Amendment 0007_LEE-SHERMAN SPECS rev.pdf

PDF 4 MB Posted

Attached to
Building 740, Lee Barracks and Building 738, Sherman Barracks Repair
Solicitation number
W912DS21B0004
Issued by

About this file

This document provides details for a federal contract opportunity with the U.S. Army Corps of Engineers to repair two barracks buildings at West Point. The project involves renovating Building 740 at Lee Barracks and has an estimated cost between $100-200 million. It will repair interior spaces, replace mechanical, electrical and plumbing systems, and address exterior envelope and site work. As an option, the project may also renovate Building 738 at Sherman Barracks for an additional 321 cadet rooms. The solicitation will be posted on August 6 on SAM.gov and proposals will be due around 30 days later. Contractors must register in SAM prior to award. The period of performance is approximately 1034 calendar days from notice to proceed. The NAICS code is 236220.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0004 Amendment 11.pdf PDF
Lee Barracks Electrical Drawings for Amendment.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008_Combined Drawings Final 9-10-21.pdf PDF
Amendment 0008_Combined Specifications 9-10-21.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_Lee Sherman Section 01 32 00 Scheduling.pdf PDF
Amendment 0007_Dwgs_Sherman Barracks.pdf PDF
Amendment 0007_Building 740 Lee Barracks Site Walk through Sign in Sheet.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007_Dwgs_Lee Barracks.pdf PDF
Amendment 0007_Sherman Barracks GER.pdf PDF
Amendment 0007_5.4 GER_West Point Lee Barracks signed.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS SHERMAN.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS LEE.pdf PDF
Amendment 0004_Photos_Steam Vault F-4.pdf PDF
Amendment 0004_Photos_Steam Vault F-8.pdf PDF
Amendment 0004_WP Lee and Sherman Steam Vault Amendment SPECIFICATIONS 17 AUG 2021.pdf PDF
Amendment 0004_Photos_Steam Vault F-3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part1.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part2.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RTA Drawings Lee Vol 2.pdf PDF
RTA Drawings Lee Vol 3.pdf PDF
RTA Drawings Lee Vol 1_Part3.pdf PDF
RTA Drawings Lee Vol 1_Part2.pdf PDF
RTA Drawings Lee Vol 1_Part1.pdf PDF
RTA Drawings Sherman Vol 2_Part2.pdf PDF
RTA Drawings Sherman Vol 2_Part1.pdf PDF
RTA Drawings Sherman Vol 1_Part2.pdf PDF
RTA Drawings Sherman Vol 1_Part1.pdf PDF
VOL 3 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 2 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
W912DS-21-B-0004_Solicitation.pdf PDF
VOL 4 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 1 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lee and Sherman Barracks Upgrades Project August 27, 2021 US Military Academy, West Point, NY Issued for Amendment

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 00 00 06/15 SEALS PAGE

00 00 01 01/18 COVER SHEET

00 00 02 01/18 CHECK LIST FOR BIDDERS

00 10 00 12/17 SF 1442 AND BIDDING SCHEDULE

00 21 16 09/16 INSTRUCTIONS, CONDITIONS, AND NOTICE

TO BIDDERS

00 22 20 09/17 PROPOSAL SUBMISSION REQUIREMENTS AND

INSTRUCTIONS

00 24 00 06/17 EVALUATION FACTORS FOR AWARD

00 45 00 09/16 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 09/16 CONTRACT CLAUSES

00 90 00 06/17 WAGE RATES

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/15 SUMMARY OF WORK

01 14 00 11/11 WORK RESTRICTIONS

01 22 00.00 10 08/15 PRICE AND PAYMENT PROCEDURES

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 33 00 08/18 SUBMITTAL PROCEDURES

01 33 29 02/17 SUSTAINABILITY REPORTING

01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 91 07/21 HISTORIC TREATMENT PROCEDURES

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 11/16 QUALITY CONTROL

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 20.00 18 NY Dist. July 2018 TESTING FOR MECHANICAL AND ELECTRICAL

SYSTEMS

01 45 35 02/20 SPECIAL INSPECTIONS

01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 53 00 06/21 TEMPORARY CONSTRUCTION

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19 PROJECT IDENTIFICATION

01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 05/18 FACILITY DATA REQUIREMENTS

01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 05/10 DEMOLITION AND DECONSTRUCTION

02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC

CONSTRUCTION MATERIALS

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00 11/18 ASBESTOS REMEDIATION

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 84 33 05/20 REMOVAL AND DISPOSAL OF

POLYCHLORINATED BIPHENYLS (PCBs)

PROJECT TABLE OF CONTENTS Page 1

02 85 00 11/18 MOLD REMEDIATION

DI VI SI ON 03 - CONCRETE

03 01 00 02/18 REHABILITATION OF CONCRETE

03 30 00 02/19 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 03 00 11/17 CONSERVATION TREATMENT FOR PERIOD

MASONRY

04 20 00 11/15 UNIT MASONRY

DI VI SI ON 05 - METALS

05 12 00 08/18 STRUCTURAL STEEL

05 30 00 05/15 STEEL DECKS

05 40 00 05/15 COLD-FORMED METAL FRAMING

05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS

05 51 00 02/17 METAL STAIRS

05 52 00 02/18 METAL RAILINGS

05 72 00 05/18 DECORATIVE METAL RESTORATION

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/16 ROUGH CARPENTRY

06 20 00 08/16 FINISH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 11 13 08/11 BITUMINOUS DAMPPROOFING

07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING

07 14 00 02/12 FLUID-APPLIED WATERPROOFING

07 17 00 02/16 BENTONITE WATERPROOFING

07 21 13 02/16 BOARD AND BLOCK INSULATION

07 21 16 11/11 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16 ROOF AND TRAFFIC DECK INSULATION

07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17 SPRAY FOAM AIR BARRIERS

07 42 13 05/11 METAL WALL PANELS

07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 05/17 FLASHING AND SHEET METAL

07 62 13 08/09 COPPER SHEET METAL FLASHING AND TRIM

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10 FIRESTOPPING

07 92 00 08/16 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00 08/16 WOOD DOORS

08 33 23 08/20 OVERHEAD COILING DOORS

08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 51 13 05/19 ALUMINUM WINDOWS

PROJECT TABLE OF CONTENTS Page 2

08 71 00 02/16 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 01/08 LATH

09 23 00 08/16 GYPSUM PLASTERING

09 29 00 08/16 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17 STATIC-CONTROL FLOORING

09 65 00 08/10 RESILIENT FLOORING

09 66 16.01 08/16 TERRAZZO BASE AND STAIR TREADS

09 66 23 08/16 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 68 00 11/17 CARPETING

09 90 00 05/11 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

10 51 26 05/11 PLASTIC LOCKERS

10 56 13 04/06 STEEL SHELVING

DI VI SI ON 11 - EQUI PMENT

11 72 13 04/06 MEDICAL EQUIPMENT, MISCELLANEOUS

11 81 19 02/09, CHG 1: 02/15 VACUUM CLEANING SYSTEMS

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 08/17 WINDOW BLINDS

12 22 00 08/16 CURTAINS AND DRAPES

12 36 00 08/18 COUNTERTOPS

12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 08/17 SITE FURNISHINGS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 21 48 04/06 PREFABRICATED AUDIOMETRIC ROOMS

13 34 23.13 06/19 PORTABLE BUILDINGS

13 49 10 11/20 X-RAY SHIELDING

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

PROJECT TABLE OF CONTENTS Page 3

AdamsL3 Cross-Out

21 12 00 05/11 STANDPIPE SYSTEMS

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15 PLUMBING, GENERAL PURPOSE

22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES

22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

22 07 19.00 40 08/16 PLUMBING PIPING INSULATION

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 01 30.41 02/15 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 48.00 40 08/15 VIBRATION AND SEISMIC CONTROLS FOR

HVAC PIPING AND EQUIPMENT

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.01 02/19 LONWORKS DIRECT DIGITAL CONTROL FOR

HVAC AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 23 00 10/07 REFRIGERANT PIPING

23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20 HVAC AIR DISTRIBUTION

23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING

WATER AND STEAM HEAT EXCHANGERS

23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.21 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS FIRE AND LIFE SAFETY

25 05 11.23 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS UTILITY MONITORING

CONTROL SYSTEM (UMCS)

25 08 10 04/06 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 10 10 02/19 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 09 13 11/08 POWER MONITORING SYSTEM

PROJECT TABLE OF CONTENTS Page 4

26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM

26 24 13 05/15 SWITCHBOARDS

26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION

26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 36 23 05/20 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20 INTERIOR LIGHTING

26 56 00 05/20 EXTERIOR LIGHTING

26 56 10 01/17 HISTORIC EXTERIOR LIGHTING RESTORATION

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 52 24 08/17 NURSE CALL SYSTEM

27 53 19.13 05/20 FIRST RESPONDER DISTRIBUTED ANTENNAE

SYSTEMS (DAS)

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 08/08 EARTHWORK

31 05 19 08/08 GEOTEXTILE

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16 PAVEMENT MARKINGS

32 31 13 11/16 CHAIN LINK FENCES AND GATES

32 92 19 08/17 SEEDING

32 93 00 08/17 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 02/10 STORM DRAINAGE UTILITIES

33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS

DISTRIBUTION PIPELINES

33 63 13 04/06 EXTERIOR UNDERGROUND STEAM

DISTRIBUTION SYSTEM

33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

PROJECT TABLE OF CONTENTS Page 5

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 137 PAGES

West Point Lee and Sherman Barracks

01 14 00 SD-01 Preconstruction Submittals

1.4.4.1Personnel List

01 30 00 SD-01 Preconstruction Submittals

1.4 G ROView Location Map

1.5 G ROProgress and Completion

Pictures

1.5.5.2Preconstruction Video Recording

1.5.4.2Preconstruction Digital

Photographs

1.10 G ROWork To Be Performed By The

Contractor

1.21 G ROEng Form 93

1.21 G ROEng Form 93

1.21 G ROEng Form 93

SD-04 Samples

1.3 G ROColor Boards

SD-05 Design Data

1.5.5.3Periodic Construction Video

Recordings

1.5.4.3Periodic Construction Digital

Photographs

1.5.5.4Final Completion Construction

Video Recordings

SD-07 Certificates

1.21 G ROEng Form 93

1.21 G ROEng Form 93

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 137 PAGES

01 30 00 1.21 G ROEng Form 93

SD-11 Closeout Submittals

1.5.4.4Final Completion Construction

Digital Photographs

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.7.1 G ROPreliminary Project Schedule

3.7.2 G ROInitial Project Schedule

3.9.2 G ROPeriodic Schedule Update

3.8.2 G RONarrative Report

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 S ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 S ROSustainability Action Plan

1.5.3.1 S ROPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.1 S ROFinal High Performance and

Sustainable Building Checklist

1.5.3.1 S ROFinal Sustainability eNotebook

1.5.3.1 S ROAmended Final Sustainability

eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 137 PAGES

01 33 29 1.5.3.1 S ROAmended Final High

Performance and Sustainable

Building Checklist

3.2 S ROThird Party Certification

Certificate, Assessment, or

Validation

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet

1.14.1 G ROPortable Gauge Operations

Planning Worksheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 137 PAGES

01 35 91 SD-01 Preconstruction Submittals

2.1 G ROConstruction Schedule for

Historic Treatment

2.2 G ROPhotographic Documentation

2.1 G ROHistoric Treatment Program

3.3 G ROHistoric Treatment Program

2.3 G ROAlternative Methods and

Materials

3.2.1 G ROFire-Prevention Plan

SD-05 Design Data

2.2 G AEProgress Photos

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

SD-07 Certificates

3.10 G ROQCR Report

01 45 20.00 18 SD-01 Preconstruction Submittals

1.3 G ROTest Plan List

01 45 35 SD-01 Preconstruction Submittals

3.1.2Written NDT Practices

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 137 PAGES

01 45 35 2.1AISC Certified Steel Fabricator

1.5 G ROSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.4 G ROConstruction Site Plan

3.5.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

1.7.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.7.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

3.6.1 G ROExisting Conditions Report

SD-02 Shop Drawings

3.7.2.2Steel Truss Drawing

3.7.2.2Building Elevations (Typical)

3.7.2.2Module Multiple Plans

3.7.2.2Key Plan Business Use Plans

3.7.2.2Power Riser Diagrams

3.7.2.2Steel Frame Plans

3.7.2.2Cross Section

3.7.2.2Floor Framing Plan

3.7.2.2Roof Framing Plan Shell Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 137 PAGES

01 50 00 3.7.2.2Ceiling Layout

3.7.2.2Roof Ventilation Plan And Details

3.7.2.2Plumbing Schematics

3.7.2.2Typical Foundation Plan

3.7.2.2Millwork Shop Drawings

3.7.2.2Site Electrical

3.7.2.2Site Domestic Water And

Sanitary Service Connections And

Routing

3.7.2.2Heat Tracing System For

Exposed Sanitary And Domestic

Water Service

SD-05 Design Data

3.7.2.2Perimeter Frame Calculations

3.7.2.2Floor Joist Calculation

3.7.2.2Exterior Stud Calculation

3.7.2.2Solid Rafter Calculation

3.7.2.2Mechanical Calculations

3.7.2.2Code Notes

3.7.2.2Uplift Siding Mansard Calculation

3.7.2.2Window and Door Design

Pressure (DP) Ratings

SD-07 Certificates

1.5.1Backflow Tester

1.5Backflow Preventers

3.7.2.2 G ROAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 137 PAGES

01 50 00 3.7.2.2Lead-Free Products

3.7.2.2Architectural Barriers Act

SD-10 Operation and Maintenance

Data

3.7.2.2 G ROHeat Distribution System

01 53 00 SD-01 Preconstruction Submittals

2.2.1 G ROConstruction Vehicle And

Delivery Route Plan

1.4 G ROConstruction Site Plan

SD-02 Shop Drawings

3.2 G ROSteel Truss Drawing

3.2 G ROBuilding Elevations (Typical)

3.2 G ROModule Multiple Plans

3.2 G ROKey Plan Business Use Plans

3.2 G ROPower Riser Diagrams

3.2 G ROSteel Frame Plans

3.2 G ROCross Section

3.2 G ROFloor Framing Plan

3.2 G RORoof Framing Plan Shell Units

3.2 G ROCeiling Layout

3.2 G RORoof Ventilation Plan And Details

3.2 G ROPlumbing Schematics

3.2 G ROTypical Foundation Plan

3.2 G ROMillwork Shop Drawings

3.2 G ROSite Electrical

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 137 PAGES

01 53 00 3.2 G ROSite Domestic Water And

Sanitary Service Connections And

Routing

3.2 G ROHeat Tracing System For

Exposed Sanitary And Domestic

Water Service

SD-03 Product Data

2.1.2 G ROFacility Identification Signs

SD-05 Design Data

3.2 G ROPerimeter Frame Calculations

3.2 G ROFloor Joist Calculation

3.2 G ROExterior Stud Calculation

3.2 G ROSolid Rafter Calculation

3.2 G ROMechanical Calculations

3.2 G ROCode Notes

3.2 G ROUplift Siding Mansard Calculation

3.2 G ROWindow And Door Dp Ratings

SD-07 Certificates

3.2 G ROAsbestos Free Materials

3.2 G ROLead-Free Products

3.2 G ROArchitectural Barriers Act

1.5 G ROBackflow Preventers Certificate

1.5.1Backflow Tester Certificate

SD-10 Operation and Maintenance

Data

3.2 G ROHeat Distribution System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 137 PAGES

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.10 G ROSolid Waste Management Permit

1.5.2 G RORegulatory Notifications

1.6 G ROEnvironmental Protection Plan

3.2.1.1 G ROStormwater Pollution Prevention

Plan

3.2.1.2 G ROStormwater Notice of Intent

1.6.9.1 G RODirt and Dust Control Plan

1.5.5 G ROEmployee Training Records

1.5.4 G ROEnvironmental Manager

Qualifications

SD-06 Test Reports

3.2.1.3Inspection Reports

1.10.1 G ROMonthly Solid Waste Disposal

Report

SD-07 Certificates

1.5.5 G ROEmployee Training Records

1.5.5.1Certificate of Competency

1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 137 PAGES

01 57 19 3.7.1 G ROWaste Determination

Documentation

3.7.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.5.5 G ROAssembled Employee Training

Records

1.10 G ROSolid Waste Management Permit

3.7.2.1 G ROProject Solid Waste Disposal

Documentation Report

3.7.3.1 G ROHazardous Waste/Debris

Management

1.5.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

01 58 00 SD-02 Shop Drawings

1.4.1 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.7 G ROConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.9.1Warranty Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 137 PAGES

01 78 00 1.9.5Warranty Tags

1.7Spare Parts Data

SD-08 Manufacturer’s Instructions

1.9.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

2.2 G RORecord Model

1.9.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 G ROFinal Approved Shop Drawings

3.5 G ROConstruction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

2.4 G ROCertification Of USDA Designated

Items

3.9.1 G ROInterim DD FORM 1354

3.9.2 G ROChecklist for DD FORM 1354

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 137 PAGES

01 78 00 3.9.2 G ROHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.5.1Facility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

3.1 G ROFacility Data Workbook, Construction Progress

3.1 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G ROFacility Data Workbook, Construction Final

1.5.3 G ROFacility Document Set, Construction Final

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 137 PAGES

01 78 24.00 10 3.2 G ROFacility Document Set, Construction Final

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.4 G DODesign Review Report

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.2 G DOFinal Construction Phase

Commissioning Plan

3.1.3.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.6.2 G DOBuilding Envelope Inspection

Checklists

3.1.6.3 G DOPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

3.3.1 G DOPost-Construction Trend Log

Report

SD-07 Certificates

1.10 G DOCertificate of Readiness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 137 PAGES

01 91 00.15 10 SD-10 Operation and Maintenance

Data

3.1.7 G ROTraining Plan

3.1.7 G ROTraining Attendance Rosters

3.1.8 G DOSystems Manual

3.1.9 G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

3.1.3.2 SFinal Construction Phase

Commissioning Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.2.2 G RODeconstruction Plan

1.10Existing Conditions

1.10.2Scaled And Dimensioned

Drawings Of All Major Existing To

Remain Architectural And

Structural Elements

SD-07 Certificates

1.7 G RONotification

02 42 91 SD-01 Preconstruction Submittals

1.2 G ROWork Plan

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 137 PAGES

02 81 00 3.1 G ROHazardous Waste Management

Plan

3.2 G ROOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7 G RORecordkeeping

3.7 G ROException Report

3.8Spill Response

SD-07 Certificates

1.4.1 G ROTransportation and Disposal

Coordinator

1.4.2 G ROTraining

1.4.3Certification

3.3.3 G ROShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 G ROAmended Water

1.3.9 G ROSafety Data Sheets (SDS) for All

Materials

3.1.2.1 G RORespirators

3.1.7 G ROLocal Exhaust Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 137 PAGES

02 82 00 3.1.7 G ROPressure Differential Automatic

Recording Instrument

3.1.8 G ROVacuums

SD-06 Test Reports

1.5.5 G ROAir Sampling Results

1.5.6 G ROPressure Differential Recordings

for Local Exhaust System

3.3.3.2 G ROAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 G ROEmployee Training

1.3.5 G RONotifications

1.3.7 G RORespiratory Protection Program

1.3.10 G ROAsbestos Hazard Abatement Plan

1.3.11 G ROTesting Laboratory

1.3.12 G ROLandfill Approval

1.3.12 G RODelivery Tickets

1.3.12 G ROWaste Shipment Records

1.3.13 G ROTransporter Certification

1.3.14 G ROMedical Certification

1.5.1 G ROPrivate Qualified Person

Documentation

1.5.2 G ROCompetent Person

1.5.3 G ROWorker's License

1.5.4 G ROContractor's License

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 137 PAGES

02 82 00 1.5.7 G ROFederal, State or Local Citations on Previous Projects

3.1 G ROEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.2 G ROWater Filtration Equipment

3.1.8 G ROVacuums

3.1.8 G ROVentilation Systems

SD-11 Closeout Submittals

1.3.5 G ROPermits and Licenses

1.3.5 G RONotifications

1.3.7.1 G RORespirator Program Records

1.7.1 G RORental Equipment

02 84 16 SD-07 Certificates

1.8.1 G ROQualifications of CIH

1.8.1 G ROTraining Certification

1.8.2 G ROPCB and Lamp Removal Work

Plan

1.8.3 G ROPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 G ROTransporter Certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.2DD Form 1348-1

3.3.1Testing Results

02 84 33 SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 137 PAGES

02 84 33 1.7.1Training certification

1.7.2 G ROQualifications of CIH

1.7.3 G ROPCB Removal Work Plan

1.7.4 G ROPCB Disposal Plan

1.7.5 G RONotification

3.8Transporter Certification

3.5.4Certification of Decontamination

3.5.5Post Cleanup Sampling

3.8.1Certificate of Disposal

02 85 00 SD-01 Preconstruction Submittals

1.2.26 G ROVentilation System Mold

Remediator Qualifications (VSMR)

1.4.1.1 G ROMold Assessment Report

1.4.1.2 G ROMold Remediation Plan

1.4.1.3 G RORespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 G ROCertified Industrial Hygienist

(CIH)/Licensed NYS Mold

Assessor Qualifications

1.4.1.6 G RONYS Mold Remediation

Supervisor Qualifications

1.4.1.6 G ROCorporate NYS Mold License

SD-03 Product Data

1.2.11 G RODisinfectants or Biocide

Sanitizing Solutions

1.2.14 G ROFungicidal Agents, (EPA)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 137 PAGES

02 85 00 1.2.21 G ROPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 G ROSafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 G ROLicensed NYS Mold Assessor

Daily Reports

1.4.4 G ROLicensed NYS Mold Assessor

Daily Reports

SD-11 Closeout Submittals

1.4.4 G ROSubmittals at Completion of

Remediation Work

03 01 00 SD-01 Preconstruction Submittals

1.5.3 G ROQualifications

1.5.5 G ROWork Plan

1.6.1 G ROWork Plan

1.5.2 G ROQuality Control Plan

SD-03 Product Data

2.5Conventional Concrete

2.6Polymers

2.7Miscellaneous Materials And

Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 137 PAGES

03 01 00 SD-05 Design Data

3.1.3 G AEFormwork And Shoring

1.5.1 G AERepair Procedures

2.8 G AEMixture Proportioning

SD-06 Test Reports

2.8Mixture Proportioning

3.1.5Quality Control

3.2.3Quality Control

3.3.3Quality Control

3.5.3Quality Control

2.4Reinforcement And

Reinforcement Supports

2.5Conventional Concrete

SD-07 Certificates

1.5.3Qualifications

2.4Reinforcement And

Reinforcement Supports

03 30 00 SD-01 Preconstruction Submittals

1.6.5 G ROQuality Control Plan

1.6.6 G ROQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 G ROLaboratory Accreditation

3.3.8Maturity Method Data

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 137 PAGES

03 30 00 2.1Formwork

1.6.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

2.2.3Biodegradable Form Release

Agent

1.6.3.3Finishing Plan

2.4.2Nonshrink Grout

2.4.3.3 G AEClear Waterbased Curing

Compound and Sealer Finish

(SC1)

SD-04 Samples

1.6.3.6 G AEField Test Panels for Finish (SC1)

SD-05 Design Data

1.6.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G AEConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 137 PAGES

03 30 00 1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.14.2.3 G AECompressive Strength Tests

3.14.2.5Unit Weight of Lightweight

Structural Concrete

3.14.2.4Air Content

3.14.2.1Slump Tests

2.3.2Water

1.6.4.4Slip Resistance Testing for

Finished Sealed Concrete (SC1)

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.3.4VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.5Joint Sealants

2.4.3.3 G AEClear Waterbased Curing

Compound and Sealer Finish

(SC1)

2.4.1Curing Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 137 PAGES

04 03 00 SD-01 Preconstruction Submittals

1.6.1 G ROQuality Control Plan

1.6.1 G ROProject Training Program

1.6.2 G ROQualifications

3.1 G ROHistoric Masonry Repair

Assessment

SD-02 Shop Drawings

1.6.5Photographic Documentation

3.8.1 G ROStructural Upgrades

SD-03 Product Data

1.6.2 G ROQualifications

1.6.6 G ROCleaning and Restoration

Methods

2.1 G ROCleaning Materials

1.3.2 G ROBiocides

2.2.2.2 G ROReplacement Mortar

2.4 G ROMortar Mix

SD-04 Samples

1.6.7.1 G ROMock-ups

SD-05 Design Data

3.8.1 G ROStructural Upgrades

SD-06 Test Reports

2.2.2.1 G ROTesting and Matching

SD-07 Certificates

2.2 G RORepair Materials

04 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 137 PAGES

04 20 00 3.3.3.1 G ROCut CMU

3.4.1.1 G RO Detail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.3.2.5 G RO Hollow Load Bearing Units

2.2.3.2.5 G RO Hollow Non-Load Bearing Units

2.2.3.2.5 G RO Glazed Fire Rated Load Bearing

Units

2.2.3.2.5 G RO Glazed Hollow Non-Load Bearing

Units

2.2.3.2.5 G RO Ground and Polished Hollow

Non-Load Bearing Units

2.4.1.1 G ROCementitious Materials

2.2.3.2.1 G ROCement

2.2.3.2 G ROConcrete Masonry Units (CMU)

3.3.1.4 G ROControl Joint

2.6.3 G ROJoint Reinforcement

1.3.1.1 G ROColored Mortar

2.2.3.2.2 G RO Recycled Content

2.2.2 G ROClay or Shale Brick

SD-04 Samples

1.3.1 G ROMock-Up

2.2.3.2 G ROConcrete Masonry Units (CMU)

2.2.3.2.5 G RO Glazed Hollow Non-Load Bearing

Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 137 PAGES

04 20 00 2.2.3.2.5 G RO Ground and Polished Hollow

Non-Load Bearing Units

2.2.5 G RODimension Stone Units

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

2.6.7 G ROInsulation

SD-05 Design Data

2.1.2 G RO Masonry Compressive Strength

2.2.3.3 G ROFire-Rated Concrete Masonry

Units

3.2.4 G RO Bracing Calculations

SD-06 Test Reports

2.2.3.3 G ROFire-Rated Concrete Masonry

Units

3.6.1.1 G ROField Testing of Mortar

3.6.1.2 G ROField Testing of Grout

SD-07 Certificates

2.2.3.2 G ROConcrete Masonry Units (CMU)

2.4.1.4 G ROAdmixtures for Masonry Mortar

2.4.2.2 G ROAdmixtures for Grout

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 137 PAGES

04 20 00 3.8 G ROTake-Back Program

SD-11 Closeout Submittals

2.2.3.2.2 S RORecycled Content

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G AEErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.5.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 137 PAGES

05 12 00 SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.5.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.7Mechanical Fasteners

2.1.2Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 137 PAGES

05 30 00 SD-05 Design Data

2.1 G RODeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 G ROFraming Components

SD-03 Product Data

2.1Studs

2.1 S RORecycled Content of Steel

Products

2.1 S RORecycled Content of Steel

Products

SD-05 Design Data

1.6.2 G RO Metal Framing Calculations

SD-07 Certificates

1.4Cold-Formed Metal Framing

05 50 13 SD-02 Shop Drawings

2.10 G AEStructural Steel Gate Frames

2.5 G ROCover Plates and Frames

2.6 G ROExpansion Joint Covers

2.4 G AEAccess Doors and Panels

2.7 G ROFloor Gratings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 137 PAGES

05 50 13 2.7 G AERoof/Trash Enclosure Walkways

2.8 G ROBollards/Pipe Guards

2.9 G ROAngles and Plates

SD-03 Product Data

2.4 G AEAccess Doors and Panels

2.5 G ROCover Plates and Frames

2.6 G ROExpansion Joint Covers

2.10 G ROStructural Steel Gate Frames

2.1 S RORecycled Content

SD-04 Samples

2.6Expansion Joint Covers

2.1 G ROCertificates of Compliance

2.2 G ROCertified Mill

05 51 00 SD-02 Shop Drawings

1.3.2 G AEMember and Connection

Calculation

2.1 G ROSteel Hardware

2.1 G ROSteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SD-03 Product Data

2.4.1 G AEStructural-Steel Plates, Shapes, and Bars

2.4.2 G AEStructural-Steel Tubing

2.4.5 G AEHot-Rolled Carbon Steel Sheets

and Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 137 PAGES

05 51 00 2.4.4 G AECold-Finished Steel Bars

2.4.3 G AEHot-Rolled Carbon Steel Bars

2.4.6 G AECold-Rolled Carbon Steel Sheets

2.4.8 G AECold-Drawn Steel Tubing

2.3.3 G AEConcrete Inserts

2.3.4 G AEMasonry Anchorage Devices

2.2.4 G AEProtective Coating

2.2.2 G AESteel Pan Stairs

2.3.1 G AESteel Stairs

SD-07 Certificates

1.3.1 G ROWelding Procedures

1.3.1 G ROWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 G ROStructural-Steel Plates, Shapes, and Bars

2.4.2 G ROStructural-Steel Tubing

2.2.4 G ROProtective Coating

2.3.4 G AEMasonry Anchorage Devices

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

3.2 G ROIron and Steel Hardware

3.2 G ROSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 G ROStructural-Steel Plates, Shapes, and Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 137 PAGES

05 52 00 3.2 G ROStructural-Steel Plates, Shapes, and Bars

2.2.2 G ROStructural-Steel Tubing

2.2.5 G ROConcrete Inserts

2.2.6 G ROMasonry Anchorage Devices

2.1.2 G ROProtective Coating

2.2.8 G AESteel Railings and Handrails

1.2.1 G ROAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

05 72 00 SD-01 Preconstruction Submittals

1.1 G ROExisting Conditions

SD-02 Shop Drawings

1.5.3 G RODocumentation

SD-03 Product Data

2.1 G ROCleaning Materials

2.3 G ROFinish Materials

1.5.1 G ROQualifications

SD-04 Samples

1.5.4 G ROMock-ups

06 10 00 SD-02 Shop Drawings

2.1.2 G RONailing Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 137 PAGES

06 10 00 SD-03 Product Data

2.2 G ROPlywood and oriented strand

board (OSB)

1.8 G ROFire-retardant treatment

2.3.1 G ROGypsum wall sheathing

2.3.3 G ROAdhesives

2.2.2.1 G RONAUF Composite Wood and

Laminating Adhesives

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.10.1Certificates of Grade

2.2.1.1 SCertified Sustainably Harvested

Plywood

SD-11 Closeout Submittals

1.9.1 G RO Local/Regional Materials

2.3.3Adhesives

2.2.2.1NAUF Composite Wood and

Laminating Adhesives

1.10.1 G ROCertified Wood

1.9.1 G RO LEED(tm) Documentation

06 20 00 SD-02 Shop Drawings

1.3 G AEDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 G ROWood Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 137 PAGES

06 20 00 2.2.1 G ROCountertops

2.2.1 G ROVanity Tops

1.4 G ROTreated Wood Products

2.5 G ROHardware and Accessories

SD-04 Samples

2.1.7 G AEWood Chair Rail, Crown Molding

and Trim

SD-07 Certificates

1.7.1.1 G ROCertificates of Grade

2.6.1.2 SIndoor Air Quality for Non-aerosol

Adhesives

2.6.1.2 SIndoor Air Quality for Aerosol

Adhesives

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G AEShop Drawings

2.14 G AEShop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G ROWood Materials

2.12 G ROWood Finishes

2.14.7.3 G ROFinish Schedule

1.5.3 G ROCertification

SD-04 Samples

2.3 G AEPlastic Laminates

2.9 G AECabinet Hardware

1.5.2.1 G AETextured MDF Panel - XW12

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 137 PAGES

06 41 16.00 10 2.5 G AETextured MDF Panel - XW12

1.5.2.2 G AEGraphics on Laminate Panels -

XW13

2.6 G AEGraphics on Laminate Panels -

XW13

1.5.2 G AEMock-ups

SD-07 Certificates

1.5Quality…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .