This document is an Amendment to Solicitation No. W912DS24R0020 for the repair of Building 120 at the Watervliet Arsenal in New York. The amendment provides the following key details:

  1. A site visit sign-in sheet from August 8, 2024 and answers to Requests for Information (RFIs) #2 through #38.
  2. Revisions and reissuance of Specification Section 41 22 13.15 for the bridge crane.
  3. Provision of furniture specifications.
  4. Extension of the proposal due date from August 14 to August 19, 2024.
  5. Clarification on various technical and administrative aspects of the project, such as controls integration, load capacities, furniture, signage, and excavated soil handling.

The solicitation is for the repair and renovation of a 102,000 square foot multi-use building at the Watervliet Arsenal, with an estimated value between $25 million and $100 million. The acquisition strategy is a single-step "Best Value Trade Off" procurement with a required Project Labor Agreement (PLA).

View the file

Other files

File Type Posted
Weapons Development Lab (Photo Lab sprinklers)_Bldg 120_2nd Floor_Drawing 4856-120_Sheet 36 of 79_1 Oct 71.pdf PDF
31 00 00.docx DOCX document
Miscellaneous Sprinkler Work_Bldg 120_Drawing 4782-120_Sheet 1 of 1_Aug 74.pdf PDF
Automatic Sprinkler System_Bldg 120_Drawing 2664-120_Sheet 1 of 1_Apr 52.pdf PDF
Sprinkler System Warehouse_Bldg 120_Drawing 2661-120_Sheet 1 of 1_6 Jun 45.pdf PDF
Lab 253 Work Order 7 fire protection_Bldg 120_Drawing 5877-120_Sheet M2_Apr 93.pdf PDF
C-WVA_B120_Amdt 7_C-500 Details_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-101 Demolition Plan_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-104 Natural Gas Service Line Plan_ UNSTAMPED.pdf PDF
33 51 15.docx DOCX document
C-WVA_B120_Amdt 7_C-102 Site Plan_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-103 Utilities Plan_ UNSTAMPED.pdf PDF
Fire Protection_Bldg 120_Drawing 7557-6910 and 6911_Sheet 31 and 311 of 356_3 Nov 81.pdf PDF
Install Additions To Sprinkler System_Bldg 120_Drawing 5459-120_Sheet 1 of 1_Feb 84.pdf PDF
Amendment 9 W912DS24R0020.pdf PDF
Amendment 8 W912DS24R0020.pdf PDF
Amendment 8 W912DS24C0025.pdf PDF
A-606 - DOOR HARDWARE SCHEDULE_Amend7.pdf PDF
G-006 - PHASING PLAN_Amend7.pdf PDF
G-005 - PHASING PLAN_Amend7.pdf PDF
Amendment 7 W912DS24R0020.pdf PDF
G-008 - TEMPORARY BOX SHOP PLAN_Amend7.pdf PDF
A-102 - SECOND FLOOR PLAN_amend7.pdf PDF
A-605 - DOOR SCHEDULE PANEL FRAME TYPES DOOR HARDWARE SCHEDULE Amend7.pdf PDF
A-110 - ENTRY LEVEL REFLECTED CEILING PLAN_Amend7.pdf PDF
WVA B120 - Furniture Specification - RTA.pdf PDF
Site Visit Sign In Sheet 8 Aug 2024.pdf PDF
41 22 13.15.pdf PDF
Amendment 5 W912DS24R0020.pdf PDF
Site Visit Sign In Sheet 24 July 2024.pdf PDF
Amendment 0004 -W912DS24R0020.pdf PDF
Amendment 3 Drawings.pdf PDF
Amendment 3 - W912DS24R0020.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 7.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 5.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 4.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 6.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 2.pdf PDF
Amendment 2 - W912DS24R0020.pdf PDF
12 35 53.19.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 3.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 1.pdf PDF
MP-WVA120_R22_PP-201.pdf PDF
MP-WVA120_R22_PP-200.pdf PDF
WVA Visitor Notificaton form - Site Visit B120 (002).pdf PDF
Amendment 1 W912DS24R0020.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 300-345.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 150-175.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 1-25.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 200-249.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1. Provide the Site Visit Sign In Sheet from 8 August 2024.

2. Provide Answ ers to Requests for Information #2 through #38.

3. Revise and Reissue Specification Section 41 22 13.15.

4. Provide Furniture Specif ications attachment.

NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods:

In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE

WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24R0020

X 9B. DATED (SEE ITEM 11)

15-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24R0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 6

Recapitalization of Building 120 (B120) Watervliet Arsenal, NY AMMENDMENT 006 for WVA B120 Recapitalization.

TO BIDDERS:

The following changes shall be made to the drawings and specifications in response to bidder RFI’s.

DRAWINGS:

1. The following DRAWINGS have been REVISED and REISSUED:

a. None

2. The following DRAWINGS have been REVISED but NOT REISSUED:

3. The following NEW DETAILS have been ADDED:

4. The following DRAWINGS have been DELETED:

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

a. None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

a. section 41 22 13.15

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

a. None.

BIDDERS’ QUESTIONS AND GOVERNMENT REPLY:

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).

Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)

Bidder Inquiry 02: Requesting additional site visit for all interested subcontractors who missed the original site visit.

RESPONSE: Additional site visit hosted Thursday August 8th at 1000.

Bidder Inquiry 03: Because this bid requires a PLA, requesting a 2-week extension to provide an acceptable PLA.

RESPONSE: The Project Labor Agreement should be submitted after the award to the successful offeror and must be approved prior to issuance of the Notice to Proceed. It should not be submitted with the solicitation.

Bidder Inquiry 04: Will all new controls in this project be integrated into the existing Johnson Controls Metasys system onsite?

RESPONSE: All the 2nd-floor lab serving equipment including MAUs, EFs, hoods, and ACVs will have a new separate control system. All the HVAC equipment serving the 1st floor, 2nd floor (non-lab), and 3rd floor will be tied into the existing Metasys system.

Bidder Inquiry 05: Per Spec section 23 09 13 Page 13, there are references to Pressure Independent Control Valves (PICV). However, no PICV valves are shown on any of the M Drawings. Please confirm if the controls contractor needs to furnish PCV valves or if standard Ball valves are acceptable.

RESPONSE: The answer can be found in Spec section 23 09 13 Page#13 as it references a differential pressure sensor.

Bidder Inquiry 06: As per the mechanical plan M-601 schedule note, we have found a reference for the unit-provided BACnet controller for DX RTU. However, no controls schematic is provided. Please provide a controls schematic and confirm if DX RTUs will be coming with packaged controls and BACnet integration.

RESPONSE: Contractor to coordinate with the selected vender to provide BACnet controller that is compatible with the DX RTU unit.

Bidder Inquiry 07: Who is responsible for providing the Supply and Exhaust air valves for the Laboratory Airflow Control System? The Mechanical contractor or Temperature Controls contractor?

RESPONSE: The Mechanical contractor is responsible.

Bidder Inquiry 08: Looking at the bridge crane section 41 22 13 spec there is very little information on what they want/need. All of the speeds are blank, as well as classifications, lift height, chain or wire rope, and they list all types of hazardous location info, which doesn’t seem to be necessary for this application. If we could get some clarification on it that would be great.

RESPONSE: The following specification section 41 22 13.15 has been revised.

Bidder Inquiry 09: Requesting a proposal due date extension of at least two weeks, from 14 August 2024 to 28 August 2024.

RESPONSE: Proposal date has been extended out to August 19th.

Bidder Inquiry 10: Can you provide the name the of the dust collector manufacturer that was used for the BOD as well as a dust collector specification and a specification for the dust collector duct.

RESPONSE: Not able to provide brand names, Pursuant to FAR 6.302.

Bidder Inquiry 11: Confirm if the dust collector system within the box shop is currently active. If so, are there any requirements for the system to remain active for any given period during construction? Furthermore, are there any tempering or continuous operation requirements of mechanical equipment within the box shop during construction?

RESPONSE: The existing dust collector serving the Box Shop is currently active. It will need to be removed prior to installation of the new dust collector. It is recommended that point of use vacuum collectors be used during construction for each piece of equipment.

Bidder Inquiry 12: Antennas were observed on the roof during pre-bid walkthrough, please confirm if they are still active and need to remain active throughout construction.

RESPONSE: Yes, all existing communications elements must be kept active and protected unless otherwise noted/shown in the plans.

Bidder Inquiry 13: A sign regarding load capacity on level 2 was observed that noted 400PSF. Please confirm that this is accurate for all elevated slabs within the building. If not, provide baseline load capacity that should be utilized when considering lifts and miscellaneous equipment throughout construction.

RESPONSE: 2nd Floor is rated to 350 psf live load.

3rd Floor is rated to 35o psf live load.

Roof slab is rated to 140 psf live load.

Mezzanine is rated to 100 psf live load.

Bidder Inquiry 14: Confirm if all existing furniture will be removed by the Owner before work begins and that all new furniture will be provided and installed by the Owner.

RESPONSE: The existing furniture currently in building 120 will be removed prior to NTP being issued.

Bidder Inquiry 15: Can you provide a signage schedule detailing the locations of the signage shown in Drawings A650-A653?

RESPONSE: As noted in section 10 14 00.20.3.1, signage schedule\plan shall be GC provided as part of submittal responsibility.

Bidder Inquiry 16: Is it permissible to use 19’ electric scissor lifts on the 2nd and 3rd floors?

RESPONSE: Yes, as long as the floor load rating is not exceeded.

Bidder Inquiry 17: If a complete building and life safety code analysis is required for the entire existing building, please confirm that deficiencies found outside of the scope of work (as identified in the Statement of Work document provided by the Government) are not the responsibility of the contractor to correct as part of this contract.

RESPONSE: Any deficiencies found that are deemed outside the scope of work of this contract will not be the responsibility of the contractor.

Bidder Inquiry 18: During the walk through, it was stated that the gate directly north of Building 120 will be open and active spring of 2025. Will this gate be available for construction use, both entry and exit?

RESPONSE: This gate, once opened, will be the main contract access to Watervliet.

Bidder Inquiry 19: Are the whiteboards part of our scope or will they be provided by the Owner?

RESPONSE: Refer to general notes #2 and #7 of the furniture plans (A-140 series sheets). Whiteboards are owner provided/ GC installed. Coordinate with owner. Furniture Specification will be provided.

Bidder Inquiry 20: Could you provide a furniture schedule with information on which tags refer to the whiteboards?

RESPONSE: Furniture Specification provided.

Bidder Inquiry 21: Could you provide a specified manufacturer for the tile?

RESPONSE: Not able to provide brand names, Pursuant to FAR 6.302.

Bidder Inquiry 22: Are we to treat excavated soils as if they are contaminated until determined otherwise by testing? If yes, then will stockpile construction require polyethylene lining beneath and as cover until a characterization and disposal location is established?

RESPONSE: No. Soils in the project location are not assumed to be contaminated. Unless obvious/visible/gross contamination is present, soil can be returned to the excavation without sampling. If not needed in the existing excavation, sample/analysis will be needed. All soil that leaves the installation must be sampled and characterized.

Bidder Inquiry 23: Will space be provided for stockpiling of excavated soils onsite, if not, the will space be provided offsite, and where?

RESPONSE: Excavated soils can be placed in “3-acre” area temporarily. Located on WVA

Bidder Inquiry 24: Please identify any Government Furnished Borrow Area(s) for this project.

RESPONSE: Nothing provided outside of what is shown on plans.

Bidder Inquiry 25: Please confirm if there is a location on site to dispose of all excavated materials. Please provide approximate location if there is space available.

RESPONSE: Soils may be placed back in excavation if not contaminated or may be removed from site and disposed of after being sampled and characterized. Characterization will determine appropriate landfill sites.

Bidder Inquiry 26: The Bridge Crane Spec has blank spaces where values are located. Can you provide those values?

RESPONSE: Specification section 41 22 13.15 has been REVISED and REISSUED.

Bidder Inquiry 27: Does the Bridge Crane Track need to be patented? Or are other types of track acceptable?

RESPONSE: Bridge crane tracks shall be the bottom flange of the W12 beams as shown on S-401 and S-

402. Additionally, see Picture #2 on SD-401.

Bidder Inquiry 28: The DDC Spec references the site wide Niagara controls system. This site is not Niagara. It is Metasys by Johnson Controls. The server and operator’s workstations are all Metasys. Is the intention to continue to build upon the Metasys or is this building getting a new system?

RESPONSE: The existing system is a Metasys system. It is the intent to build on this system for new building HVAC equipment serving the 1st floor, 2nd floor (non-lab areas) and the 3rd floor. The lab ventilation equipment (MAUs, Lab EFs and chilled water system) serving the 2nd floor labs will be a new system independent of the Metasys system.

Bidder Inquiry 29: 2024-08-02 Freight Elevator Use during construction.

There is no explicit mention of the freight elevator usage policy. Please confirm if the awarded contractor has access to the use of the freight elevator and if so, what are the limitations.

RESPONSE: GC will have access to the freight elevator during construction. Its design Capacity (lbs.) is 20000. Once the second floor has a certificate of occupancy, the second-floor access will be restricted.

Bidder Inquiry 30: 2024-08-02 CLIN NTP and period of performance Regarding CLIN 0004 - 0011, propose that the NTP for these CLINs be adjusted to 30 calendar days. Additionally, we suggest extending the performance period based on the NTP date for each specific CLIN to accommodate these lead times.

RESPONSE: Option CLINs will remain as is at 240 days.

Bidder Inquiry 31: 2024-08-02 Temporary Utilities Reference 3.3.1 notes consumption by the government. Please clarify.

RESPONSE: Contractor will not bare any utility cost that support the trailers. The contractor will make all utility connections within the boundaries of Watervliet that are needed for this project.

Bidder Inquiry 32: 2024-08-02 South Access Gate Could you please confirm if the government plans to reestablish the south gate and whether construction deliveries will be permitted through it?

RESPONSE: This gate, once opened, will be the main contract access to Watervliet.

Bidder Inquiry 33: 2024-08-02 C-004 Material Storage Dwg. C-004 notes no materials are allowed to be stored on-site except for day of installation. Please expand on this statement. There will be materials that will be required to be on-site prior to the day of installation.

RESPONSE: Material storage will be limited to the contractor limits of work (within the contractor’s fence) to include within the building.

Bidder Inquiry 34: 2024-08-02 Trailer Utilities Will the government be responsible for utility consumption for the Construction and USACE Trailers. Please confirm that costs for utility connection and disconnect are by the contractor.

RESPONSE: Contractor will not bare any utility cost that support the trailers. The contractor will make all utility connections within the boundaries of Watervliet that are needed for this project, with the new gas line being the exception. National Grid will handle the connections with the new gas regulator/meter interning building 120 and the main tie in at 10th Street.

Bidder Inquiry 35: Per General Notes for phase 1b on G-008. Please confirm who will be relocating DPW.

RESPONSE: Watervliet will be relocating Public Works section out of Building 120. This will not be the responsibility of the contractor.

Bidder Inquiry 36: Per G008 notes, Weekend or off-shift work is required for box shop operations; what will the GC be required to coordinate /provide to support this space/weekend operation?

RESPONSE: Contractor will work with the USACE COR to coordinate any work outside of normal hours to ensure the tenants "Box Shop" are aware of the work that will be taking place so they can adjust their production as needed to facilitate the contractors required work in the area.

Bidder Inquiry 37: Who would be the Authorities having Jurisdiction on this project?

RESPONSE: Once awarded USACE will have Jurisdiction over the project.

Bidder Inquiry 38: Please confirm the required working hours within the “Box Shop” area. Will there be any other specific work restrictions while working within this area?

RESPONSE: The Box Shop area will require full use unless previously coordinated. It is understandable that the contract will require limited shutdowns in this area to facilitate with work in the contract.