A-110 - ENTRY LEVEL REFLECTED CEILING PLAN_Amend7.pdf
PDF 685 KB Posted
- Solicitation number
- W912DS24R0020
About this file
This document appears to be a Reflected Ceiling Plan (RCP) for the Entry Level of Building 120 at Watervliet Arsenal in New York. The RCP provides detailed information about the ceiling configuration, lighting, and HVAC elements for the ground floor of this 102,000 square foot multi-use commercial and industrial building.
The related federal contract opportunity is for the repair and renovation of Building 120 at Watervliet Arsenal. The project will consolidate a wood shop and general facility maintenance space on the ground level, construct a new modern lab facility on the second level, and provide new office space on the third level. This is a single-step "Best Value Trade Off" solicitation with an estimated contract value between $25M-$100M. The acquisition will involve a Project Labor Agreement. The contracting agency is the U.S. Army Corps of Engineers, New York District.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C R
OS1
OS1
OS1
OS1
OS1
OS1 OS1
OS1
O S
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C
D
E
B
F
G
A
A-302
A-302
A-302
A-302
A-311
A-301
A-301
PASSENGER
ELEV
ELEV2
MECH/ELEC
0EL1 STAIR 03
0STR03
VESTIBULE
HISTORIC LOBBY
ELEV LOBBY
A-311
A-311
A-310
@ EXPOSED
STRUCTURE
@ BAFFLE
LOBBY
004A-401
OPEN SPACE
0SH1
OPEN SPACE
0SH2
N29
N29
UNEXCAVATED
UNEXCAVATEDUNEXCAVATED
UNEXCAVATED UNEXCAVATED
9' - 4"
WD-02
8' - 1 1/2"
GC-01,PT-01
9' - 7 1/4"
PC-01,PT-01
9' - 7 1/4"
ETR
8' - 6"
GC-01,PT-01
EXPOSED
11' - 5"
PT-01,EXP
N/A
PT-01,EXP
11' - 5"
EXP
11' - 5"
EXP, PT-05
10' - 5"
N29
N36
N37
EXP
11' - 5"
MECH ROOM
0ME1
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
7'
1"
5'
0"
5'
4' - 6"
8' - 4 1/2" 4' - 7"
10' - 6" 4' - 11"
4'
8'
8'
13' - 8" 13' - 8" 5' - 10"
3'
1. ALL VERTICAL SURFACES OF SOFFITS TO BE PAINTED THE SAME COLOR AS ADJACENT
WALL U.N.O.
2. ALL LAY-IN CEILING SYSTEMS SHALL BE CENTERED IN ROOM U.N.O.
3. CEILING HEIGHTS INDICATED ARE TAKEN FROM THE FINISH FLOOR ELEVATION. THE SIZE, LOCATION AND CHARACTERISTICS OF ALL MECHANICAL, ELECTRICAL AND STRUCTURAL
ITEMS SHALL BE VERIFIED BEFORE CEILING CONSTRUCTION IS BEGUN.
4. ALL DEVICES AND FIXTURES TO BE INSTALLED IN A LAY-IN CEILING TILE SYSTEM SHALL
BE LOCATED IN THE CENTER OF THE TILE U.N.O. DEVICES INCLUDE, BUT ARE NOT
LIMITED TO: RECESSED CAN LIGHTS, SPEAKERS,FIRE PROTECTION DEVICES AND
SPRINKLER HEADS.
5. COORDINATE WITH ALL TRADES IN ORDER TO MAINTAIN SCHEDULED CEILING HEIGHTS.
IN AREAS WITH NO CEILINGS, ENSURE ALL DUCTWORK, PIPING & CEILING MOUNTED
EQUIPMENT MAINTAINS A MINIMUM CLEARANCE OF 7'-0"AFF. WHERE THERE IS
UNAVOIDABLE OVERLAP, LIGHTING SHALL BE SUSPENDED AT A CONSISTENT HEIGHT
WITHIN EACH AREA SO THAT LIGHTS ARE NOT OBSTRUCTED. VERIFY THAT REQUIRED
OPERATION AND MAINTENANCE CLEARANCES ARE PROVIDED FOR ALL EQUIPMENT
ITEMS.
6. ACCESS PANELS SHALL MATCH THE FIRE RATING AND/OR ACOUSTICAL REQUIREMENTS
OF THE WALL OR CEILING.
GENERAL RCP NOTES
7. ALL CEILING DEVICES AND LIGHT FIXTURES ARE SHOWN FOR
COORDINATION PURPOSES ONLY; GRAPHICS MAY VARY FROM
MANUFACTURER'S ACTUAL MODEL. REFER TO EACH DISCIPLINE'S
DRAWINGS AND SPECIFICATIONS (MECHANICAL, ELECTRICAL, FIRE ALARM,
FIRE PROTECTION & SECURITY) FOR QUANTITIES, SPECIFIED TYPES AND
OTHER REQUIREMENTS.
8. ALL DEVICES AND FIXTURES TO BE INSTALLED SHALL BE SELF-SUPPORTING
OR HAVE REQUIRED BLOCKING PROVIDED SO THAT NO ADDITIONAL WEIGHT
BEARS ON THE FINISHED CEILING.
9. REFER TO FINISH/MATERIAL SCHEDULE FOR SINGLE SHADE HOUSING AND
DOUBLE SHADE HOUSING.
10. REFER TO SHEET A-112A FOR UNDERSLAB INSULATION AND PERFORATED
METAL PANEL EXTENT
CEILING LEGEND
RECESSED DOWNLIGHT
GYPSUM
ACOUSTICAL CEILING TILE
PENDANT LINEAR LIGHT
CYLINDRICAL PENDANT LIGHT
RECESSED SLOT LIGHTING
LIGHTING SCHEDULE, FOR LOCATION ONLY
HIGH BAY WORKSHOP LED LIGHT
UNDERSLAB SEMI RIGID
INSULATION WITH PERFORATED
METAL PANEL FINISH
WOOD SLAT CEILING
UNDERSLAB SEMI RIGID
INSULATION
FELT CEILING BAFFLES; J
MOUNTING TYPE
XX-XX CEILING MATERIAL
CEILING TAG:
RS01
RS02A
RS03
SINGLE ROLLER SUN SHADE
DUAL ROLLER SHADE, SUN &
BLACK OUT, PLASTIC CHAIN
SINGLE ROLLER BLACK OUT
SHADE
WOOD VENEER CEILING
WALL MOUNTED LINEAR
LIGHT; AT STAIRS 1,3,
AND 5
2X2 TROFFER LIGHT
CEILING HT AFF
XX-XXX' - XX" CEILING HEIGHT
REFER TO LIGHTING PLAN E304 (ETC) FOR MORE INFORMATION. MAKE NOTE THAT THIS
CONTAINS BID ALTERNATE WHERE LOOKS ARE OPTIONS FOR LIGHTING.
SPRAY CELLULOSE ACOUSTICAL
INSULATION COATING
REFER TO FINISH SCHEDULE
ON SHEET A-640 FOR COLOR
SELECTION
2x2 SUPPLY
(IN ACT CEILING)
2x2 RETURN
(IN ACT CEILING)
ROUND DIFFUSER,
SUPPLY/RETURN
1X1 EXHAUST
(IN TOILET ROOM)
SUPPLY OR RETURN
SIDE DUCT
(IN OPEN CEILING)
RS02
DUAL ROLLER SHADE, SUN &
BLACK OUT, METAL CHAIN
PLASTER
EXPOSED CEILING
EPOXY
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R T
A S
U B
M
IS
S
IO
N /0
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
A u to d e s k D o c s
/A U
S -0
-U
S A
C E
N
Y W
V A
B ld g R e c a p /A
-W V
A R
.r v t
/1
/2
:2
:5
P
M
A-110
E N
T R
Y L
E V
E L R
E F
L E
C T
E D
C E
IL
IN
G P
L A
N
W A
T E
R V
L
IE
T A
R S
E N
A L N
Y
N Y
D
IS
T R
IC
T
A R
C A
D
IS
U .S
I N
C
R
O U
T E
S
U
IT
E
C L
IF
T O
N P
A R
K N
Y
E W
R
IG
H T
L L U
B M
C C
A R
T H
Y
E W
R
IG
H T
/0
/2
W D
S F
W D
S D
I D
C -M
R E
C A
P
IT
A L
IZ
A T
IO
N
O F
B U
IL
D
IN
G
B
P R
O J E
C T
N O
W
D
S F
1/8" = 1'-0"1
ENTRY LEVEL RCP
PLAN NORTH
8'4' 16'0
KEYNOTE LEGEND
KEY VALUE EXISTING ELEMENT(S)
08 EXISTING PLASTER CEILING TO REMAIN
KEY VALUE NEW ELEMENT(S)
N29 BOH LIGHTING REFER TO EL DRAWING SERIES
N36 NEW PLASTER CEILING WITH CROWN MOLDING, PROFILE TO MATCH EXISTING
N37 CONCEAL ALL NEW SPRINKLER PIPES ABOVE PLASTER CEILING
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
/1
/2
| Sheets |
| A-102 - SECOND FLOOR PLAN |
| A-110 - ENTRY LEVEL REFLECTED CEILING PLAN |
| A-605 - DOOR SCHEDULE, PANEL & FRAME TYPES, DOOR HARDWARE SCHEDULE |
| A-606 - DOOR HARDWARE SCHEDULE |
File details come from the government source that posted it. Updated .