W912DS21B0004 Amendment 11.pdf

PDF 752 KB Posted

Attached to
Building 740, Lee Barracks and Building 738, Sherman Barracks Repair
Solicitation number
W912DS21B0004
Issued by

About this file

This document provides details for a federal construction contract opportunity to repair two barracks buildings at the United States Military Academy in West Point, New York. The project includes a base scope to fully renovate Building 740, Lee Barracks, along with optional work to repair Building 738, Sherman Barracks.

The base work for Building 740 involves interior and exterior repairs, replacement of mechanical, electrical and plumbing systems, addition of a Cadet Health Clinic, and abatement of hazardous materials. The optional scope for Building 738 includes similar full building repairs. The estimated value of the construction is between $100-200 million. The solicitation is expected to be posted on August 6, 2021 on sam.gov, with proposals due approximately 30 days later. The period of performance if all options are exercised is 1034 calendar days. The NAICS code is 236220.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Lee Barracks Electrical Drawings for Amendment.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008_Combined Drawings Final 9-10-21.pdf PDF
Amendment 0008_Combined Specifications 9-10-21.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_LEE-SHERMAN SPECS rev.pdf PDF
Amendment 0007_Lee Sherman Section 01 32 00 Scheduling.pdf PDF
Amendment 0007_Dwgs_Sherman Barracks.pdf PDF
Amendment 0007_Building 740 Lee Barracks Site Walk through Sign in Sheet.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007_Dwgs_Lee Barracks.pdf PDF
Amendment 0007_Sherman Barracks GER.pdf PDF
Amendment 0007_5.4 GER_West Point Lee Barracks signed.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS SHERMAN.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS LEE.pdf PDF
Amendment 0004_Photos_Steam Vault F-4.pdf PDF
Amendment 0004_Photos_Steam Vault F-8.pdf PDF
Amendment 0004_WP Lee and Sherman Steam Vault Amendment SPECIFICATIONS 17 AUG 2021.pdf PDF
Amendment 0004_Photos_Steam Vault F-3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part1.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part2.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RTA Drawings Lee Vol 2.pdf PDF
RTA Drawings Lee Vol 3.pdf PDF
RTA Drawings Lee Vol 1_Part3.pdf PDF
RTA Drawings Lee Vol 1_Part2.pdf PDF
RTA Drawings Lee Vol 1_Part1.pdf PDF
RTA Drawings Sherman Vol 2_Part2.pdf PDF
RTA Drawings Sherman Vol 2_Part1.pdf PDF
RTA Drawings Sherman Vol 1_Part2.pdf PDF
RTA Drawings Sherman Vol 1_Part1.pdf PDF
VOL 3 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 2 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
W912DS-21-B-0004_Solicitation.pdf PDF
VOL 4 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 1 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise and Reissue Bid Schedule

2. Revise Bid opening instructions. BIDS ARE REQUIRED TO BE DELIVERED TO 26 FEDERAL PLAZA ROOM 16-300

3. Extend Bid opening date to 21-Sept-2021 at 2:00 P.M.

4. Revise Draw ings

5. Answ er Questions from Prospective Bidders for Informational Purposes only

Off eror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0004

X 9B. DATED (SEE ITEM 11)

06-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Sep-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGES

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job All work associated with the repair of

FFP

All work associated with the repair of Building 740 in accordance with Drawings and Specifications. Excluding work associated with CLIN 0002 through CLIN 0005, and CLIN 0020.

FOB: Destination

NET AMT

0002 1 Job All work associated with the

FFP

installation of the Cadet Health Clinic in accordance with Drawings and Specifications.

INFORMATIONAL PURPOSES ONLY

FFP

Provide abatement and removal in accordance with Drawings and Specifications and Hazardous Material report included in Specification Section 02 82 00 for B740. CLIN 0003 is the total of CLINs 0003A through 0003F.

0003AA 1,529 Linear

Foot

Asbestos bulk pipe insulation abatement.

FFP

"Estimated Quantities"

0003AB 840 Square

Asbestos bulk asbestos removal, roofing material abatement. "Estimated Quantities"

0003AC 15,493 Square

Demolition in asbestos contaminated area ceiling, gypsum board. "Estimated Quantities"

0003AD 25,280 Square

Lead based paint removal

(walls and floors) "Estimated Quantities"

0003AE 150 Each Lead Paint Door Demolition

0003AF 793 Gallon Hydraulic Elevator Fluid Tank Removal

FFP

0004 1 Job

PRE-PRICED CLIN

FFP

Turn Over As Built Documents, Equipment List and O&M manuals for B740 in accordance with Drawings and Specifications

$220,000.00

0005 1 Job All work associated with Barber and

FFP

Beauty Shop Swing Space in accordance with the Drawings and Specifications.

OPTION INFORMATIONAL PURPOSES ONLY

FFP

OPTION #1 Clean and repoint exterior of B740 in accordance with Drawings and Specifications (B740 drawings AD201-204). Not Included in CLIN 0001 CLIN 0006 is the total of CLIN 0006A, 0006B, 0006C, and 0006D

0006AA 1080 Square

OPTION Limestone Restoration

0006AB 2,860 Linear

OPTION Granite Venere Repointing

0006AC 2,280 Square

OPTION Granite Unit Replacement

0006AD 1 Job OPTION Sealant Replacement

0007 2,000 Square

OPTION Option # 2

All work associated with Building 740 Fiber Reinforced Polmner (FRP) reinforcement that is NOT shown on plans and mandatory in the repair in accordance to the Drawings and Specifications specifically shown on S-002. This is an additional amount of FRP Flexural Repair in addition to the Base Bid for a total amount of 8,000 SF. "Estimated Quantities"

0008 300 Square

OPTION Option # 3

All work associated with Building 740 repair of spalled concrete that is NOT shown on plans and mandatory in the repair in accordance to the Drawings and Specifications specifically shown on S-002. This is an additional amount of spalled surfaces in addition to the Base Bid for a total amount of 1,300 SF.

0009 4000 Linear

OPTION Option # 4

All work associated with Building 740 repair of concrete cracks that is NOT shown on plans and mandatory in the repair in accordance to the Drawings and Specifications specifically shown on S-002. This is additional structural repairs to existing cracks in addition to the Base Bid for a total amount of 16,000 LF.

0010 1 Job OPTION Option # 5

FFP

All work associated with Steam Vaults F3, F4 and F8 repair in accordance with Drawings and Specifications.

0011 1 Job OPTION Option # 6

FFP

All work associated with the repair of Building 738 in accordance with Drawing and Specifications excluding CLINs 0012, 0013, 0014, 0015, 0016, 0017, 0018 and 0020. .

OPTION INFORMATIONAL PURPOSES ONLY

FFP

Option # 7, Provide abetment and removal in accordance with Drawings and Specifications and Hazardous Material report included in Specification Section 02 82 00 for B738. CLIN 0012 is the total of CLINs 0012A through 0012F.

0012AA 1,820 Linear

OPTION Asbestos bulk pipe insulation abatement.

0012AB 1,000 Square

OPTION Asbestos Bulk asbestos removal, roofing material abatment. "Estimated Quantities"

0012AC 76,418 Square

OPTION Demo of Gypsum Board in Asbestos

Containing Area. "Estimated Quantities"

0012AD 113,143 Square

OPTION Lead based paint (walls and floors)

0012AE 265 Each OPTION Lead Paint Door Demolition.

FFP

0012AF 793 Gallon OPTION Hydraulic Elevator Fluid Tank Removal

FFP

OPTION INFORMATIONAL PURPOSES ONLY

FFP

Option #8 Additional cleaning and repoint exterior of B738 in accordance with design requirements and Drawings (see drawing Sherman AD201-AD204) NOT included in CLIN 0011. CLIN 0013 is the total of CLIN 0013A, 0013B, 0013C, 0013D, 0013E, 0013F, and 0013G..

0013AA 1,285 Square

OPTION Additional Limestone Restoration

0013AB 2,610 Linear

OPTION Additional Granite Venere Repointing

0013AC 1,150 Square

OPTION Additional Granite Unit Replacement

0013AD 1 Job OPTION Additional Sealant Replacement

0013AE 1350 Linear

Feet

OPTION Additional Brick Veneer Repointing (west elevation)

0013AF 725 Square

OPTION Additional Brick Unit Replacement (west elevation)

0013AG 400 Square

OPTION Brick Veneer Lintel Restoration (west elevation)

0014 3,000 Square

OPTION Option # 9

All work associated with Building 738 Fiber Reinforced Polymer (FRP) reinforcement that is NOT shown on plans and mandatory in the repair in accordance to the Drawings and Specifications specifically shown on S-002. This is an additional amount of FRP Flexural Repair in addition to the amount in CLIN0011 for a total amount of 10,000 SF. "Estimated Quantities"

0015 500 Square

OPTION Option # 10

All work associated with Building 738 repair of spalled concrete that is NOT shown on plans and mandatory in the repair in accordance to the Drawings and Specifications specifically shown on S-002. This is an additional amount of spalled surfaces in addition to the amount in CLIN 0011 for a total amount of 1,750 SF. "Estimated Quantities"

0016 6,000 Square

OPTION Option # 11

All work associated with Building 738 repair of concrete cracks that is NOT shown on plans and mandatory in the repair in accordance to the Drawings and Specifications specifically shown on S-002. This is additional structural repairs to existing cracks in addition to the amount in CLIN 0011 for a total amount of 23,000 LF. "Estimated Quantities"

0017 200 Cubic

Yard

OPTION Option # 12

All work associated removal of rock. Assume 200 CY of rock removal for Transformer installation. "Estimated Quantities"

0018 1 Job OPTION Option # 13 - PRE-PRICED CLIN

FFP

Turn Over As Builts Documents, Equipment List and O&M manuals for B738 in accordance with Drawings and Specifications.

$220,000.00

0019 1 Job OPTION Option # 14

FFP

Relocate Cooler in Grant Alleyway in accordance with Drawings and Specifications, drawing AS-100

0020 1 Job OPTION Option # 15

FFP

Extended Construction Warranty work for Building 740 as per 01 78 00 for an additional year after contract completion in accordance with Drawings and specifications.

OTALS

TOTAL BASE (CLINS 0001-0005) $_____________________

TOTAL OPTION (CLINS 0006-0020) $____________________

TOTAL BASE PLUS OPTIONS (CLINS 0001- 0020) $_________________________

NOTES:

1. Total Offer shall include all costs associated with each item number including all bonding, overhead and profit.

2. Offeror must submit a price for every CLIN. Failure to bid on all items may be cause for rejection of bid.

3. The base contract duration is 639 calendar days from issuance of Notice to Proceed.

4. CLINs 0006, 0007, 0008, and 0009 include the uncertainty of the extent of repair needed for the exterior repairs, spalled surface, flexural repairs and crack repairs in support of Building 740 (Lee) and may be exercised within 365 calendar days from issuance of the Notice to Proceed (NTP). CLIN 0010 is for repair of steam vaults and may be exercised within 365 calendar days from issuance of the Notice to Proceed (NTP). CLINs 0011, 0012, 0017 and 0018 include the repair and abatement of Building 738 (Sherman) and may be exercised within 450 calendar days from issuance of the Notice to Proceed (NTP). CLINs 0013, 0014, 0015, and 0016 include the uncertainty of the extent of repair needed for exterior repairs, spalled surface, flexural repairs and crack repairs in support of Building 738 (Sherman) and may be exercised within 815 calendar days from issuance of the Notice to Proceed (NTP). CLIN 0019 includes relocating cooler in Grant Alleyway and may be exercised within 180 calendar days from issuance of the Notice to Proceed (NTP). CLIN 0020 includes an extended construction warranty for Building 740 (Lee) and may be exercised within 540 calendar days from issuance of the Notice to Proceed (NTP). The Contracting Officer may exercise the Optional Item by written notice to the Contractor, within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order. When an Optional Item is exercised, the base contract completion date will not be adjusted, however the Optional Item CLIN 0011 will establish a new completion date for the optional work only.

5. The basis of award (low bidder) shall be based on the sum of base plus all optional items.

Lee and Sherman Barracks

USMA, West Point, New York

W912DS21B0014

Amendment 0010

AMENDMENT 0010 for Renovation of Lee and Sherman Barracks at West Point, NY

W912DS21B0014.

TO BIDDERS:

Bid Opening:

The bid opening date is revised from 20 Sep 2021 to 21 Sep 21. Electronic copies will not be accepted. Hard copies to be sent to 26 Federal Plaza.

Contractors are required to deliver Bids to 26 Federal Plaza room 16-300 the designated recipiet of bids is Nicholas Emanuel (917)790-8069 Bids are due no later than 21 Sep 2021 at 2:00 P.M. Bid opening will happen on 21 Sep 2021 at 2:00 P.M. EST Contractors are encouraged to wear a mask on the main floor and are required to wear a mask on floor 16.

The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that Bids are submitted so as to reach the designated recipient and designated location. Offerors are responsible for allowing sufficient time for the bids to be received in accordance with the instructions provided.

Contractors will not be allowed to phyiscally be in the conference room during the bid opening however

Bidders are encouraged to call into the following teleconference line:

Call number

+1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 476 8533

Bidder must keep their phone on mute as to not disrupt the reader. Please limit the amount of company employees calling into the line so that the line does not disconnect. The abstract of bids will be posted to the Beta.Sam website.

ADDITIONAL INSTRUCTIONS

Potential Bidders are reminded that only the minimum documents are required for bid submission:

1. Signed 1442.

2. Acknowledged amendments.

3. Filled out bid schedule and totals.

4. Bid Guarantee.

5. Bidders must check off box (d) in 52.204-8 Annual Representations and

Certifications (DEC 2019) for being on SAM.gov

Price Schedule Changes:

CLIN 0001 - Add an exclusion to CLIN 0001.

CLIN 0004 – Moved to Optional CLIN 0006. Renumbered all.

CLIN 0006 and 0013 – Corrected unit quantities.

The following changes shall be made to the drawings and specifications.

DRAWINGS:

ELECTRICAL

I. DRAWING CHANGES

Lee E-102 1) Modified note from 50A to 30A.

Lee E-103 1) Modified note from 50A to 30A.

Lee E-104 1) Modified note from 50A to 30A.

Lee E-105 1) Modified note from 50A to 30A.

Lee E-611 1) Revision included in previous amendment

2) Changed MDP2 - Removed Dryer loads from riser, MDP3, 4, & 5 - Removed one Dryer load from each riser.

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).

Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)

1. Q. Thank you for your Q&A responses in Amendment#8. However, there still seems to be some ambiguity regarding some of the Q&A Reponses. In reference to Lee Barracks. Amendment#8 Q&A#38 clarifies that the Repair Quantities table reflected in the exterior elevation AD200 series drawings are to address additional quantities over and above what is shown on the AD200 drawings. The Limestone restoration quantity per Repair Quantities table [Lee] is 1,080sf [all elevations combined]. However, bid form CLIN0004AA calls for 846sf. Which is correct? Per the Q&A response the 1,080sf should be used and if that is the case then the bid form quantity needs to be revised to 1,080sf.

Amendment#8 Q&A#38 we feel is accurate as the bid form quantity has been revised to match the total summation of Repair Quantities table for Granite Veneer Repointing.

The granite unit Repair Quantities table [Lee] is 2,280sf [all elevations combined] However, bid form CLIN0004AC calls for 1,500sf. Which is correct? Based on the above Q&A responses the 2,280sf should be used and if that is the case then the bid form quantity needs to be revised to 2,280sf.

This also applies to the Sherman Barracks CLIN Items 0013AA, 0013AB & 0013AC. Please advise.

A. See the revised price schedule attached.

2. Q. Please advise which is correct information for dryer outlets: Second Floor: Riser shows 5 - 30A Circuits, Floor plan shows 5 - 50A Outlets, MDP2 panel schedule shows 0 branch breakers.

Third, Fourth and Fifth Floors: Risers shows 3 - 30A circuits, Floor Plans show 2 - 50A Outlets, MDP panel schedules show 2 30A branch breakers A. 5-30A circuits are shown on panel RP2 schedule (not MDP2) matching the floor plan. The 5- 30A circuits have been removed from MDP2 riser since no dryers are connected to MDP2. See amendment revised drawing E-611. Revised related keyed note from 50A circuits to 20A circuits. See amendment revised drawing E-102. MDP2 schedule shows 0 breakers because no dryer is connected to

it. There are 2-30A dryers only on each 3,4&5 floors. One dryer has been removed from each MDP-3, MDP-4 & MDP-5. See amendment revised drawing E-611. Revised related keyed note from 50A circuits to 20A circuits. See amendment revised drawings E-103, E-104 & E-105. 2-30A breakers is correct. Panel schedules on E-800 & E-801 are correct.

File details come from the government source that posted it. Updated .