G-008 - TEMPORARY BOX SHOP PLAN_Amend7.pdf
PDF 847 KB Posted
- Solicitation number
- W912DS24R0020
About this file
This document appears to be a set of drawings and plans related to the temporary relocation of a Box Shop as part of the Recapitalization of Building 120 project at the Watervliet Arsenal in New York.
The drawings outline the temporary layout and equipment locations for the Box Shop during two phases of construction. Key details include maintaining two means of life safety egress at all times, relocating existing Box Shop equipment, providing temporary electric and dust collection systems, and ensuring adequate forklift clearances and access. The phasing plan indicates that the relocation of Public Works to a swing space must precede the Box Shop work. The drawings also note that weekend or off-shift work will be required to coordinate with the user during Box Shop operations.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21 3 4 5 6 7 8 9 10 11 12
D
E
F
G
PLYWOOD STORAGE RACKS PLYWOOD STORAGE RACKS
PLYWOOD
STORAGE
RACKS
BS-8B BS-8A
BS-4BBS-4A
BS-2
BS-6
BS-1A
BS-7
BS-1B
WS-1
BS-8B
BS-8B
BS-3B
BS-8B
BS-8B
WOOD STORAGE
BOX SHOP
AREA UNDER
CONSTRUCTION
TEMPORARY
PARTITION WALL
BOX SHOP OFFICE
DESIGNATED ENTRY/
EGRESS DOOR
DESIGNATED ENTRY/
EGRESS DOOR
TEMP BOX
SHOP OFFICE
DEMOLISH EXISTING
OVERHEAD DOOR PRIOR TO
TEMPORARY RELOCATION
OF BOX SHOP
AREA UNDER CONSTRUCTION
EXISTING STAIR TO
REMAIN FREE AND
CLEAR
GC TO MAINTAIN
FREE AND CLEAR
ACCESS TO THE
FREIGHT ELEVATOR
TW1D
BS-9
TW1D
TW1D
TW1DTW1D TW1D
TW1D
DEMO EXISTING
WALL PRIOR TO
RELOCATION OF
BOX SHOP
DEMO EXISTING
WALL PRIOR TO
RELOCATION OF
BOX SHOP
TW1D
TW1D
G1F
G1F
G1F
G1F TW1DTW1D
AREA UNDER
CONSTRUCTION
FREIGHT ELEVATOR
PLYWOOD STORAGE RACKS
TW1D
TW1D
PROVIDE PATHWAY
THRU AREA OF
CONSTRUCTION FOR
EGRESS IN HATCH
AREA
EXISTING ENTRY/
EGRESS DOOR
FREE EGRESS
DOOR
21 3 4 5 6 7 8 9 10 11 12
C
D
E
F
G
BOX SHOP
AREA UNDER
CONSTRUCTION
WOOD STORAGE RACKS
WOOD STORAGE AREA
BS-9
BOX SHOP
OFFICE
TW1D
TW1DTW1D TW1D
BS-8B BS-8A
BS-3A
BS-1A
BS-4A
BS-8B BS-8B
BS-4A
BS-7
AREA UNDER
CONSTRUCTION
TW1DTW1D
TW1D
TW1D
TW1D
G1F
G1F
G1F
G1FG1F
G1F
TW1D
M2D
GC TO MAINTAIN
FREE AND CLEAR
ACCESS TO THE
FREIGHT ELEVATOR
FREIGHT ELEVATOR
DESIGNATED ENTRY/
EGRESS DOOR
EXISTING STAIR TO
REMAIN UNTIL A
SECOND MEANS OF
EGRESS IS AVAILABLE
BS-2
DESIGNATED EGRESS
DOOR
DESIGNATED
ENTRY/EGRESS DOOR
DESIGNATED
ENTRY/EGRESS DOOR
DESIGNATED
ENTRY/EGRESS DOOR
DESIGNATED
ENTRY/EGRESS
DOOR
DESIGNATED
ENTRY/EGRESS
DOOR
EXISTING ENTRY/
EGRESS DOOR
FREE EGRESS
DOOR
EQUIPMENT TYPE
BS-1A RADIAL ARM SAW 1
BS-1B RADIAL ARM SAW 2
BS-2 TABLE SAW
BS-3A BAND SAW 1
BS-3B BAND SAW 2
BS-4A BELT SANDER 1
BS-4B BELT SANDER 2
BS-6 PLANER
BS-7 PANEL SAW
BS-8A ASSEMBLY TABLE 1
BS-8B ASSEMBLY TABLE 2
BS-9 SCALE
BS-10 WORK BENCH
WS-1 BAND SAW 3
BS-5 ROUTER TABLE
B O
X S
H O
P
EQ. # SHOP #
WV 2322
WV 11257
WV 11686
WV 9293
WV 9265
WV 11711
WV 12157
WV 9358
WV 12932
N/A
N/A
N/A
N/A
WV 9358
WV 1052
GENERAL NOTES FOR PHASE 1B
1. RELOCATION OF PUBLIC WORKS TO A SWING SPACE OUTSIDE
OF BUILDING 125 MUST PRECEDE BEFORE ANY BOX SHOP
PHASING.
2. CENTER STAIR TO BE ENCLOSED WITH A 1 HR FIRE RATED
TEMPORARY WALL AND DOOR AT LOBBY LEVEL FOR LIFE
SAFETY EGRESS PRIOR TO ANY BOX SHOP PHASING.
3. DEMOLISH EXISTING OVERHEAD DOOR BETWEEN 6 AND 7
ALONG COLUMN LINE G, PRIOR TO ANY BOX SHOP PHASING.
4. MAINTAIN TWO MEANS OF LIFE SAFETY EGRESS FOR THE BOX
SHOP AT ALL TIMES.
5. GC MOVE BOX SHOP EXISTING EQUIPMENT, UNINSTALL AND
REINSTALL IN LOCATIONS SHOWN. MOUNT AS REQUIRED TO
SLAB.
6. GC TO PROVIDE TEMPORARY ELECTRIC HOOK UP FOR BOX
SHOP EQUIPMENT.
7. GC TO PROVIDE TEMPORARY DUST COLLECTOR AND LOOP TO
SERVE ALL EQUIPMENT. THE NEW DUST COLLECTION SYSTEM
WILL BE COMMISSIONED PRIOR TO THE TEMPORARY DUST
COLLECTION SYSTEM'S REMOVAL.
8. FORK LIFT CLEARANCES AND ACCESS THRU THE OVERHEAD
DOOR NEEDS TO BE READILY AVAILABLE AT ALL TIMES.
9. THE BRIDGE CRANES TO BE OPERATIONAL FOR BOTH PHASES.
10. WEEKEND OR OFF SHIFT WORK IS REQUIRED FOR BOX SHOP
OPERATIONS AND GC WILL NEED TO COORDINATE WITH USER.
11. COMPRESSED AIR LOCATIONS FOR EACH PHASE ARE
REQUIRED. A MODULAR SYSTEM SHALL BE PROVIDED.
GENERAL NOTES FOR PHASE 2
1. MAINTAIN TWO MEANS OF LIFE SAFETY EGRESS FOR THE BOX
SHOP AT ALL TIMES.
2. GC MOVE BOX SHOP EXISTING EQUIPMENT, UNINSTALL AND
REINSTALL IN LOCATIONS SHOWN. MOUNT AS REQUIRED TO
SLAB.
3. GC TO PROVIDE TEMPORARY ELECTRIC HOOK UP FOR BOX
SHOP EQUIPMENT.
4. GC TO PROVIDE TEMPORARY DUST COLLECTOR AND LOOP TO
SERVE ALL EQUIPMENT. THE NEW PERMANENT DUST
COLLECTION SYSTEM WILL BE COMMISSIONED PRIOR TO THE
TEMPORARY DUST COLLECTION SYSTEM'S REMOVAL.
5. FORK LIFT CLEARANCES AND ACCESS THRU THE OVERHEAD
DOOR NEEDS TO BE READILY AVAILABLE AT ALL TIMES.
6. THE BRIDGE CRANES TO BE OPERATIONAL FOR BOTH PHASES.
7. WEEKEND OR OFF SHIFT WORK IS REQUIRED FOR BOX SHOP
OPERATIONS AND GC WILL NEED TO COORDINATE WITH USER.
8. COMPRESSED AIR LOCATIONS FOR EACH PHASE ARE
REQUIRED. A MODULAR SYSTEM SHALL BE PROVIDED.
9. NO CONTRACTOR ACCESS IS ALLOWED IN THE BOX SHOP
OCCUPIED SPACE. ALL TEMPORARY DOORS SHALL HAVE
KEYED LOCKS.
AREA UNDER CONSTRUCTION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y x
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
WVA B120
R T
A S
U B
M
IS
S
IO
N /0
/2
IS
S
U E
F O
R C
O N
S T
R U
C T
IO
N
A u to d e s k D o c s
/A U
S -0
-U
S A
C E
N
Y W
V A
B ld g R e c a p /A
-W V
A R
.r v t
/1
/2
:0
:0
P
M
G-008
T E
M P
O R
A R
Y B
O X
S H
O P
P L A
N
W A
T E
R V
L
IE
T A
R S
E N
A L N
Y
N Y
D
IS
T R
IC
T
A R
C A
D
IS
U .S
I N
C
R
O U
T E
S
U
IT
E
C L
IF
T O
N P
A R
K N
Y
E W
R
IG
H T
L L U
B M
C C
A R
T H
Y
E W
R
IG
H T
/0
/2
W D
S F
W D
S D
I D
C -M
R E
C A
P
IT
A L
IZ
A T
IO
N
O F
B U
IL
D
IN
G
B
P R
O J E
C T
N O
W
D
S F
PLAN NORTH
8'4' 16'0
1/8" = 1' - 0" SCALE OF FEET
SCALE: 1/8" = 1'-0"1
BOX SHOP TEMPORARY LAYOUT_PHASE 1B
SCALE: 1/8" = 1'-0"2
BOX SHOP TEMPORARY LAYOUT_PHASE 2
EQUIPMENT SCHEDULE
R
T A
S U
B M
IS
S
IO
N
/0
/2
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
/1
/2
| Sheets |
| G-005 - PHASING PLAN |
| G-008 - TEMPORARY BOX SHOP PLAN |
File details come from the government source that posted it. Updated .