This document appears to be a set of drawings and plans related to the temporary relocation of a Box Shop as part of the Recapitalization of Building 120 project at the Watervliet Arsenal in New York.

The drawings outline the temporary layout and equipment locations for the Box Shop during two phases of construction. Key details include maintaining two means of life safety egress at all times, relocating existing Box Shop equipment, providing temporary electric and dust collection systems, and ensuring adequate forklift clearances and access. The phasing plan indicates that the relocation of Public Works to a swing space must precede the Box Shop work. The drawings also note that weekend or off-shift work will be required to coordinate with the user during Box Shop operations.

View the file

Other files

File Type Posted
Weapons Development Lab (Photo Lab sprinklers)_Bldg 120_2nd Floor_Drawing 4856-120_Sheet 36 of 79_1 Oct 71.pdf PDF
31 00 00.docx DOCX document
Miscellaneous Sprinkler Work_Bldg 120_Drawing 4782-120_Sheet 1 of 1_Aug 74.pdf PDF
Automatic Sprinkler System_Bldg 120_Drawing 2664-120_Sheet 1 of 1_Apr 52.pdf PDF
Sprinkler System Warehouse_Bldg 120_Drawing 2661-120_Sheet 1 of 1_6 Jun 45.pdf PDF
Lab 253 Work Order 7 fire protection_Bldg 120_Drawing 5877-120_Sheet M2_Apr 93.pdf PDF
C-WVA_B120_Amdt 7_C-500 Details_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-101 Demolition Plan_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-104 Natural Gas Service Line Plan_ UNSTAMPED.pdf PDF
33 51 15.docx DOCX document
C-WVA_B120_Amdt 7_C-102 Site Plan_ UNSTAMPED.pdf PDF
C-WVA_B120_Amdt 7_C-103 Utilities Plan_ UNSTAMPED.pdf PDF
Fire Protection_Bldg 120_Drawing 7557-6910 and 6911_Sheet 31 and 311 of 356_3 Nov 81.pdf PDF
Install Additions To Sprinkler System_Bldg 120_Drawing 5459-120_Sheet 1 of 1_Feb 84.pdf PDF
Amendment 9 W912DS24R0020.pdf PDF
Amendment 8 W912DS24R0020.pdf PDF
Amendment 8 W912DS24C0025.pdf PDF
A-606 - DOOR HARDWARE SCHEDULE_Amend7.pdf PDF
G-006 - PHASING PLAN_Amend7.pdf PDF
G-005 - PHASING PLAN_Amend7.pdf PDF
Amendment 7 W912DS24R0020.pdf PDF
A-102 - SECOND FLOOR PLAN_amend7.pdf PDF
A-605 - DOOR SCHEDULE PANEL FRAME TYPES DOOR HARDWARE SCHEDULE Amend7.pdf PDF
A-110 - ENTRY LEVEL REFLECTED CEILING PLAN_Amend7.pdf PDF
WVA B120 - Furniture Specification - RTA.pdf PDF
Site Visit Sign In Sheet 8 Aug 2024.pdf PDF
41 22 13.15.pdf PDF
Amendment 6 W912DS24R0020.pdf PDF
Amendment 5 W912DS24R0020.pdf PDF
Site Visit Sign In Sheet 24 July 2024.pdf PDF
Amendment 0004 -W912DS24R0020.pdf PDF
Amendment 3 Drawings.pdf PDF
Amendment 3 - W912DS24R0020.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 7.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 5.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 4.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 6.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 2.pdf PDF
Amendment 2 - W912DS24R0020.pdf PDF
12 35 53.19.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 3.pdf PDF
WVA B120 - COMBINED DRAWING - RTA part 1.pdf PDF
MP-WVA120_R22_PP-201.pdf PDF
MP-WVA120_R22_PP-200.pdf PDF
WVA Visitor Notificaton form - Site Visit B120 (002).pdf PDF
Amendment 1 W912DS24R0020.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 300-345.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 150-175.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 1-25.pdf PDF
WVA B120 - COMBINED DRAWING - RTA 200-249.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21 3 4 5 6 7 8 9 10 11 12

D

E

F

G

PLYWOOD STORAGE RACKS PLYWOOD STORAGE RACKS

PLYWOOD

STORAGE

RACKS

BS-8B BS-8A

BS-4BBS-4A

BS-2

BS-6

BS-1A

BS-7

BS-1B

WS-1

BS-8B

BS-8B

BS-3B

BS-8B

BS-8B

WOOD STORAGE

BOX SHOP

AREA UNDER

CONSTRUCTION

TEMPORARY

PARTITION WALL

BOX SHOP OFFICE

DESIGNATED ENTRY/

EGRESS DOOR

DESIGNATED ENTRY/

EGRESS DOOR

TEMP BOX

SHOP OFFICE

DEMOLISH EXISTING

OVERHEAD DOOR PRIOR TO

TEMPORARY RELOCATION

OF BOX SHOP

AREA UNDER CONSTRUCTION

EXISTING STAIR TO

REMAIN FREE AND

CLEAR

GC TO MAINTAIN

FREE AND CLEAR

ACCESS TO THE

FREIGHT ELEVATOR

TW1D

BS-9

TW1D

TW1D

TW1DTW1D TW1D

TW1D

DEMO EXISTING

WALL PRIOR TO

RELOCATION OF

BOX SHOP

DEMO EXISTING

WALL PRIOR TO

RELOCATION OF

BOX SHOP

TW1D

TW1D

G1F

G1F

G1F

G1F TW1DTW1D

AREA UNDER

CONSTRUCTION

FREIGHT ELEVATOR

PLYWOOD STORAGE RACKS

TW1D

TW1D

PROVIDE PATHWAY

THRU AREA OF

CONSTRUCTION FOR

EGRESS IN HATCH

AREA

EXISTING ENTRY/

EGRESS DOOR

FREE EGRESS

DOOR

21 3 4 5 6 7 8 9 10 11 12

C

D

E

F

G

BOX SHOP

AREA UNDER

CONSTRUCTION

WOOD STORAGE RACKS

WOOD STORAGE AREA

BS-9

BOX SHOP

OFFICE

TW1D

TW1DTW1D TW1D

BS-8B BS-8A

BS-3A

BS-1A

BS-4A

BS-8B BS-8B

BS-4A

BS-7

AREA UNDER

CONSTRUCTION

TW1DTW1D

TW1D

TW1D

TW1D

G1F

G1F

G1F

G1FG1F

G1F

TW1D

M2D

GC TO MAINTAIN

FREE AND CLEAR

ACCESS TO THE

FREIGHT ELEVATOR

FREIGHT ELEVATOR

DESIGNATED ENTRY/

EGRESS DOOR

EXISTING STAIR TO

REMAIN UNTIL A

SECOND MEANS OF

EGRESS IS AVAILABLE

BS-2

DESIGNATED EGRESS

DOOR

DESIGNATED

ENTRY/EGRESS DOOR

DESIGNATED

ENTRY/EGRESS DOOR

DESIGNATED

ENTRY/EGRESS DOOR

DESIGNATED

ENTRY/EGRESS

DOOR

DESIGNATED

ENTRY/EGRESS

DOOR

EXISTING ENTRY/

EGRESS DOOR

FREE EGRESS

DOOR

EQUIPMENT TYPE

BS-1A RADIAL ARM SAW 1

BS-1B RADIAL ARM SAW 2

BS-2 TABLE SAW

BS-3A BAND SAW 1

BS-3B BAND SAW 2

BS-4A BELT SANDER 1

BS-4B BELT SANDER 2

BS-6 PLANER

BS-7 PANEL SAW

BS-8A ASSEMBLY TABLE 1

BS-8B ASSEMBLY TABLE 2

BS-9 SCALE

BS-10 WORK BENCH

WS-1 BAND SAW 3

BS-5 ROUTER TABLE

B O

X S

H O

P

EQ. # SHOP #

WV 2322

WV 11257

WV 11686

WV 9293

WV 9265

WV 11711

WV 12157

WV 9358

WV 12932

N/A

N/A

N/A

N/A

WV 9358

WV 1052

GENERAL NOTES FOR PHASE 1B

1. RELOCATION OF PUBLIC WORKS TO A SWING SPACE OUTSIDE

OF BUILDING 125 MUST PRECEDE BEFORE ANY BOX SHOP

PHASING.

2. CENTER STAIR TO BE ENCLOSED WITH A 1 HR FIRE RATED

TEMPORARY WALL AND DOOR AT LOBBY LEVEL FOR LIFE

SAFETY EGRESS PRIOR TO ANY BOX SHOP PHASING.

3. DEMOLISH EXISTING OVERHEAD DOOR BETWEEN 6 AND 7

ALONG COLUMN LINE G, PRIOR TO ANY BOX SHOP PHASING.

4. MAINTAIN TWO MEANS OF LIFE SAFETY EGRESS FOR THE BOX

SHOP AT ALL TIMES.

5. GC MOVE BOX SHOP EXISTING EQUIPMENT, UNINSTALL AND

REINSTALL IN LOCATIONS SHOWN. MOUNT AS REQUIRED TO

SLAB.

6. GC TO PROVIDE TEMPORARY ELECTRIC HOOK UP FOR BOX

SHOP EQUIPMENT.

7. GC TO PROVIDE TEMPORARY DUST COLLECTOR AND LOOP TO

SERVE ALL EQUIPMENT. THE NEW DUST COLLECTION SYSTEM

WILL BE COMMISSIONED PRIOR TO THE TEMPORARY DUST

COLLECTION SYSTEM'S REMOVAL.

8. FORK LIFT CLEARANCES AND ACCESS THRU THE OVERHEAD

DOOR NEEDS TO BE READILY AVAILABLE AT ALL TIMES.

9. THE BRIDGE CRANES TO BE OPERATIONAL FOR BOTH PHASES.

10. WEEKEND OR OFF SHIFT WORK IS REQUIRED FOR BOX SHOP

OPERATIONS AND GC WILL NEED TO COORDINATE WITH USER.

11. COMPRESSED AIR LOCATIONS FOR EACH PHASE ARE

REQUIRED. A MODULAR SYSTEM SHALL BE PROVIDED.

GENERAL NOTES FOR PHASE 2

1. MAINTAIN TWO MEANS OF LIFE SAFETY EGRESS FOR THE BOX

SHOP AT ALL TIMES.

2. GC MOVE BOX SHOP EXISTING EQUIPMENT, UNINSTALL AND

REINSTALL IN LOCATIONS SHOWN. MOUNT AS REQUIRED TO

SLAB.

3. GC TO PROVIDE TEMPORARY ELECTRIC HOOK UP FOR BOX

SHOP EQUIPMENT.

4. GC TO PROVIDE TEMPORARY DUST COLLECTOR AND LOOP TO

SERVE ALL EQUIPMENT. THE NEW PERMANENT DUST

COLLECTION SYSTEM WILL BE COMMISSIONED PRIOR TO THE

TEMPORARY DUST COLLECTION SYSTEM'S REMOVAL.

5. FORK LIFT CLEARANCES AND ACCESS THRU THE OVERHEAD

DOOR NEEDS TO BE READILY AVAILABLE AT ALL TIMES.

6. THE BRIDGE CRANES TO BE OPERATIONAL FOR BOTH PHASES.

7. WEEKEND OR OFF SHIFT WORK IS REQUIRED FOR BOX SHOP

OPERATIONS AND GC WILL NEED TO COORDINATE WITH USER.

8. COMPRESSED AIR LOCATIONS FOR EACH PHASE ARE

REQUIRED. A MODULAR SYSTEM SHALL BE PROVIDED.

9. NO CONTRACTOR ACCESS IS ALLOWED IN THE BOX SHOP

OCCUPIED SPACE. ALL TEMPORARY DOORS SHALL HAVE

KEYED LOCKS.

AREA UNDER CONSTRUCTION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y x

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

WVA B120

R T

A S

U B

M

IS

S

IO

N /0

/2

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

A u to d e s k D o c s

/A U

S -0

-U

S A

C E

N

Y W

V A

B ld g R e c a p /A

-W V

A R

.r v t

/1

/2

:0

:0

P

M

G-008

T E

M P

O R

A R

Y B

O X

S H

O P

P L A

N

W A

T E

R V

L

IE

T A

R S

E N

A L N

Y

N Y

D

IS

T R

IC

T

A R

C A

D

IS

U .S

I N

C

R

O U

T E

S

U

IT

E

C L

IF

T O

N P

A R

K N

Y

E W

R

IG

H T

L L U

B M

C C

A R

T H

Y

E W

R

IG

H T

/0

/2

W D

S F

W D

S D

I D

C -M

R E

C A

P

IT

A L

IZ

A T

IO

N

O F

B U

IL

D

IN

G

B

P R

O J E

C T

N O

W

D

S F

PLAN NORTH

8'4' 16'0

1/8" = 1' - 0" SCALE OF FEET

SCALE: 1/8" = 1'-0"1

BOX SHOP TEMPORARY LAYOUT_PHASE 1B

SCALE: 1/8" = 1'-0"2

BOX SHOP TEMPORARY LAYOUT_PHASE 2

EQUIPMENT SCHEDULE

R

T A

S U

B M

IS

S

IO

N

/0

/2

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M D

T

/1

/2

Sheets
G-005 - PHASING PLAN
G-008 - TEMPORARY BOX SHOP PLAN

File details come from the government source that posted it. Updated .