Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS LEE.pdf

PDF 27 MB Posted

Attached to
Building 740, Lee Barracks and Building 738, Sherman Barracks Repair
Solicitation number
W912DS21B0004
Issued by

About this file

This document provides details on a federal contract opportunity for repair work at two barracks buildings on the United States Military Academy campus. The U.S. Army Corps of Engineers, New York District intends to issue a solicitation seeking a firm-fixed price contract to repair Building 740 at Lee Barracks and Building 738 at Sherman Barracks, including supporting facilities and infrastructure. Renovations at Lee Barracks will replace substandard spaces and systems, improve energy efficiency, and add a cadet health clinic, totaling around 69,000 square feet for 138 cadets. Repairs at Sherman Barracks will address similar deficiencies across around 111,000 square feet for 321 cadets. Both projects will abate hazardous materials and comply with sustainability requirements. The optional work at Sherman Barracks is anticipated to have a contract value between $100-200 million. The response deadline will be around 30 days after the solicitation is posted to SAM.gov on August 6, 2021. Vendors must register in SAM to receive the solicitation and be eligible for award.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0004 Amendment 11.pdf PDF
Lee Barracks Electrical Drawings for Amendment.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008_Combined Drawings Final 9-10-21.pdf PDF
Amendment 0008_Combined Specifications 9-10-21.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_LEE-SHERMAN SPECS rev.pdf PDF
Amendment 0007_Lee Sherman Section 01 32 00 Scheduling.pdf PDF
Amendment 0007_Dwgs_Sherman Barracks.pdf PDF
Amendment 0007_Building 740 Lee Barracks Site Walk through Sign in Sheet.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007_Dwgs_Lee Barracks.pdf PDF
Amendment 0007_Sherman Barracks GER.pdf PDF
Amendment 0007_5.4 GER_West Point Lee Barracks signed.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS SHERMAN.pdf PDF
Amendment 0004_Photos_Steam Vault F-4.pdf PDF
Amendment 0004_Photos_Steam Vault F-8.pdf PDF
Amendment 0004_WP Lee and Sherman Steam Vault Amendment SPECIFICATIONS 17 AUG 2021.pdf PDF
Amendment 0004_Photos_Steam Vault F-3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part1.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part2.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RTA Drawings Lee Vol 2.pdf PDF
RTA Drawings Lee Vol 3.pdf PDF
RTA Drawings Lee Vol 1_Part3.pdf PDF
RTA Drawings Lee Vol 1_Part2.pdf PDF
RTA Drawings Lee Vol 1_Part1.pdf PDF
RTA Drawings Sherman Vol 2_Part2.pdf PDF
RTA Drawings Sherman Vol 2_Part1.pdf PDF
RTA Drawings Sherman Vol 1_Part2.pdf PDF
RTA Drawings Sherman Vol 1_Part1.pdf PDF
VOL 3 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 2 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
W912DS-21-B-0004_Solicitation.pdf PDF
VOL 4 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 1 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

P S

O F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

JKJKEWEW

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/LB-81721A-18-CENTRAL.rvt

8/16/2021 3:13:54 PM

G-001B

LEE

D R

AW

IN

G

IN

D

EX

VO

LU

M

E O

N E

W

ES

T

PO

IN

T, N Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

E R

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

J

U

LY

W

2D S1

7D

RTA SUBMISSION

LE

E

BA

R

R

AC

KS

W

2D S1

8F

PN

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

INTERIORS

I-001 INTERIOR FINISH SCHEDULE & GENERAL NOTES

I-002 INTERIOR FINISH SCHEDULE (CONT)

I-003 INTERIOR FINISH SCHEDULE (CONT)

I-100S SUB-BASEMENT FINISH PLAN

I-100SA SUB-BASEMENT FINISH PLAN - PART A

I-100SB SUB-BASEMENT FINISH PLAN - PART B

I-100B BASEMENT FINISH PLAN

I-100BA BASEMENT FINISH PLAN - PART A

I-100BB BASEMENT FINISH PLAN - PART B

I-101 FIRST FLOOR FINISH PLAN

I-101A FIRST FLOOR FINISH PLAN - PART A

I-101B FIRST FLOOR FINISH PLAN - PART B

I-102 SECOND FLOOR FINISH PLAN

I-102A SECOND FLOOR FINISH PLAN - PART A

I-102B SECOND FLOOR FINISH PLAN - PART B

I-103 THIRD FLOOR FINISH PLAN

I-103A THIRD FLOOR FINISH PLAN - PART A

I-103B THIRD FLOOR FINISH PLAN - PART B

I-104 FOURTH FLOOR FINISH PLAN

I-104A FOURTH FLOOR FINISH PLAN - PART A

I-104B FOURTH FLOOR FINISH PLAN - PART B

I-105 FIFTH FLOOR FINISH PLAN

I-105A FIFTH FLOOR FINISH PLAN - PART A

I-105B FIFTH FLOOR FINISH PLAN - PART B

I-200.A BARBER & BEAUTY SHOP FURNITURE LEGEND

I-200.B BARRACKS FURNITURE LEGEND & NOTES

I-200S.1 SUB-BASEMENT FURNITURE SCHEDULE

I-200S.2 SUB-BASEMENT FURNITURE PLAN

I-200SA SUB-BASEMENT FURNITURE PLAN - PART A

I-200SB SUB-BASEMENT FURNITURE PLAN - PART B

I-200B.1 BASEMENT FURNITURE SCHEDULE

I-200B.2 BASEMENT FURNITURE PLAN

I-200BA BASEMENT FURNITURE PLAN - PART A

I-200BB BASEMENT FURNITURE PLAN - PART B

I-201.1 FIRST FLOOR FURNITURE PLAN & FURNITURE SCHEDULE

I-201A FIRST FLOOR FURNITURE PLAN - PART A

I-201B FIRST FLOOR FURNITURE PLAN - PART B

I-202.1 SECOND FLOOR FURNITURE SCHEDULE

I-202.2 SECOND FLOOR FURNITURE PLAN

I-202A SECOND FLOOR FURNITURE PLAN - PART A

I-202B SECOND FLOOR FURNITURE PLAN - PART B

I-203.1 THIRD FLOOR FURNITURE SCHEDULE

I-203.2 THIRD FLOOR FURNITURE PLAN

I-203A THIRD FLOOR FURNITURE PLAN - PART A

I-203B THIRD FLOOR FURNITURE PLAN - PART B

I-204.1 FOURTH FLOOR FURNITURE SCHEDULE

I-204.2 FOURTH FLOOR FURNITURE PLAN

I-204A FOURTH FLOOR FURNITURE PLAN - PART A

I-204B FOURTH FLOOR FURNITURE PLAN - PART B

I-205.1 FIFTH FLOOR FURNITURE SCHEDULE

I-205.2 FIFTH FLOOR FURNITURE PLAN

I-205A FIFTH FLOOR FURNITURE PLAN - PART A

I-205B FIFTH FLOOR FURNITURE PLAN - PART B

I-300.1 SIGNAGE DETAILS

I-300.2 SIGNAGE DETAILS

I-300.3 CHC INTERIOR SIGNAGE

I-300.4 CHC INTERIOR SIGNAGE

I-300.5 CHC INTERIOR SIGNAGE

I-300S SUB-BASEMENT SIGNAGE SCHEDULE

I-300SA SUB-BASEMENT SIGNAGE PLAN - PART A

I-300SB SUB-BASEMENT SIGNAGE PLAN - PART B

I-300B BASEMENT SIGNAGE SCHEDULE

I-300BA BASEMENT SIGNAGE PLAN - PART A

I-300BB BASEMENT SIGNAGE PLAN - PART B

I-301 FIRST FLOOR SIGNAGE SCHEDULE

I-301A FIRST FLOOR SIGNAGE PLAN - PART A

I-301B FIRST FLOOR SIGNAGE PLAN - PART B

I-302 SECOND FLOOR SIGNAGE SCHEDULE

I-302A SECOND FLOOR SIGNAGE PLAN - PART A

I-302B SECOND FLOOR SIGNAGE PLAN - PART B

I-303 THIRD FLOOR - SIGNAGE SCHEDULE

I-303A THIRD FLOOR - SIGNAGE PLAN - PART A

I-303B THIRD FLOOR - SIGANGE PLAN - PART B

I-304 FOURTH FLOOR SIGNAGE SCHEDULE

I-304A FOURTH FLOOR SIGNAGE PLAN - PART A

I-304B FOURTH FLOOR SIGNAGE PLAN - PART B

I-305 FIFTH FLOOR SIGNAGE SCHEDULE

I-305A FIFTH FLOOR SIGNAGE PLAN - PART A

I-305B FIFTH FLOOR SIGNAGE PLAN - PART B

I-400 TYPICAL FLOOR PATTERN PLAN - SUB-BASEMENT

I-401 TYPICAL FLOOR PATTERN PLAN - BASEMENT

I-402 TYPICAL FLOOR PATTERN PLAN - TYP. CORRIDORS & STAIRS

I-403 ENLARGED FLOOR PATTERN PLAN - CADET ROOM & COLLABORATION ROOM

I-404 ENLARGED FLOOR PATTERN PLAN - TOILET ROOMS

I-405 ENLARGED FLOOR PATTERN PLAN - BARBER & BEAUTY SHOP

I-406 ENLARGED FLOOR PATTERN PLAN - CADET HEALTH CLINIC

I-501 MISCELLANEOUS DETAILS

I-502 MISCELLANEOUS DETAILS

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

A-202 SOUTH ELEVATION

A-203 EAST ELEVATION

A-204 WEST ELEVATION

A-301 SITE SECTIONS

A-302 SITE SECTIONS

A-310 BUILDING SECTIONS

A-311 BUILDING SECTIONS

A-312 BUILDING SECTIONS

A-313 BUILDING SECTIONS

A-314 BUILDING SECTIONS

A-400 ENLARGED FLOOR PLANS - CADET ROOMS

A-401 ENLARGED FLOOR PLANS - COLLABORATION ROOM

A-402 ENLARGED FLOOR PLANS - BATHROOM

A-404 ENLARGED FLOOR PLANS - EXTERIOR

A-406 ENLARGED FLOOR PLANS - CHC

A-407 ENLARGED FLOOR PLANS - CHC

A-410 INTERIOR ELEVATIONS - CADET LEVEL

A-411 INTERIOR ELEVATIONS - BATHROOMS

A-412 INTERIOR ELEVATIONS - CADET LEVEL CORRIDORS

A-413 INTERIOR ELEVATIONS - BARBER & BEAUTY SHOP

A-414 INTERIOR ELEVATIONS - BARBER & BEAUTY SHOP

A-415 INTERIOR ELEVATIONS - BARBER & BEAUTY SHOP

A-420 INTERIOR ELEVATIONS - CHC

A-421 INTERIOR ELEVATIONS - CHC

A-422 INTERIOR ELEVATIONS - CHC

A-423 INTERIOR ELEVATIONS - CHC

A-424 INTERIOR ELEVATIONS - CHC

A-425 INTERIOR ELEVATIONS - CHC

A-426 INTERIOR ELEVATIONS - CHC

A-430 WALL SECTIONS

A-431 WALL SECTIONS

A-432 WALL SECTIONS

A-440 WALL SECTIONS - SITE

A-441 WALL SECTIONS - SITE

A-442 SITE ENCLOSURES

A-450 ENLARGED STAIR 01 PLANS & SECTION

A-451 ENLARGED STAIR 02 PLANS & SECTION

A-452 ENLARGED STAIR 03 PLANS & SECTION

A-453 ENLARGED STAIR 04 PLANS & SECTION

A-454 ENLARGED ELEVATOR 01 PLANS & SECTION

A-455 ENLARGED ELEVATOR 02 PLANS & SECTION

A-456 ELEVATOR DETAILS

A-457 ELEVATOR DETAILS

A-460 ENLARGED REFLECTED CEILING PLANS

A-500 STAIR DETAILS

A-501 STAIR DETAILS

A-510 ROOF DETAILS

A-511 ROOF DETAILS

A-512 ROOF DETAILS

A-520 PENTHOUSE DETAILS

A-530 EXTERIOR PLAN DETAILS

A-540 WALL SECTION DETAILS

A-560 PLAN DETAILS

A-570 CEILING DETAILS

A-571 CEILING DETAILS

A-580 INTERIOR DETAILS - CADET

A-590 INTERIOR DETAILS - CHC

A-600 PARTITION TYPES & DETAILS

A-601 PARTITION SCHEDULE & DETAILS

A-610 DOOR SCHEDULE - EXTERIOR, SUB-BASEMENT & BASEMENT

A-611 DOOR SCHEDULE - 1ST, 2ND 3RD, 4TH, 5TH, ROOF

A-612 DOOR TYPES & DETAILS

A-613 DOOR DETAILS

A-614 DOOR DETAILS

A-615 DOOR DETAILS

A-616 DOOR DETAILS

A-620 WINDOW TYPES & SCHEDULE

A-621 EXTERIOR WINDOW DETAILS

A-622 EXTERIOR WINDOW DETAILS

A-623 EXTERIOR WINDOW DETAILS

A-624 EXTERIOR WINDOW DETAILS

A-625 EXTERIOR WINDOW & LOUVER DETAILS

A-630 INTERIOR WINDOW DETAILS

A-640 RAILING TYPES & SCHEDULE

A-650 SUB-BASEMENT EQUIPMENT PLAN - PART A

A-651 SUB-BASEMENT EQUIPMENT PLAN - PART B

A-652 BASEMENT EQUIPMENT PLAN - PART A

A-653 BASEMENT EQUIPMENT PLAN - PART B

A-654 EQUIPMENT/FURNITURE SCHEDULE - CHC

A-655 EQUIPMENT/FURNITURE SCHEDULE - CHC

A-656 EQUIPMENT/FURNITURE SCHEDULE - CHC

A-700 MILLWORK DETAILS - CADET

A-701 MILLWORK DETAILS - CADET

A-702 MILLWORK DETAILS - CADET

A-703 MILLWORK DETAILS - CADET

A-710 MILLWORK DETAILS - BBS

A-711 MILLWORK DETAILS - BBS

A-712 MILLWORK DETAILS - BBS

A-720 MILLWORK DETAILS - CHC

A-721 MILLWORK DETAILS - CHC

A-722 MILLWORK DETAILS - CHC

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

ARCHITECTURAL

A-001 ABBREVIATIONS

A-002 GENERAL SYMBOLS AND NOTES

A-003 MOUNTING HEIGHTS & CLEARANCES

AD100S DEMOLITION SUB-BASEMENT PLAN

AD100SA DEMOLITION SUB-BASEMENT PLAN - PART A

AD100SB DEMOLITION SUB-BASEMENT PLAN - PART B

AD100 DEMOLITION BASEMENT PLAN

AD100A DEMOLITION BASEMENT PLAN - PART A

AD100B DEMOLITION BASEMENT PLAN - PART B

AD101 DEMOLITION FIRST FLOOR PLAN

AD101A DEMOLITION FIRST FLOOR PLAN - PART A

AD101B DEMOLITION FIRST FLOOR PLAN - PART B

AD102 DEMOLITION SECOND FLOOR PLAN

AD102A DEMOLITION SECOND FLOOR PLAN - PART A

AD102B DEMOLITION SECOND FLOOR PLAN - PART B

AD103 DEMOLITION THIRD FLOOR PLAN

AD103A DEMOLITION THIRD FLOOR PLAN - PART A

AD103B DEMOLITION THIRD FLOOR PLAN - PART B

AD104 DEMOLITION FOURTH FLOOR PLAN

AD104A DEMOLITION FOURTH FLOOR PLAN - PART A

AD104B DEMOLITION FOURTH FLOOR PLAN - PART B

AD105 DEMOLITION FIFTH FLOOR PLAN

AD105A DEMOLITION FIFTH FLOOR PLAN - PART A

AD105B DEMOLITION FIFTH FLOOR PLAN - PART B

AD106 DEMOLITION PENTHOUSE FLOOR PLAN

AD106A DEMOLITION PENTHOUSE FLOOR PLAN - PART A

AD106B DEMOLITION PENTHOUSE FLOOR PLAN - PART B

AD107 DEMOLITION ROOF PLAN

AD107A DEMOLITION ROOF PLAN - PART A

AD107B DEMOLITION ROOF PLAN - PART B

AD121 DEMOLITION FIRST FLOOR RCP

AD201 DEMOLITION NORTH ELEVATION

AD202 DEMOLITION SOUTH ELEVATION

AD203 DEMOLITION EAST ELEVATION

AD204 DEMOLITION WEST ELEVATION

AD301 DEMOLITION BUILDING SECTION

AD302 DEMOLITION BUILDING SECTION

AD303 DEMOLITION BUILDING SECTION

AD304 DEMOLITION BUILDING SECTION

AD400 DEMOLITION ENLARGED PLANS

AD401 DEMOLITION ENLARGED SECTIONS

AS100 SITE PLAN X

A-100S SUB-BASEMENT FLOOR PLAN

A-100SA SUB-BASEMENT FLOOR PLAN - PART A

A-100SB SUB-BASEMENT FLOOR PLAN - PART B

A-100B BASEMENT FLOOR PLAN

A-100BA BASEMENT FLOOR PLAN - PART A

A-100BB BASEMENT FLOOR PLAN - PART B

A-101 FIRST FLOOR PLAN

A-101A FIRST FLOOR PLAN - PART A

A-101B FIRST FLOOR PLAN - PART B

A-102 SECOND FLOOR PLAN

A-102A SECOND FLOOR PLAN - PART A

A-102B SECOND FLOOR PLAN - PART B

A-103 THIRD FLOOR PLAN

A-103A THIRD FLOOR PLAN - PART A

A-103B THIRD FLOOR PLAN - PART B

A-104 FOURTH FLOOR PLAN

A-104A FOURTH FLOOR PLAN - PART A

A-104B FOURTH FLOOR PLAN - PART B

A-105 FIFTH FLOOR PLAN

A-105A FIFTH FLOOR PLAN - PART A

A-105B FIFTH FLOOR PLAN - PART B

A-106 PENTHOUSE FLOOR PLAN

A-106A PENTHOUSE FLOOR PLAN - PART A

A-106B PENTHOUSE FLOOR PLAN - PART B

A-107 ROOF PLAN

A-107A ROOF PLAN - PART A

A-107B ROOF PLAN - PART B

A-120S SUB-BASEMENT RCP

A-120SA SUB-BASEMENT RCP - PART A

A-120SB SUB-BASEMENT RCP - PART B

A-120B BASEMENT RCP

A-120BA BASEMENT RCP - PART A

A-120BB BASEMENT RCP - PART B

A-121 FIRST FLOOR RCP

A-121A FIRST FLOOR RCP - PART A

A-121B FIRST FLOOR RCP - PART B

A-122 SECOND FLOOR RCP

A-122A SECOND FLOOR RCP - PART A

A-122B SECOND FLOOR RCP - PART B

A-123 THIRD FLOOR RCP

A-123A THIRD FLOOR RCP - PART A

A-123B THIRD FLOOR RCP - PART B

A-124 FOURTH FLOOR RCP

A-124A FOURTH FLOOR RCP - PART A

A-124B FOURTH FLOOR RCP - PART B

A-125 FIFTH FLOOR RCP

A-125A FIFTH FLOOR RCP - PART A

A-125B FIFTH FLOOR RCP - PART B

A-201 NORTH ELEVATION

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

GENERAL

G-001A COVER SHEET - VOLUME ONE

G-001B DRAWING INDEX - VOLUME ONE X

G-100S CHC SCOPING DIAGRAM - SUB-BASEMENT LEVEL

G-100B CHC SCOPING DIAGRAM - BASEMENT LEVEL

G-101 CHC SCOPING DIAGRAM - FIRST FLOOR

LIFE SAFETY

LP001 LIFE SAFETY CODE SUMMARY

LP002 CODE COMPLIANCE SITE PLAN

LP100S SUB BASEMENT LIFE SAFETY PLAN

LP100B BASEMENT LIFE SAFETY PLAN

LP101 FIRST FLOOR LIFE SAFETY PLAN

LP102 SECOND FLOOR LIFE SAFETY PLAN

LP103 THIRD FLOOR LIFE SAFETY PLAN

LP104 FOURTH FLOOR LIFE SAFETY PLAN

LP105 FIFTH FLOOR LIFE SAFETY PLAN

CIVIL

C-001 GENERAL NOTES

C-002 GENERAL NOTES, LEGEND AND ABBREVIATIONS

C-101 EXISTING CONDITIONS PLAN - LEE BARRACKS X

C-102 BARBER AND BEAUTY SHOP SWING SPACE AREA PLAN

CD101 DEMOLITION PLAN - LEE BARRACKS X

CS101 SITE PLAN – LEE BARRACKS

CS102 CONSTRUCTION VEHICLE ACCESS ROUTE PLAN X

CS103 PHASE I CONSTRUCTION EXHIBIT - BARBER AND BEAUTY SHOP SWING SPACE

AREA

CS104 PHASE II CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS X

CS105 PHASE III CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS X

CS106 PHASE IV CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS X

CS107 PHASE V CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS X

CG101 GRADING AND DRAINAGE PLAN - LEE BARRACKS X

CG102 SOIL EROSION PLAN - LEE BARRACKS X

CU101 UTILITY PLAN – LEE BARRACKS X

C-201 NORTH RAMP PLAN AND PROFILE - LEE BARRACKS

C-202 SOUTH RAMP PLAN AND PROFILE - LEE BARRACKS X

C-203 STORM DRAINAGE AND SANITARY SEWER PROFILES - LEE BARRACKS

C-204 ELECTRIC DUCT BANK PROFILES - LEE BARRACKS X

C-205 WATER MAIN PROFILES - LEE BARRACKS X

C-301 NORTH RAMP CROSS SECTIONS - LEE BARRACKS

C-501 CONSTRUCTION DETAILS

C-502 CONSTRUCTION DETAILS X

C-503 CONSTRUCTION DETAILS X

C-504 CONSTRUCTION DETAILS

C-505 CONSTRUCTION DETAILS

C-506 CONSTRUCTION DETAILS

L-101 LANDSCAPE PLAN - LEE BARRACKS

L-501 LANDSCAPE DETAILS - LEE BARRACKS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 CONCRETE REPAIR NOTES

SS101 STRUCTURAL SITE PLAN - FIRST FLOOR LEVEL X

S-100S SUB-BASEMENT FOUNDATION PLAN X

S-100B BASEMENT FLOOR FRAMING PLAN

S-101 FIRST FLOOR FRAMING PLAN

S-102 SECOND FLOOR FRAMING PLAN

S-103 THIRD FLOOR FRAMING PLAN

S-104 FOURTH FLOOR FRAMING PLAN

S-105 FIFTH FLOOR FRAMING PLAN

S-106 MAIN ROOF FRAMING PLAN

S-301 SECTIONS

S-302 SECTIONS

S-303 SECTIONS

S-304 SECTIONS

S-305 UTILITY VAULTS F3, F4 & F8 X

S-306 WATERPROOFING REQUIREMENTS AT UTILITY VAULTS F3, F4 & F8 X

S-501 TYPICAL DETAILS

S-502 TYPICAL DETAILS

IS

SU

ED

B Y

AM

EN

D M

EN

T

/1

7/

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

P S

O F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

JKJKEWEW

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/LB-81721A-18-CENTRAL.rvt

8/16/2021 3:14:01 PM

G-002B

LEE

D R

AW

IN

G

IN

D

EX

VO

LU

M

E

TW

O

W

ES

T

PO

IN

T, N Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

E R

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

J

U

LY

W

2D S1

7D

RTA SUBMISSION

LE

E

BA

R

R

AC

KS

W

2D S1

8F

PN

DRAWING LIST - VOLUME 02

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

E-100S SUB-BASEMENT POWER PLAN

E-100B BASEMENT POWER PLAN

E-101 FIRST FLOOR POWER PLAN

E-102 SECOND FLOOR POWER PLAN

E-103 THIRD FLOOR POWER PLAN

E-104 FOURTH FLOOR POWER PLAN

E-105 FIFTH FLOOR POWER PLAN

E-106 ROOF FLOOR POWER PLAN

E-115 ELECTRICAL FLOOR PLANS - STEAM VAULTS X

E-120S SUB-BASEMENT LIGHTING RCP

E-120B BASEMENT LIGHTING RCP

E-121 FIRST FLOOR LIGHTING RCP

E-122 SECOND FLOOR LIGHTING RCP

E-123 THIRD FLOOR LIGHTING RCP

E-124 FOURTH FLOOR LIGHTING RCP

E-125 FIFTH FLOOR LIGHTING RCP

E-126 ROOF LIGHTING RCP

E-201 GROUNDING & LIGHTNING PROTECTION SYSTEM - SITE PLAN

E-202 LIGHTNING PROTECTION PLAN - ROOF

E-203 GROUNDING & LIGHTNING PROTECTION SYSTEM RISER DIAGRAM

E-204 GROUNDING & LIGHTNING PROTECTION SYSTEM RISER DIAGRAM

E-210 CONDUIT ROUTING PLAN - SUB BASEMENT LEVEL

E-300 LIGHTING LAYOUT ELEVATIONS

E-401 ENLARGED ELECTRICAL ROOMS

E-402 ENLARGED FLOOR PLANS

E-430 GRANT HALL ALLEY MODIFICATIONS

E-500 ELECTRICAL DETAILS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-510 LIGHTNING PROTECTION DETAILS

E-511 GROUNDING DETAILS

E-512 GROUNDING DETAILS

E-601 ELECTRICAL PRIMARY POWER ONE-LINE DIAGRAM

E-602 ELECTRICAL SECONDARY POWER ONE-LINE DIAGRAM

E-610 ELECTRICAL ROOM POWER RISER DIAGRAM

E-611 ELECTRICAL ROOM POWER RISER DIAGRAM

E-621 MECHANICAL / ELECTRICAL EQUIPMENT COORDINATION SCHEDULE

E-622 MECHANICAL / ELECTRICAL EQUIPMENT COORDINATION SCHEDULE

E-700 LIGHTING FIXTURE SCHEDULE

E-701 LIGHTING CONTROL SEQUENCE OF OPERATIONS

E-702 LIGHTING CONTROL DIAGRAMS AND SCHEMATICS

E-703 LIGHTING CONTROL DIAGRAMS AND SCHEMATICS

E-704 EMERGENCY LUMINAIRE CIRCUITING DIAGRAM

E-710 EMERGENCY POWER OFF SYSTEM

E-800 PANELBOARD SCHEDULES

E-801 PANELBOARD SCHEDULES

E-802 PANELBOARD SCHEDULES

E-803 PANELBOARD SCHEDULES

E-804 PANELBOARD SCHEDULES

E-805 PANELBOARD SCHEDULES X

E-806 PANELBOARD SCHEDULES

E-807 PANELBOARD SCHEDULES

E-808 PANELBOARD SCHEDULES

E-809 PANELBOARD SCHEDULES

E-810 PANELBOARD SCHEDULES

E-811 PANELBOARD SCHEDULES

E-812 PANELBOARD SCHEDULES

E-813 PANELBOARD SCHEDULES

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

TS101 TELECOM SITE PLAN - LEE BARRACKS X

TS102 BASE WIDE PA PARTIAL SITE PLAN

TS501 DETAILS - MAINTENANCE HOLE X

TS502 SITE DETAILS

TD101 DEMOLITION SUB-BASEMENT, BASEMENT, FIRST FLOOR TELECOM PLANS

TD102 DEMOLITION SECOND THRU FIFTH FLOOR TELECOM PLANS

TD600 DEMOLITION ONE LINE DIAGRAM - VOICE AND DATA OSP

T-100S SUB-BASEMENT COMMUNICATIONS PLAN

T-100B BASEMENT COMMUNICATIONS PLAN

T-101 FIRST FLOOR COMMUNICATIONS PLAN

T-102 SECOND FLOOR COMMUNICATIONS PLAN

T-103 THIRD FLOOR COMMUNICATIONS PLAN

T-104 FOURTH FLOOR COMMUNICATIONS PLAN

T-105 FIFTH FLOOR COMMUNICATIONS PLAN

T-106 ROOF COMMUNICATIONS PLAN

T-201 RACK AND WALL ELEVATIONS

T-202 CABINET/RACK AND WALL ELEVATIONS

T-203 TELECOM ROOM CABINET/RACK WALL ELEVATIONS

T-401 ENLARGED TELECOM ROOMS - SUB-BASEMENT- SECOND FLOOR

T-402 ENLARGED TELECOM ROOMS - THIRD - FIFTH FLOOR

T-501 DETAILS - WALL OUTLET AND LABELING

T-502 DETAILS - FLOOR OUTLETS

T-503 PATHWAY DETAILS

T-600 VOICE AND DATA OSP ONE-LINE DIAGRAM

T-601 VOICE AND NIPR DATA ONE-LINE DIAGRAM

T-602 WREN AND WAP DATA ONE-LINE DIAGRAM

T-603 ECS, C-DAS, PA AND CLOCK ONE-LINE DIAGRAM

T-604 CHC DATA ONE-LINE DIAGRAM

SECURITY

TY100S SUB-BASEMENT SECURITY PLAN

TY100B BASEMENT SECURITY PLAN

TY101 FIRST FLOOR SECURITY PLAN

TY102 SECOND FLOOR SECURITY PLAN

TY103 THIRD FLOOR SECURITY PLAN

TY104 FOURTH FLOOR SECURITY PLAN

TY105 FIFTH FLOOR SECURITY PLAN

TY106 ROOF SECURITY PLAN

TY501 SECURITY DOOR DETAILS

TY502 SECURITY DETAILS

TY503 CHC SECURITY DETAILS

TY601 SECURITY ONE - LINE DIAGRAMS

DRAWING LIST - VOLUME 02

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

MH104B FOURTH FLOOR DUCTWORK PLAN - PART B

MH105 FIFTH FLOOR DUCTWORK PLAN

MH105A FIFTH FLOOR PLAN - DUCTWORK - AREA A

MH105B FIFTH FLOOR PLAN - DUCTWORK - AREA B

MH106 ROOF DUCTWORK PLAN

MH106A ROOF DUCTWORK PLAN - PART A

MH106B ROOF DUCTWORK PLAN - PART B

MP120S SUB-BASEMENT PIPING PLAN

MP120SA SUB-BASEMENT PIPING PLAN - PART A

MP120SB SUB-BASEMENT PIPING PLAN - PART B

MP120B BASEMENT PIPING PLAN

MP120BA BASEMENT PIPING PLAN - PART A

MP120BB BASEMENT PIPING PLAN - PART B

MP121 FIRST FLOOR PIPING PLAN

MP121A FIRST FLOOR PIPING PLAN - PART A

MP121B FIRST FLOOR PIPING PLAN - PART B

MP122 SECOND FLOOR PIPING PLAN

MP122A SECOND FLOOR PIPING PLAN - PART A

MP122B SECOND FLOOR PIPING PLAN - PART B

MP123 THIRD FLOOR PIPING PLAN

MP123A THIRD FLOOR PIPING PLAN - PART A

MP123B THIRD FLOOR PIPING PLAN - PART B

MP124 FOURTH FLOOR PIPING PLAN

MP124A FOURTH FLOOR PIPING PLAN - PART A

MP124B FOURTH FLOOR PIPING PLAN - PART B

MP125 FIFTH FLOOR PIPING PLAN

MP125A FIFTH FLOOR PIPING PLAN - PART A

MP125B FIFTH FLOOR PIPING PLAN - PART B

MP126 ROOF PIPING PLAN

MP126A ROOF PIPING PLAN - PART A

MP126B ROOF PIPING PLAN - PART B

MP127 STEAM VAULT F3 NEW WORK X

MP128 STEAM VAULT F4 NEW WORK X

MP129 STEAM VAULT F8 NEW WORK X

M-301 BUILDING SECTIONS

M-302 BUILDING SECTIONS

M-401 ENLARGED PLANS

M-402 ENLARGED PLANS

M-403 ENLARGED PLANS

M-404 ENLARGED PLANS

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-503 HVAC DETAILS

M-504 HVAC DETAILS

M-505 HVAC DETAILS

M-506 HVAC DETAILS

M-507 HVAC DETAILS

M-601 EQUIPMENT SCHEDULE

M-602 EQUIPMENT SCHEDULE

M-603 EQUIPMENT SCHEDULE

M-604 EQUIPMENT SCHEDULE X

M-651 FLOW DIAGRAM

M-652 FLOW DIAGRAM

M-653 FLOW DIAGRAM

M-654 FLOW DIAGRAM

M-655 FLOW DIAGRAM

M-656 FLOW DIAGRAM

M-657 FLOW DIAGRAM

M-658 FLOW DIAGRAM

M-659 FLOW DIAGRAM X

M-701 CONTROLS

M-702 CONTROLS

M-703 CONTROLS

M-704 CONTROLS

M-705 CONTROLS

M-706 CONTROLS

M-707 CONTROLS

M-708 CONTROLS

M-709 CONTROLS

M-710 CONTROLS

M-711 CONTROLS

M-712 CONTROLS

M-713 CONTROLS

M-714 CONTROLS

M-715 CONTROLS

M-716 CONTROLS

M-717 CONTROLS

M-718 CONTROLS

M-719 CONTROLS

M-720 CONTROLS

M-721 CONTROLS

M-722 CONTROLS

M-723 CONTROLS

M-724 CONTROLS

M-725 CONTROLS

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS & DRAWING INDEX

E-002 ELECTRICAL GENERAL NOTES & SYMBOLS

E-003 ELECTRICAL GENERAL SYMBOLS & FEEDER SCHEDULE

ED010 DEMOLITION SITE POWER PLAN

ED100S DEMOLITION SUB-BASEMENT POWER PLAN

ED100B DEMOLITION BASEMENT POWER PLAN

ED101 DEMOLITION FIRST FLOOR POWER PLAN

ED102 DEMOLITION SECOND FLOOR POWER PLAN

ED103 DEMOLITION THIRD FLOOR POWER PLAN

ED104 DEMOLITION FOURTH FLOOR POWER PLAN

ED105 DEMOLITION FIFTH FLOOR POWER PLAN

ED106 DEMOLITION ROOF POWER PLAN

ED115 ELECTRICAL FLOOR PLAN - STEAM VAULT - DEMOLITION X

E-010 SITE POWER PLAN - NEW WORK

DRAWING LIST - VOLUME 02

SHEET

NUMBER SHEET NAME

ISSUED BY

AMENDMENT

GENERAL

G-002A COVER SHEET - VOLUME TWO

G-002B DRAWING INDEX - VOLUME TWO X

FIRE PROTECTION

F-001 FIRE PROTECTION GENERAL NOTES

FD100S DEMOLITION SUB-BASEMENT FIRE PROTECTION PLAN

FD100B DEMOLITION BASEMENT FIRE PROTECTION PLAN

FD101 DEMOLITION FIRST FLOOR FIRE PROTECTION PLAN

FD102 DEMOLITION SECOND THRU FIFTH FLOOR FIRE PROTECTION PLANS

F-100S SUB BASEMENT FIRE PROTECTION PLAN

F-100B BASEMENT FIRE PROTECTION PLAN

F-101 FIRST FLOOR FIRE PROTECTION PLAN

F-102 SECOND FLOOR FIRE PROTECTION PLAN

F-103 THIRD FLOOR FIRE PROTECTION PLAN

F-104 FOURTH FLOOR FIRE PROTECTION PLAN

F-105 FIFTH FLOOR FIRE PROTECTION PLAN

F-701 FIRE PROTECTION DETAILS

F-702 FIRE PUMP DETAILS

F-703 FIRE PROTECTION RISER

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES

FAD100S DEMOLITION SUB-BASEMENT FIRE ALARM PLAN

FAD100B DEMOLITION BASEMENT FIRE ALARM PLAN

FAD101 DEMOLITION FIRST FLOOR FIRE ALARM PLAN

FAD102 DEMOLITION SECOND THRU FIFTH FLOOR FIRE ALARM PLANS

FA100S SUB BASEMENT FIRE ALARM PLAN

FA100B BASEMENT FIRE ALARM PLAN

FA101 FIRST FLOOR FIRE ALARM PLAN

FA102 SECOND FLOOR FIRE ALARM PLAN

FA103 THIRD FLOOR FIRE ALARM PLAN

FA104 FOURTH FLOOR FIRE ALARM PLAN

FA105 FIFTH FLOOR FIRE ALARM PLAN

FA106 ROOF FIRE ALARM PLAN

FA701 FIRE ALARM DETAILS

FA702 FIRE ALARM RISER

PLUMBING

P-001 PLUMBING GENERAL NOTES

PD100S DEMOLITION SUB-BASEMENT PLUMBING PLAN

PD100B DEMOLITION BASEMENT PLUMBING PLAN

PD101 DEMOLITION FIRST FLOOR PLUMBING PLAN

PD102 DEMOLITION SECOND THRU FIFTH FLOOR PLUMBING PLANS

PD106 DEMOLITION ROOF PLUMBING PLAN

P-100S.D SUB BASEMENT DRAINAGE PLUMBING PLAN

P-100S.S SUB BASEMENT SERVICE PLUMBING PLAN

P-100B.D BASEMENT DRAINAGE PLUMBING PLAN

P-100B.S BASEMENT SERVICE PLUMBING PLAN

P-101 FIRST FLOOR PLUMBING PLAN

P-102 SECOND FLOOR PLUMBING PLAN

P-103 THIRD FLOOR PLUMBING PLAN

P-104 FOURTH FLOOR PLUMBING PLAN

P-105 FIFTH FLOOR PLUMBING PLAN

P-106 ROOF PLUMBING PLAN

P-400 ENLARGED PUMBING PLAN - PLUMBING ROOM SUB BASEMENT

P-401 ENLARGED PLUMBING PLAN-MEN'S & WOMEN'S RESTROOM - LEVEL 1

P-401.CD ENLARGED PLUMBING PLAN - MEN'S & WOMEN'S RESTROOM - CEILING DRAINAGE - LEVEL 1 P-402 ENLARGED PLUMBING PLANS - MEN'S & WOMEN'S RESTROOM-SECOND THRU FIFTH FLOORS P-402.CD ENLARGED PLUMBING PLANS - MEN'S AND WOMEN'S RESTROOM - CEILING DRAINAGE - LEVELS 2 THRU 4

P-403 ENLARGED PLUMBING PLANS - STEAM VAULTS X

P-500 PLUMBING DETAILS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULE

P-700 DOMESTIC WATER RISER DIAGRAM

P-700.1 DOMESTIC WATER RISER DIAGRAM

P-701 NATURAL GAS RISER DIAGRAM

P-702 SANITARY RISER DIAGRAM

P-702.1 SANITARY RISER DIAGRAM

P-703 STORM WATER RISER DIAGRAM

MECHANICAL

M-001 HVAC GENERAL NOTES X

M-002 HVAC GENERAL NOTES

M-003 HVAC GENERAL NOTES

M-004 TEMPORARY MOBILE BOILER SITE PLAN X

MD100S DEMOLITION SUB-BASEMENT MECHANICAL PLAN

MD100B DEMOLITION BASEMENT MECHANICAL PLAN

MD101 DEMOLITION FIRST FLOOR MECHANICAL PLAN

MD102 DEMOLITION SECOND FLOOR MECHANICAL PLAN

MD103 DEMOLITION THIRD FLOOR MECHANICAL PLAN

MD104 DEMOLITION FOURTH FLOOR MECHANICAL PLAN

MD105 DEMOLITION FIFTH FLOOR MECHANICAL PLAN

MD106 DEMOLITION ROOF MECHANICAL PLAN

MD107 DEMOLITION STEAM VAULT PIPING AND EQUIPMENT X

MH100S SUB-BASEMENT DUCTWORK PLAN

MH100SA SUB-BASEMENT DUCTWORK PLAN - PART A

MH100SB SUB-BASEMENT DUCTWORK PLAN - PART B

MH100B BASEMENT DUCTWORK PLAN

MH100BA BASEMENT DUCTWORK PLAN - PART A

MH100BB BASEMENT DUCTWORK PLAN - PART B

MH101 FIRST FLOOR DUCTWORK PLAN

MH101A FIRST FLOOR DUCTWORK PLAN - PART A

MH101B FIRST FLOOR DUCTWORK PLAN - PART B

MH102 SECOND FLOOR DUCTWORK PLAN

MH102A SECOND FLOOR DUCTWORK PLAN - PART A

MH102B SECOND FLOOR DUCTWORK PLAN - PART B

MH103 THIRD FLOOR DUCTWORK PLAN

MH103A THIRD FLOOR DUCTWORK PLAN - PART A

MH103B THIRD FLOOR DUCTWORK PLAN - PART B

MH104 FOURTH FLOOR DUCTWORK PLAN

MH104A FOURTH FLOOR DUCTWORK PLAN - PART A

IS

SU

ED

B Y

AM

EN

D M

EN

T

/1

7/

COMM

COMM

C

O

M

M

COMM

COMM

C

O

M

M

C O

M M

CO

M

MCOMM

COMM

S

D

S

D

S

D

S D

SD

SD

SD

SD

S

D

S

D

SD

SD

SD

SD

S D

S D

S

D

S D

S D

S D

S D

S D

S

D

S

D

S

D

S

D

S

D

S D

SD

S

D

S

D

SD

SD

SD

SD

SD SD

SD

S

D

S D

S

A

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S A

N

C

O

M

M

C O

M M

C O

M M

COMM

COMM

C O

M M

C O

M M

C O

M M

COMM COMM COMM COMM

COMM

C O

M M

S

MH

RIM=150.59'

E

S

SAMH 1757J29

RIM=150.74'

149.24' AT TOP

OF PIPE/CLEANOUT

S

SAMH 1355J29

RIM=150.99'

INV=146.99 N. 10" VT

147.29 W. 10" VT

E

150.22

150.31

150.79

150.84

150.81 150.81

150.47

150.36

151.74

151.15

151.73

157.96

S

SAMH 1762J29

RIM=158.12'

INV=156.30± (S)

INV=151.07 E. 10" VT

151.12 W. 10" VT

152.57 152.90

153.00

160.47

D

STMH 1350J29

RIM=150.30'

INV=146.65 NE. 24" CMP

146.80 SE. 10" CONC.

146.70 W. 18" CONC.

C

CB

STCB 1743J29

RIM=162.32'

INV=159.52 S. 8" SDR

D

STMH 1742J29

RIM=162.22'

INV=159.02 N. 12" VT

154.17 E. 18" CONCRETE

158.82 W. 18" CONCRETE

D

STMH 1755J29

RIM=154.79'

INV=147.29 NE.

18" CONCRETE

148.09 S. 12" VT

150.69 W.

18" CONCRETE

ST

150.36

C

151.12

E

151.11

150.55

150.34

150.79

149.83

149.87

DOOR SILL

ELEV=156.45'

D

STMH 1741J29

RIM=167.09'

INV=160.74 E. 15" CONCRETE

162.59 S. 10" CMP

160.79 W. 15" CONCRETE

173.03

C

D

STMH 1414J29

RIM=171.73'

INACCESSIBLE

INV. 162.90±(S)

INV. 162.80±(E)

INV. (W) UNKNOWN

C

153.36

173.37

153.14

152.44

172.71

172.68

172.98

172.37

S

D

STMH 1335J29

RIM=149.97'

INV=140.97 NE. 24" VT

141.17 S. 24" VT

144.87 SW. 24" CMP

S

SAMH 1338J29

RIM=150.72'

INV=134.42 SE. 24" SDR

134.02 NW. 24" SDR

S

SEWER MH

RIM=149.25'

C

CB

CATCH BASIN

RIM=150.02'

INV=146.92 NW.

10" CONC.

D

DMH

RIM 151.05'

INV 134.55 NE.

18" CPP

142.70 S. 18" CPP

146.35 NW. 12" CPP

CB

CATCH BASIN

RIM=150.41'

INV=147.11 NE.

8" CPP

147.06 SE.

12" CPP

H

150.89

BM

149.96

150.14

150.92

E

151.02

151.47

FIRST FLOOR

ELEV=175.16'

SECOND FLOOR

ELEV=185.13'

THIRD FLOOR

ELEV=194.13'

FOURTH FLOOR

ELEV=203.03'

FIFTH FLOOR

ELEV=211.97'

BASEMENT FLOOR

ELEV=164.23'

SHADE TREE

150.29

150.37

151.70

150.66

SHADE TREE

FINISH FLOOR

ELEV=152.61'

150.86

151.37

150.34

150.91

C

D

STMH 2084J29

RIM=151.79'

INV=146.69 NE. 18" CONCRETE

146.74 S. 15" CONCRETE

146.84 W. CONCRETE?

151.31

151.80

152.47

C

E

152.65

153.15

D

STMH 1769J29

RIM=152.75'

INV=147.55 N.

15" CONCRETE

147.65 W.

15" CONCRETE

E

153.67

151.57

152.31

151.71

151.49

150.33

150.53

150.71

150.59

151.40

152.23

152.51

152.72

D

STORM MH

RIM=152.57'

LID LOCKED

154.87

154.87

154.83

CB

STCB 1779J29

RIM=155.63'

INV=149.68 NE. 18" CONCRETE

149.73 W. 18" CONCRETE

159.48

D

STMH

RIM=158.13'

INV=151.93 E.

18" CONCRETE

151.98 W. 15" VT

C

DOOR SILL

ELEV=154.61'

DOOR SILL

ELEV=153.18'

CB

STCB 1074J29

RIM=153.13'

INV= E. 15" SDR

147.48 W. 12" SDR

155.88

158.85

156.78

169.23

171.04

171.60

MANHOLE

COVER

EMPTY

FINISH FLOOR

ELEV=172.16'

171.73

171.54

172.37

171.55

S

SAMH 1749J29

RIM=172.56'

INV=157.46 N. 10" CMP

157.56 SE. 10" CMP

158.36 W. 10"?

172.79

172.96

172.66

173.21

173.45

172.40

173.56

173.58

172.52

172.66

173.52

N. 10" CMP

INV=170.52'

172.80

172.68

172.89

152.57

W

W

W

W

W W

W

W

W

W

W

W

W

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

W

W

W W

W W W W W

W

W W

W W

W W

W

172.88

W

159.05

LANDSCAPE AREA

LANDSCAPE AREA

GRANITE

CURB

GRANITE CURB

VENTS

VENTS

STEPS

STEPS

STONE PILLAR

STONE

PILLARS

BLOCK RETAINING WALL

CONCRETE

STRUCTURE

TRASH AREA

CHAIN LINK GATE

HAND RAIL

HAND RAIL

DOOR

KEYPAD

DOUBLE

DOOR

KEYPAD

HYDRANT

HYDRANT

HYDRANT

STONE BLOCKS

(MOVEABLE)

EXERCISE EQUIPMENT

(MOVEABLE)

WATER VALVES

WATER VALVE

WATER VALVES

WATER

VALVES

GAS VALVE

GAS VALVE

EMH 2D

HANDHOLE

HANDHOLE

LIGHT POLE

EMH

LIGHT POLE

LIGHT POLE

HANDHOLE

LIGHT POLE

WATER

VALVE

WATER VALVE

WATER VALVES

GAS VALVES

WATER VALVE

WATER VALVE

WATER VALVE

CMH X4

CMH X5

CMH 3B

CMH 3A1

CMH 3A

LIGHT POLE

POSSIBLE CARDBOARD

RECYCLING CONTAINER

NOT THERE AS OF 07/25/18

170.74

168.49

EMH 2H

RIM=168.53'

INACCESSIBLE

168.73

FINISH FLOOR

ELEV=172.15'

C

E

CB

CATCH BASIN

RIM=168.78'

INV=166.28 SE. 6" VT

166.38 NW. 6" VT

FINISH FLOOR

ELEV=172.10'

171.01

THRESHHOLD

ELEV=170.56'

BASEMENT FLOOR

ELEV=168.22'

BASEMENT FLOOR

ELEV=168.25'

CB

CB

RIM=175.89'

INV=173.49 E. 6" SDR

172.49 SE. 12" SDR

E

172.47

171.90

180.41

180.38

180.36

180.36

213.08

CB

STCB 1415J29

RIM 177.32'

INV. 172.32 E.

12" CONCRETE

172.42 W.

12" CONCRETE

CB

STCB

RIM=177.52'

INV=174.22 N. 4" CPP

173.52 S. 12" CONCRETE

177.48

177.57

165.06

CB

STCB

RIM=163.32'

INV=155.72 N. 24" CONCRETE

158.82 S. 18" HDPE

CB

STCB

RIM=178.08'

INV=173.33 E.

12" CONCRETE

177.48

158.74

CO

CO

CO

CO

169.89

166.12

D

STCB

RIM=166.06'

INV=160.06 N. 18" HDPE

162.06 W. 18" HDPE

CB

STCB

RIM=177.35'

INV= S. 4" CPP

177.54

164.62

164.34

FIRST FLOOR

ELEV=178.14'

SECOND FLOOR

ELEV=188.11'

THIRD FLOOR

ELEV=197.12'

FOURTH FLOOR

ELEV=206.19'

FIFTH FLOOR

ELEV=215.11'

ROOF

ELEV=224.70'

170.56

180.74

180.38

179.41

199.07

209.18

DUMPSTER

EMH 2J

EMH 2G

T H

A Y

E R

W

A L K

BLOCK RETAINING WALL

CONCRETE RAMP

CONCRETE RAMP

ASPHALT AREA

D R

A I N

G

A

T E

A S

P H

A L

T

W

A L

K

SHED

M

O

N

U

M

E

N

T

S

GRATE C

A

N O

P Y

GRATE

BARRICADE

ASPHALT

AREA

BLDG 740

LEE BARRACKS

BLDG 602

GRANT HALL

BLDG 606

BLDG 738

SHERMAN BARRACKS

D E

P R

E S

S E

D

C

U R

B

W A

L L

W A

L L

C

U

R

B

D E

P R

E S

S E

D

C

U R

B

BLOCK RETAINING WALL

C

U

R

B

CMH

C

O

N

C

R

E

T

S

R

U

C

T

U

R

E

CB

STCB

RIM=177.52'

INV=174.22 N. 4" CPP

173.52 S. 12" CONCRETE

WATER

OUTLET

CLEAN OUTS

STONE PILLAR

PIV

WATER VALVE

STONE WALL

W W

T H

A Y

O A

D

BLOCK

RETAINING

WALL

N

W

W

W

W

W

W W

W

W W W W W W W W

W W

W

HPS

HPS

HPS

HPS

HPS

W

W

G

G G G G G

G

G G

G G

5'-6"x5'-9"

UNDERGROUND

TUNNEL

C O

O L

E R

E

E

E

E

E

E E

E

E

E

W

W

W W

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

E

GENERATOR

POWER

CONNECTION

CABINET

DRAIN

GRATE

C

ST

ST

ST

ST

ST

E

C

W

E

E

E

E

E

E E E E E E E E E E

E E

E E

E

E

E

E

UGU

E

E

E

E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

W W

W W

W

W

W W

W W

W W

W W

W W

W W

W W

W

E

E

E

E

E

E

E

E

E

EMH 2E

EMH 2F

ELEC.

VAULT

E

E

E

E

E

E

E

E

E

E E E E E E

E

E

E

E

E

E

E

E

E

E

S

D

SD

SD

SD

SD

SD

SD

SD

APPROXIMATE

LOCATION

ABANDONED

ELEC. CONDUITS

ABANDONED

ELEC. CONDUITS

COLD WATER LINE

PER AVAILABLE

RECORDS

UNDERGROUND

UNKNOWN

TEMPORARY

COMPACTOR

CHW

C

O

M

M

C

O

M

M

C

O

M

M

CMH 3

CMH X3

COMM

COMM

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

E E

E E

E E

E E

E E

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

W O

D

M

P

A S

P H

A L

T

W

A L

K

E

ST MHF8

APPROXIMATE LOCATION

OF CONCRETE EXPANSION

JOINT, MECHANICAL ROOM

BELOW

ST MHF4

H P

S

ST MHF3

S

D

SANITARY

LATERAL

H P

S

3'x5'

UNDERGROUND

TUNNEL

3'x5'

UNDERGROUND

TUNNEL

E

EB

EB

EB

(3)

C O

M M

COMM COMM COMM COMM COMM COMM

COMMUNICATION CONDUIT,

TERMINATION UNKNOWN

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

S

A

N

S A

N

R

C

P

R

C P

SAMH1767J29

RIM 152.13

INV IN 131.73 (S)

INV IN 150.03 (SE)

INV OUT 131.80

S

D

C

P

G

G

G

G

G

G

G

POSSIBLE LOCATION

OF EXISTING GAS

SERVICE

S A

N

INV. 163.06±

RETRACTABLE

WEDGE BARRIER

6" HPS

12" LPS

4" COND RET.

FORMATION AREA

5" HPS

8" LPS

2.5" COND RET.

8" HPS

8" LPS

2.5" COND RET.

4" HPS

8" LPS

2" COND RET.

2" TRAP LINE

6" HPS

12" LPS

4" COND RET.

6" HPS

12" LPS

4" COND RET.

6" HPS

10" LPS

4" COND RET.

2" TRAP LINE

HPS

HPS

5" HPS

8" LPS

2.5" COND RET.

H P

S

H P

S

H P

S

H P

S

H

PS

HPS

H

PS

HPS

D A

T E

M A

R K

D E

S C

R I P

T I O

N

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

SHEET ID

W D

S F

U S

A

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

US Army Corps of Engineers

N E

W

Y

O R

K

D

I S

T R

I C

T

F

E D

E R

A L

P

L A

Z A

N

Y

R

K

N

Y

W D

S D

J U

L

A N

S I

D

W E

I N

T

N

Y

C B

U

E

B

A R

R A

C K

RTA SUBMISSION

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

LEE

N

A1

EXISTING CONDITIONS PLAN - LEE BARRACKS

SCALE: 1"=20'

J C

D P

J K

E X

I S

T I N

G

C

O N

D I T

I O

A

N

L E

E

B

A R

R A

C K

S

C I V

I L

C-101

20' 40'0

GENERAL SHEET NOTES

1. SIZE SHOWN OF EXISTING MANHOLE STRUCTURES IS

APPROXIMATE.

I S

S U

B

A

M E

N D

M E

N T

AutoCAD SHX Text

TELE BOX

COMM

C

O

M

M

COMM

COMM

C

O

M

M

C O

M M

C O

M

MCOMM

COMM

S

D

S

D

S

D

S D

SD

SD

SD

SD

S

D

S

D

SD

SD

SD

SD

S D

S D

S

D

S D

S D

S D

S D

S D

S

D

S

D

S

D

S

D

S

D

S D

SD

S

D

S

D

SD

SD

SD

SD

SD SD

SD

S

D

S

D

S

A

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S A

N

C

O

M

M

C O

M M

C O

M M

COMM

COMM

C O

M M

C O

M M

C O

M M

COMM COMM COMM COMM

COMM

C O

M M

S

MH

RIM=150.59'

E

S

SAMH 1757J29

RIM=150.74'

149.24' AT TOP

OF PIPE/CLEANOUT

S

SAMH 1355J29

RIM=150.99'

INV=146.99 N. 10" VT

147.29 W. 10" VT

E

150.22

150.31

150.79

150.84

150.81 150.81

150.47

150.36

151.74

151.15

151.73

157.96

S

SAMH 1762J29

RIM=158.12'

INV=156.30± (S)

INV=151.07 E. 10" VT

151.12 W. 10" VT

152.57 152.90

153.00

160.47

D

STMH 1350J29

RIM=150.30'

INV=146.65 NE. 24" CMP

146.80 SE. 10" CONC.

146.70 W. 18" CONC.

C

CB

STCB 1743J29

RIM=162.32'

INV=159.52 S. 8" SDR

D

STMH 1742J29

RIM=162.22'

INV=159.02 N. 12" VT

154.17 E. 18" CONCRETE

158.82 W. 18" CONCRETE

D

STMH 1755J29

RIM=154.79'

INV=147.29 NE.

18" CONCRETE

148.09 S. 12" VT

150.69 W.

18" CONCRETE

ST

150.36

C

151.12

E

151.11

150.55

150.34

150.79

149.83

149.87

DOOR SILL

ELEV=156.45'

D

STMH 1741J29

RIM=167.09'

INV=160.74 E. 15" CONCRETE

162.59 S. 10" CMP

160.79 W. 15" CONCRETE

173.03

C

D

STMH 1414J29

RIM=171.73'

INACCESSIBLE

INV. 162.90±(S)

INV. 162.80±(E)

INV. (W) UNKNOWN

C

153.36

173.37

153.14

152.44

172.71

172.68

172.98

172.37

S

D

STMH 1335J29

RIM=149.97'

INV=140.97 NE. 24" VT

141.17 S. 24" VT

144.87 SW. 24" CMP

S

SAMH 1338J29

RIM=150.72'

INV=134.42 SE. 24" SDR

134.02 NW. 24" SDR

S

SEWER MH

RIM=149.25'

C

CB

CATCH BASIN

RIM=150.02'

INV=146.92 NW.

10" CONC.

D

DMH

RIM 151.05'

INV 134.55 NE.

18" CPP

142.70 S. 18" CPP

146.35 NW. 12" CPP

CB

CATCH BASIN

RIM=150.41'

INV=147.11 NE.

8" CPP

147.06 SE.

12" CPP

H

150.89

BM

149.96

150.14

150.92

E

151.02

151.47

FIRST FLOOR

ELEV=175.16'

SECOND FLOOR

ELEV=185.13'

THIRD FLOOR

ELEV=194.13'

FOURTH FLOOR

ELEV=203.03'

FIFTH FLOOR

ELEV=211.97'

BASEMENT FLOOR

ELEV=164.23'

SHADE TREE

150.29

150.37

151.70

150.66

SHADE TREE

FINISH FLOOR

ELEV=152.61'

150.86

151.37

150.34

150.91

C

D

STMH 2084J29

RIM=151.79'

INV=146.69 NE. 18" CONCRETE

146.74 S. 15" CONCRETE

146.84 W. CONCRETE?

151.31

151.80

152.47

C

E

152.65

153.15

D

STMH 1769J29

RIM=152.75'

INV=147.55 N.

15" CONCRETE

147.65 W.

15" CONCRETE

E

153.67

151.57

152.31

151.71

151.49

150.33

150.53

150.71

150.59

151.40

152.23

152.51

152.72

D

STORM MH

RIM=152.57'

LID LOCKED

154.87

154.87

154.83

CB

STCB 1779J29

RIM=155.63'

INV=149.68 NE. 18" CONCRETE

149.73 W. 18" CONCRETE

159.48

D

STMH

RIM=158.13'

INV=151.93 E.

18" CONCRETE

151.98 W. 15" VT

C

DOOR SILL

ELEV=154.61'

DOOR SILL

ELEV=153.18'

CB

STCB 1074J29

RIM=153.13'

INV= E. 15" SDR

147.48 W. 12" SDR

155.88

158.85

156.78

169.23

171.04

171.60

MANHOLE

COVER

EMPTY

FINISH FLOOR

ELEV=172.16'

171.73

171.54

172.37

171.55

S

SAMH 1749J29

RIM=172.56'

INV=157.46 N. 10" CMP

157.56 SE. 10" CMP

158.36 W. 10"?

172.79

172.96

172.66

173.21

173.45

172.40

173.56

173.58

172.52

172.66

173.52

N. 10" CMP

INV=170.52'

172.80

172.68

172.89

152.57

W

W

W

W

W

W W

W

W

W

W

W

W

G

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

W

W

W W

W W W W W

W

W W

W W

W W

W

172.88

W

159.05

LANDSCAPE AREA

LANDSCAPE AREA

GRANITE

CURB

GRANITE CURB

VENTS

VENTS

STEPS

STEPS

STONE PILLAR

STONE

PILLARS

BLOCK RETAINING WALL

CONCRETE

STRUCTURE

TRASH AREA

CHAIN LINK GATE

HAND RAIL

HAND RAIL

DOOR

KEYPAD

DOUBLE

DOOR

KEYPAD

HYDRANT

HYDRANT

HYDRANT

STONE BLOCKS

(MOVEABLE)

EXERCISE EQUIPMENT

(MOVEABLE)

WATER VALVES

WATER VALVE

WATER VALVES

WATER

VALVES

GAS VALVE

GAS VALVE

EMH 2D

HANDHOLE

HANDHOLE

LIGHT POLE

EMH

LIGHT POLE

LIGHT POLE

HANDHOLE

LIGHT POLE

WATER

VALVE

WATER VALVE

WATER VALVES

GAS VALVES

WATER VALVE

WATER VALVE

WATER VALVE

CMH X4

CMH X5

CMH 3B

CMH 3A1

CMH 3A

LIGHT POLE

POSSIBLE CARDBOARD

RECYCLING CONTAINER

NOT THERE AS OF 07/25/18

170.74

168.49

EMH 2H

RIM=168.53'

INACCESSIBLE

168.73

FINISH FLOOR

ELEV=172.15'

C

E

CB

CATCH BASIN

RIM=168.78'

INV=166.28 SE. 6" VT

166.38 NW. 6" VT

FINISH FLOOR

ELEV=172.10'

171.01

THRESHHOLD

ELEV=170.56'

BASEMENT FLOOR

ELEV=168.22'

BASEMENT FLOOR

ELEV=168.25'

CB

CB

RIM=175.89'

INV=173.49 E. 6" SDR

172.49 SE. 12" SDR

E

172.47

171.90

180.41

180.38

180.36

180.36

213.08

CB

STCB 1415J29

RIM 177.32'

INV. 172.32 E.

12" CONCRETE

172.42 W.

12" CONCRETE

CB

STCB

RIM=177.52'

INV=174.22 N. 4" CPP

173.52 S. 12" CONCRETE

177.48

177.57

165.06

CB

STCB

RIM=163.32'

INV=155.72 N. 24" CONCRETE

158.82 S. 18" HDPE

CB

STCB

RIM=178.08'

INV=173.33 E.

12" CONCRETE

177.48

158.74

CO

CO

CO

CO

169.89

166.12

D

STCB

RIM=166.06'

INV=160.06 N. 18" HDPE

162.06 W. 18" HDPE

CB

STCB

RIM=177.35'

INV= S. 4" CPP

177.54

164.62

164.34

FIRST FLOOR

ELEV=178.14'

SECOND FLOOR

ELEV=188.11'

THIRD FLOOR

ELEV=197.12'

FOURTH FLOOR

ELEV=206.19'

FIFTH FLOOR

ELEV=215.11'

ROOF

ELEV=224.70'

170.56

180.74

180.38

179.41

199.07

209.18

DUMPSTER

EMH 2J

EMH 2G

T H

A Y

L K

BLOCK RETAINING WALL

CONCRETE RAMP

CONCRETE RAMP

ASPHALT AREA

D R

A

G

A

T E

A S

P H

A L

T

W

A L

K

SHED

M

O

N

U

M

E

N

T

S

GRATE C

A

N O

P Y

GRATE

BARRICADE

ASPHALT

AREA

BLDG 740

LEE BARRACKS

BLDG 602

GRANT HALL

BLDG 606

BLDG 738

SHERMAN BARRACKS

D E

P R

E S

S E

D

C

U R

B

W A

L L

W A

L L

C

U

R

B

D E

P R

E S

S E

D

C

U R

B

BLOCK RETAINING WALL

C

U

R

B

CMH

C

O

N

C

R

E

R

U

C

T

U

R

E

CB

STCB

RIM=177.52'

INV=174.22 N. 4" CPP

173.52 S. 12" CONCRETE

WATER

OUTLET

CLEAN OUTS

STONE PILLAR

PIV

WATER VALVE

STONE WALL

W W

T H

A Y

A

D

BLOCK

RETAINING

WALL

N

W

W

W

W

W

W W

W

W W W W W W W

W

W W

W

HPS

HPS

HPS

HPS

HPS

W

W

G

G G

G G G G

G G

G G

5'-6"x5'-9"

UNDERGROUND

TUNNEL

C O

O L

E R

E

E

E

E

E

E E

E

E

E

W

W

W W

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

E

GENERATOR

POWER

CONNECTION

CABINET

DRAIN

GRATE

C

ST

ST

ST

ST

ST

E

C

W

E

E

E

E

E

E E E E E E E E E E

E E

E E

E

E

E

E

UGU

E

E

E

E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

W W

W W

W

W

W W

W W

W W

W W

W W

W W

W W

W

E

E

E

E

E

E

E

E

E

EMH 2E

EMH 2F

ELEC.

VAULT

E

E

E

E

E

E

E

E

E

E E E E E E

E

E

E

E

E

E

E

E

E

E

S

D

SD

SD

SD

SD

SD

SD

SD

APPROXIMATE

LOCATION

ABANDONED

ELEC. CONDUITS

ABANDONED

ELEC. CONDUITS

COLD WATER LINE

PER AVAILABLE

RECORDS

UNDERGROUND

UNKNOWN

TEMPORARY

COMPACTOR

CHW

C

O

M

M

C

O

M

M

C

O

M

M

CMH 3

CMH X3

COMM

COMM

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

E E

E E

E E

E E

E E

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

W O

M

P

A S

P H

A L

T

W

A L

K

E

ST MHF8

APPROXIMATE LOCATION

OF CONCRETE EXPANSION

JOINT, MECHANICAL ROOM

BELOW

ST MHF4

H P

S

ST MHF3

S

D

SANITARY

LATERAL

H P

S

3'x5'

UNDERGROUND

TUNNEL

3'x5'

UNDERGROUND

TUNNEL

E

EB

EB

EB

(3)

C O

M M

COMM COMM COMM COMM COMM COMM

COMMUNICATION CONDUIT,

TERMINATION UNKNOWN

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

S

A

N

S A

N

R

C

P

R

C P

SAMH1767J29

RIM 152.13

INV IN 131.73 (S)

INV IN 150.03 (SE)

INV OUT 131.80

S

D

P

G

G

G

G

G

G

G

POSSIBLE LOCATION

OF EXISTING GAS

SERVICE

S A

N

INV. 163.06±

RETRACTABLE

WEDGE BARRIER

6" HPS

12" LPS

4" COND RET.

FORMATION AREA

5" HPS

8" LPS

2.5" COND RET.

8" HPS

8" LPS

2.5" COND RET.

4" HPS

8" LPS

2" COND RET.

2" TRAP LINE

6" HPS

12" LPS

4" COND RET.

6" HPS

12" LPS

4" COND RET.

6" HPS

10" LPS

4" COND RET.

2" TRAP LINE

HPS

HPS

5" HPS

8" LPS

2.5" COND RET.

H P

S

H P

S

H P

S

H P

S

H

PS

H

PS

H

PS

H

PS

X X

X X

X X

X X

X X

X

X

X

11'

ALONG LEE

BARRACKS

BUILDING

(TYP.)

1. EXISTING ASPHALT PAVEMENT TBR (TYP.)

2. SAWCUT EXISTING ASPHALT/CONCRETE PAVEMENT

3. EXISTING CONCRETE PAVEMENT TBR (TYP.)

4. SAWCUT EXISTING CONCRETE PAVEMENT

5. EXISTING WALL TO BE REPAIRED (SEE STRUCTURAL

DRAWINGS)

6. EXISTING CARDBOARD RECYCLING CONTAINER TBR BY

GOVERNMENT

7. LIMIT OF DISTURBANCE (TYP.)

8. EXERCISE EQUIPMENT TBR BY GOVERNMENT

9. EXISTING ASPHALT WALK TBR

10. EXISTING CONCRETE PIERS AND CAPS TO BE

REPAIRED/REPLACED (SEE ARCHITECTURAL /

STRUCTURAL DRAWINGS)

11. METAL HANDRAIL TBR

12. WOOD RAMP TBR AND TURNED OVER TO GOVERNMENT

13. SANITARY PIPE TBR

14. SANITARY MANHOLE TBR

15. ABANDON 3" GAS SERVICE IN PLACE

16. REMOVE EXISTING BOLLARDS, TURN OVER TO

GOVERNMENT

17. STEAM MANHOLE FRAME AND COVER TBR

18. TRENCH DRAIN TBR

19. VEHICLE BARRICADE SYSTEM (POWER, MOTOR,

COMMUNICATION ETC) TBR AND TURNED OVER TO

GOVERNMENT

20. REMOVE WALL, LANDSCAPING AND OTHER EXISTING

CONDITIONS FOR RAMP CONSTRUCTION AND

IMPROVEMENTS (SEE ARCHITECTURAL / STRUCTURAL

DRAWINGS)

21. LANDSCAPE AREA TBR

22. STORM INLET / MANHOLE TBR

23. STORM PIPE TBR

24. WATERMAIN TBR

25. WATER VALVE TBR

26. HYDRANT TBR

27. COMMUNICATION MANHOLE FRAME AND COVER TBR

28. GATE AND FENCE TBR AND SAFELY STORED FOR

RELOCATION (SEE CS101)

29. REMOVE EXISTING IMPROVEMENTS AS REQUIRED FOR

USACE LEE AND SHERMAN BARRACKS CONSTRUCTION

TRAILERS AND UTILITY INSTALLATION. INSTALL PRIOR

TO SITE DEMOLITION. TRAILERS AND TRAILER

IMPROVEMENTS TO BE REMOVED AT THE COMPLETION

OF SHERMAN BARRACKS RESTORATION

IMPROVEMENTS

30. BUILDING 606 CADET BOOK STORE AREA TO BE

PROVIDED TO LEE SHERMAN BARRACKS

CONSTRUCTION CONTRACTOR IN LIEU OF TRAILER

SPACE

31. REMOVE EXISTING CONCRETE/WALL TO 8" BELOW

PROPOSED GRADE

32. REMOVE ALL LOOSE GRANITE CURBING AND STORE

FOR RESETTING. REMOVE ALL GRANITE CURB

SECTIONS DAMAGED DURING CONSTRUCTION

33. COMMUNICATION MANHOLE TBR

34. COMMUNICATIONS DUCT BANK TBR (SEE

TELECOMMUNICATION DRAWINGS FOR ADDITIONAL

REQUIREMENTS)

35. ELECTRICAL DUCT BANK TBR (SEE ELECTRICAL

DRAWINGS FOR ADDITIONAL REQUIREMENTS)

36. COOLER TBR AND SAFELY STORED FOR RELOCATION

(C-505/A1)

37. CONDENSING UNIT, ELECTRICAL CONNECTION AND

CONNECTION TO COOLER TBR AND SAFELY STORED

FOR RELOCATION

38. GENERATOR POWER CONNECTION CABINET TBR AND

SAFELY STORED FOR RELOCATION, CONCRETE PAD

TBR

39. CAP EXISTING ELECTRICAL CONDUITS

40. EXISTING BOLLARD TBR

41. CAP EXISTING WATERMAIN

42. STORM MANHOLE FRAME AND COVER / INLET FRAME

AND GRATE TBR

43. REMOVE GRAVEL AND REGARADE AREA AS REQUIRED

FOR PROPOSED IMPROVEMENTS

44. REMOVE EXISTING ELECTRIC MANHOLE. PROVIDE

SHORING AS REQUIRED TO SUPPORT ADJACENT

STRUCTURES

45. REMOVE ALL THAYER WALK BLOCK PAVERS AND BASE

AS REQUIRED FOR BITUMINOUS PAVEMENT

INSTALLATION

46. PARTIALLY REMOVE PIER (SEE ARCHITECTURAL

DRAWINGS)

1. ONLY REMOVE THE ITEMS THAT ARE IDENTIFIED IN

THE SHEET KEYNOTES AND SHOWN DARK. ITEMS

SHOWN SCREENED ARE INDICATED TO REMAIN.

2. REFER TO THE PHASING EXHIBITS FOR

CONSTRUCTION SEQUENCE.

47. SECURITY BARRIER WEDGE AND POWER SOURCE

FROM LEE BARRACKS. GOVERNMENT TO

DEMONSTRATE FUNCTIONING SECURITY WEDGE

BARRIER PRIOR TO ANY SITE DEMOLITION.

CONTRACTOR TO ACKNOWLEDGE FUNCTIONALITY IN

WRITING. MAINTAIN FUNCTIONALITY THROUGHOUT

CONSTRUCTION (SEE ELECTRICAL DRAWINGS)

48. SECURITY GUARD BOOTH AND ELECTRIC POWER FROM

LEE BARRACKS TO REMAIN OPERATIONAL (SEE

ELECTRICAL AND TELECOMMUNICATION DRAWINGS)

49. MAINTAIN EMERGENCY EGRESS ROUTE FROM BLDG 606

AT ALL TIMES. PROVIDE 24x24 LAMINATED SIGN IN B606

AT GOVERNMENT SPECIFIED LOCATION, "EMERGENCY

EGRESS ONLY, ENTERING INTO A CONSTRUCTION

ZONE"

50. ELECTRIC MH FRAME AND COVER TBR

51. STEAM MH TBR, PROVIDE SHORING AS REQUIRED TO

SUPPORT ADJACENT STRUCTURES

52. HPS, LPS, COND (AND TRAP LINE IF PRESENT) STEAM

PIPING TBR

53. HPS, LPS, COND STEAM PIPING TBR AS REQUIRED FOR

CONNECTION TO EXISTING. SEE MECHANICAL

DRAWINGS

54. DISCONNECT STEAM LINES TO SOUTH. SEE

MECHANICAL DRAWINGS

55. ELECTRIC DUCT BANK AND 5000 KV SERVICE TO BLDG

606 TO REMAIN IN PLACE AND OPERATIONAL. POWER

TO BLDG 606 MUST NOT BE INTERRUPTED. SHORE AND

SUPPORT CONDUITS/DUCT BANK AS REQUIRED. SUBMIT

CONDUIT/DUCT BANK SUPPORT PLANS AND SCHEDULE

TO GOVERNMENT FOR APPROVAL.

A. THE DUCT BANK AND CONDUIT MAY BE FRAGILE

AND PRONE TO CRUMBLING

B. CONTRACTOR TO PROVIDE STRUCTURAL

SUPPORT AS THE EXISTING DUCT BANK IS

EXPOSED

C. CONTRACTOR IS RESPONSIBLE FOR REPAIRING

ANY DAMAGE TO B606 CONDUIT/CABLE CAUSED

BY EXCAVATION.

56. REMOVE CONNECTION TO EXISTING GOOSE NECK

VENTS (TO REMAIN) AS REQUIRED FOR

RECONNECTION. RESET VENT IF REQUIRED. SEE

MECHANICAL DRAWINGS

D A

T E

M A

R K

D E

S C

R I P

T I O

N

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

SHEET ID

W D

S F

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

US Army Corps of Engineers

N E

W

Y

O R

K

D

I S

T R

I C

T

F

E D

E R

A L

P

L A

Z A

N

R

K

N

Y

W D

S D

J U

A N

S I

D

W E

I N

T

N

Y

C B

E

B

A R

R A

C

RTA SUBMISSION

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

LEE

N

J C

D P

J K

D E

M O

L I T

I O

N

P

L A

N

L E

E

B

A R

R A

C K

S

C I V

I L

CD101

20' 40'0

GENERAL SHEET NOTES

SHEET KEYNOTES

A1

DEMOLITION PLAN - LEE BARRACKS

SCALE: 1"=20'

I S

S U

A

M E

N D

M E

N T

S

S

E

150.22

150.31

150.79

150.84

150.81 150.81

150.47

150.36

151.74

151.15

151.73

157.96

S

152.57 152.90

153.00

160.47

150.36

C

151.12

151.11

150.55

150.34

150.79

149.83

149.87

DOOR SILL

ELEV=156.45'

173.03

153.36

173.37

153.14

152.44

172.71

172.68

172.98

172.37

S

D

S

S

D

CB

H

150.89

BM

149.96

150.14

150.92

E

151.02

151.47

FIRST FLOOR

ELEV=175.16'

SECOND FLOOR

ELEV=185.13'

THIRD FLOOR

ELEV=194.13'

FOURTH FLOOR

ELEV=203.03'

FIFTH FLOOR

ELEV=211.97'

BASEMENT FLOOR

ELEV=164.23'

SHADE TREE

150.29

150.37

151.70

150.66

SHADE TREE

FINISH FLOOR

ELEV=152.61'

150.86

151.37

150.34

150.91

C

151.31

151.80

152.47

152.65

153.15

E

153.67

151.57

152.31

151.71

151.49

150.33

150.53

150.71

150.59

151.40

152.23

152.51

152.72

D

154.87

154.87

154.83

CB

159.48

D

DOOR SILL

ELEV=154.61'

DOOR SILL

ELEV=153.18'

155.88

158.85

156.78

169.23

171.04

171.60

MANHOLE

COVER

EMPTY

FINISH FLOOR

ELEV=172.16'

171.73

171.54

172.37

171.55

172.79

172.96

172.66

173.21

173.45

172.40

173.56

173.58

172.52

172.66

173.52

172.80

172.68

172.89

152.57

G

G

172.88

159.05

LANDSCAPE AREA

LANDSCAPE AREA

GRANITE

CURB

GRANITE CURB

VENTS

VENTS

STEPS

STEPS

STONE PILLAR

STONE

PILLARS

BLOCK RETAINING WALL

CONCRETE

STRUCTURE

TRASH AREA

CHAIN LINK GATE

DOOR

KEYPAD

DOUBLE

DOOR

KEYPAD

HYDRANT

HYDRANT

WATER

VALVES

GAS VALVE

GAS VALVE

EMH 2D

HANDHOLE

HANDHOLE

LIGHT POLE

EMH

LIGHT POLE

LIGHT POLE

HANDHOLE

LIGHT POLE

WATER

VALVE

WATER VALVE

WATER VALVES

GAS VALVES

WATER VALVE

WATER VALVE

WATER VALVE

CMH 3B

CMH 3A1

CMH 3A

LIGHT POLE

170.74

168.49

EMH 2H

RIM=168.53'

INACCESSIBLE

168.73

FINISH FLOOR

ELEV=172.15'

C

E

CB

FINISH FLOOR

ELEV=172.10'

171.01

THRESHHOLD

ELEV=170.56'

BASEMENT FLOOR

ELEV=168.22'

BASEMENT FLOOR

ELEV=168.25'

CB

E

172.47

171.90

180.41

180.38

180.36

180.36

213.08

CB

CB

177.48

177.57

165.06

CB

CB

177.48

158.74

CO

CO

CO

CO

169.89

166.12

D

CB

177.54

164.62

164.34

FIRST FLOOR

ELEV=178.14'

SECOND FLOOR

ELEV=188.11'

THIRD FLOOR

ELEV=197.12'

FOURTH FLOOR

ELEV=206.19'

FIFTH FLOOR

ELEV=215.11'

ROOF

ELEV=224.70'

170.56

180.74

180.38

179.41

199.07

209.18

DUMPSTER

EMH 2J

EMH 2G

T H

A Y

L K

BLOCK RETAINING WALL

CONCRETE RAMP

CONCRETE RAMP

ASPHALT AREA

A S

P H

A L

T

W

A L

K

SHED

M

O

N

U

M

E

N

T

S

GRATE C

A

N O

P Y

GRATE

ASPHALT

AREA

BLDG 740

LEE BARRACKS

BLDG 602

GRANT HALL

BLDG 606

BLDG 738

SHERMAN BARRACKS

D E

P R

E S

S E

D

C

U R

B

W A

L L

W A

L L

C

U

R

B

D E

P R

E S

S E

D

C

U R

B

C

U

R

B

CMH

C

O

N

C

R

E

R

U

C

T

U

R

E

CB

WATER

OUTLET

CLEAN OUTS

STONE PILLAR

PIV

WATER VALVE

STONE WALL

T H

A Y

A

D

BLOCK

RETAINING

WALL

N

5'-6"x5'-9"

UNDERGROUND

TUNNEL

E

C

ST

C UGU

EMH 2E

ELEC.

VAULT

E

UNDERGROUND

UNKNOWN

TEMPORARY

COMPACTOR

CMH 3

CMH X3

E

ST MHF8

APPROXIMATE LOCATION

OF CONCRETE EXPANSION

JOINT, MECHANICAL ROOM

BELOW

ST MHF4

ST MHF3

3'x5'

UNDERGROUND

TUNNEL

3'x5'

UNDERGROUND

TUNNEL

EB

EB

(3)

S

G

G

G

G

G

G

G

POSSIBLE LOCATION

OF EXISTING GAS

SERVICE

RETRACTABLE

WEDGE BARRIER

FORMATION AREA

H P

S

H P

S

H P

S

H P

S

THIS AREA TO BE

COORDINATED WITH THE

SHERMAN BARRACKS

RENOVATION DESIGN

ST

CO

C

E

D

D

W

D

W

W

W

W

W

W

W

PIV

C

ST

ST

C

D D

G

RD

SW

T

D

E

W

CO

C

C

C

D

X X

X X

X X

X X

X X

X

X

X

S

D

S

CO

S

CB

E

E

C

E

ST

ST

N: 931607.8372

E: 641118.0835

N: 931607.3223

E: 641179.7480

N: 931445.7950

E: 641123.2764

N: 931445.4133

E: 641173.6083

30'25'

D

C

(FOR GRANT HALL

COMPACTOR, TO BE

RELOCATED BY

GOVERNMENT)

(FOR WALK-IN

COOLER)

N: 931584.7810

E: 641373.2151

N: 931533.7848

E: 641372.5961

N: 931534.2884

E: 641331.0992

N: 931585.2847

E: 641331.7181

(3)

C J

CJ

C J

E J

E J

E J

(TYP.)

(TYP.)

2'

(3 EQ.

SPACED)

(2)

(3)

(4)

(3 EQ.

SPACED)

9.7'7'

E J

E J

E J

E J

E J

D C

D C

1. CONCRETE PAVEMENT (SEE STRUCTURAL DRAWINGS)

2. PAVEMENT SAWCUT / MEET EXISTING (TYP.)

3. TYPICAL BITUMINOUS ROADWAY PAVEMENT FULL

DEPTH (C-501/A5)

4. LIMIT OF DISTURBANCE (TYP.)

5. RECYCLING AND ELECTRICAL ENCLOSURE (SEE

STRUCTURAL AND ARCHITECTURAL DRAWINGS)

6. TRANSFORMER AND SWITCH (SEE ELECTRICAL

DRAWINGS)

7. TRASH DUMPSTER

8. POWER PANEL

9. METAL STAIR AND PLATFORM (SEE STRUCTURAL AND

ARCHITECTURAL DRAWINGS)

10. GENERATOR (SEE ELECTRICAL DRAWINGS)

11. REPLACE GRANITE CURBING AS REQUIRED FOR DC

12. EXISTING WALL TO BE REPAIRED (SEE STRUCTURAL

DRAWINGS)

13. TYPICAL TRENCH DRAIN (C-504/E1)

14. COMPACTED DGA AREA FOR SHERMAN BARRACKS

UTILITY STUBS

15. TYPICAL CONCRETE GUTTER (C-502/F1, D1)

16. 12'Wx16'L WALK-IN COOLER TO BE RELOCATED

(C-505/A1)

17. TYPICAL CONCRETE PAD (C-501/E1)

18. SEE ARCHITECTURAL DRAWINGS FOR WALL AND PIER

REPAIR

19. RAMP/SITE IMPROVEMENTS (SEE STRUCTURAL AND

ARCHITECTURAL DRAWINGS)

20. ELECTRICAL MANHOLE

21. COMMUNICATION MANHOLE

22. EXISTING GATE TO BE RE-INSTALLED AND FENCE AND

GATE RELOCATED (C-506/A1)

23. METAL HANDRAIL (SEE ARCHITECTURAL DRAWINGS)

24. PATIO AREA (SEE LANDSCAPE DRAWING)

25. UNDERGROUND FIRE PUMP ROOM

26. TYPICAL SURFACE MOUNTED BOLLARD (C-501/A8)

27. TYPICAL BITUMINOUS SIDEWALK HERRINGBONE

STAMPED PATTERN (C-501/E8)

28. RESET ALL LOOSE GRANITE CURBING AND FILL ALL

JOINTS. REPLACE SECTIONS DAMAGED DURING

CONSTRUCTION. MAINTAIN EXISTING ALIGNMENT

29. TYPICAL 8' HIGH VINYL COATED CHAIN LINK FENCING

WITH GRAY SLATS (C-502/D5)

30. USACE LEE AND SHERMAN BARRACKS CONSTRUCTION

FLEX TRAILERS, CONNECTED ((3) @ 10' W x 36' L).

AS PER SPECIFICATION SECTION 01 50 00,

PREFABRICATED STRUCTURES ARE PERMITTED. REFER

TO 01 50 00 FOR GOVERNMENT FIELD OFFICE

REQUIREMENTS

31. TRASH AND GENERATOR ENCLOSURE (SEE

STRUCTURAL AND ARCHITECTURAL DRAWINGS)

32. RECYCLING DUMPSTER

33. GENERATOR POWER CONNECTION CABINET TO BE

RELOCATED (SEE ELECTRICAL DRAWINGS)

34. WALK-IN COOLER CONDENSING UNIT CANOPY

STRUCTURE (C-505/A7)

35. WALK-IN COOLER CONDENSING UNIT AND

APPURTENANCES TO BE RELOCATED (SEE ELECTRICAL

DRAWINGS)

36. TYPICAL REMOVABLE BOLLARD (TOTAL 4) / W

TEMPORARY HOLDING RECEIVERS (C-504/A2)

37. TYPICAL BOLLARD COVER OVER EXISTING BOLLARD

(TOTAL 18), (C-504-A6)

38. 3' WIDE TYPICAL TEMPORARY CONSTRUCTION FENCE

GATE (C-502/A1)

39. GRANITE BLOCK WALK AND CONCRETE EDGE REPAIR

40. 20'±, ALIGN GATE, TRANSFORMER PAD AND POWER

PANEL WITH USACE TRAILER POWER SERVICE

CONNECTION

41. INSTALLATION OF USACE TRAILERS, FENCING, UTILITY

EXTENSIONS AND ALL RELATED IMPROVEMENTS MUST

NOT DISTURB MONUMENTS AND LIGHT POLES

42. TYPICAL CONCRETE EMBEDDED BOLLARD (C-501/E4)

43. 60"L x 24"W x 36"H, 2,400 LB+/- CONCRETE JERSEY

BARRIER POSITIONED TO MAINTAIN ACCESS TO

ACCESSIBILITY RAMP. BARRIER MUST BE NEW AND IN

EXCELLENT CONDITION

44. TYPICAL 8' HIGH, 8' WIDE DOUBLE SWING GATE

(C-502/E8), ALIGN OPENING WITH TRANSFORMER PAD

45. TRANSFORMER PAD

46. USACE TRAILER POWER SERVICE PANEL

47. STEAM MH

48. REPAIR MASONRY STAIRS IF DAMAGED DURING

CONSTRUCTION

D A

T E

M A

R K

D E

S C

R I P

T I O

N

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

SHEET ID

W D

S F

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

US Army Corps of Engineers

N E

W

Y

O R

K

D

I S

T R

I C

T

F

E D

E R

A L

P

L A

Z A

N

R

K

N

Y

W D

S D

J U

A N

S I

D

W E

I N

T

N

Y

C B

E

B

A R

R A

C

RTA SUBMISSION

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

LEE

A1

SITE PLAN - LEE BARRACKS

SCALE: 1"=20'

J C

D P

J K

S I T

E

P

L A

N

L E

E

B

A R

R A

C K

S

C I V

I L

CS101

N

20' 40'0

SHEET KEYNOTES

I S

S U

A

M E

N D

M E

N T

M M

CO

M

MCOMM

COMM

S

D

S

D

S

D

S D

S

D

S

D

S

D

S

D

S D

S

D

S

D

S

D

S

D

S

D

S D

S

D

S

D

SD

SD

SD

SD

SD SD

SD

S

D

S D

S

A

N

SAN

SAN

SAN

SAN

SAN

S A

N

C

O

M

M

C O

M M

C O

M M

COMM

COMM

C O

M M

C O

M M

C O

M M

COMM COMM COMM COMM

COMM

C O

M M

S

E

S

S

E

S

C

S

D

S

S

D

CB

H

BM

E

C

E

D

CB

D

MANHOLE

COVER

EMPTY

W

W

W

W

W

W W

W

W

W

W

W

W

G

G

G

G

G

G

G

G

G

G

G

G

G

G

W W

W W

W W

W

LANDSCAPE AREA

LANDSCAPE AREA

GRANITE

CURB

GRANITE CURB

VENTS

VENTS

STEPS

STEPS

STONE PILLAR

STONE

PILLARS

BLOCK RETAINING WALL

CONCRETE

STRUCTURE

TRASH AREA

CHAIN LINK GATE

DOOR

KEYPAD

DOUBLE

DOOR

KEYPAD

HYDRANT

HYDRANT

WATER

VALVES

GAS VALVE

GAS VALVE

EMH 2D

HANDHOLE

HANDHOLE

LIGHT POLE

EMH

LIGHT POLE

LIGHT POLE

HANDHOLE

LIGHT POLE

WATER

VALVE

WATER VALVE

WATER VALVES

GAS VALVES

WATER VALVE

WATER VALVE

WATER VALVE

CMH 3B

CMH 3A1

CMH 3A

LIGHT POLE

EMH 2H

RIM=168.53'

INACCESSIBLE

C

E

CB

CB

E

CB

CB

CB

CB

CO

CO

CO

CO

D

CB

DUMPSTER

EMH 2J

EMH 2G

T H

A Y

L K

BLOCK RETAINING WALL

CONCRETE RAMP

CONCRETE RAMP

ASPHALT AREA

A S

P H

A L

T

W

A L

K

SHED

M

O

N

U

M

E

N

T

S

GRATE C

A

N O

P Y

GRATE

ASPHALT

AREA

BLDG 740

LEE BARRACKS

BLDG 602

GRANT HALL

BLDG 606

BLDG 738

SHERMAN BARRACKS

D E

P R

E S

S E

D

C

U R

B

W A

L L

W A

L L

C

U

R

B

D E

P R

E S

S E

D

C

U R

B

C

U

R

B

CMH

C

O

N

C

R

E

R

U

C

T

U

R

E

CB

WATER

OUTLET

CLEAN OUTS

STONE PILLAR

PIV

WATER VALVE

STONE WALL

W W

T H

A Y

A

D

BLOCK

RETAINING

WALL

N

HPS

HPS

HPS

HPS

HPS

W

W

5'-6"x5'-9"

UNDERGROUND

TUNNEL

C O

O L

E R

W

W

W W

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

H P

S

E

C

ST

C

W

E

E

E

E

E

E E E E E E E E E E

E E

E E

E

E

E

E

UGU

E

E

E

E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

W W

W W

W

W

W W

W W

W W

W W

W W

W W

W W

W

E

E

E

E

E

E

E

E

E

EMH 2E

ELEC.

VAULT

E

E

E

E

E

E

E

E

E

E E E E E E

E

E

E

S

D

SD

SD

SD

SD

SD

SD

SD

ABANDONED

ELEC. CONDUITS

ABANDONED

ELEC. CONDUITS

COLD WATER LINE

PER AVAILABLE

RECORDS

UNDERGROUND

UNKNOWN

TEMPORARY

COMPACTOR

CHW

C

O

M

M

C

O

M

M

C

O

M

M

CMH 3

CMH X3

COMM

COMM

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

E E

E E

E E

E E

E E

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

E

ST MHF8

APPROXIMATE LOCATION

OF CONCRETE EXPANSION

JOINT, MECHANICAL ROOM

BELOW

ST MHF4

H P

S

ST MHF3

S

D

H P

S

3'x5'

UNDERGROUND

TUNNEL

3'x5'

UNDERGROUND

TUNNEL

EB

EB

(3)

C O

M M

COMM COMM COMM COMM COMM COMM

COMMUNICATION CONDUIT,

TERMINATION UNKNOWN

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

S

S

A

N

S A

N

S

D

G

G

G

G

G

G

G

POSSIBLE LOCATION

OF EXISTING GAS

SERVICE

S A

N

RETRACTABLE

WEDGE BARRIER

FORMATION AREA

H P

S

H P

S

H P

S

H P

S

ST

CO

C

E

D

D

SD

S D

S D

S D

E

E

E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

H W

S

HWSHWSHWSHWS

W

D

W

W

W

W

W

W W

W W

W

W W W W W W W

W W

W

W

W

W

W

W

W

W

W

PIV

G G

G G G

G

G G

G G

G G G

S D

SD

SD

SD

SD

SD

SD

C

S

A

N

S

A

N

ST

ST

C

W

S

D

SD

D D

G

RD

SW

T

E

C

H

W

C

H

W

C

H

W

C

H

W

C

H

W

CHW

CHW

CHW

C

H

W

E

D

SD

SD

SD

E

E

E

E

W W

CO

S

A

N

S A

N

S A

N

S A

N

C

C

C

C O

M M

COMM

COMM

C O

M M

C O

M M

COMM COMM COMM COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

D

H

W

R

H

W

S

X X

X X

X X

X X

X X

X

X

X

S

E E

E E

E E

E E

E E

E E

E E

D

S

CO

G G G G G G

G

HWR HWR HWR HWR

H W

R

W W

W W

W W

W W

W W

W

E

E

E

E E

S

CB

E

E

C

E E E E E E E E E

E

E

E

E

E

E E E

ST

ST

SD

COMM

COMM

COMM

COMM

COMM

COMM COMM

COMM

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS HPS

HPS HPS

HPS

HPS

HPS

HPS

HPS

HPS HPS HPS

HPS HPS

SOUTH RAMP REMAINS OPEN DURING

PHASE II FOR CONSTRUCTION

VEHICLES AND EMERGENCY VEHICLE

ACCESS

X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X

X X

TYPICAL TEMPORARY

CONSTRUCTION FENCE

DOUBLE SWING GATE,

12' WIDE (C-502/E8)

COORDINATE EXACT

LOCATION WITH

GOVERNMENT SO

EMERGENCY VEHICLE

ACCESS IS MAINTAINED

CONTRACTOR

DEBRIS

LOADING

AREA

MAINTAIN 15' CLEAR IN THAYER

WALK FOR EMERGENCY AND

CONTRACTOR VEHICLE ACCESS

TYPICAL TEMPORARY

CONSTRUCTION

FENCE (C-502/D5)

LEE BARRACKS

RESTORATION BEGINS

MARCH 2022

TEMPORARY

GRANT HALL

DELIVERY

ACCESS

TEMPORARILY REMOVE

BOTH SIDES OF GATE

AND REPLACE AFTER

PHASE II

TYPICAL

TEMPORARY

CONSTRUCTION

FENCE FOR WALL

REPAIR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .