WVA B120 - COMBINED DRAWING - RTA 300-345.pdf
PDF 6 MB Posted
- Solicitation number
- W912DS24R0020
About this file
This document appears to be a set of construction drawings and related documents for the Repair Building 120 project at Watervliet Arsenal in New York. The project scope includes renovating a 102,000 square foot commercial and industrial building to consolidate a wood shop and general facility maintenance on the ground level, construct a new lab facility on the second level, and provide new office space on the third level.
The federal contract opportunity is a Solicitation (W912DS24R0020) issued by the U.S. Army Corps of Engineers Engineering District New York with an estimated value of $25M-$100M. The acquisition strategy is a single-step "Best Value Trade Off" procurement that will involve a Project Labor Agreement. Key details include the requirement to provide pathways, conduit, and back boxes for various security, communications, and audio visual systems, as well as coordination with the government's systems contractor. The solicitation is currently open with no specific closing date provided.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/01/2024
SYMBOL DESCRIPTION
KEYED NOTE (SEE SCHEDULE)
ROLLUP DOOR PROXIMITY DOOR CONTACT
CARD READER
ELECTRIC STRIKE
MOTION DETECTOR (TYPE DENOTED)
KEYPAD
MAGNETIC LOCK
COMBINATION LOCK
CCTV CAMERA WITH PAN/TILT DRIVE
CCTV CAMERA
ELECTRIC LOCK
ACCESS CONTROL SYSTEM PANEL
REQUEST TO EXIT PUSH BUTTON
REQUEST TO EXIT MOTION SENSOR
PROVIDE PATHWAYS, CONDUIT AND BACKBOXES
TO LOCATIONS INDICATED ON PLANS. OWNER SYSTEMS
CONTRACTOR WILL PROVIDE DEVICES AND WIRING FOR THESE
SYSTEMS.
DOOR CONTACT
1. SYSTEMS SCOPE INCLUDES BACK BOXES, CONDUIT AND PATHWAYS FOR SYSTEMS INDICATED. CABLING AND SYSTEM COMPONENTS ARE PROVIDED
BY OTHERS.
2. ALL WORK IS TO BE COMPLETED PER DIVISION 26 & 27 SPECIFICATIONS, NFPA 70 AND ALL APPLICABLE LOCAL STANDARDS AND CODE AMENDMENTS AS
ENFORCED BY THE LOCAL AUTHORITY HAVING JURISDICTION.
3. IN THE EVENT OF CONFLICTS BETWEEN THE DRAWINGS, SPECIFICATIONS, CODES AND REGULATIONS, THE STRICTER REQUIREMENT SHALL BE
FOLLOWED UNLESS PRIOR APPROVAL IS OBTAINED FROM THE GOVERNMENT'S REPRESENTATIVE.
4. SYMBOLS IN THE LEGEND ARE GENERALLY APPLICABLE. FOR EXACT REQUIREMENTS REFER TO THE SCHEDULES, LAYOUTS, DETAILS AND SPECIFICATIONS SINCE THE APPEARANCE OF A PARTICULAR SYMBOL IN THE LEGEND DOES NOT NECESSARILY IMPLY THAT THE ITEM IS INCLUDED IN
THE CONTRACT.
5. ALL EQUIPMENT CONTROL SYSTEM CUT-OVERS, OUTAGES AND SHUTDOWNS ARE TO BE COORDINATED WITH THE GOVERNMENT'S REPRESENTATIVES
PRIOR TO EXECUTION.
6. PROVIDE 200# PULL CORD IN EACH EMPTY CONDUIT.
7. CONDUIT RUNS THAT ARE ROUTED BEHIND PERMANENTLY FIXED LADDER POSITIONS SHALL BE ROUTED SUCH AS TO MAINTAIN 7" (MINIMUM)
CLEARANCE BETWEEN THE LADDER AND CONDUIT AND/OR MOUNTING HARDWARE.
8. PROVIDE SEAL-OFF FITTINGS IN CONDUITS THAT ENTER A CLASSIFIED OR CONDITIONED AREA FROM A NON-CLASSIFIED OR NON-CONDITIONED AREA.
9. ALL EQUIPMENT LOCATIONS AND CONDUIT ROUTES ARE APPROXIMATE AND ARE SHOWN FOR REFERENCE AND CLARITY. EXACT LOCATIONS ARE TO
BE VERIFIED WITH ALL APPLICABLE DISCIPLINES.
10. PROVIDE ADDITIONAL SUPPORTS FOR RACEWAYS AND OTHER ELECTRICAL DEVICES WHEREVER THE BUILDING STRUCTURE IS NOT SUITABLE FOR
DIRECT MOUNTING. ELECTRICAL EQUIPMENT SHALL NOT BE SUPPORTED BY EQUIPMENT OF OTHER TRADES.
11. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO ROUGH-IN.
12. PROVIDE ALL CONDUIT AND ACCESSORIES REQUIRED BY THE EQUIPMENT MANUFACTURER(S). COORDINATE REQUIREMENTS WITH THE EQUIPMENT
MANUFACTURER(S) DURING THE SUBMITTAL PROCESS.
13. WHERE DIMENSIONS ARE SHOWN ADJACENT TO A DEVICE (FOR EXAMPLE: +6"), THE DEVICE SHALL BE INSTALLED WITH IT'S CENTERLINE 6" ABOVE THE
FINISHED FLOOR.
14. AC POWER AND LIGHTING CIRCUIT RACEWAYS SHALL BE SEPARATED FROM AUDIO AND VISUAL SYSTEM RACEWAYS UTILIZING THE FOLLOWING
MINIMUM SEPARATION REQUIREMENTS (PARALLEL ROUTING):
A. LINE LEVEL AUDIO CONDUIT: 2' FROM SPEAKER AND POWER CONDUITS; 1' FROM CONTROL AND VIDEO CONDUITS.
B. CONTROL AND VIDEO CONDUIT: 1' FROM POWER CONDUITS.
C. SPEAKER CONDUIT: 1' FROM POWER CONDUIT.
D. ALL CROSSINGS SHALL BE AS CLOSE TO 90˚ AS POSSIBLE.
15. DURING ROUGH-IN COORDINATE PLACEMENT OF BOXES FOR DEVICES., TO ENSURE THAT BOXES ARE GANGED AND GROUPED TOGETHER, AND CENTERED ON WALL SECTIONS OR BENEATH WINDOWS EXCEPT AS NOTED ON PLANS. CONTRACTOR SHALL SPAN BETWEEN FRAMING CHANNELS AS NECESSARY TO ACCOMPLISH POSITIONING OF DEVICES DESCRIBED ABOVE. USE PARTITIONS WHERE VOLTAGE BETWEEN EXPOSED LIVE PARTS OF
ADJACENT SWITCHES MAY EXCEED 300 VOLTS.
16. DO NOT INSTALL BOXES IN WALLS BACK-TO-BACK. PROVIDE A MINIMUM SEPARATION OF 3" FOR BOXES TO BE INSTALLED ON OPPOSITE SIDES OF
WALLS.
17. REFER TO ARCHITECTURAL AND STRUCTURAL CONSTRUCTION DRAWINGS FOR EXACT LOCATIONS OF EQUIPMENT (I.E. TELEVISIONS, FAX MACHINES/COPIERS, MOTORIZED SCREENS, KITCHEN EQUIPMENT, MOTORS, ETC.). MAKE ADJUSTMENTS IN THE FIELD AS REQUIRED.
18. FOR ALL RATED FLOORS AND WALLS, PENETRATIONS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PACKAGE AND/OR
THE MOST RECENT U.L. DETAILS AND STANDARDS.
19. ALL DETAILS ARE TYPICAL, UNLESS OTHERWISE NOTED. WHERE CONSTRUCTION ACTIVITIES MAY DICTATE MODIFICATION TO AN ELECTRICAL DETAIL NOTIFY ENGINEER WITH EXACT CONDITIONS AND PROPOSED SOLUTION FOR REVIEW AND APPROVAL TO PROCEED.
20. ALL PENETRATIONS THRU FLOORS OR WALLS FOR CONDUITS, CABLE TRAY, ETC. SHALL BE SEALED TO MAINTAIN THE WALL OR FLOOR RATING AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE MOST CURRENT U.L. DETAILS AND STANDARDS, AND ANY SPECIFIC REQUIREMENTS CONTAINED IN THE ARCHITECTURAL/STRUCTURAL CONSTRUCTION DOCUMENTS. COORDINATION SHALL BE PERFORMED PRIOR TO MAKING ANY PENETRATION TO
DETERMINE THE APPROPRIATE METHOD REQUIRED FOR SEALING THE PENETRATION.
21. INSTALL EXPANSION FITTINGS IN CONDUITS CROSSING BUILDING EXPANSION JOINTS.
22. MAINTAIN CODE REQUIRED MINIMUM CLEARANCE AROUND EQUIPMENT.
23. DESIGN SHALL BE IN COMPLIANCE WITH APPLICABLE CYBER SECURITY REQUIREMENTS.
24. REFER TO G-003 SIGNAGE & DEVICE LOCATIONS FOR TYPICLA MOUNTING HEIGHTS, UON.
SYMBOL DESCRIPTION
COMMUNICATIONS OUTLET, VOICE ONLY; MOUNT AT 18” AFF
UNLESS OTHERWISE NOTED; PROVIDE 4 SQUARE BOX, SINGLE
GANG MUD RING, 1” CONDUIT STUBBED OUT ABOVE THE NEAREST
ACCESSIBLE CEILING SPACE, PLASTIC BUSHING, AND 200LB TEST
PULL STRING. PROVIDE ALL MOUNTING HARDWARE TO MAKE THIS
A COMPLETE AND FULLY FUNCTIONAL INSTALLATION. “W”
INDICATES WALL MOUNTED AT 54” AFF.
AUDIO VISUAL BACK BOX, PROVIDE 1"C TO ACCESSIBLE CEILING.
PROVIDE 1"C TO FLOOR BOX AS APPLICABLE.
POWER/COMMUNICATION FLOOR BOX. REFER TO FLOOR AND POKE
THRU SCHEDULE
PROVIDE PATHWAYS, CONDUIT AND BACKBOXES
TO LOCATIONS INDICATED ON PLANS. OWNER SYSTEMS
CONTRACTOR WILL PROVIDE DEVICES AND WIRING FOR THESE
SYSTEMS.
AV
DATA BACK BOX WITH 1" FMC WIP TO FURNIURE DATA TROUGH
FC
OPEN SPACE
COORDINATE CR INSTALLATION
WITH ELEVATOR EQUIPMENT.
60" A.F.F.
AV
SBB
COORDINATE LOCATION
WITH EQUIPMENT PRIOR
TO ROUGH-IN
COORDINATE LOCATION
WITH EQUIPMENT PRIOR
TO ROUGH-IN
COORDINATE LOCATION
WITH EQUIPMENT PRIOR
TO ROUGH-IN
COORDINATE LOCATION
WITH EQUIPMENT PRIOR
TO ROUGH-IN
SBB
PBB
SBB
' A
FF
' A
FF
' A
FF
12' AFF
DATA FOR VHP REMOTE
COMMUNICATIONS
EMERGENCY PHONE
EMERGENCY
PHONE
EMERGENCY PHONE
EMERGENCY PHONE
EMERGENCY
PHONE
EMERGENCY PHONE
EMERGENCY PHONE
CEILING
1/2" C (TYP)
1/2" C
JUNCTION BOX
1"C
1" FLEXIBLE C
TO BENCH TROUGH
CEILING
PBB
SBB
SBB
SBB
TO MAIN GROUND BAR
NOTES:
1. RISER IS DIGRAMITIC SEE FLOOR PLANS FOR ROOM LOCATIONS
SBB
(2) 4" SLEEVES
(2) 4" SLEEVES
CABLE TRAY
File details come from the government source that posted it. Updated .