MP-WVA120_R22_PP-200.pdf

PDF 3 MB Posted

Attached to
Repair Building 120 at Watervliet Arsenal (WVA), New York
Solicitation number
W912DS24R0020
Issued by

About this file

This document appears to be a design drawing (MP-WVA120_R22_PP-200.pdf) related to a federal contract opportunity for the repair of Building 120 at the Watervliet Arsenal in New York.

The federal contract opportunity, identified as Solicitation Number W912DS24R0020, is for the renovation of a 102,000 square foot commercial and industrial building at the Watervliet Arsenal. The scope includes consolidating wood shop and maintenance operations on the ground floor, constructing a new modern laboratory facility on the second floor, and adding new office space on the third floor. This is a single-step "Best Value Trade Off" solicitation with a magnitude of $25M-$100M. The acquisition strategy includes the use of a Project Labor Agreement. The contracting agency is the Department of the Army Corps of Engineers Engineering District New York.

View the file

Other files

File Type Posted
Weapons Development Lab (Photo Lab sprinklers)_Bldg 120_2nd Floor_Drawing 4856-120_Sheet 36 of 79_1 Oct 71.pdf PDF
31 00 00.docx DOCX document
Miscellaneous Sprinkler Work_Bldg 120_Drawing 4782-120_Sheet 1 of 1_Aug 74.pdf PDF
Automatic Sprinkler System_Bldg 120_Drawing 2664-120_Sheet 1 of 1_Apr 52.pdf PDF
Sprinkler System Warehouse_Bldg 120_Drawing 2661-120_Sheet 1 of 1_6 Jun 45.pdf PDF
Lab 253 Work Order 7 fire protection_Bldg 120_Drawing 5877-120_Sheet M2_Apr 93.pdf PDF
C-WVA_B120_Amdt 7_C-500 Details_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-101 Demolition Plan_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-104 Natural Gas Service Line Plan_ UNSTAMPED.pdf PDF
33 51 15.docx DOCX document
C-WVA_B120_Amdt 7_C-102 Site Plan_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-103 Utilities Plan_ UNSTAMPED.pdf PDF
Fire Protection_Bldg 120_Drawing 7557-6910 and 6911_Sheet 31 and 311 of 356_3 Nov 81.pdf PDF
Install Additions To Sprinkler System_Bldg 120_Drawing 5459-120_Sheet 1 of 1_Feb 84.pdf PDF
Amendment 9 W912DS24R0020.pdf PDF
Amendment 8 W912DS24R0020.pdf PDF
Amendment 8 W912DS24C0025.pdf PDF
A-606 - DOOR HARDWARE SCHEDULE_Amend7.pdf PDF
G-006 - PHASING PLAN_Amend7.pdf PDF
G-005 - PHASING PLAN_Amend7.pdf PDF
Amendment 7 W912DS24R0020.pdf PDF
G-008 - TEMPORARY BOX SHOP PLAN_Amend7.pdf PDF
A-102 - SECOND FLOOR PLAN_amend7.pdf PDF
A-605 - DOOR SCHEDULE PANEL FRAME TYPES DOOR HARDWARE SCHEDULE Amend7.pdf PDF
A-110 - ENTRY LEVEL REFLECTED CEILING PLAN_Amend7.pdf PDF
WVA B120 - Furniture Specification - RTA.pdf PDF
Site Visit Sign In Sheet 8 Aug 2024.pdf PDF
41 22 13.15.pdf PDF
Amendment 6 W912DS24R0020.pdf PDF
Amendment 5 W912DS24R0020.pdf PDF
Site Visit Sign In Sheet 24 July 2024.pdf PDF
Amendment 0004 -W912DS24R0020.pdf PDF
Amendment 3 Drawings.pdf PDF
Amendment 3 - W912DS24R0020.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 7.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 5.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 4.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 6.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 2.pdf PDF
Amendment 2 - W912DS24R0020.pdf PDF
12 35 53.19.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 3.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 1.pdf PDF
MP-WVA120_R22_PP-201.pdf PDF
WVA Visitor Notificaton form - Site Visit B120 (002).pdf PDF
Amendment 1 W912DS24R0020.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 300-345.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 150-175.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 1-25.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 200-249.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F

G

161514131211987654321

FREIGHT

ELEVATOR

79 SF

WELLNESS

184 SF

PPE

611 SF

MECHANICAL ROOM

2TL2

TELECOM

234 SF

OFFICE

241 SF

OFFICE CONFERENCE

211 SF

ELECTRICAL

JC

160 SF

PPE

339 SF

SUPERVISOR OFFICE

213 SF

OFFICE

PASSENGER

ELEVATOR

PROCESS LAB

MAIN LAB

P

U

P U

M P

R O

O M

Q

U

IE

T L A

B

239 SF

COMPUTATIONAL

SPACE

898 SF

OPEN OFFICE

119 SF

OFFICE

JC

ELEVATOR

VESTIBULE

ELEVATOR

VESTIBULE

275 SF

OFFICE

2CL1

CLOSET

P

U

P U

M P

R O

O M

Q

U

IE

T L A

B

BSL 2 LAB

QUIET LAB

NMR LAB

TOILET TOILET TOILET

TOILETTOILETTOILET

CORRIDOR

423 SF

PANTRY

CORRIDOR

283 SF

PREFUNCTION

CHEMICAL STORAGE

2SE1

SECURITY

2STR05

STAIR 05

2STR01

STAIR 01

121 SF

COPIER RM

CORRIDOR

A

A

A

B

B

172-1

213201 202

212C

115A 125 112 113 93 94 95

97 98 101 99

193 188 133

123 124 122

182A

134 88 89

64210194

120U119U 121U

90 27

174U

71U

105 67 68

104 103

185 35A

35B

35C

C

,1

C

U

B

U

B

A

C

1710206

208160

184C

20973

33575815859

22 2125

1511B1A171

184A 203C

U

170 169

70-3

7C 9C

223 222

13 12

P

SS

201P

157P

213C

202P

212P

84P

199P

200P

211P

163P 162P

161P

187,127,128,131,132,138,114, 129O,130O,143O,124O,220O

174U,19,116,117,140, 118O,135O,136O,139O141O,142O

P

125P

112P 113P 93P 94P 95P 96P 97P 98P 101P 99P 50P 76P

77P

63P

77P

83P80P79P

81P29P

27P90P

26P 28P64P210P

133P

BALANCE

ENCLOSURE

92P 9 P

P

P

P

CO2 UC

110P 107P 108P

35P

104P106P

34P32P

36P

37P

41P

17P10P

53P,54P,55P

206P

208P160P

207P

204P

33P

20P 1818P

57P58P158P24P

25P 22P 21P

44P

43P

159P

152P154P

77P

170P 169P 171P 1P 151P

209P

2P3P

73P

6P5P

4P 221P11P

9P203P

7P

13P 12P

30" BENCH

16P15P

C

C

P

CANOPY EXHAUST HOODS

172-2

CARPET TILE

PROCESS PREP. AREA

MAIN LAB

MAIN LAB

77-1 70-1 61 62

74 7284-2

87868579 63

77-4 77-3 75

70-277-5

77-2

152 153

45 46 47 48 49

54 55

SS

SS

SS

SS

SSSS

SS

SS

SS

FH-BE-1

EQA-30

84-1

163 162 161

HD-MS

U

EQA-22

EQA-23

EQA-21

EQA-19

EQA-17

EQA-24 EQA-25

EQA-18

EQA-20

EQA-1 EQA-3

EQA-29 EQA-31

EQA-32

EQA-26

EQA-14

EQA-13

EQA-11

EQA-10

EQA-8

EQA-4

EQA-12

EQA-28

EQA-15EQA-16

EQA-27

EQA-7

EQA-6

EQA-5

EQA-9

EQA-2

59P

134P

81 23

SS

126P

103P

207C

CFH-08

CFH-07

CFH-10

CFH-09 CFH-11

CFH-12 CFH-14 CFH-16

CFH-15CFH-13

CFH-01

CFH-02

CFH-04

CFH-03 CFH-05

CFH-06

CFH-18 CFH-20 CFH-22

CFH-21CFH-19CFH-17

CFH-26CFH-25CFH-24CFH-23 CFH-27 CFH-28 CFH-29 CFH-30 CFH-31 CFH-32

C F

H -3

C F

H -3

CFH-35 CFH-36 CFH-37 CFH-38

FH-BE-6

FH-BE-2

F H

-B E

-7

FH-BE-3

FH-BE-4

FH-BE-5

F H

-1 A

F H

-1 B

12C13C

12" X 18" SERVICE CHASE

(SEE LAB FURNITURE PLAN A-450)

12" X 18" SERVICE CHASE (SEE LAB FURNITURE PLAN DWG A-450)

F H

-M L

FH-ML14-(1)FH-ML12-(1)

FH-ML26-(1) FH-ML24-(1) FH-ML20-(1)FH-ML22-(1)

FH-ML10-(1)FH-ML8-(1)FH-ML6-(1)FH-ML4-(1)

FH-ML18-(3)

FH-PL2-(2)

FH-P162-(2)FH-P163-(2)

FH-PL4-(1)

FH-PL3-(1)

FH-P161-(2)

FH-ML3-(1) FH-ML5-(1) FH-ML7-(1) FH-ML9-(1) FH-ML11-(1) FH-ML13-(1)

FH-ML21-(1) FH-ML19-(1)FH-ML25-(1) FH-ML23-(1) FH-ML17-(4)

F H

-P C

FH-PL1-(1)

F H

-M L

F H

-N M

R

FH-ML16-(1)

FH-ML15-(1)

SDPSDP

SDP SDP

SDP SDP

SDP SDP

SDP

SDP

SDP

SDP

SDPSDPSDP

SDP

SDP

SDP

SDP

A

B S

L

A

IR

L O

C K

B

B

SS

COORDINATE LIGHT FIXTURE LOCATION ABOVE

BENCHTOP EQUIPMENT #5

S D

P

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

WVA B120

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

A u to d e s k D o c s

/A U

S -0

-U

S A

C E

N

Y W

V A

B ld g R e c a p /M

P -W

V A

R

.r v t

/2

/2

:2

:0

P

M

PP-200

L A

B P

R O

C E

S S

P

IP

IN

G

S

E C

O N

D F

L O

O R

O V

E R

A L L

W A

T E

R V

L

IE

T A

R S

E N

A L N

Y

N Y

D

IS

T R

IC

T

A R

C A

D

IS

U .S

I N

C

R

O U

T E

S

U

IT

E

C L

IF

T O

N P

A R

K N

Y

G H u ll

W D a v is

J H e il

J H e il

/2

/2

W D

S F

W D

S D

I D

C -M

R E

C A

P

IT

A L

IZ

A T

IO

N

O F

B U

IL

D

IN

G

B

P R

O J E

C T

N O

W

D

S F

SCALE: 1/8" = 1'-0"

LAB PROCESS PIPING - SECOND FLOOR OVERALL

0 4' 8' 16'

PLAN NORTH

GENERAL PLAN NOTESKEYNOTE LEGEND

KEY VALUE KEYNOTE TEXT A. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO THE

FABRICATION AND INSTALLATION OF PROCESS PIPING.

B. PIPE SUPPORTS ARE NOT SHOWN FOR CLARITY. PROVIDE PIPE SUPPORT

PER PROJECT SPECIFICATIONS.

C. PROVIDE A MINIMUM 1-INCH CLEARANCE BETWEEN BARE PIPING OR PIPE

INSULATION.

D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PIPING INSTALLATION IN

SUCH A MANNER AS TO CONFORM TO AN EXISTING STRUCTURE. AVOID

OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS AND

PASSAGEWAYS CLEAR AND ACCESSIBLE WITHOUT ADDITIONAL COST TO THE

OWNER.

E. ALL PIPING SHALL BE SUPPORTED FROM BUILDING STRUCTURE ONLY. NO

PIPING SHALL BE SUPPORTED FROM OTHER PIPING OR DUCTWORK.

F. COORDINATE ALL PIPING WITH ALL OTHER WORK TO AVOID CONFLICTS.

INSTALL ALL PIPING TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH

THE INSTALLATION WORK OF OTHER TRADES. THE DRAWINGS ARE

DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE THE EXACT

LOCATION OF MECHANICAL WORK.

G. THE CONTRACTOR SHALL INCLUDE ANY PIPE TURNS OR ANY ADDITIONAL

APPURTENANCE NECESSARY FOR THE PROPER FUNCTION OF THE SYSTEM

EVEN IF THEY ARE NOT SHOWN ON THE DRAWINGS.

H. FIELD ROUTE ALL FINAL CONNECTIONS TO THE LAB EQUIPMENT.

I. FIELD ROUTED DROPS TO BE PROVIDED WITH POINT-OF-USE PRESSURE

REGULATORS AS NEEDED FOR EQUIPMENT AND INSTRUMENTS (10-30 PSIG).

REFER TO SPECIFICATION SECTION 40 05 13 FOR REGULATOR

SPECIFICATION.

KEYPLAN

R

T A

S U

B M

IS

S

IO

N

/0

/2

A

M E

N D

M E

N T

/2

/2

JHeil Stamp

JHeil Date 07/25/2024

Sheets
PP-200 - LAB PROCESS PIPING - SECOND FLOOR OVERALL
2024-07-25T14:57:28-0400
Jeffrey Heil
I am approving this document

File details come from the government source that posted it. Updated .