING; STAIR TO REMAIN
D11 DEMOLISH STAIR, RAILING, AND LANDING
D12 REMOVE EXISTING RECESS SCALE, FILL IN PIT FLUSH WITH SLAB
D13 DEMOLISH TWO-LEVEL STRUCTURE
D15 REFER TO A-703 FOR CENTER STAIR DEMOLITION SCOPE
D16 DEMOLISH SLAB FOR NEW DOCK LEVELER
KEYNOTE LEGEND
KEY VALUE EXISTING ELEMENT(S)
03 EXISTING OVERHEAD DOOR TO REMAIN, PREP FOR REPAINT
04 EXISTING WINDOW TO REMAIN
05 EXISTING RECESSED SCALE TO REMAIN, PROTECT IN PLACE
09 EXISTING FENCE TO REMAIN
16 EXISTING MASONRY WALL; GC TO ENSURE 1 HR RATING
17 EYE WASH STATION; REMOVE AND STORE FOR FUTURE REINSTALLATION
29 EXISTING ELEVATOR CALL BUTTON PANEL TO REMAIN AND HALL, CONFIRM WORKING CONDITION AND REPAIR AS NEEDED
31 PORTABLE RAMP; REMOVE AND STORE FOR FUTURE REINSTALLATION
EQUIPMENT SCHEDULE
KEY VALUE DEMOLISHED ELEMENT(S)
D18 DEMOLISH RUBBER TREADS AND HANDRAIL/GUARDRAIL; EXISTING STAIRS TO
REMAIN; PREP FOR FUTURE FINISH
D27 DEMOLISH SLIDING DOOR AND DOOR TRACK
D29 EXISTING SHOP EQUIPMENT TO BE ITEMIZED IN LIST, REFER TO EQUIPMENT
SCHEDULE ON THIS PAGE; PROTECT & RELOCATE AS NEEDED FOR STAGING
D30 DEMOLISH OVERHEAD DOOR; FRAMING AND GRILLE TO REMAIN AND PREPARED FOR
REPAINT
D43 FOR ALL APPLIANCES/EQUIPMENT, COORDINATE WITH OWNER FOR SALVAGE VS
DISPOSE. TOASTER OVEN TO BE STORED FOR REUSE IN THE NEW CONSTRUCTION
D44 DEMOLISH MILLWORK, PLUMBING FIXTURES, ETC; CAP/FILL PLUMBING PIPES
D45 DEMOLISH FENCE
D50 DEMOLISH WATERFOUNTAIN AND/OR SINK BASIN AND ASSOCIATED PIPING
D51 DEMOLISH PIPE GUARDS AND/OR PIPE BOLLARDS; PATCH CONCRETE
D52 DEMOLISH ROD AND WELDING CURTAIN
D59 DEMOLISH PANEL BOX, REFER TO ELECTRICAL
D
E
B
F
G
A
0"
0"
0"
0"
0"
7"
AD-201
AD-201
AD-2021AD-202 2
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
0"
0"
0"
0"
0"
7"
FREIGHT
ELEVATOR
ELEV1
AD-201
D11
D23
D24
D09 D15 D18
D11
D23
D08
D08
D22D14
D08
TYP. @ CORRIDOR
D20
D21
1' - 0" 9' - 8"
1'
- 0
7'
- 1 0"
8 1/2" 18' - 7" 8 1/2"
3'
- 1
7"
5'
- 4
7 1 /2"
SEE GENERAL NOTE #4
9' - 10"
TYP.
D59 TYP.
D08
D42
7 1 /2"
9' - 10"
5"6' - 6"
DEMO EXISTING
INFILL FOR REPAIR
OF ELEVATOR DOOR
AND CONTROLS
ELEVATOR CALL
BUTTON, CONFIRM
WORKING CONDITION
AND REPAIR AS NEEDED
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1.
2.
3.
4.
5.
REMOVE EXISTING FLOORING AND ADHESIVES UNLESS NOTED OTHERWISE - LEAVE
SUBSTRATE READY FOR FINISHED FLOOR. PROVIDE SELF LEVELING COMPOUND AS
REQUIRED AND CRACK CONTROL MEMBRANE WHERE NECESSARY.
PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY. WHERE EXISTING TO REMAIN
WORK IS DAMAGED, RETURN TO LIKE NEW CONDITION.
DEMOLISH ALL EXISTING RESTROOMS FIXTURES AND ACCESSORIES.
COORDINATE DIMENSION FOR EXISTING WALLS TO REMAIN WITH NEW CONSTRUCTION
WORK.
EXISTING FIRST FLOOR SHOP EQUIPMENT TO PROTECT & RELOCATE AS NEEDED FOR
STAGING IN NEW PLAN.
6. REMOVE ALL WALL BASES EXCEPT AT LOBBY VESTIBULE
7. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
8. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
9. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF DAMAGE AT
ALL OPENINGS CREATED BY SELECTIVE DEMOLITION AND NEW CONSTRUCTION WORK.
REPAIR AND REPLACE DAMAGED AREAS AT NO ADDITIONAL COST TO THE OWNER.
10. FOR ALL STRUCTURAL SUPPORT POSTS INCLUSIVE OF DUCT AND COOLING TOWER
SUPPORTS, COORDINATE REMOVAL OF ROOF ASSEMBLY
GENERAL DEMOLITION NOTES
11. ALL PENETRATIONS OF EXISTING FLOORS AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE
PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ETC. SHALL BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO MAINTAIN THE REQUIRED CODE
COMPLIANT FIRE RATING.
12. EXISTING FLOOR PENETRATIONS, WHERE PIPING, DUCTWORK, CONDUIT, OR OTHER ITEMS HAVE BEEN
REMOVED DURING DEMOLITION ARE TO BE FILLED WITH CONCRETE TO MATCH THE EXISTING
SURROUNDING FLOOR AND REQUIRED FIRE RATINGS.
13. PROTECT EXISTING INTERIOR WALLS TO REMAIN DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC.; CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS TO BE CONSISTENT WITH THE SPECIFICATIONS SECTION AND
DIVISION 1, GENERAL REQUIREMENTS.
14. PLANS ARE DIAGRAMMATIC AND PROVIDED TO SHOW INTENT ONLY, UNLESS SPECIFICALLY NOTED.
OTHERWISE, ALL PARTITION ASSEMBLIES INDICATED TO BE DEMOLISHED SHALL BE DEMOLISHED COMPLETELY, INCLUDING PLASTER, MASONRY, GWB, STUDS, TRACKS FASTENING DEVICES, AND ALL
RELATED PARTS.
15. SALVAGED MATERIALS INDICATED ARE PROPERTY OF THE OWNER. TEMPORARILY STORE MATERIALS ON SITE AS DIRECTED BY THE OWNER. PROVIDE ALL NECESSARY PROTECTION AGAINST MOISTURE, IMPACT, AND ANY OTHER TYPE OF POTENTIAL DAMAGE. WALK EXISTING CONDITIONS WITH OWNER TO
IDENTIFY ITEMS.
16. REMOVE EXISTING FURNITURE AND/OR WORKSTATIONS; OWNER TO DETERMINE WHAT TO SALVAGE.
17. ALL WALLS TO BE DEMOED ARE FULL HEIGHT METAL STUD AND GYP BD UNLESS OTHERWISE NOTED.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
7:
P M
AD102
SE
C
O N
D F
LO
O
R D
EM
O
LI
TI
O N
P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"1 SECOND FLOOR DEMO PLAN
FOR REFERENCE ONLY2 FREIGHT ELEVATOR WALL DEMO PLAN NORTH
8'4' 16'0
1/8" = 1' - 0" SCALE OF FEET
KEYNOTE LEGEND
KEY VALUE DEMOLISHED ELEMENT(S)
D08 DEMOLISH ALL EXISTING RESTROOM AND/OR JANITOR FIXTURES & ACCESSORIES -
CAP/FILL SLAB PENETRATIONS
D09 DEMOLISH SLAB AND BEAM FOR PASSENGER ELEVATOR, REFER TO STRUCTURAL
D11 DEMOLISH STAIR, RAILING, AND LANDING
D14 DEMOLISH MASONRY INFILL OPENING FOR EXISTING FREIGHT ELEVATOR DOOR AT
THIS LOCATION ONLY, PREPARE FOR REPAINT
D15 REFER TO A-703 FOR CENTER STAIR DEMOLITION SCOPE
D18 DEMOLISH RUBBER TREADS AND HANDRAIL/GUARDRAIL; EXISTING STAIRS TO
REMAIN; PREP FOR FUTURE FINISH
D20 DEMOLISH EXISTING CHILLERS
D21 DEMOLISH DUCT AND ASSOCIATED COMPONENTS
D22 REMOVE AND RELOCATE TELECOM/RADIO EQUIPMENT
D23 DEMOLISH SLAB AND BEAM FOR WIDENING OF STAIRS; REFER TO STRUCTURAL
D24 REMOVE EPOXY ON EXISTING CONCRETE SLAB
D42 COORDINATE DEMOLITION OF THE EXISTING ROOF ASSEMBLY WHERE EXISTING
SUPPORTS, CURBS, AND PENETRATIONS ARE TO BE REMOVED. REFER TO
MECHANICAL FOR ADDITIONAL INFORMATION. COORDIANTE THE DEMOLITION OF THE
EXISTING ROOF FOR NEW CONSTRUCTION OF CURBS, PENETRATIONS, AND
SUPPORTS.
D59 DEMOLISH PANEL BOX, REFER TO ELECTRICAL
KEY VALUE EXISTING ELEMENT(S)
18 ASSUMED 1 HR RATED EXISTING WALLS AT STAIR ENCLOSURE; GC TO CONFIRM AND
REPAIR AS NEEDED TO MEET RATING
29 EXISTING ELEVATOR CALL BUTTON PANEL TO REMAIN AND HALL, CONFIRM WORKING
CONDITION AND REPAIR AS NEEDED
M
C
D
E
B
F
G
A
AD-201
AD-201
AD-2021AD-202 2
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
0"
0"
0"
0"
0"
7"
FREIGHT
ELEVATOR
ELEV1
ROOF
D11
D23
D09
D11
D23
1'
- 0
7'
- 1 0"
1' - 0" 9' - 8"
1' - 5"
D59 TYP.
D26
7 1 /2"
9' - 10"
7 1 /2"
9' - 10"
3' - 6"
1' - 2" 8' - 4"
6'
- 6
1'
- 2
9" 8'
- 1 0"
1' - 0" 6' - 6"
7' - 0" 1' - 1"
2'
- 8
6'
- 9
9" 7'
- 1
6' - 4" 1' - 2"
CONFERENCE
X301
OFFICE
X302
TELECOM
3TL1
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1.
2.
3.
4.
5.
REMOVE EXISTING FLOORING AND ADHESIVES UNLESS NOTED OTHERWISE - LEAVE
SUBSTRATE READY FOR FINISHED FLOOR. PROVIDE SELF LEVELING COMPOUND AS
REQUIRED AND CRACK CONTROL MEMBRANE WHERE NECESSARY.
PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY. WHERE EXISTING TO REMAIN
WORK IS DAMAGED, RETURN TO LIKE NEW CONDITION.
DEMOLISH ALL EXISTING RESTROOMS FIXTURES AND ACCESSORIES.
COORDINATE DIMENSION FOR EXISTING WALLS TO REMAIN WITH NEW CONSTRUCTION
WORK.
EXISTING FIRST FLOOR SHOP EQUIPMENT TO PROTECT & RELOCATE AS NEEDED FOR
STAGING IN NEW PLAN.
6. REMOVE ALL WALL BASES EXCEPT AT LOBBY VESTIBULE
7. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
8. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
9. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF DAMAGE AT
ALL OPENINGS CREATED BY SELECTIVE DEMOLITION AND NEW CONSTRUCTION WORK.
REPAIR AND REPLACE DAMAGED AREAS AT NO ADDITIONAL COST TO THE OWNER.
10. FOR ALL STRUCTURAL SUPPORT POSTS INCLUSIVE OF DUCT AND COOLING TOWER
SUPPORTS, COORDINATE REMOVAL OF ROOF ASSEMBLY
GENERAL DEMOLITION NOTES
11. ALL PENETRATIONS OF EXISTING FLOORS AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE
PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ETC. SHALL BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO MAINTAIN THE REQUIRED CODE
COMPLIANT FIRE RATING.
12. EXISTING FLOOR PENETRATIONS, WHERE PIPING, DUCTWORK, CONDUIT, OR OTHER ITEMS HAVE BEEN
REMOVED DURING DEMOLITION ARE TO BE FILLED WITH CONCRETE TO MATCH THE EXISTING
SURROUNDING FLOOR AND REQUIRED FIRE RATINGS.
13. PROTECT EXISTING INTERIOR WALLS TO REMAIN DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC.; CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS TO BE CONSISTENT WITH THE SPECIFICATIONS SECTION AND
DIVISION 1, GENERAL REQUIREMENTS.
14. PLANS ARE DIAGRAMMATIC AND PROVIDED TO SHOW INTENT ONLY, UNLESS SPECIFICALLY NOTED.
OTHERWISE, ALL PARTITION ASSEMBLIES INDICATED TO BE DEMOLISHED SHALL BE DEMOLISHED COMPLETELY, INCLUDING PLASTER, MASONRY, GWB, STUDS, TRACKS FASTENING DEVICES, AND ALL
RELATED PARTS.
15. SALVAGED MATERIALS INDICATED ARE PROPERTY OF THE OWNER. TEMPORARILY STORE MATERIALS ON SITE AS DIRECTED BY THE OWNER. PROVIDE ALL NECESSARY PROTECTION AGAINST MOISTURE, IMPACT, AND ANY OTHER TYPE OF POTENTIAL DAMAGE. WALK EXISTING CONDITIONS WITH OWNER TO
IDENTIFY ITEMS.
16. REMOVE EXISTING FURNITURE AND/OR WORKSTATIONS; OWNER TO DETERMINE WHAT TO SALVAGE.
17. ALL WALLS TO BE DEMOED ARE FULL HEIGHT METAL STUD AND GYP BD UNLESS OTHERWISE NOTED.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
7:
P M
AD103
TH
IR
D F
LO
O
R D
EM
O
LI
TI
O N
P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"1 THIRD FLOOR DEMO PLAN
KEY VALUE DEMOLISHED ELEMENT(S)
D09 DEMOLISH SLAB AND BEAM FOR PASSENGER ELEVATOR, REFER TO STRUCTURAL
D11 DEMOLISH STAIR, RAILING, AND LANDING
D23 DEMOLISH SLAB AND BEAM FOR WIDENING OF STAIRS; REFER TO STRUCTURAL
D26 DEMOLISH EXISTING MEMBRANE ROOFING SYSTEM INCLUDING ALL ROOFING
COMPENENTS AND INSULATION. PERIMETER FLASHING AT COPING TO BE REMOVED
AS NEEDED FOR NEW CONSTRUCTION. PROTECT EXISITNG COPING TO BE REMAIN OR
TO BE REINSTALLED. PREP SUBSTRATE FOR NEW TPO ROOFING SYSTEM. EXISITNG
ROOF DRAIN VERTICAL PIPING TO REMAIN. ROOF DRAIN BODY TO BE REMOVED.
D59 DEMOLISH PANEL BOX, REFER TO ELECTRICAL
KEY VALUE EXISTING ELEMENT(S)
18 ASSUMED 1 HR RATED EXISTING WALLS AT STAIR ENCLOSURE; GC TO CONFIRM AND
REPAIR AS NEEDED TO MEET RATING
KEYNOTE LEGEND
PLAN NORTH
8'4' 16'0
D
E
B
F
G
A
AD-201
AD-201
AD-2021AD-202 2
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
0"
0"
0"
0"
0"
7"
FREIGHT ELEVATOR
OVERRUN
DOCK CANOPY ROOF BELOW
ROOF BELOW, REFER TO SHEET AD103
D09
ROOF OF FREIGHT ELEVATOR
IS NOT IN SCOPE OF WORK
ROOF OF STAIR #3 IS
NOT IN SCOPE OF WORK
1'
- 0
7'
- 1 0"
1' - 0" 9' - 8"
D41
D42
CONFIRM DEMOLISH
REQUIREMENT WITH
ROOFTOP MANUF. FOR
SUPPORT LOCATIONS, TYP
@MAU & EXHAUST FAN
COORDINATE SIZE AND
LOCATION PER RTU
LOCATION
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1. REMOVE EXISTING FLOORING AND ADHESIVES UNLESS NOTED OTHERWISE - LEAVE
SUBSTRATE READY FOR FINISHED FLOOR. PROVIDE SELF LEVELING COMPOUND AS
REQUIRED AND CRACK CONTROL MEMBRANE WHERE NECESSARY.
2. PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY. WHERE EXISTING TO REMAIN
WORK IS DAMAGED, RETURN TO LIKE NEW CONDITION.
3. DEMOLISH ALL EXISTING RESTROOMS FIXTURES AND ACCESSORIES.
4. COORDINATE DIMENSION FOR EXISTING WALLS TO REMAIN WITH NEW CONSTRUCTION
WORK.
5. EXISTING FIRST FLOOR SHOP EQUIPMENT TO PROTECT & RELOCATE AS NEEDED FOR
STAGING IN NEW PLAN.
6. REMOVE ALL WALL BASES EXCEPT AT LOBBY VESTIBULE
7. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
8. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
9. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF DAMAGE AT
ALL OPENINGS CREATED BY SELECTIVE DEMOLITION AND NEW CONSTRUCTION WORK.
REPAIR AND REPLACE DAMAGED AREAS AT NO ADDITIONAL COST TO THE OWNER.
10. FOR ALL STRUCTURAL SUPPORT POSTS INCLUSIVE OF DUCT AND COOLING TOWER
SUPPORTS, COORDINATE REMOVAL OF ROOF ASSEMBLY
GENERAL DEMOLITION NOTES
11. ALL PENETRATIONS OF EXISTING FLOORS AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE
PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ETC. SHALL BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO MAINTAIN THE REQUIRED CODE
COMPLIANT FIRE RATING.
12. EXISTING FLOOR PENETRATIONS, WHERE PIPING, DUCTWORK, CONDUIT, OR OTHER ITEMS HAVE BEEN
REMOVED DURING DEMOLITION ARE TO BE FILLED WITH CONCRETE TO MATCH THE EXISTING
SURROUNDING FLOOR AND REQUIRED FIRE RATINGS.
13. PROTECT EXISTING INTERIOR WALLS TO REMAIN DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC.; CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS TO BE CONSISTENT WITH THE SPECIFICATIONS SECTION AND
DIVISION 1, GENERAL REQUIREMENTS.
14. PLANS ARE DIAGRAMMATIC AND PROVIDED TO SHOW INTENT ONLY, UNLESS SPECIFICALLY NOTED.
OTHERWISE, ALL PARTITION ASSEMBLIES INDICATED TO BE DEMOLISHED SHALL BE DEMOLISHED COMPLETELY, INCLUDING PLASTER, MASONRY, GWB, STUDS, TRACKS FASTENING DEVICES, AND ALL
RELATED PARTS.
15. SALVAGED MATERIALS INDICATED ARE PROPERTY OF THE OWNER. TEMPORARILY STORE MATERIALS ON SITE AS DIRECTED BY THE OWNER. PROVIDE ALL NECESSARY PROTECTION AGAINST MOISTURE, IMPACT, AND ANY OTHER TYPE OF POTENTIAL DAMAGE. WALK EXISTING CONDITIONS WITH OWNER TO
IDENTIFY ITEMS.
16. REMOVE EXISTING FURNITURE AND/OR WORKSTATIONS; OWNER TO DETERMINE WHAT TO SALVAGE.
17. ALL WALLS TO BE DEMOED ARE FULL HEIGHT METAL STUD AND GYP BD UNLESS OTHERWISE NOTED.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
3:
:0
PM
AD104
R O
O F
D
EM
O
LI
TI
O
N P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"1 ROOF DEMO PLAN
KEY VALUE DEMOLISHED ELEMENT(S)
D09 DEMOLISH SLAB AND BEAM FOR PASSENGER ELEVATOR, REFER TO STRUCTURAL
D41 AREA OF EXISTING ROOFTOP DRY COOLER, ASSOCIATED REFRIGERANT PIPING,
SUPPORTS, ACCESSORIES, AND CONTROLS TO BE REMOVED - PATCH AND REPAIR
ROOF
D42 COORDINATE DEMOLITION OF THE EXISTING ROOF ASSEMBLY WHERE EXISTING
SUPPORTS, CURBS, AND PENETRATIONS ARE TO BE REMOVED. REFER TO
MECHANICAL FOR ADDITIONAL INFORMATION. COORDIANTE THE DEMOLITION OF THE
EXISTING ROOF FOR NEW CONSTRUCTION OF CURBS, PENETRATIONS, AND
SUPPORTS.
KEY VALUE EXISTING ELEMENT(S)
06 EXISTING STAIR TO REMAIN
07 EXISTING ROOFING SYSTEM TO REMAIN
19 EXISTING ROOF OF ELEVATOR MACHINE ROOM ABOVE; EXISTING TO REMAIN
PLAN NORTH
8'4' 16'0
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C
D
E
B
F
G
A
D53 D53 D53 D53
D54
D55
D58
D56
REMOVE & REPLACE
LIGHT, REFER TO ELEC
D65
1. PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY.
2. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
3. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
GENERAL CEILING DEMOLITION NOTES
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
7:
P M
AD110
EN
TR
Y D
EM
O
LI
TI
O N
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
PLAN NORTH
8'4' 16'0
1/8" = 1'-0"1 ENTRY LEVEL RCP_DEMO
KEYNOTE LEGEND
KEY VALUE EXISTING ELEMENT(S)
08 EXISTING PLASTER CEILING TO REMAIN
32 EXISTING PLASTER CROWN MOLDING TO REMAIN
33 EXISTING CANOPY TO PROTECT IN PLACE
KEY VALUE DEMOLISHED ELEMENT(S)
D53 DEMOLISH EXISTING BULKHEAD AND ASSOCIATED CEILING MOUNTED DEVICES
D54 REMOVE EXPOSED SPRINKLER PIPING
D55 DEMOLISH PORTION OF PLASTER CEILING; COORDINATE WITH NEW FIRE RATED PARTITION
D56 DEMOLISH LIGHTING AND LIGHTING COVE/VALANCE
D58 DEMOLISH PORTION OF PLASTER CEILING; COORDINATE WITH NEW VESTIBULE WORK
D65 DEMOLISH PLASTER CEILING
D
E
B
F
G
A
D37
D13
D57
PI
TC
HE
D
CE
ILI
NG
PI
TC
HE
D
CE
ILI
NG
PI
TC
HE
D
CE
ILI
NG
PI
TC
HE
D
CE
ILI
NG
D32
D32
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1. PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY.
2. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
3. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
GENERAL CEILING DEMOLITION NOTES
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
8:
P M
AD111
FI
R
ST
F
LO
O
R A
N D
M
EZ
ZA
N
IN
E
D
EM
O
LI
TI
O
N R
EF
LE
C
TE
D C
EI
LI
N G
P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
PLAN NORTH
8'4' 16'0
1/8" = 1'-0"1 FIRST FLOOR AND MEZANNINE RCP DEMO
KEY VALUE DEMOLISHED ELEMENT(S)
D13 DEMOLISH TWO-LEVEL STRUCTURE
D32 CAREFULLY REMOVE COILING GRILLE, TRACK, HOUSING AND MOTOR
D37 REFER TO STRUCTURE FOR HOIST BEAM SCOPE OF WORK
D57 REFER TO STRUCTURAL FOR BEAM DEMOLITION SCOPE
KEY VALUE EXISTING ELEMENT(S)
34 HANGING TRAFFIC LIGHT; CONSULT USER FOR PROTECT/SALVAGE/REUSE
D
E
B
F
G
A
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1. PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY.
2. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
3. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
GENERAL CEILING DEMOLITION NOTES
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
8:
P M
AD112
SE
C
O N
D F
LO
O
R D
EM
O
LI
TI
O N
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
PLAN NORTH
1/8" = 1'-0"1 SECOND LEVEL RCP DEMO
D
E
B
F
G
A
TEMPORARILY REMOVE AND SALVAGE EXISTING CEILING GRID AND TILES
TO ACCOMMODATE MECHANICAL, FIRE PROTECTION AND ELECTRICAL
WORK. INSTALL NEW WORK. PROTECT FINISHES, EQUIPMENT, FURNISHING
DURING REMOVAL. RE-INSTALL EXISTING CEILING TILES. PATCH, CLEAN
AND REPAIR ANY DAMAGE TO THE EXISTING SPACE.
REMOVE BEAM AND BRACKETS BELOW
SLAB, REFER TO STRUCTURAL
DEMO PORTION OF EXISTING BEAM,
REFER TO STRUCTURAL
EXISTING TO REMAIN
DEMOLITION LEGEND
EXISTING TO BE DEMOLISHED
FLOOR/ ROOF SLAB TO BE REMOVED
ROOF ASSEMBLY TO BE REMOVED
EXISTING ACT CEILING TO BE DEMOLISHED
CMU WALL TO BE DEMOLISHED
1. PROTECT ALL EXISTING WORK INDICATED TO REMAIN FROM DAMAGE DURING
DEMOLITION INCLUDING HISTORIC ENTRANCE LOBBY.
2. CONTRACTOR SHALL NOTIFY THE OWNER OF ANY AND ALL DISCREPANCIES BETWEEN
THE DEMOLITION DRAWINGS AND SPECIFICATIONS AND ACTUAL CONDITIONS PRIOR TO
PROCEEDING WITH THE WORK.
3. REFER TO M/E/P AND FP DEMOLITION AND NEW WORK DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
GENERAL CEILING DEMOLITION NOTES
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
8:
P M
AD113
TH
IR
D F
LO
O
R D
EM
O
LI
TI
O N
R
EF
LE
C
TE
D
C
EI
LI
N
G
PL
AN
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
PLAN NORTH
1/8" = 1'-0"1 THIRD FLOOR RCP DEMO
ENTRANCE FLOOR_FF
-5' - 11 1/2"
MEZZANINE_FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
02_LEVEL_FF
17' - 10 1/2"
03_LEVEL_FF
32' - 9 1/4"
ROOF_BTM OF SLAB
46' - 5 1/4"
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BRIDGE TO
BLDG 115;
NOT IN
SCOPE
ELEVATOR MACHINE RM
56' - 5 1/4"
D01
D01
TYP.
TYP.
EXISTING FREIGHT
ELEVATOR OVERRUN;
NOT IN SCOPE
DEMOLISH
DOWNSPOUTS
D01 TYP.
D01
TYP.
D01 TYP.
D01 TYP.
DEMO BRICK & PREPARE
FOR FIRE DEPARTMENT
CONNECTION
ENTRANCE FLOOR_FF
-5' - 11 1/2"
MEZZANINE_FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
02_LEVEL_FF
17' - 10 1/2"
03_LEVEL_FF
32' - 9 1/4"
ROOF_BTM OF SLAB
46' - 5 1/4"
2 1345678910111213141516
ELEVATOR MACHINE RM
56' - 5 1/4"
D01
D01
TYP.
D01
TYP.
D3003 D30 D30 D30
D28
D01 TYP.
EXISTING FREIGHT
ELEVATOR OVERRUN;
NOT IN SCOPE
PREP FOR REPAINT
D19 D19 2727 27 27 27
D33 D33 D33
REMOVE EXISTING BUMPER
D60 D01 D32 D62 D62 D62
D03
8. CLEAN ALL EXTERIOR MASONRY WITH LOW-PRESSURE PRESSURE WASH AND NON-
ACID MASONRY CLEANING SOLUTION.
9. THE DOCK OVERHEAD CANOPY WILL BE PREPPED AND REPAINTED AS WELL AS THE
CRANE BEAM STRUCTURAL SUPPORTS. REMOVE OLD CRANE, TRACKS TO REMAIN.
10. REFER TO AR SERIES DRAWINGS, TYP. FOR ADDITIONAL DEMOLITION SCOPE.
11. EXISTING SILLS TO REMAIN UNLESS OTHERWISE INDICATED ON THE AR DRAWINGS,
TYP.
12. PATCH/REPAIR EXTERIOR MASONRY AT AREAS WHERE BRICK IS DAMAGED OR HAS
FASTENER HOLES FROM DEMOLISHED SCOPE.
13. REFER TO MECHANICAL FOR EXTERIOR DEMOLITION SCOPE.
GENERAL DEMOLITION NOTES
1. DEMOLISH EXISTING WINDOWS.
2. DEMOLISH ALL EXISTING EXTERIOR DUCT & PIPES ON ELEVATION.
3. DEMOLISH ALL EXISTING DOWNSPOUTS & CONDUCTORS.
4. REMOVE LOOSE BRICK AND PREPARE FOR NEW WORK.
5. DEMOLISH ALL EXTERIOR DOORS & HARDWARE, EXCEPT FOR ENTRY DOOR.
6. DEMOLISH ALL OVERHEAD DOORS, EXCEPT THE NORTHWEST DOOR.
7. PREPARE METAL FOR PAINTING.
ELEMENTS TO REMAIN
LEGEND
ELEMENTS TO BE REMOVED
WINDOW TO BE REMOVED
EXISTING BRICK TO REMAIN
EXISTING DUCTS AND PIPES TO BE REMOVED.
FOR INFORMATION ONLY, GC TO CONFIRM.
EXISTING BRICK TO BE REMOVED
MEZZANINE_FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
02_LEVEL_FF
17' - 10 1/2"
3456789
D01
TYP.
D03 D30
D03D34 D34 D64D64D64
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
3:
:5
PM
AD-201
EX
TE
R
IO
R E
LE
VA
TI
O
N S
D
EM
O
EA
ST
W
ES
T
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"1 EXTERIOR ELEVATION - EAST - DEMO
1/8" = 1'-0"2 EXTERIOR ELEVATION - WEST- DEMO
1/8" = 1'-0"3
DEMO ELEVATION OF BRICK WALL AT
FIBER SHOP
FOR REFERENCE ONLY5 EAST PERSPECTIVE 2
FOR REFERENCE ONLY4 EAST PERSPECTIVE 1
FOR REFERENCE ONLY6 WEST PERSPECTIVE 1
FOR REFERENCE ONLY7 WEST PERSPECTIVE 2
KEY VALUE DEMOLISHED ELEMENT(S)
D01 DEMOLISH WINDOW UNIT; REFER TO SHEET A-502 FOR SILL, HEAD & JAMB EXISTING TO REMAIN CONDITIONS
D03 DEMOLISH DOOR, FRAMING, AND ACCESSORIES
D19 PREP FOR REPAINT
D28 REMOVE CRANE; TRACKS TO REMAIN
D30 DEMOLISH OVERHEAD DOOR; FRAMING AND GRILLE TO REMAIN AND PREPARED FOR REPAINT
D32 CAREFULLY REMOVE COILING GRILLE, TRACK, HOUSING AND MOTOR
D33 DEMOLISH LOUVER
D34 DEMOLISH BRICK
D60 DEMOLISH EXHAUST FAN
D62 DEMOLISH METAL WALL WHERE LOUVERS WILL BE INSTALLED
D64 DEMOLISH SILL
KEYNOTE LEGEND
KEY VALUE EXISTING ELEMENT(S)
03 EXISTING OVERHEAD DOOR TO REMAIN, PREP FOR REPAINT
06 EXISTING STAIR TO REMAIN
12 EXISTING EQUIPMENT TO REMAIN
24 EXISTING METAL PANEL EXTERIOR WALL ASSEMBLY, STEEL COLUMNS, AND PURLINS TO REMAIN IN PLACE
27 EXISTING COILING GRILLE HOUSING TO REMAIN
ENTRANCE FLOOR_FF
-5' - 11 1/2"
MEZZANINE_FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
02_LEVEL_FF
17' - 10 1/2"
03_LEVEL_FF
32' - 9 1/4"
ROOF_BTM OF SLAB
46' - 5 1/4"
CDE BFG A
BRIDGE TO BLDG 115
A-310
ELEVATOR MACHINE RM
56' - 5 1/4"
D36
D30 D33
D40
EXISTING FREIGHT
ELEVATOR OVERRUN
5'
- 1
1 1 /2"
D30
ENTRANCE FLOOR
-5' - 11 1/2"
D34
D01
D01
D01
D01
D01
D01
D01
TYP
TYP
TYP
EXISTING LOUVER
TO REMAIN
ENTRANCE FLOOR_FF
-5' - 11 1/2"
MEZZANINE_FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
02_LEVEL_FF
17' - 10 1/2"
03_LEVEL_FF
32' - 9 1/4"
ROOF_BTM OF SLAB
46' - 5 1/4"
C D EB F GA
BRIDGE TO BLDG 115
A-310
ELEVATOR MACHINE RM
56' - 5 1/4"
D07 D11
D31
D03
D39
D06
EXISTING FREIGHT
ELEVATOR OVERRUN
D32
ENTRANCE FLOOR
-5' - 11 1/2"
D01
D01
D01 D01
D01 TYP
D01
D01
TYP
TYP
BRICK DEMO FOR
NEW GAS PIPE
PENETRATION
8. CLEAN ALL EXTERIOR MASONRY WITH LOW-PRESSURE PRESSURE WASH AND NON-
ACID MASONRY CLEANING SOLUTION.
9. THE DOCK OVERHEAD CANOPY WILL BE PREPPED AND REPAINTED AS WELL AS THE
CRANE BEAM STRUCTURAL SUPPORTS. REMOVE OLD CRANE, TRACKS TO REMAIN.
10. REFER TO AR SERIES DRAWINGS, TYP. FOR ADDITIONAL DEMOLITION SCOPE.
11. EXISTING SILLS TO REMAIN UNLESS OTHERWISE INDICATED ON THE AR DRAWINGS,
TYP.
12. PATCH/REPAIR EXTERIOR MASONRY AT AREAS WHERE BRICK IS DAMAGED OR HAS
FASTENER HOLES FROM DEMOLISHED SCOPE.
13. REFER TO MECHANICAL FOR EXTERIOR DEMOLITION SCOPE.
GENERAL DEMOLITION NOTES
1. DEMOLISH EXISTING WINDOWS.
2. DEMOLISH ALL EXISTING EXTERIOR DUCT & PIPES ON ELEVATION.
3. DEMOLISH ALL EXISTING DOWNSPOUTS & CONDUCTORS.
4. REMOVE LOOSE BRICK AND PREPARE FOR NEW WORK.
5. DEMOLISH ALL EXTERIOR DOORS & HARDWARE, EXCEPT FOR ENTRY DOOR.
6. DEMOLISH ALL OVERHEAD DOORS, EXCEPT THE NORTHWEST DOOR.
7. PREPARE METAL FOR PAINTING.
ELEMENTS TO REMAIN
LEGEND
ELEMENTS TO BE REMOVED
WINDOW TO BE REMOVED
EXISTING BRICK TO REMAIN
EXISTING DUCTS AND PIPES TO BE REMOVED.
FOR INFORMATION ONLY, GC TO CONFIRM.
EXISTING BRICK TO BE REMOVED
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R
TA
S U
BM
IS
SI
O
N
/0 1/
IS
SU
E
FO
R C
O N
ST
R
U C
TI
O
N Au to de sk D oc s:
//A U
S-
-U
SA
C
E_ N
Y_ W
VA
_B ld g1
_R ec ap
/A -W
VA
0_ R
.rv t 6/
/2
:1
8:
P M
AD-202
EX
TE
R
IO
R E
LE
VA
TI
O
N S
D
EM
O
N O
R
TH
S
O U
TH
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
E.
W
R
IG
H T
L.
L
U
B.
M
C C
AR
TH
Y
E.
W
R
IG
H T
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
1/8" = 1'-0"2 EXTERIOR ELEVATION - SOUTH - DEMO
1/8" = 1'-0"1 EXTERIOR ELEVATION - NORTH - DEMO
FOR REFERENCE ONLY3 NORTH PERSPECTIVE
FOR REFERENCE ONLY4 SOUTH PERSPECTIVE
KEY VALUE DEMOLISHED ELEMENT(S)
D01 DEMOLISH WINDOW UNIT; REFER TO SHEET A-502 FOR SILL, HEAD & JAMB EXISTING TO REMAIN CONDITIONS
D03 DEMOLISH DOOR, FRAMING, AND ACCESSORIES
D06 DEMOLISH STAIR & ASSOCIATED HANDRAIL/GUARDRAIL
D07 REFER TO CIVIL
D11 DEMOLISH STAIR, RAILING, AND LANDING
D30 DEMOLISH OVERHEAD DOOR; FRAMING AND GRILLE TO REMAIN AND PREPARED FOR REPAINT D31 CAREFULLY REMOVE ELECTRONIC SIGNAGE AND PROVIDE TO OWNER FOR SAFE STORAGE; PATCH/REPAIR BRICK AS NEEDED
D32 CAREFULLY REMOVE COILING GRILLE, TRACK, HOUSING AND MOTOR
D33 DEMOLISH LOUVER
D34 DEMOLISH BRICK
D36 DEMOLISH DUST COLLECTOR
D39 DEMOLISH COLLECTOR HEADS AND DOWNSPOUTS
D40 DEMOLISH DOOR, RAIL, AND BEAMS
KEYNOTE LEGEND
KEY VALUE EXISTING ELEMENT(S)
07 EXISTING ROOFING SYSTEM TO REMAIN
23 EXISTING STEEL PANEL TO REMAIN, PREP FOR REPAINT
24 EXISTING METAL PANEL EXTERIOR WALL ASSEMBLY, STEEL COLUMNS, AND PURLINS TO REMAIN IN PLACE
27 EXISTING COILING GRILLE HOUSING TO REMAIN
2 1345678 910111213141516
WW1B WW7EWW1B WW1
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
EXTR 02
EXTR 01EXTR 05EXTR 06
EXTR 07
WW15 WW15 WW15
N10
N19
N11
N30
N30 N30 N30
N19
N11
N30
N30
N45
ROOF_BOTTOM OF SLAB
46' - 5 1/4"
03_LEVEL_FF
32' - 9 1/4"
02_LEVEL_FF
17' - 10 1/2"
MEZZANINE FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
ENTRANCE FLOOR FF
-5' - 11 1/2"
RJ
50 LF
BR
200 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
1 SF
CS
1 SF
BR
FP
2 SF
BR
2 SF
RB
40 SF
BC
30 SF
BR
32 SF
RJ
20 LF
BR
8 SF
RJ
30 LF
BR
1 SF
RB
10 SF
BR
2 SF
RJ
30 LF
RB
25 SF
BR
2 SF
RJ
30 LF
RJ
50 LF
BR
5 SF
BR
4 SF
RB
25 SF
RJ
50 LF
BR
2 SF
RJ
50 LF
BB
(TYP) FLOOR 2
AND 3
300 SF LR
(TYP) ALL
WINDOWS
16 LF
RJ
(TYP) ALL
WINDOW SILLS
2 LF
CJ
50 LF
CJ
50 LF
CR
1 SF
SEE DETAIL 11/AR-452
SEE DETAIL 12/AR-452
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BRIDGE TO
BLDG 115
EXISTING FENCE
NEW PASSENGER
ELEVATOR OVERRUN
NEW FENCE
WW8
WW8
WW1
WW8
WW8
WW1
WW8
WW8
WW7B
WW8
WW8
WW1
WW8
WW8
WW1
WW8 WW8 WW8 WW8 WW8
WW2B WW2B WW2B.1 WW2B.1 WW2B WW2B WW2B WW2B
WW2A WW2A WW2A.1 WW2A WW2A WW2A WW2A WW2A
WW8
WW8
WW7B
WW8
WW8
WW1
WW8
WW8
WW7A
WW8
WW8
WW1
WW8
WW8
WW1WW2A WW2A
EXTR 08
N23
N19 TYP.
PREP AND REPAINT
EXISTING STAIR AND RAIL,
PT-55
EXISTING FREIGHT
ELEVATOR OVERRUN
WW2A.1 WW2A.1WW2A.1
WW2A.1
WW2A WW2A WW2A WW2A WW2A
LVR-8 LVR-7 LVR-6
ROOF_BOTTOM OF SLAB
46' - 5 1/4"
03_LEVEL_FF
32' - 9 1/4"
02_LEVEL_FF
17' - 10 1/2"
MEZZANINE FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
ENTRANCE FLOOR FF
-5' - 11 1/2"
RJ
40 LF
BR
100 SF
BC
30 SF
RB
2 SF
BR
6 SF
BR
6 SF
BR
2 SF
BR
10 SF
BC
25 SF
BC
25 SF
BC
25 SF
BR
15 SF
BR
5 SF
LR
TYP ALL MEZZ,
2 ,3 FLOOR
WINDOWS
16 LF
BB
TYP MEZZ, 2
AND 3 FLOORS
300 SF
RJ
53 LF
BR
20 SF
BR
20 SF
BR
30 SF
RB
4 SF
BR
15 SF
RJ
53 LF
RJ
40 LF
RJ
40 LF
BR
10 SF
RJ
53 LF
BR
10 SF
BR
15 SF
RJ
53 LF
RJ
40 LF
BR
15 SF
BR
15 SF
BC
40 SF
RJ
(TYP) ALL
WINDOW SILLS
2 LF
RJ
25 LF
BB
42 SF
LR
(TYP) ALL 1ST
FLOOR
WINDOWS
8 LF
STONE SILL
REPLACE
STONE SILL
REPLACE
BR
2 SF
RJ
25 LF
BRIDGE TO
BLDG 125
CJ
53 LF
AR-452
SEE DETAIL 5/AR-451
(TYP), FULL LENGTH OF
FACADE, ALL LEVELS
INFILL VENT
OPENING
INFILL VENT
OPENING
BB
42 SF
SEE DETAIL 1/AR-451
(TYP), FULL LENGTH OF
FACADE, ALL LEVELS
SEE DETAIL 5/AR-451
(TYP), FULL LENGTH OF
FACADE, ALL LEVELS
BC
25 SF
BC
25 SF
(SIM)
LR
8 LF
(TYP) ALL
MEZZANINE AND
SECOND FLOOR
WINDOWS
LR
10 LF
(SIM TO 2B/AR-451, ENGINEER
TO REVIEW CONDITIONS
FOLLOWING REMOVALS TO
CONFIRM REPAIR SCOPE)
REPOINT INTERIOR MASONRY.
SEE 14/AR-452
KEY NOTES
CJ
DESCRIPTION NOTES SYMBOLSDETAILMARK
CM
BR BRICK REMOVAL AND REPLACEMENT
INSTALL CONTROL JOINT
CLEAN MASONRY
RB REPOINT BRICK MASONRY
MORTAR JOINTS
REPAIR TAG
RJ REPLACE EXISTING BACKER ROD AND
SEALANT AT MASONRY JOINT
0.00 SF
XXX-XX-XX
NOTE
REPAIR CODE
REPAIR CODE SUFFIX
AND PRIORITY
APPROXIMATE SIZE OF REPAIR
ADDITIONAL NOTES
BI
INFILL OPENING WITH MASONRY PER ARCH DWGS. MATCH
EXIST COURSING AND TOOTH BRICK WITH EXISTING
ADJACENT BRICK TO REMAIN AT PERIMETER OF INFILL
LR LINTEL REPAIR
2 / AR-452
7 / AR-452
SEE SPECIFICATION
040300
1 / AR-452
5 (SIM) / AR-452
ALL ELEVATIONS
WHERE PROFILE OF BRICK
PROJECTS, BRICK IS TO BE SOLID,
WITHOUT CORE HOLES
BC INSTALL MORTAR WASH ALONG TOP OF
PROJECTING BRICK
FP INSTALL FLASHING AT PENETRATION
CR CONCRETE REPAIR
BB REMOVE AND REPLACE EXISTING MASONRY 1 / AR-451, 5 / AR-451
13 / AR-452
SEE ARCH DWGS
6 / AR-452
SEE ARCH DWGS
1/AR-451, 5 / AR-451
CS CLEAN AND COAT STEEL
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
R
TA
S U
BM
IS
SI
O
N
/0 1/
EX
PI
R
AT
IO
N
D
AT
E:
D
EC
EM
BE
R
1, Au to de sk
D oc s:
//A
U S-
-U
SA
C E_
N Y_
W
VA
_B ld g1
_R ec ap /A
R -W
VA
0_ R
.rv t 6/
/2
7:
:1
AM
Au to de sk
D oc s:
//A
U S-
-U
SA
C E_
N Y_
W
VA
_B ld g1
_R ec ap /A
R -W
VA
0_ R
.rv t 6/
/2
7:
:1
AM
AR-211
EA
ST
A N
D W
ES
T
BU
IL
D
IN
G E
LE
VA
TI
O
N S
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
P.
R
O U
IS
C . M
AX
O
N
PA
U
L A
R O
U
IS
P.
R
O U
IS
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0)
PR
O
JE
C
T N
O . W
2D
S2 3F
RTA SUBMISSION
SCALE: 1/8" = 1'-0"AR-211
2 EXTERIOR ELEVATION WEST
SCALE: 1/8" = 1'-0"AR-211
1 EXTERIOR ELEVATION EAST
1. RESTORATION CLEAN MASONRY FACADE, TYPICAL. ALL ELEVATIONS.
2. PATCH MASONRY AT ABANDONED FASTENER LOCATIONS FOLLOWING
MEP EQUIPMENT REMOVAL. COORD WITH MEP AND ARCH DRAWINGS.
3. FOR ESTIMATING PURPOSES, ASSUME AN ADDITIONAL 600 SF OF
REPOINTING FOR THE EAST AND WEST ELEVATIONS (EACH).
NOTES:
KEY NOTES
CJ
DESCRIPTION NOTES SYMBOLSDETAILMARK
CM
BR BRICK REMOVAL AND REPLACEMENT
INSTALL CONTROL JOINT
CLEAN MASONRY
RB REPOINT BRICK MASONRY
MORTAR JOINTS
REPAIR TAG
RJ REPLACE EXISTING BACKER ROD AND
SEALANT AT MASONRY JOINT
0.00 SF
XXX-XX-XX
NOTE
REPAIR CODE
REPAIR CODE SUFFIX
AND PRIORITY
APPROXIMATE SIZE OF REPAIR
ADDITIONAL NOTES
BI
INFILL OPENING WITH MASONRY PER ARCH DWGS. MATCH
EXIST COURSING AND TOOTH BRICK WITH EXISTING
ADJACENT BRICK TO REMAIN AT PERIMETER OF INFILL
LR LINTEL REPAIR
2 / AR-452
7 / AR-452
SEE SPECIFICATION
040300
1 / AR-452
5 (SIM) / AR-452
ALL ELEVATIONS
WHERE PROFILE OF BRICK
PROJECTS, BRICK IS TO BE SOLID,
WITHOUT CORE HOLES
BC INSTALL MORTAR WASH ALONG TOP OF
PROJECTING BRICK
FP INSTALL FLASHING AT PENETRATION
CR CONCRETE REPAIR
BB REMOVE AND REPLACE EXISTING MASONRY 1 / AR-451, 5 / AR-451
13 / AR-452
SEE ARCH DWGS
6 / AR-452
SEE ARCH DWGS
1/AR-451, 5 / AR-451
CS CLEAN AND COAT STEEL
C D EB F GA
WW7C
WW9
WW5 WW5
WW1
WW8
WW8
WW3A
WW3A
WW3B
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW8
WW7CWW1B
EXTR 08
EXTR 07
ROOF_BOTTOM OF SLAB
46' - 5 1/4"
03_LEVEL_FF
32' - 9 1/4"
02_LEVEL_FF
17' - 10 1/2"
MEZZANINE FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
ENTRANCE FLOOR FF
-5' - 11 1/2"
BC
25 SF
RB
5 SF
BR
4 SF
RJ
53 LF
BR
1 SF
BB
(TYP) ALL
FLOORS
10 SF EA
LR
5 LF (EA)
RB
8 SF
LR
5 LF
BR
3 SF
BC
10 SF
RB
5 SF
BR
3 SF
BC
5 SF
LR
(TYP) ALL
WINDOWS
16 LF
BB
(TYP) ALL
FLOORS
102 SF
RJ
53 LF
RJ
(TYP) ALL
WINDOW SILLS
10 LF
RB
15 SF
BR
10 SF
RJ
53 LF
BR
30 SF
RB
10 SF
BC
25 SF
BC
5 SF
BR
5 SF
BRIDGE TO
BLDG 125
RJ
53 LF RJ
53 LF
BC
10 SF
SEE DETAIL
11/AR-452 (SIM)
LR
(TYP)
BR
10 SF
BR
2 SF
BC
10 SF
SEE DETAIL
11/AR-452 (SIM)
SEE 1/AR-451 (TYP). AT
ALL LARGE WINDOWS
CDE BFG A
WW3B
WW3A
WW5
WW1WW7BWW7D
WW8 WW8 WW10 WW8 WW8
WW8 WW8 WW10 WW8 WW8
WW3A
EXTR 01
ROOF_BOTTOM OF SLAB
46' - 5 1/4"
03_LEVEL_FF
32' - 9 1/4"
02_LEVEL_FF
17' - 10 1/2"
MEZZANINE FF
5' - 11 1/2"
01_LEVEL_FF
0' - 0"
ENTRANCE FLOOR FF
-5' - 11 1/2"
BR
(TYP) ALL
FLOORS
102 SF
RB
200 SF
BC
50 SF
BR
15 SF
BR
2 SF
BI
110 SF
BR
15 SF
RB
200 SF
BC
50 SF
LR
10 LF
BR
(TYP) ALL
FLOORS
10 SF EA
BR
2 SF
LR
5 LF
LR
(TYP) ALL
WINDOWS
16 LF
RJ
(TYP) ALL
WINDOW SILLS
10 LF
BR
4 SF
LR
5 LF
NEW DUST
COLLECTOR
BRIDGE TO
BLDG 125
5/A451
SEE
PRECAST CONCRETE SILL.
SEE ARCH DWGS
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
x
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Fi le
P at h:
Pl ot D at e:
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
IS
SU
ED
F
O R
C O
N
ST
R U
C
TI
O N
R
TA
S U
BM
IS
SI
O
N
/0 1/
EX
PI
R
AT
IO
N
D
AT
E:
D
EC
EM
BE
R
1, Au to de sk
D oc s:
//A
U S-
-U
SA
C E_
N Y_
W
VA
_B ld g1
_R ec ap /A
R -W
VA
0_ R
.rv t 6/
/2
7:
:4
AM
Au to de sk
D oc s:
//A
U S-
-U
SA
C E_
N Y_
W
VA
_B ld g1
_R ec ap /A
R -W
VA
0_ R
.rv t 6/
/2
7:
:4
AM
AR-212
N O
R
TH
A N
D S
O U
TH
B
U
IL
D
IN
G E
LE
VA
TI
O
N S
W
AT
ER
VL
IE
T
AR
SE
N
AL
, N Y
N Y
D
IS
TR
IC
T
AR
C
AD
IS
U .S
IN
C
R O
U
TE
, S U
IT
E
0, C
LI
FT
O
N P
AR
K, N Y
P.
R
O U
IS
C . M
AX
O
N
PA
U
L A
R O
U
IS
P.
R
O U
IS
/0
1/
W
2D S2
3F
W
2D S2
0D
ID
C
-M
R
EC
AP
IT
AL
IZ
AT
IO
N O
F
BU
IL
D
IN
G
(B
0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .