MP-WVA120_R22_PP-200.pdf
PDF 3 MB Posted
- Solicitation number
- W912DS24R0020
About this file
This document appears to be a design drawing (MP-WVA120_R22_PP-200.pdf) related to a federal contract opportunity for the repair of Building 120 at the Watervliet Arsenal in New York.
The federal contract opportunity, identified as Solicitation Number W912DS24R0020, is for the renovation of a 102,000 square foot commercial and industrial building at the Watervliet Arsenal. The scope includes consolidating wood shop and maintenance operations on the ground floor, constructing a new modern laboratory facility on the second floor, and adding new office space on the third floor. This is a single-step "Best Value Trade Off" solicitation with a magnitude of $25M-$100M. The acquisition strategy includes the use of a Project Labor Agreement. The contracting agency is the Department of the Army Corps of Engineers Engineering District New York.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
G
161514131211987654321
FREIGHT
ELEVATOR
79 SF
WELLNESS
184 SF
PPE
611 SF
MECHANICAL ROOM
2TL2
TELECOM
234 SF
OFFICE
241 SF
OFFICE CONFERENCE
211 SF
ELECTRICAL
JC
160 SF
PPE
339 SF
SUPERVISOR OFFICE
213 SF
OFFICE
PASSENGER
ELEVATOR
PROCESS LAB
MAIN LAB
P
U
P U
M P
R O
O M
Q
U
IE
T L A
B
239 SF
COMPUTATIONAL
SPACE
898 SF
OPEN OFFICE
119 SF
OFFICE
JC
ELEVATOR
VESTIBULE
ELEVATOR
VESTIBULE
275 SF
OFFICE
2CL1
CLOSET
P
U
P U
M P
R O
O M
Q
U
IE
T L A
B
BSL 2 LAB
QUIET LAB
NMR LAB
TOILET TOILET TOILET
TOILETTOILETTOILET
CORRIDOR
423 SF
PANTRY
CORRIDOR
283 SF
PREFUNCTION
CHEMICAL STORAGE
2SE1
SECURITY
2STR05
STAIR 05
2STR01
STAIR 01
121 SF
COPIER RM
CORRIDOR
A
A
A
B
B
172-1
213201 202
212C
115A 125 112 113 93 94 95
97 98 101 99
193 188 133
123 124 122
182A
134 88 89
64210194
120U119U 121U
90 27
174U
71U
105 67 68
104 103
185 35A
35B
35C
C
,1
C
U
B
U
B
A
C
1710206
208160
184C
20973
33575815859
22 2125
1511B1A171
184A 203C
U
170 169
70-3
7C 9C
223 222
13 12
P
SS
201P
157P
213C
202P
212P
84P
199P
200P
211P
163P 162P
161P
187,127,128,131,132,138,114, 129O,130O,143O,124O,220O
174U,19,116,117,140, 118O,135O,136O,139O141O,142O
P
125P
112P 113P 93P 94P 95P 96P 97P 98P 101P 99P 50P 76P
77P
63P
77P
83P80P79P
81P29P
27P90P
26P 28P64P210P
133P
BALANCE
ENCLOSURE
92P 9 P
P
P
P
CO2 UC
110P 107P 108P
35P
104P106P
34P32P
36P
37P
41P
17P10P
53P,54P,55P
206P
208P160P
207P
204P
33P
20P 1818P
57P58P158P24P
25P 22P 21P
44P
43P
159P
152P154P
77P
170P 169P 171P 1P 151P
209P
2P3P
73P
6P5P
4P 221P11P
9P203P
7P
13P 12P
30" BENCH
16P15P
C
C
P
CANOPY EXHAUST HOODS
172-2
CARPET TILE
PROCESS PREP. AREA
MAIN LAB
MAIN LAB
77-1 70-1 61 62
74 7284-2
87868579 63
77-4 77-3 75
70-277-5
77-2
152 153
45 46 47 48 49
54 55
SS
SS
SS
SS
SSSS
SS
SS
SS
FH-BE-1
EQA-30
84-1
163 162 161
HD-MS
U
EQA-22
EQA-23
EQA-21
EQA-19
EQA-17
EQA-24 EQA-25
EQA-18
EQA-20
EQA-1 EQA-3
EQA-29 EQA-31
EQA-32
EQA-26
EQA-14
EQA-13
EQA-11
EQA-10
EQA-8
EQA-4
EQA-12
EQA-28
EQA-15EQA-16
EQA-27
EQA-7
EQA-6
EQA-5
EQA-9
EQA-2
59P
134P
81 23
SS
126P
103P
207C
CFH-08
CFH-07
CFH-10
CFH-09 CFH-11
CFH-12 CFH-14 CFH-16
CFH-15CFH-13
CFH-01
CFH-02
CFH-04
CFH-03 CFH-05
CFH-06
CFH-18 CFH-20 CFH-22
CFH-21CFH-19CFH-17
CFH-26CFH-25CFH-24CFH-23 CFH-27 CFH-28 CFH-29 CFH-30 CFH-31 CFH-32
C F
H -3
C F
H -3
CFH-35 CFH-36 CFH-37 CFH-38
FH-BE-6
FH-BE-2
F H
-B E
-7
FH-BE-3
FH-BE-4
FH-BE-5
F H
-1 A
F H
-1 B
12C13C
12" X 18" SERVICE CHASE
(SEE LAB FURNITURE PLAN A-450)
12" X 18" SERVICE CHASE (SEE LAB FURNITURE PLAN DWG A-450)
F H
-M L
FH-ML14-(1)FH-ML12-(1)
FH-ML26-(1) FH-ML24-(1) FH-ML20-(1)FH-ML22-(1)
FH-ML10-(1)FH-ML8-(1)FH-ML6-(1)FH-ML4-(1)
FH-ML18-(3)
FH-PL2-(2)
FH-P162-(2)FH-P163-(2)
FH-PL4-(1)
FH-PL3-(1)
FH-P161-(2)
FH-ML3-(1) FH-ML5-(1) FH-ML7-(1) FH-ML9-(1) FH-ML11-(1) FH-ML13-(1)
FH-ML21-(1) FH-ML19-(1)FH-ML25-(1) FH-ML23-(1) FH-ML17-(4)
F H
-P C
FH-PL1-(1)
F H
-M L
F H
-N M
R
FH-ML16-(1)
FH-ML15-(1)
SDPSDP
SDP SDP
SDP SDP
SDP SDP
SDP
SDP
SDP
SDP
SDPSDPSDP
SDP
SDP
SDP
SDP
A
B S
L
A
IR
L O
C K
B
B
SS
COORDINATE LIGHT FIXTURE LOCATION ABOVE
BENCHTOP EQUIPMENT #5
S D
P
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
A u to d e s k D o c s
/A U
S -0
-U
S A
C E
N
Y W
V A
B ld g R e c a p /M
P -W
V A
R
.r v t
/2
/2
:2
:0
P
M
PP-200
L A
B P
R O
C E
S S
P
IP
IN
G
S
E C
O N
D F
L O
O R
O V
E R
A L L
W A
T E
R V
L
IE
T A
R S
E N
A L N
Y
N Y
D
IS
T R
IC
T
A R
C A
D
IS
U .S
I N
C
R
O U
T E
S
U
IT
E
C L
IF
T O
N P
A R
K N
Y
G H u ll
W D a v is
J H e il
J H e il
/2
/2
W D
S F
W D
S D
I D
C -M
R E
C A
P
IT
A L
IZ
A T
IO
N
O F
B U
IL
D
IN
G
B
P R
O J E
C T
N O
W
D
S F
SCALE: 1/8" = 1'-0"
LAB PROCESS PIPING - SECOND FLOOR OVERALL
0 4' 8' 16'
PLAN NORTH
GENERAL PLAN NOTESKEYNOTE LEGEND
KEY VALUE KEYNOTE TEXT A. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO THE
FABRICATION AND INSTALLATION OF PROCESS PIPING.
B. PIPE SUPPORTS ARE NOT SHOWN FOR CLARITY. PROVIDE PIPE SUPPORT
PER PROJECT SPECIFICATIONS.
C. PROVIDE A MINIMUM 1-INCH CLEARANCE BETWEEN BARE PIPING OR PIPE
INSULATION.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PIPING INSTALLATION IN
SUCH A MANNER AS TO CONFORM TO AN EXISTING STRUCTURE. AVOID
OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR AND ACCESSIBLE WITHOUT ADDITIONAL COST TO THE
OWNER.
E. ALL PIPING SHALL BE SUPPORTED FROM BUILDING STRUCTURE ONLY. NO
PIPING SHALL BE SUPPORTED FROM OTHER PIPING OR DUCTWORK.
F. COORDINATE ALL PIPING WITH ALL OTHER WORK TO AVOID CONFLICTS.
INSTALL ALL PIPING TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH
THE INSTALLATION WORK OF OTHER TRADES. THE DRAWINGS ARE
DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE THE EXACT
LOCATION OF MECHANICAL WORK.
G. THE CONTRACTOR SHALL INCLUDE ANY PIPE TURNS OR ANY ADDITIONAL
APPURTENANCE NECESSARY FOR THE PROPER FUNCTION OF THE SYSTEM
EVEN IF THEY ARE NOT SHOWN ON THE DRAWINGS.
H. FIELD ROUTE ALL FINAL CONNECTIONS TO THE LAB EQUIPMENT.
I. FIELD ROUTED DROPS TO BE PROVIDED WITH POINT-OF-USE PRESSURE
REGULATORS AS NEEDED FOR EQUIPMENT AND INSTRUMENTS (10-30 PSIG).
REFER TO SPECIFICATION SECTION 40 05 13 FOR REGULATOR
SPECIFICATION.
KEYPLAN
R
T A
S U
B M
IS
S
IO
N
/0
/2
A
M E
N D
M E
N T
/2
/2
JHeil Stamp
JHeil Date 07/25/2024
| Sheets |
| PP-200 - LAB PROCESS PIPING - SECOND FLOOR OVERALL |
| 2024-07-25T14:57:28-0400 | |
| Jeffrey Heil | |
| I am approving this document |
File details come from the government source that posted it. Updated .