Amendment 0002.pdf

PDF 129 KB Posted

Attached to
Building 740, Lee Barracks and Building 738, Sherman Barracks Repair
Solicitation number
W912DS21B0004
Issued by

About this file

This document provides details for a federal construction contract opportunity involving repair work at two barracks buildings at the United States Military Academy at West Point. The contract will involve repair of Building 740 at Lee Barracks and repair of Building 738 at Sherman Barracks, including supporting work. The work at Building 740 will include full interior and exterior renovation, replacement of mechanical, electrical and plumbing systems, addition of a cadet health clinic, and supporting site work. The work at Building 738 is an optional scope that would involve full interior and exterior repair and replacement of utilities systems. The estimated value of the contract is between $100 million and $200 million. The solicitation is expected to be posted on August 6, 2021 with proposals due approximately 30 days later. The North American Industry Classification System code for this procurement is 236220 and the period of performance is expected to be approximately 1034 calendar days.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0004 Amendment 11.pdf PDF
Lee Barracks Electrical Drawings for Amendment.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008_Combined Drawings Final 9-10-21.pdf PDF
Amendment 0008_Combined Specifications 9-10-21.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_LEE-SHERMAN SPECS rev.pdf PDF
Amendment 0007_Lee Sherman Section 01 32 00 Scheduling.pdf PDF
Amendment 0007_Dwgs_Sherman Barracks.pdf PDF
Amendment 0007_Building 740 Lee Barracks Site Walk through Sign in Sheet.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007_Dwgs_Lee Barracks.pdf PDF
Amendment 0007_Sherman Barracks GER.pdf PDF
Amendment 0007_5.4 GER_West Point Lee Barracks signed.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS SHERMAN.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS LEE.pdf PDF
Amendment 0004_Photos_Steam Vault F-4.pdf PDF
Amendment 0004_Photos_Steam Vault F-8.pdf PDF
Amendment 0004_WP Lee and Sherman Steam Vault Amendment SPECIFICATIONS 17 AUG 2021.pdf PDF
Amendment 0004_Photos_Steam Vault F-3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part1.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part2.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0001.pdf PDF
RTA Drawings Lee Vol 2.pdf PDF
RTA Drawings Lee Vol 3.pdf PDF
RTA Drawings Lee Vol 1_Part3.pdf PDF
RTA Drawings Lee Vol 1_Part2.pdf PDF
RTA Drawings Lee Vol 1_Part1.pdf PDF
RTA Drawings Sherman Vol 2_Part2.pdf PDF
RTA Drawings Sherman Vol 2_Part1.pdf PDF
RTA Drawings Sherman Vol 1_Part2.pdf PDF
RTA Drawings Sherman Vol 1_Part1.pdf PDF
VOL 3 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 2 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
W912DS-21-B-0004_Solicitation.pdf PDF
VOL 4 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 1 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is:

1) Bid opening remains 07 September 2021 at 2:00 P.M.

2) Incorporate Contract Draw ings. Please see Continuation Page.

NOTE: Bidders must acknow ledge receipt of this amendment by date specified in the bid (or as amended) by one of the follow ing methods: In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS21B0004

X 9B. DATED (SEE ITEM 11)

06-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

Repair Building 740, Lee Barracks and Repair Building 738, Sherman Barracks, West Point, NY

W912DS-21-B-0004

Amendment 0002

AMENDMENT 0002 to DRAWINGS and SPECIFICATIONS for Repair Building 740, Lee Barracks and Repair

Building 738, Sherman Barracks, West Point, NY

TO OFFORERS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- None

3. The following DRAWINGS have been ADDED:

RTA Drawings Lee Vol 1_Part1 RTA Drawings Lee Vol 1_Part2 RTA Drawings Lee Vol 1_Part3 RTA Drawings Lee Vol 2 RTA Drawings Lee Vol 3 RTA Drawings Sherman Vol 1_Part1 RTA Drawings Sherman Vol 1_Part2 RTA Drawings Sherman Vol 2_Part1 RTA Drawings Sherman Vol 2_Part2

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been REVISED:

W912DS21B0004

3. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

(End of Summary of Changes)