G-005 - PHASING PLAN_Amend7.pdf
PDF 1 MB Posted
- Solicitation number
- W912DS24R0020
About this file
This document is a phasing plan that outlines the construction sequence and logistics for renovating Building 120 at the Watervliet Arsenal in New York. The key details include:
The project will consolidate a wood shop and general facility maintenance workspace on the ground level into a centralized facility, construct a new modern lab facility on the second level, and provide new office space on the third level. The phasing plan specifies that the public works shops and storage must be moved to a different building during construction, and the wood box shop operations must remain fully operational at all times. The plan indicates that the emergency responder radio equipment must also remain active throughout construction, and two means of egress are required at all times. The phasing is divided into pre-construction and Phase 1A, with detailed floor plans showing the reconfiguration of spaces.
The related federal contract opportunity is for the repair and renovation of Building 120, a 102,000 square foot multi-use commercial and industrial building at the Watervliet Arsenal. The estimated contract value is between $25M-$100M, and the acquisition strategy is a single-step best value trade-off solicitation that will involve a Project Labor Agreement.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OTHERS TO MOVE PW SHOP OPERATION TO A
NEW SITE (INCLUDE FURNITURE ); NIC
OTHERS TO MOVE PW STORAGE
TO A NEW SITE (INCLUDE ALL
EQUIPMENT AND SHELVING; NIC
CLEAR ALL EQUIPMENT AND
STORED OBJECTS FROM 3RD
FLOOR - BY OTHERS
CONSOLIDATE BOX SHOP
OPERATION, REF SHEET G-008
DEMO OVERHEAD DOOR,
INFILL ROUGH OPENING WITH
TEMP WATERTIGHT INSULATED
WALL WITH AN EGRESS DOOR
TEMP SHOP(S)
STORAGE SWING
PHASING PLAN NOTES
1. GC IS RESPONSIBLE FOR FINAL PHASING PLANS AND
CONSTRUCTION SCHEDULE.
2. PHASING PLANS ARE FOR INFORMATION ONLY.
3. REFER TO SHEET G-008 FOR CRITICAL BOX SHOP PHASING.
BOX SHOP MUST BE FULLY OPERATIONAL AT ALL TIMES.
4. IT IS ALSO IMPERATIVE THAT THE EMERGENCY RESPONDER
RADIO EQUIPMENT REMAIN ACTIVE THROUGHOUT
CONSTRUCTION.
5. TWO MEANS OF EGRESS IS REQUIRED AT ALL TIMES.
SEQUENCING OF THE STAIR CONSTRUCTION MUST MAINTAIN
(2) STAIRS IN OPERATION AT ALL TIMES.
6. THE CENTER STAIR IS THE ONLY MEANS OF EGRESS FROM THE
ROOF.
AREA UNDER CONSTRUCTION
CONSTRUCTION COMPLETED
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R T
A S
U B
M
IS
S
IO
N /0
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
A u to d e s k D o c s
/A U
S -0
-U
S A
C E
N
Y W
V A
B ld g R e c a p /A
-W V
A R
.r v t
/1
/2
:0
:0
P
M
G-005
P H
A S
IN
G
P L A
N
W A
T E
R V
L
IE
T A
R S
E N
A L N
Y
N Y
D
IS
T R
IC
T
A R
C A
D
IS
U .S
I N
C
R
O U
T E
S
U
IT
E
C L
IF
T O
N P
A R
K N
Y
E W
R
IG
H T
L L U
B M
C C
A R
T H
Y
E W
R
IG
H T
/0
/2
W D
S F
W D
S D
I D
C -M
R E
C A
P
IT
A L
IZ
A T
IO
N
O F
B U
IL
D
IN
G
B
P R
O J E
C T
N O
W
D
S F
1" = 30'-0"1
ENTRANCE FLOOR
PLAN_PRECONSTRUCTION
1" = 30'-0"2
FIRST AND MEZANNINE FLOOR
PLAN_PRECONSTRUCTION
1" = 30'-0"3
SECOND FLOOR
PLAN_PRECONSTRUCTION
1" = 30'-0"4
THIRD FLOOR PLAN_PRECONSTRUCTION
PRECONSTRUCTION (BY OTHERS)
1" = 30'-0"5
ROOF PLAN_PRECONSTRUCTION
PHASE 1A
1" = 30'-0"6
ENTRANCE FLOOR PLAN_PHASE 1A
1" = 30'-0"7
FIRST AND MEZANNINE FLOOR
PLAN_PHASE 1A
MOVE PUBLIC WORKS SHOPS AND STORAGE TO BUILDING 38.
1" = 30'-0"8
SECOND FLOOR PLAN_PHASE 1A
1" = 30'-0"9
THIRD FLOOR PLAN_PHASE 1A
1" = 30'-0"10
ROOF PLAN_PHASE 1A
WOOD BOX SHOP TOOLS, STORAGE, OFFICES WILL BE CONSOLIDATED ON THE WEST HALF OF THE CURRENT WOOD BOX SHOP. FLOOR PLAN INCLUDING THE METAL ENCLOSED AREA ON THE ORIGINAL LOADING DOCK WHERE WOOD IS
CURRENTLY STORED.
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
/1
/2
| Sheets |
| G-005 - PHASING PLAN |
| G-008 - TEMPORARY BOX SHOP PLAN |
File details come from the government source that posted it. Updated .