RTA Drawings Lee Vol 3.pdf

PDF 6 MB Posted

Attached to
Building 740, Lee Barracks and Building 738, Sherman Barracks Repair
Solicitation number
W912DS21B0004
Issued by

About this file

This document provides details for a federal contract opportunity to repair two barracks buildings at the United States Military Academy at West Point. The project entails full renovation of Building 740 at Lee Barracks and optional full renovation of Building 738 at Sherman Barracks. Building 740 repairs will include interior renovations to address space deficiencies, failing conditions, and MEP systems replacements. Temporary swing space will be required for the barber shop during repairs. A new cadet health clinic will be added. Building 738 repairs are optional and will also address interior and exterior renovations along with MEP system replacements. Hazardous materials abatement will be included. The contract is valued between $100-200 million with a period of performance of approximately 1034 calendar days. The solicitation is expected to be posted on August 6, 2021 on SAM.gov with proposals due around 30 days later. The NAICS code is 236220 and registration on SAM.gov is required to access the solicitation.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912DS21B0004 Amendment 11.pdf PDF
Lee Barracks Electrical Drawings for Amendment.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008_Combined Drawings Final 9-10-21.pdf PDF
Amendment 0008_Combined Specifications 9-10-21.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_LEE-SHERMAN SPECS rev.pdf PDF
Amendment 0007_Lee Sherman Section 01 32 00 Scheduling.pdf PDF
Amendment 0007_Dwgs_Sherman Barracks.pdf PDF
Amendment 0007_Building 740 Lee Barracks Site Walk through Sign in Sheet.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007_Dwgs_Lee Barracks.pdf PDF
Amendment 0007_Sherman Barracks GER.pdf PDF
Amendment 0007_5.4 GER_West Point Lee Barracks signed.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS SHERMAN.pdf PDF
Amendment 0004_STEAM VAULT AMENDMENT DRAWINGS LEE.pdf PDF
Amendment 0004_Photos_Steam Vault F-4.pdf PDF
Amendment 0004_Photos_Steam Vault F-8.pdf PDF
Amendment 0004_WP Lee and Sherman Steam Vault Amendment SPECIFICATIONS 17 AUG 2021.pdf PDF
Amendment 0004_Photos_Steam Vault F-3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part3.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part1.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part2.pdf PDF
Amendment 0003_RTA Drawings Lee Vol 1_Part4.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RTA Drawings Lee Vol 2.pdf PDF
RTA Drawings Lee Vol 1_Part3.pdf PDF
RTA Drawings Lee Vol 1_Part2.pdf PDF
RTA Drawings Lee Vol 1_Part1.pdf PDF
RTA Drawings Sherman Vol 2_Part2.pdf PDF
RTA Drawings Sherman Vol 2_Part1.pdf PDF
RTA Drawings Sherman Vol 1_Part2.pdf PDF
RTA Drawings Sherman Vol 1_Part1.pdf PDF
VOL 3 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 2 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
W912DS-21-B-0004_Solicitation.pdf PDF
VOL 4 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
VOL 1 WP Lee and Sherman RTA Specs 23 JULY 2021.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

P S

O F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE.:

VOLUME:

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

JKJKEWEW

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/LB-81721A-18-CENTRAL.rvt

7/21/2021 2:34:56 PM

G-003A

SWING

SW

IN

G S

PA

C

E C

O

VE

R S

H

EE

T -V

O

LU

M E

TH

R

EE

W

ES

T

PO

IN

T, N Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

E R

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

J

U

LY

W

2D S1

7D

RTA SUBMISSION

LE

E

BA

R

R

AC

KS

W

2D S1

8F

NEW YORK DISTRICT

WEST POINT, NY

LEE BARRACKS

W912DS17D0007

23 JULY 2021

PN 81721

PN

SITE MAP PROJECT LOCATION

VICINITY MAP LEE / SHERMAN BARRACKS

BUILDINGS LEE BARRACKS

SWING SPACE

SHEET ID

U S

AR

M

Y C

O R

P S

O F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

JKJKEWEW

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/LB-81721A-18-CENTRAL.rvt

7/22/2021 2:35:29 PM

G-001B

LEE

D R

AW

IN

G

IN

D

EX

VO

LU

M

E O

N E

W

ES

T

PO

IN

T, N Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

E R

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

J

U

LY

W

2D S1

7D

RTA SUBMISSION

LE

E

BA

R

R

AC

KS

W

2D S1

8F

PN

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

INTERIORS

I-001 INTERIOR FINISH SCHEDULE & GENERAL NOTES

I-002 INTERIOR FINISH SCHEDULE (CONT)

I-003 INTERIOR FINISH SCHEDULE (CONT)

I-100S SUB-BASEMENT FINISH PLAN

I-100SA SUB-BASEMENT FINISH PLAN - PART A

I-100SB SUB-BASEMENT FINISH PLAN - PART B

I-100B BASEMENT FINISH PLAN

I-100BA BASEMENT FINISH PLAN - PART A

I-100BB BASEMENT FINISH PLAN - PART B

I-101 FIRST FLOOR FINISH PLAN

I-101A FIRST FLOOR FINISH PLAN - PART A

I-101B FIRST FLOOR FINISH PLAN - PART B

I-102 SECOND FLOOR FINISH PLAN

I-102A SECOND FLOOR FINISH PLAN - PART A

I-102B SECOND FLOOR FINISH PLAN - PART B

I-103 THIRD FLOOR FINISH PLAN

I-103A THIRD FLOOR FINISH PLAN - PART A

I-103B THIRD FLOOR FINISH PLAN - PART B

I-104 FOURTH FLOOR FINISH PLAN

I-104A FOURTH FLOOR FINISH PLAN - PART A

I-104B FOURTH FLOOR FINISH PLAN - PART B

I-105 FIFTH FLOOR FINISH PLAN

I-105A FIFTH FLOOR FINISH PLAN - PART A

I-105B FIFTH FLOOR FINISH PLAN - PART B

I-200.A BARBER & BEAUTY SHOP FURNITURE LEGEND

I-200.B BARRACKS FURNITURE LEGEND & NOTES

I-200S.1 SUB-BASEMENT FURNITURE SCHEDULE

I-200S.2 SUB-BASEMENT FURNITURE PLAN

I-200SA SUB-BASEMENT FURNITURE PLAN - PART A

I-200SB SUB-BASEMENT FURNITURE PLAN - PART B

I-200B.1 BASEMENT FURNITURE SCHEDULE

I-200B.2 BASEMENT FURNITURE PLAN

I-200BA BASEMENT FURNITURE PLAN - PART A

I-200BB BASEMENT FURNITURE PLAN - PART B

I-201.1 FIRST FLOOR FURNITURE PLAN & FURNITURE SCHEDULE

I-201A FIRST FLOOR FURNITURE PLAN - PART A

I-201B FIRST FLOOR FURNITURE PLAN - PART B

I-202.1 SECOND FLOOR FURNITURE SCHEDULE

I-202.2 SECOND FLOOR FURNITURE PLAN

I-202A SECOND FLOOR FURNITURE PLAN - PART A

I-202B SECOND FLOOR FURNITURE PLAN - PART B

I-203.1 THIRD FLOOR FURNITURE SCHEDULE

I-203.2 THIRD FLOOR FURNITURE PLAN

I-203A THIRD FLOOR FURNITURE PLAN - PART A

I-203B THIRD FLOOR FURNITURE PLAN - PART B

I-204.1 FOURTH FLOOR FURNITURE SCHEDULE

I-204.2 FOURTH FLOOR FURNITURE PLAN

I-204A FOURTH FLOOR FURNITURE PLAN - PART A

I-204B FOURTH FLOOR FURNITURE PLAN - PART B

I-205.1 FIFTH FLOOR FURNITURE SCHEDULE

I-205.2 FIFTH FLOOR FURNITURE PLAN

I-205A FIFTH FLOOR FURNITURE PLAN - PART A

I-205B FIFTH FLOOR FURNITURE PLAN - PART B

I-300.1 SIGNAGE DETAILS

I-300.2 SIGNAGE DETAILS

I-300.3 CHC INTERIOR SIGNAGE

I-300.4 CHC INTERIOR SIGNAGE

I-300.5 CHC INTERIOR SIGNAGE

I-300S SUB-BASEMENT SIGNAGE SCHEDULE

I-300SA SUB-BASEMENT SIGNAGE PLAN - PART A

I-300SB SUB-BASEMENT SIGNAGE PLAN - PART B

I-300B BASEMENT SIGNAGE SCHEDULE

I-300BA BASEMENT SIGNAGE PLAN - PART A

I-300BB BASEMENT SIGNAGE PLAN - PART B

I-301 FIRST FLOOR SIGNAGE SCHEDULE

I-301A FIRST FLOOR SIGNAGE PLAN - PART A

I-301B FIRST FLOOR SIGNAGE PLAN - PART B

I-302 SECOND FLOOR SIGNAGE SCHEDULE

I-302A SECOND FLOOR SIGNAGE PLAN - PART A

I-302B SECOND FLOOR SIGNAGE PLAN - PART B

I-303 THIRD FLOOR - SIGNAGE SCHEDULE

I-303A THIRD FLOOR - SIGNAGE PLAN - PART A

I-303B THIRD FLOOR - SIGANGE PLAN - PART B

I-304 FOURTH FLOOR SIGNAGE SCHEDULE

I-304A FOURTH FLOOR SIGNAGE PLAN - PART A

I-304B FOURTH FLOOR SIGNAGE PLAN - PART B

I-305 FIFTH FLOOR SIGNAGE SCHEDULE

I-305A FIFTH FLOOR SIGNAGE PLAN - PART A

I-305B FIFTH FLOOR SIGNAGE PLAN - PART B

I-400 TYPICAL FLOOR PATTERN PLAN - SUB-BASEMENT

I-401 TYPICAL FLOOR PATTERN PLAN - BASEMENT

I-402 TYPICAL FLOOR PATTERN PLAN - TYP. CORRIDORS & STAIRS

I-403 ENLARGED FLOOR PATTERN PLAN - CADET ROOM & COLLABORATION ROOM

I-404 ENLARGED FLOOR PATTERN PLAN - TOILET ROOMS

I-405 ENLARGED FLOOR PATTERN PLAN - BARBER & BEAUTY SHOP

I-406 ENLARGED FLOOR PATTERN PLAN - CADET HEALTH CLINIC

I-501 MISCELLANEOUS DETAILS

I-502 MISCELLANEOUS DETAILS

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

A-201 NORTH ELEVATION

A-202 SOUTH ELEVATION

A-203 EAST ELEVATION

A-204 WEST ELEVATION

A-301 SITE SECTIONS

A-302 SITE SECTIONS

A-310 BUILDING SECTIONS

A-311 BUILDING SECTIONS

A-312 BUILDING SECTIONS

A-313 BUILDING SECTIONS

A-314 BUILDING SECTIONS

A-400 ENLARGED FLOOR PLANS - CADET ROOMS

A-401 ENLARGED FLOOR PLANS - COLLABORATION ROOM

A-402 ENLARGED FLOOR PLANS - BATHROOM

A-404 ENLARGED FLOOR PLANS - EXTERIOR

A-406 ENLARGED FLOOR PLANS - CHC

A-407 ENLARGED FLOOR PLANS - CHC

A-410 INTERIOR ELEVATIONS - CADET LEVEL

A-411 INTERIOR ELEVATIONS - BATHROOMS

A-412 INTERIOR ELEVATIONS - CADET LEVEL CORRIDORS

A-413 INTERIOR ELEVATIONS - BARBER & BEAUTY SHOP

A-414 INTERIOR ELEVATIONS - BARBER & BEAUTY SHOP

A-415 INTERIOR ELEVATIONS - BARBER & BEAUTY SHOP

A-420 INTERIOR ELEVATIONS - CHC

A-421 INTERIOR ELEVATIONS - CHC

A-422 INTERIOR ELEVATIONS - CHC

A-423 INTERIOR ELEVATIONS - CHC

A-424 INTERIOR ELEVATIONS - CHC

A-425 INTERIOR ELEVATIONS - CHC

A-426 INTERIOR ELEVATIONS - CHC

A-430 WALL SECTIONS

A-431 WALL SECTIONS

A-432 WALL SECTIONS

A-440 WALL SECTIONS - SITE

A-441 WALL SECTIONS - SITE

A-442 SITE ENCLOSURES

A-450 ENLARGED STAIR 01 PLANS & SECTION

A-451 ENLARGED STAIR 02 PLANS & SECTION

A-452 ENLARGED STAIR 03 PLANS & SECTION

A-453 ENLARGED STAIR 04 PLANS & SECTION

A-454 ENLARGED ELEVATOR 01 PLANS & SECTION

A-455 ENLARGED ELEVATOR 02 PLANS & SECTION

A-456 ELEVATOR DETAILS

A-457 ELEVATOR DETAILS

A-460 ENLARGED REFLECTED CEILING PLANS

A-500 STAIR DETAILS

A-501 STAIR DETAILS

A-510 ROOF DETAILS

A-511 ROOF DETAILS

A-512 ROOF DETAILS

A-520 PENTHOUSE DETAILS

A-530 EXTERIOR PLAN DETAILS

A-540 WALL SECTION DETAILS

A-560 PLAN DETAILS

A-570 CEILING DETAILS

A-571 CEILING DETAILS

A-580 INTERIOR DETAILS - CADET

A-590 INTERIOR DETAILS - CHC

A-600 PARTITION TYPES & DETAILS

A-601 PARTITION SCHEDULE & DETAILS

A-610 DOOR SCHEDULE - EXTERIOR, SUB-BASEMENT & BASEMENT

A-611 DOOR SCHEDULE - 1ST, 2ND 3RD, 4TH, 5TH, ROOF

A-612 DOOR TYPES & DETAILS

A-613 DOOR DETAILS

A-614 DOOR DETAILS

A-615 DOOR DETAILS

A-616 DOOR DETAILS

A-620 WINDOW TYPES & SCHEDULE

A-621 EXTERIOR WINDOW DETAILS

A-622 EXTERIOR WINDOW DETAILS

A-623 EXTERIOR WINDOW DETAILS

A-624 EXTERIOR WINDOW DETAILS

A-625 EXTERIOR WINDOW & LOUVER DETAILS

A-630 INTERIOR WINDOW DETAILS

A-640 RAILING TYPES & SCHEDULE

A-650 SUB-BASEMENT EQUIPMENT PLAN - PART A

A-651 SUB-BASEMENT EQUIPMENT PLAN - PART B

A-652 BASEMENT EQUIPMENT PLAN - PART A

A-653 BASEMENT EQUIPMENT PLAN - PART B

A-654 EQUIPMENT/FURNITURE SCHEDULE - CHC

A-655 EQUIPMENT/FURNITURE SCHEDULE - CHC

A-656 EQUIPMENT/FURNITURE SCHEDULE - CHC

A-700 MILLWORK DETAILS - CADET

A-701 MILLWORK DETAILS - CADET

A-702 MILLWORK DETAILS - CADET

A-703 MILLWORK DETAILS - CADET

A-710 MILLWORK DETAILS - BBS

A-711 MILLWORK DETAILS - BBS

A-712 MILLWORK DETAILS - BBS

A-720 MILLWORK DETAILS - CHC

A-721 MILLWORK DETAILS - CHC

A-722 MILLWORK DETAILS - CHC

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

ARCHITECTURAL

A-001 ABBREVIATIONS

A-002 GENERAL SYMBOLS AND NOTES

A-003 MOUNTING HEIGHTS & CLEARANCES

AD100S DEMOLITION SUB-BASEMENT PLAN

AD100SA DEMOLITION SUB-BASEMENT PLAN - PART A

AD100SB DEMOLITION SUB-BASEMENT PLAN - PART B

AD100 DEMOLITION BASEMENT PLAN

AD100A DEMOLITION BASEMENT PLAN - PART A

AD100B DEMOLITION BASEMENT PLAN - PART B

AD101 DEMOLITION FIRST FLOOR PLAN

AD101A DEMOLITION FIRST FLOOR PLAN - PART A

AD101B DEMOLITION FIRST FLOOR PLAN - PART B

AD102 DEMOLITION SECOND FLOOR PLAN

AD102A DEMOLITION SECOND FLOOR PLAN - PART A

AD102B DEMOLITION SECOND FLOOR PLAN - PART B

AD103 DEMOLITION THIRD FLOOR PLAN

AD103A DEMOLITION THIRD FLOOR PLAN - PART A

AD103B DEMOLITION THIRD FLOOR PLAN - PART B

AD104 DEMOLITION FOURTH FLOOR PLAN

AD104A DEMOLITION FOURTH FLOOR PLAN - PART A

AD104B DEMOLITION FOURTH FLOOR PLAN - PART B

AD105 DEMOLITION FIFTH FLOOR PLAN

AD105A DEMOLITION FIFTH FLOOR PLAN - PART A

AD105B DEMOLITION FIFTH FLOOR PLAN - PART B

AD106 DEMOLITION PENTHOUSE FLOOR PLAN

AD106A DEMOLITION PENTHOUSE FLOOR PLAN - PART A

AD106B DEMOLITION PENTHOUSE FLOOR PLAN - PART B

AD107 DEMOLITION ROOF PLAN

AD107A DEMOLITION ROOF PLAN - PART A

AD107B DEMOLITION ROOF PLAN - PART B

AD121 DEMOLITION FIRST FLOOR RCP

AD201 DEMOLITION NORTH ELEVATION

AD202 DEMOLITION SOUTH ELEVATION

AD203 DEMOLITION EAST ELEVATION

AD204 DEMOLITION WEST ELEVATION

AD301 DEMOLITION BUILDING SECTION

AD302 DEMOLITION BUILDING SECTION

AD303 DEMOLITION BUILDING SECTION

AD304 DEMOLITION BUILDING SECTION

AD400 DEMOLITION ENLARGED PLANS

AD401 DEMOLITION ENLARGED SECTIONS

AS100 SITE PLAN

A-100S SUB-BASEMENT FLOOR PLAN

A-100SA SUB-BASEMENT FLOOR PLAN - PART A

A-100SB SUB-BASEMENT FLOOR PLAN - PART B

A-100B BASEMENT FLOOR PLAN

A-100BA BASEMENT FLOOR PLAN - PART A

A-100BB BASEMENT FLOOR PLAN - PART B

A-101 FIRST FLOOR PLAN

A-101A FIRST FLOOR PLAN - PART A

A-101B FIRST FLOOR PLAN - PART B

A-102 SECOND FLOOR PLAN

A-102A SECOND FLOOR PLAN - PART A

A-102B SECOND FLOOR PLAN - PART B

A-103 THIRD FLOOR PLAN

A-103A THIRD FLOOR PLAN - PART A

A-103B THIRD FLOOR PLAN - PART B

A-104 FOURTH FLOOR PLAN

A-104A FOURTH FLOOR PLAN - PART A

A-104B FOURTH FLOOR PLAN - PART B

A-105 FIFTH FLOOR PLAN

A-105A FIFTH FLOOR PLAN - PART A

A-105B FIFTH FLOOR PLAN - PART B

A-106 PENTHOUSE FLOOR PLAN

A-106A PENTHOUSE FLOOR PLAN - PART A

A-106B PENTHOUSE FLOOR PLAN - PART B

A-107 ROOF PLAN

A-107A ROOF PLAN - PART A

A-107B ROOF PLAN - PART B

A-120S SUB-BASEMENT RCP

A-120SA SUB-BASEMENT RCP - PART A

A-120SB SUB-BASEMENT RCP - PART B

A-120B BASEMENT RCP

A-120BA BASEMENT RCP - PART A

A-120BB BASEMENT RCP - PART B

A-121 FIRST FLOOR RCP

A-121A FIRST FLOOR RCP - PART A

A-121B FIRST FLOOR RCP - PART B

A-122 SECOND FLOOR RCP

A-122A SECOND FLOOR RCP - PART A

A-122B SECOND FLOOR RCP - PART B

A-123 THIRD FLOOR RCP

A-123A THIRD FLOOR RCP - PART A

A-123B THIRD FLOOR RCP - PART B

A-124 FOURTH FLOOR RCP

A-124A FOURTH FLOOR RCP - PART A

A-124B FOURTH FLOOR RCP - PART B

A-125 FIFTH FLOOR RCP

A-125A FIFTH FLOOR RCP - PART A

A-125B FIFTH FLOOR RCP - PART B

DRAWING LIST - VOLUME 01

SHEET

NUMBER SHEET NAME

GENERAL

G-001A COVER SHEET - VOLUME ONE

G-001B DRAWING INDEX - VOLUME ONE

G-100S CHC SCOPING DIAGRAM - SUB-BASEMENT LEVEL

G-100B CHC SCOPING DIAGRAM - BASEMENT LEVEL

G-101 CHC SCOPING DIAGRAM - FIRST FLOOR

LIFE SAFETY

LP001 LIFE SAFETY CODE SUMMARY

LP002 CODE COMPLIANCE SITE PLAN

LP100S SUB BASEMENT LIFE SAFETY PLAN

LP100B BASEMENT LIFE SAFETY PLAN

LP101 FIRST FLOOR LIFE SAFETY PLAN

LP102 SECOND FLOOR LIFE SAFETY PLAN

LP103 THIRD FLOOR LIFE SAFETY PLAN

LP104 FOURTH FLOOR LIFE SAFETY PLAN

LP105 FIFTH FLOOR LIFE SAFETY PLAN

CIVIL

C-001 GENERAL NOTES

C-002 GENERAL NOTES, LEGEND AND ABBREVIATIONS

C-101 EXISTING CONDITIONS PLAN - LEE BARRACKS

C-102 BARBER AND BEAUTY SHOP SWING SPACE AREA PLAN

CD101 DEMOLITION PLAN - LEE BARRACKS

CS101 SITE PLAN – LEE BARRACKS

CS102 CONSTRUCTION VEHICLE ACCESS ROUTE PLAN

CS103 PHASE I CONSTRUCTION EXHIBIT - BARBER AND BEAUTY SHOP SWING SPACE AREA

CS104 PHASE II CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS

CS105 PHASE III CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS

CS106 PHASE IV CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS

CS107 PHASE V CONSTRUCTION EXHIBIT - LEE & SHERMAN BARRACKS

CG101 GRADING AND DRAINAGE PLAN - LEE BARRACKS

CG102 SOIL EROSION PLAN - LEE BARRACKS

CU101 UTILITY PLAN – LEE BARRACKS

C-201 NORTH RAMP PLAN AND PROFILE - LEE BARRACKS

C-202 SOUTH RAMP PLAN AND PROFILE - LEE BARRACKS

C-203 STORM DRAINAGE AND SANITARY SEWER PROFILES - LEE BARRACKS

C-204 ELECTRIC DUCT BANK PROFILES - LEE BARRACKS

C-205 WATER MAIN PROFILES - LEE BARRACKS

C-301 NORTH RAMP CROSS SECTIONS - LEE BARRACKS

C-501 CONSTRUCTION DETAILS

C-502 CONSTRUCTION DETAILS

C-503 CONSTRUCTION DETAILS

C-504 CONSTRUCTION DETAILS

C-505 CONSTRUCTION DETAILS

C-506 CONSTRUCTION DETAILS

L-101 LANDSCAPE PLAN - LEE BARRACKS

L-501 LANDSCAPE DETAILS - LEE BARRACKS

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 CONCRETE REPAIR NOTES

SS101 STRUCTURAL SITE PLAN - FIRST FLOOR LEVEL

S-100S SUB-BASEMENT FOUNDATION PLAN

S-100B BASEMENT FLOOR FRAMING PLAN

S-101 FIRST FLOOR FRAMING PLAN

S-102 SECOND FLOOR FRAMING PLAN

S-103 THIRD FLOOR FRAMING PLAN

S-104 FOURTH FLOOR FRAMING PLAN

S-105 FIFTH FLOOR FRAMING PLAN

S-106 MAIN ROOF FRAMING PLAN

S-301 SECTIONS

S-302 SECTIONS

S-303 SECTIONS

S-304 SECTIONS

S-305 UTILITY VAULTS F3, F4 & F8

S-501 TYPICAL DETAILS

S-502 TYPICAL DETAILS

SHEET ID

U S

AR

M

Y C

O R

P S

O F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

JKJKEWEW

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/LB-81721A-18-CENTRAL.rvt

7/21/2021 2:34:53 PM

G-002B

LEE

D R

AW

IN

G

IN

D

EX

VO

LU

M

E

TW

O

W

ES

T

PO

IN

T, N Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

E R

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

J

U

LY

W

2D S1

7D

RTA SUBMISSION

LE

E

BA

R

R

AC

KS

W

2D S1

8F

PN

DRAWING LIST - VOLUME 02

SHEET

NUMBER SHEET NAME

E-102 SECOND FLOOR POWER PLAN

E-103 THIRD FLOOR POWER PLAN

E-104 FOURTH FLOOR POWER PLAN

E-105 FIFTH FLOOR POWER PLAN

E-106 ROOF FLOOR POWER PLAN

E-115 ELECTRICAL FLOOR PLANS - STEAM VAULTS

E-120S SUB-BASEMENT LIGHTING RCP

E-120B BASEMENT LIGHTING RCP

E-121 FIRST FLOOR LIGHTING RCP

E-122 SECOND FLOOR LIGHTING RCP

E-123 THIRD FLOOR LIGHTING RCP

E-124 FOURTH FLOOR LIGHTING RCP

E-125 FIFTH FLOOR LIGHTING RCP

E-126 ROOF LIGHTING RCP

E-201 GROUNDING & LIGHTNING PROTECTION SYSTEM - SITE PLAN

E-202 LIGHTNING PROTECTION PLAN - ROOF

E-203 GROUNDING & LIGHTNING PROTECTION SYSTEM RISER DIAGRAM

E-204 GROUNDING & LIGHTNING PROTECTION SYSTEM RISER DIAGRAM

E-210 CONDUIT ROUTING PLAN - SUB BASEMENT LEVEL

E-300 LIGHTING LAYOUT ELEVATIONS

E-401 ENLARGED ELECTRICAL ROOMS

E-402 ENLARGED FLOOR PLANS

E-430 GRANT HALL ALLEY MODIFICATIONS

E-500 ELECTRICAL DETAILS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-510 LIGHTNING PROTECTION DETAILS

E-511 GROUNDING DETAILS

E-512 GROUNDING DETAILS

E-601 ELECTRICAL PRIMARY POWER ONE-LINE DIAGRAM

E-602 ELECTRICAL SECONDARY POWER ONE-LINE DIAGRAM

E-610 ELECTRICAL ROOM POWER RISER DIAGRAM

E-611 ELECTRICAL ROOM POWER RISER DIAGRAM

E-621 MECHANICAL / ELECTRICAL EQUIPMENT COORDINATION SCHEDULE

E-622 MECHANICAL / ELECTRICAL EQUIPMENT COORDINATION SCHEDULE

E-700 LIGHTING FIXTURE SCHEDULE

E-701 LIGHTING CONTROL SEQUENCE OF OPERATIONS

E-702 LIGHTING CONTROL DIAGRAMS AND SCHEMATICS

E-703 LIGHTING CONTROL DIAGRAMS AND SCHEMATICS

E-704 EMERGENCY LUMINAIRE CIRCUITING DIAGRAM

E-710 EMERGENCY POWER OFF SYSTEM

E-800 PANELBOARD SCHEDULES

E-801 PANELBOARD SCHEDULES

E-802 PANELBOARD SCHEDULES

E-803 PANELBOARD SCHEDULES

E-804 PANELBOARD SCHEDULES

E-805 PANELBOARD SCHEDULES

E-806 PANELBOARD SCHEDULES

E-807 PANELBOARD SCHEDULES

E-808 PANELBOARD SCHEDULES

E-809 PANELBOARD SCHEDULES

E-810 PANELBOARD SCHEDULES

E-811 PANELBOARD SCHEDULES

E-812 PANELBOARD SCHEDULES

E-813 PANELBOARD SCHEDULES

TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

TS101 TELECOM SITE PLAN - LEE BARRACKS

TS102 BASE WIDE PA PARTIAL SITE PLAN

TS501 DETAILS - MAINTENANCE HOLE

TS502 SITE DETAILS

TD101 DEMOLITION SUB-BASEMENT, BASEMENT, FIRST FLOOR TELECOM PLANS

TD102 DEMOLITION SECOND THRU FIFTH FLOOR TELECOM PLANS

TD600 DEMOLITION ONE LINE DIAGRAM - VOICE AND DATA OSP

T-100S SUB-BASEMENT COMMUNICATIONS PLAN

T-100B BASEMENT COMMUNICATIONS PLAN

T-101 FIRST FLOOR COMMUNICATIONS PLAN

T-102 SECOND FLOOR COMMUNICATIONS PLAN

T-103 THIRD FLOOR COMMUNICATIONS PLAN

T-104 FOURTH FLOOR COMMUNICATIONS PLAN

T-105 FIFTH FLOOR COMMUNICATIONS PLAN

T-106 ROOF COMMUNICATIONS PLAN

T-201 RACK AND WALL ELEVATIONS

T-202 CABINET/RACK AND WALL ELEVATIONS

T-203 TELECOM ROOM CABINET/RACK WALL ELEVATIONS

T-401 ENLARGED TELECOM ROOMS - SUB-BASEMENT- SECOND FLOOR

T-402 ENLARGED TELECOM ROOMS - THIRD - FIFTH FLOOR

T-501 DETAILS - WALL OUTLET AND LABELING

T-502 DETAILS - FLOOR OUTLETS

T-503 PATHWAY DETAILS

T-600 VOICE AND DATA OSP ONE-LINE DIAGRAM

T-601 VOICE AND NIPR DATA ONE-LINE DIAGRAM

T-602 WREN AND WAP DATA ONE-LINE DIAGRAM

T-603 ECS, C-DAS, PA AND CLOCK ONE-LINE DIAGRAM

T-604 CHC DATA ONE-LINE DIAGRAM

SECURITY

TY100S SUB-BASEMENT SECURITY PLAN

TY100B BASEMENT SECURITY PLAN

TY101 FIRST FLOOR SECURITY PLAN

TY102 SECOND FLOOR SECURITY PLAN

TY103 THIRD FLOOR SECURITY PLAN

TY104 FOURTH FLOOR SECURITY PLAN

TY105 FIFTH FLOOR SECURITY PLAN

TY106 ROOF SECURITY PLAN

TY501 SECURITY DOOR DETAILS

TY502 SECURITY DETAILS

TY503 CHC SECURITY DETAILS

TY601 SECURITY ONE - LINE DIAGRAMS

DRAWING LIST - VOLUME 02

SHEET

NUMBER SHEET NAME

MH105 FIFTH FLOOR DUCTWORK PLAN

MH105A FIFTH FLOOR PLAN - DUCTWORK - AREA A

MH105B FIFTH FLOOR PLAN - DUCTWORK - AREA B

MH106 ROOF DUCTWORK PLAN

MH106A ROOF DUCTWORK PLAN - PART A

MH106B ROOF DUCTWORK PLAN - PART B

MP120S SUB-BASEMENT PIPING PLAN

MP120SA SUB-BASEMENT PIPING PLAN - PART A

MP120SB SUB-BASEMENT PIPING PLAN - PART B

MP120B BASEMENT PIPING PLAN

MP120BA BASEMENT PIPING PLAN - PART A

MP120BB BASEMENT PIPING PLAN - PART B

MP121 FIRST FLOOR PIPING PLAN

MP121A FIRST FLOOR PIPING PLAN - PART A

MP121B FIRST FLOOR PIPING PLAN - PART B

MP122 SECOND FLOOR PIPING PLAN

MP122A SECOND FLOOR PIPING PLAN - PART A

MP122B SECOND FLOOR PIPING PLAN - PART B

MP123 THIRD FLOOR PIPING PLAN

MP123A THIRD FLOOR PIPING PLAN - PART A

MP123B THIRD FLOOR PIPING PLAN - PART B

MP124 FOURTH FLOOR PIPING PLAN

MP124A FOURTH FLOOR PIPING PLAN - PART A

MP124B FOURTH FLOOR PIPING PLAN - PART B

MP125 FIFTH FLOOR PIPING PLAN

MP125A FIFTH FLOOR PIPING PLAN - PART A

MP125B FIFTH FLOOR PIPING PLAN - PART B

MP126 ROOF PIPING PLAN

MP126A ROOF PIPING PLAN - PART A

MP126B ROOF PIPING PLAN - PART B

MP127 STEAM VAULT F3 NEW WORK

MP128 STEAM VAULT F4 NEW WORK

MP129 STEAM VAULT F8 NEW WORK

M-301 BUILDING SECTIONS

M-302 BUILDING SECTIONS

M-401 ENLARGED PLANS

M-402 ENLARGED PLANS

M-403 ENLARGED PLANS

M-404 ENLARGED PLANS

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-503 HVAC DETAILS

M-504 HVAC DETAILS

M-505 HVAC DETAILS

M-506 HVAC DETAILS

M-507 HVAC DETAILS

M-601 EQUIPMENT SCHEDULE

M-602 EQUIPMENT SCHEDULE

M-603 EQUIPMENT SCHEDULE

M-604 EQUIPMENT SCHEDULE

M-651 FLOW DIAGRAM

M-652 FLOW DIAGRAM

M-653 FLOW DIAGRAM

M-654 FLOW DIAGRAM

M-655 FLOW DIAGRAM

M-656 FLOW DIAGRAM

M-657 FLOW DIAGRAM

M-658 FLOW DIAGRAM

M-701 CONTROLS

M-702 CONTROLS

M-703 CONTROLS

M-704 CONTROLS

M-705 CONTROLS

M-706 CONTROLS

M-707 CONTROLS

M-708 CONTROLS

M-709 CONTROLS

M-710 CONTROLS

M-711 CONTROLS

M-712 CONTROLS

M-713 CONTROLS

M-714 CONTROLS

M-715 CONTROLS

M-716 CONTROLS

M-717 CONTROLS

M-718 CONTROLS

M-719 CONTROLS

M-720 CONTROLS

M-721 CONTROLS

M-722 CONTROLS

M-723 CONTROLS

M-724 CONTROLS

M-725 CONTROLS

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS & DRAWING INDEX

E-002 ELECTRICAL GENERAL NOTES & SYMBOLS

E-003 ELECTRICAL GENERAL SYMBOLS & FEEDER SCHEDULE

ED010 DEMOLITION SITE POWER PLAN

ED100S DEMOLITION SUB-BASEMENT POWER PLAN

ED100B DEMOLITION BASEMENT POWER PLAN

ED101 DEMOLITION FIRST FLOOR POWER PLAN

ED102 DEMOLITION SECOND FLOOR POWER PLAN

ED103 DEMOLITION THIRD FLOOR POWER PLAN

ED104 DEMOLITION FOURTH FLOOR POWER PLAN

ED105 DEMOLITION FIFTH FLOOR POWER PLAN

ED106 DEMOLITION ROOF POWER PLAN

E-010 SITE POWER PLAN - NEW WORK

E-100S SUB-BASEMENT POWER PLAN

E-100B BASEMENT POWER PLAN

E-101 FIRST FLOOR POWER PLAN

DRAWING LIST - VOLUME 02

SHEET

NUMBER SHEET NAME

GENERAL

G-002A COVER SHEET - VOLUME TWO

G-002B DRAWING INDEX - VOLUME TWO

FIRE PROTECTION

F-001 FIRE PROTECTION GENERAL NOTES

FD100S DEMOLITION SUB-BASEMENT FIRE PROTECTION PLAN

FD100B DEMOLITION BASEMENT FIRE PROTECTION PLAN

FD101 DEMOLITION FIRST FLOOR FIRE PROTECTION PLAN

FD102 DEMOLITION SECOND THRU FIFTH FLOOR FIRE PROTECTION PLANS

F-100S SUB BASEMENT FIRE PROTECTION PLAN

F-100B BASEMENT FIRE PROTECTION PLAN

F-101 FIRST FLOOR FIRE PROTECTION PLAN

F-102 SECOND FLOOR FIRE PROTECTION PLAN

F-103 THIRD FLOOR FIRE PROTECTION PLAN

F-104 FOURTH FLOOR FIRE PROTECTION PLAN

F-105 FIFTH FLOOR FIRE PROTECTION PLAN

F-701 FIRE PROTECTION DETAILS

F-702 FIRE PUMP DETAILS

F-703 FIRE PROTECTION RISER

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES

FAD100S DEMOLITION SUB-BASEMENT FIRE ALARM PLAN

FAD100B DEMOLITION BASEMENT FIRE ALARM PLAN

FAD101 DEMOLITION FIRST FLOOR FIRE ALARM PLAN

FAD102 DEMOLITION SECOND THRU FIFTH FLOOR FIRE ALARM PLANS

FA100S SUB BASEMENT FIRE ALARM PLAN

FA100B BASEMENT FIRE ALARM PLAN

FA101 FIRST FLOOR FIRE ALARM PLAN

FA102 SECOND FLOOR FIRE ALARM PLAN

FA103 THIRD FLOOR FIRE ALARM PLAN

FA104 FOURTH FLOOR FIRE ALARM PLAN

FA105 FIFTH FLOOR FIRE ALARM PLAN

FA106 ROOF FIRE ALARM PLAN

FA701 FIRE ALARM DETAILS

FA702 FIRE ALARM RISER

PLUMBING

P-001 PLUMBING GENERAL NOTES

PD100S DEMOLITION SUB-BASEMENT PLUMBING PLAN

PD100B DEMOLITION BASEMENT PLUMBING PLAN

PD101 DEMOLITION FIRST FLOOR PLUMBING PLAN

PD102 DEMOLITION SECOND THRU FIFTH FLOOR PLUMBING PLANS

PD106 DEMOLITION ROOF PLUMBING PLAN

P-100S.D SUB BASEMENT DRAINAGE PLUMBING PLAN

P-100S.S SUB BASEMENT SERVICE PLUMBING PLAN

P-100B.D BASEMENT DRAINAGE PLUMBING PLAN

P-100B.S BASEMENT SERVICE PLUMBING PLAN

P-101 FIRST FLOOR PLUMBING PLAN

P-102 SECOND FLOOR PLUMBING PLAN

P-103 THIRD FLOOR PLUMBING PLAN

P-104 FOURTH FLOOR PLUMBING PLAN

P-105 FIFTH FLOOR PLUMBING PLAN

P-106 ROOF PLUMBING PLAN

P-400 ENLARGED PUMBING PLAN - PLUMBING ROOM SUB BASEMENT

P-401 ENLARGED PLUMBING PLAN-MEN'S & WOMEN'S RESTROOM - LEVEL 1

P-401.CD ENLARGED PLUMBING PLAN - MEN'S & WOMEN'S RESTROOM - CEILING DRAINAGE - LEVEL 1 P-402 ENLARGED PLUMBING PLANS - MEN'S & WOMEN'S RESTROOM-SECOND THRU FIFTH FLOORS P-402.CD ENLARGED PLUMBING PLANS - MEN'S AND WOMEN'S RESTROOM - CEILING DRAINAGE - LEVELS 2 THRU 4

P-500 PLUMBING DETAILS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-602 PLUMBING SCHEDULE

P-700 DOMESTIC WATER RISER DIAGRAM

P-700.1 DOMESTIC WATER RISER DIAGRAM

P-701 NATURAL GAS RISER DIAGRAM

P-702 SANITARY RISER DIAGRAM

P-702.1 SANITARY RISER DIAGRAM

P-703 STORM WATER RISER DIAGRAM

MECHANICAL

M-001 HVAC GENERAL NOTES

M-002 HVAC GENERAL NOTES

M-003 HVAC GENERAL NOTES

M-004 TEMPORARY MOBILE BOILER SITE PLAN

MD100S DEMOLITION SUB-BASEMENT MECHANICAL PLAN

MD100B DEMOLITION BASEMENT MECHANICAL PLAN

MD101 DEMOLITION FIRST FLOOR MECHANICAL PLAN

MD102 DEMOLITION SECOND FLOOR MECHANICAL PLAN

MD103 DEMOLITION THIRD FLOOR MECHANICAL PLAN

MD104 DEMOLITION FOURTH FLOOR MECHANICAL PLAN

MD105 DEMOLITION FIFTH FLOOR MECHANICAL PLAN

MD106 DEMOLITION ROOF MECHANICAL PLAN

MD107 DEMOLITION STEAM VAULT PIPING AND EQUIPMENT

MH100S SUB-BASEMENT DUCTWORK PLAN

MH100SA SUB-BASEMENT DUCTWORK PLAN - PART A

MH100SB SUB-BASEMENT DUCTWORK PLAN - PART B

MH100B BASEMENT DUCTWORK PLAN

MH100BA BASEMENT DUCTWORK PLAN - PART A

MH100BB BASEMENT DUCTWORK PLAN - PART B

MH101 FIRST FLOOR DUCTWORK PLAN

MH101A FIRST FLOOR DUCTWORK PLAN - PART A

MH101B FIRST FLOOR DUCTWORK PLAN - PART B

MH102 SECOND FLOOR DUCTWORK PLAN

MH102A SECOND FLOOR DUCTWORK PLAN - PART A

MH102B SECOND FLOOR DUCTWORK PLAN - PART B

MH103 THIRD FLOOR DUCTWORK PLAN

MH103A THIRD FLOOR DUCTWORK PLAN - PART A

MH103B THIRD FLOOR DUCTWORK PLAN - PART B

MH104 FOURTH FLOOR DUCTWORK PLAN

MH104A FOURTH FLOOR DUCTWORK PLAN - PART A

MH104B FOURTH FLOOR DUCTWORK PLAN - PART B

SHEET ID

U S

AR

M

Y C

O R

P S

O F

EN

G

IN

E

ER

S

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

K

ED

B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

JKJKEWEW

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/LB-81721A-18-CENTRAL.rvt

7/21/2021 2:35:02 PM

G-003B

SWING

D R

AW

IN

G

IN

D

EX

SW

IN

G

S

PA

C E

W

ES

T

PO

IN

T, N Y

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

E R

AL

P

LA

ZA

, N

EW

Y O

R K, N Y

J

U

LY

W

2D S1

7D

RTA SUBMISSION

LE

E

BA

R

R

AC

KS

W

2D S1

8F

PN

DRAWING LIST - VOLUME 03 - SWING SPACE

SHEET

NUMBER SHEET NAME

GENERAL

G-003A SWING SPACE COVER SHEET - VOLUME THREE

G-003B DRAWING INDEX - SWING SPACE

G-004 PERFORMANCE REQUIREMENTS

CIVIL

C-102_ BARBER AND BEAUTY SHOP SWING SPACE AREA PLAN

CS103_ PHASE I CONSTRUCTION EXHIBIT - BARBER AND BEAUTY SHOP SWING SPACE AREA

ARCHITECTURAL

A- 001 ABBREVIATIONS

A- 002 GENERAL SYMBOLS & NOTES

A- 003 MOUNTING HEIGHTS & CLEARANCES

AS101 SITE PLAN - SWING SPACE

A-110 FLOOR PLAN - SWING SPACE TRAILER

A-112 ROOF PLAN - SWING SPACE TRAILER

A-130 REFLECTED CEILING PLAN - SWING SPACE TRAILER

A-210 BUILDING ELEVATIONS - SWING SPACE TRAILER

A-310 BUILDING SECTION - SWING SPACE TRAILER

A-450 ENLARGED FLOOR PLANS - SWING SPACE TRAILER

A-460 ENLARGED ELEVATIONS - SWING SPACE TRAILER

A-620 DOOR, WINDOW, & EQUIPMENT SCHEDULES- SWING SPACE TRAILER

FIRE ALARM

FA101 FIRE ALARM PLAN - SWING SPACE - TRAILER

ELECTRICAL

E-110 POWER PLAN - SWING SPACE - TRAILER

E-450 ENLARGED FLOOR PLANS - SWING SPACE - TRAILER

E-650 ELECTRICAL ROOM POWER RISER DIAGRAM - SWING SPACE - TRAILER

TELECOMMUNICATIONS

TS110 TELECOM SITE PLAN - TRAILER

T-110 SWING SPACE TRAILER PLAN - COMMUNICATIONS

PERFORMANCE REQUIREMENTS FOR EACH ASSEMBLED

TRAILER (SWING SPACE) STRUCTURE

MECH:

THE SWING SPACE SHALL BE EQUIPPED WITH A BASIC

HVAC (HEATING, VENTILATING AND AIR-CONDITIONING)

SYSTEM WHICH SHALL BE CONSTRUCTED IN

ACCORDANCE WITH NYS MECHANICAL CODE.

THE SYSTEM SHALL BE CAPABLE OF MAINTAINING THE

FOLLOWING INDOOR CONDITIONS; 75 DEGREES F/50%

RH DURING THE COOLING SEASON AND 70 DEGREES F

DURING THE HEATING SEASON. NO HUMIDIFICATION

SHALL BE REQUIRED.

EACH SPACE SHALL BE VENTILATED IN ACCORDANCE

WITH NYS MECHANICAL CODE. OFFICE SPACE SHALL

BE 20 CFM OF OUTSIDE AIR PER PERSON. BATHROOMS

SHALL BE EXHAUSTED AT A RATE NOT LESS THAN 75

CFM PER WATER CLOSET/URINAL. BATHROOM

PRESSURIZATION SHALL BE NEGATIVE WITH RESPECT

TO THE TRAILER OCCUPIED AREAS.

ENSURE THAT THE INTERIOR OF THE TRAILER IS

POSITIVELY PRESSURIZED WITH RESPECT TO THE

OUTDOORS.

THERMAL ZONES SHALL ACCOMMODATE THE ACTUAL

SPACE LAYOUT (SEPARATE ZONES FOR INTERIOR AND

EXTERIOR SPACES) AND SHALL NOT EXCEED 900

SQUARE FEET PER ZONE.

FP/FA:

THE FIRE ALARM SYSTEM SHALL BE INSTALLED IN

ACCORDANCE WITH THE REQUIREMENTS OF UFC

3-600-01 AND NFPA 72. THE FIRE ALARM SYSTEM

SHALL MONITOR THE FIRE SPRINKLER SYSTEM AND

COMMUNICATE WITH THE RECEIVING STATION USING

AN APPROVED MONACO TRANSMITTER PANEL.

COORDINATE WITH USMA FIRE DEPARTMENT TO

DETERMINE FINAL SIGNAL PROTOCOL. AS

DISCUSSED WITH THE FIRE CHIEF, THE EXISTING

PANEL IN SPELLMAN HALL MAY BE USED FOR THE

SWING SPACE, AND MASS NOTIFICATION FEATURES

ARE NOT REQUIRED.

ELEC:

SEE ELECTRICAL DRAWINGS

PLUMB:

THE SWING SPACE SHALL BE EQUIPPED WITH A BASIC

PLUMBING (DOMESTIC WATER SERVICE, SANITARY)

SYSTEM WHICH SHALL BE CONSTRUCTED IN

ACCORDANCE WITH NYS PLUMBING CODE.

THE SYSTEM SHALL BE CAPABLE OF SUPPLYING

PLUMBING SERVICES TO MAINTAIN PLUMBING FIXTURES

IN SWING SPACE. ADEQUATE WATER PRESSURE SHALL

BE PROVIDED TO OPERATE PLUMBING FIXTURES INSIDE

SWING SPACE. DOMESTIC WATER CROSS CONNECTION

PROTECTION SHALL BE PROVIDED PER NYS PLUMBING

CODE AND HEALTH DEPT. STANDARDS. ISOLATION

VALVES SHALL BE FULL PORT BALL VALVE.

PIPING MATERIAL SHALL BE:

WATER SERVICE:

ABOVE GRADE: K COPPER

UNDERGROUND: K COPPER

SANITARY/VENT SERVICE:

ABOVE GRADE: CAST IRON SOIL PIPE

UNDERGROUND: REFER TO SITE/CIVIL DRAWINGS

REFER TO SITE/CIVIL FOR SANITARY, WATER SERVICE

AND RELATED EARTHWORK.

TRAILER MANF TO PROVIDE HOT WATER HEATER. HOT

WATER HEATER TO ELECTRIC, STORAGE TYPE HOT

WATER HEATER CAPABLE OF MEETING A MINIMUM FIRST

HOUR REQUIREMENT (COMBINED STORAGE AND

RECOVERY) OF 105 GALLONS.

TRAILER MANUFACTURE TO PROVIDE HEAT TRACE ON

DOMESTIC AND SANITARY LINES OUTSIDE THE TRAILER.

TRAILER MANUFATURE TO PROVIDE ELECTRICAL

OUTLET AT LOCATIOIN WHERE WATER LINES EXIT THE

TRAILER.

SINKS AT BARBER STATION TO BE KOHLER MODEL

#K-2867.

TELECOM:

DESIGN MUST PROVIDE COMPLETE TELEPHONE AND

DATA CABLE SYSTEMS FOR THE BUILDING ADDITION.

DESIGN WILL BE PROVIDED AND INSTALLED AS

DESCRIBED HEREIN AND IN ACCORDANCE WITH

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA),

ARMY I3A AND WEST POINT TELECOMMUNICATION

STANDARD.

OUTSIDE/INSIDE PLANT PATHWAY: FURNISH AND

INSTALL CONDUITS AS INDICATED TO AN EXISTING

COMMUNICATIONS MANHOLE MH5A.

OUTSIDE PLANT CABLES: FURNISH AND INSTALL (1)

12-PAIR, #24AWG, PE-89 COPPER CABLE AND (1)

6-STRAND, HIGH GRADE, OUTDOOR RATED,

SINGLE-MODE FIBER OPTIC CABLE WITH DIELECTRIC

STRENGTH MEMBERS FROM THE TRAILER TO B747 VIA

THE NEW/EXISTING UNDERGROUND CONDUITS SYSTEM.

THE UNDERGROUND CONDUIT SYSTEM IS

APPROXIMATE AND MUST BE VERIFIED PRIOR TO

INSTALLATION. THE SINGLE-MODE FIBER MUST MEET

GIGABIT ETHERNET AND 10 GIGABIT ETHERNET

PERFORMANCES.

FURNISH, INSTALL AND TERMINATE EACH 12-PAIR

COPPER CABLE ONTO 12-PAIR PROTECTED BUILDING

ENTRANCE TERMINAL (BET) FULLY POPULATED WITH

GAS TUBE PROTECTOR MODULES AT BOTH ENDS. THE

BET MUST BE EQUIPPED WITH 110 CONNECTOR INPUT

AND OUTPUT, INTERNAL SPLICE CHAMBER AND COVER.

RECOMMEND CIRCA MODEL #1880ECA1. THE

CONTRACTOR MUST STUB-OUT 12-PAIR CABLE TO 110

CROSS CONNECTING BLOCKS AFTER THE BUILDING

ENTRANCE TERMINALS AT BOTH ENDS. GROUNDING

AND BONDING MUST BE DONE IAW NFPA 70, NESC AND

MANUFACTURE PRACTICES.

FURNISH, INSTALL AND TERMINATE 12-STRAND FIBER

OPTIC CABLE AT BOTH ENDS USING 1U CORNING

CLOSET CONNECTOR HOUSING (CCH) PATCH PANEL

WITH COVER AND CCH ST PIGTAILED SPLICE

CASSETTES. FUSION SPLICE MUST BE USED IN THE

PATCH PANEL ASSEMBLY.FURNISH AND INSTALL (1)

STANDARD WALL MOUNTED 24 RU ALUMINUM

EQUIPMENT RACK WITH 19-INCH WIDE MOUNTING

SPACE AND ASSOCIATED HARDWARE IN TRAILER AS

INDICATED. PROVIDE (2) 120V, 20A, QUAD RECEPTACLES

AND (1) 120V, 20A 1U HORIZONTAL RACK MOUNT POWER

STRIP WITH 13 OUTLETS (1 FRONT/12 REAR).

INSIDE PLANT CABLES: FURNISH AND INSTALL

VOICE/DATA OUTLET BOXES IN THE TRAILERS EACH

OUTLET BOX MUST HAVE (3) PLENUM RATED 4-PAIR,

CATEGORY 6 UNSHIELDED TWISTED PAIR (UTP) CABLES

(1 VOICE AND 2 DATA). HOMERUN ALL VOICE AND DATA

CATEGORY 6 CABLES TO THE TELECOMMUNICATIONS

CABINET.

TERMINATE DATA CABLES ONE END ONTO A RJ-45

YELLOW INSERT MODULE IN THE FACEPLATE AT THE

WORKSTATION OUTLET. TERMINATE THE OTHER END

ONTO RACK MOUNTED UNLOADED PATCH PANEL WITH

YELLOW RJ-45 INSERT MODULE..

COLOR CODING OF TELECOMMUNICATIONS FOR

WIRING, OUTLETS AND PATCH PANEL WILL BE AS

FOLLOWS:

DATA - YELLOW

VOICE - GREEN

THE CONTRACTOR MUST CONDUCT ONE WAY OPTICAL

TIME DOMAIN REFLECTOMETER (OTDR) TRACE AT

1310NM AND 1550NM WAVELENGTH. THE CONTRACTOR

MUST PERFORM THE FOLLOWING TESTS ON 12-PAIR

COPPER CABLE:

a. OPENS/SHORTS

b. REVERSED PAIRS

c. CABLE LENGTH

d. INSERTION LOSS

e. NEAR-END CROSSTALK (NEXT) LOSS

f. EQUAL LEVEL FAR-END CROSSTALK (ELFEXT)

g. RETURN LOSS

PROVIDE ALL COPPER AND FIBER TEST RESULTS

(ELECTRONIC COPY) TO NETWORK ENTERPRISE

CENTER (NEC) AFTER THE PROJECT IS COMPLETED.

BUILDING COMPONENTS & GENERAL NOTES:

PROVIDE ALL NECESSARY COMPONENTS AND

SYSTEMS TO

CONFORM TO THE RFP/SOLICITATION, INCLUDING BUT

NOT LIMITED TO:

- PERIMETER FRAME W/ DETACHABLE HITCHES

- FLOOR JOISTS W/ R-19 INSULATION SIZE AS

REQUIRED TO SUPPORT LOADING ON SPANS.

- PLYWOOD DECKING W/ VINYL TILE COVERING

- 2" X 4" EXTERIOR WALL STUDS W/ R-13 INSULATION

- CEMENTITIOUS-PANEL SIDING

- VINYL COVERED GYPSUM INTERIOR WALLS

- SOLID CORE INT. DOORS

- COMMERCIAL STEEL EXT. DOORS W/ PANIC

HARDWARE

& VISION PANELS

- FIXED THERMALLY BROKEN ALUMINUM FRAMED

WINDOWS W/ MINI-BLINDS

- EPDM ROOF COVERING

- SUSPENDED CEILING W/ METAL GRID & LAY-IN

PANELS

- OUTLETS PER ELECTRICAL DRAWINGS

- TOGGLE TYPE SWITCHES

- ADA ½ BATHROOMS W/ POWERED VENT FANS

- EXTERIOR LIGHTING @ DOORS

- EXIT & EMERGENCY LIGHTING

- LAMINATE COUNTERTOP AND CABINETS

ALL NOTES HEREIN MENTIONED AND WITH THOSE ON

THE VARIOUS DRAWINGS SHALL APPLY TO ALL

DRAWINGS AND FORM PART OF THE CONSTRUCTION

CONTRACT.

ALL WORK SHALL CONFORM TO ALL APPLICABLE

FEDERAL, STATE AND LOCAL CODES AND

ORDINANCES HAVING JURISDICTION.

ANY AND ALL DEVIATION FROM THE CONTRACT

DOCUMENTS SHALL REQUIRE WRITTEN APPROVAL

FROM THE ARCHITECT AND OWNER PRIOR TO BEING

EXECUTED BY ANY SUB-CONTRACTOR, VENDOR OR

SUPPLIER.

DO NOT CUT AND/OR PATCH STRUCTURAL WORK IN

SUCH A MANNER RESULTING IN THE REDUCTION IN

LOAD CARRYING CAPACITY. PRIOR APPROVAL FROM

ENGINEER AND/OR ARCHITECT IS REQUIRED.

CONTRACTORS SHALL MAINTAIN PROPER RATINGS

WHEN PENETRATING WALLS, FLOORS AND/OR

CEILINGS IN ALL CIRCUMSTANCES.

COMPLY WITH MANUFACTURERS INSTALLATION

INSTRUCTIONS AND RECOMMENDATIONS TO THE

EXTENT THAT THEY ARE MORE STRINGENT THAN

REQUIREMENTS IN THE CONTRACT DOCUMENTS.

METHOD AND TYPE OF CONSTRUCTION MATERIALS

AND/OR EQUIPMENT SHALL CONFORM TO THE

REQUIREMENTS OF ALL GOVERNING AUTHORITIES.

EQUIPMENT MANUFACTURERS REQUIREMENTS MAY

CHANGE WITH CURRENT UPDATES OR

SUBSTITUTIONS, COORDINATION BY APPLICABLE

TRADES IS REQUIRED.

GYPSUM WALL BOARD IN ALL WET AREAS, IE TOILET

ROOMS, SHOWER

ROOMS, TUB ROOMS, SOILED UTILITY ROOMS,

JANITOR CLOSETS, KITCHENS ETC.,

SHALL BE WATER/MOLD/MOISTURE RESISTANT.

SUBSTITUTE CEMENTITIOUS BACKER BOARD AT ALL

AREAS HAVING CERAMIC TILE WALL FINISH.

CONTRACTOR SHALL FURNISH AND INSTALL ANGLES,

STRUTS, BRACKETS, TOGGLES, EYE BOLTS AND ALL

ACCESSORIES REQUIRED TO PROPERLY SUPPORT

BRACE AND/OR REINFORCE ALL FINISHED FRAMES

AND/OR EQUIPMENT ETC.

CONTRACTOR SHALL CLOSE ALL OPENINGS CREATED

BY MECHANICAL AND ELECTRICAL ETC.

INSTALLATIONS. OPENINGS SHALL BE CLOSED AND

FINISHED TO MATCH EXISTING.

TYPICAL INDICATES THE EXTENT OF WORK TO BE

EXECUTED AS THE SAME USE, LAYOUT,

CONSTRUCTION TYPE AND/OR METHOD.

ALL NEW PIPING AND ELECTRIC CONDUITS SHALL BE

CONCEALED WITHIN NEW PARTITIONS.

EXTERIOR AND INTERIOR TRAILER FINISHES

INCLUDING COLORS, PATTERNS AND FINISH MUST BE

SELECTED BY THE GOVERNMENT POST AWARD FROM

TRAILER MANUFACTURERS STANDARD OFFERING

AND INCLUDES BUT IS NOT LIMITED TO; EXTERIOR

WALLS, DOORS, SUSPENDED CEILING SYSTEM, WALL

FINISHES, FLOOR FINISHES AND WALL BASE. THE

TRAILER MFR MUST ALSO PROVIDED STANDARD

LAMINATE FACED CABINETRY & COUNTERTOP FOR

THE BREAKROOM WHICH THE GOVERNMENT WILL

SELECTED THE FINISHES PER MFR. OFFERING.

SPECIALTY MILLWORK FOR THE BARBER & BEAUTY

SHOP FUNCTIONS MUST BE PROVIDED BY THE

CONTRACTOR AS IDENTIFIED IN THESE DRAWINGS

AND IN THE FINISHES SPECIFIED ON THE DRAWINGS.

STRUCTURAL:

TRAILER MANUFACTURER AND CONTRACTOR REFER TO

S-001 FOR STRUCTURAL DESIGN CRITERIA.

ADDITIONALLY, TRAILER FLOOR FRAMING MUST MEETING

100PSF LIVE LOAD PER TABLE G-1 OF UFC 3-301-01.

TRAILER MANUFACTURER IS RESPONSIBLE FOR A SIGNED

SEALED STRUCTURAL CALCULATION AND DESIGN THAT

INCLUDES BUT NOT LIMITED TO - WIND LOAD, SEISMIC

LOAD, SNOW LOAD, SNOW DRIFT, ANCHORAGE,

STRAPPINGS, HOLD DOWNS, ETC.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

BIM 360://US-USACE-F5Y69202-Lee & Sherman Barracks Renovation/BS-81721A-18-CENTRAL.rvt

7/22/2021 8:30:31 AM

G-004

SWING

P E

R F

O R

M A

N C

E R

E Q

U

IR

E M

E N

T S

W E

S T

P O

IN

T

N

Y J K

A C

J K

J

U L Y

W D

S D

RTA SUBMISSION

C B

U P

L E

E B

A R

R A

C K

S

W D

S F

P N

S

D

S

D

SD

SD

SD

SD SD SD SD SD SD SD SD SD SD

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

SD

SD

SD

SD

SD

SD

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

COMM

COMM

COMM

COMM

COMM

COMM

C

O

M

M

C

O

M

M

COMM

COMM

COMM

COMM

COMM

SAN

SAN

SAN

SAN

G

G

G

G

G

G

G

G

G

G

G

G G

G

G G

G G

G

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

S A

N S

A N

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

W W W W W W W W W W W W

X X

X

X

D

D

CB

CB

S

S

SM

D

SM

C

E

S

X X X X X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X X

X X

X X

X X

X X

X

XXXX

E

E

E

T

W W

W W

W W

W W

W W

W W

W

W W W W W W W

CO

X X

X X

X X

X

X X

X

X

X

X

X

X

5.0'

N: 932182.9069

E: 640947.1583

N: 932182.3549

E: 641041.8280

N: 932182.4705

E: 641021.9959

N: 932182.8214

E: 640961.8303

31.5'±

4.0'

(FOR TRAILER

NORTH WALL

ALIGNMENT)

GRANITE CURB

BLDG 745C

PAVERS

GRANITE CURB

P

A

V

E

R

S

P A

V E

R S

MONUMENT

CLOCK

GRANITE CURB

BLDG 747

NININGER HALL

N

G

X

CO

E

S D x

S D x

S D x S

D x

SD

x

SD

x

X X

X

X

X X

X X

X X

X

X

X

X X

X

X X

X X

X X

X

N

1. COORDINATE WITH THE GOVERNMENT FOR

INSTALLATION AND REMOVAL OF BBSSS TRAILERS AND

OTHER IMPROVEMENTS AT THE COMPLETION OF LEE

BARRACKS CONSTRUCTION. UTILITY PRIVATIZATION

CONTRACTOR MUST REMOVE THE ABOVE GROUND

IMPROVEMENTS THAT THEY INSTALLED AND RESTORE

THE AREA. BELOW GRADE IMPROVEMENTS CAN

REMAIN.

1. BARBER AND BEAUTY SHOP SWING SPACE (BBSSS)

TRAILERS.

2. ELECTRIC SERVICE CONNECTION FROM TRANSFORMER

TO (2) UNI-STRUT MOUNTED SWITCHES/BBSSS

TRAILERS (SEE ELECTRICAL PLANS).

3. ELECTRICAL SERVICE EXTENSION FROM EXISTING

ELECTRIC MH TO TRANSFORMER/CONCRETE PAD.

4. 4" WATER SERVICE EXTENSION, VALVE AND STUB.

5. 6" SANITARY SEWER SERVICE EXTENSION AND

CLEAN-OUT.

6. TYPICAL 6' HIGH TEMPORARY CONSTRUCTION FENCE

(C-504/E4)

COORDINATE WITH GOVERNMENT AND ADJUST FENCE

LOCATION TO AVOID CONFLICT WITH BRADLEY

CONSTRUCTION FENCE GATE

(TO BE REMOVED UPON COMPLETION OF SWING SPACE

FIT-OUT).

7. TYPICAL TEMPORARY CONSTRUCTION FENCE (TO

REMAIN UPON COMPLETION OF SWING SPACE FIT-OUT

AND REMOVED WHEN TRAILERS ARE REMOVED)

(C-502/D5).

8. TYPICAL 6' HIGH, TEMPORARY CONSTRUCTION, 12'

WIDE DOUBLE SWING GATE (TO BE REMOVED UPON

COMPLETION OF SWING SPACE FIT-OUT).

9. TYPICAL TEMPORARY CONSTRUCTION, 6' WIDE DOUBLE

SWING GATE (TO REMAIN AND HAVE SLATS REMOVED

UPON COMPLETION OF SWING SPACE FIT-OUT)

(C-502/E8).

10. EXISTING BRADLEY BARRACKS CONSTRUCTION

FENCING (TO REMAIN).

11. COMMUNICATION CONDUITS, (SEE TELECOM PLANS)

12. WATER SERVICE CONNECTION WITH FREEZE

PROTECTION FROM STUB TO TRAILER.

13. SANITARY SEWER CONNECTION FROM CLEAN-OUT TO

TRAILER.

14. AFTER REMOVAL OF BBSSS TRAILERS, MILL EXISTING

PAVEMENT 1

" AND REPAVE WITH NYSDOT HMA

12.5M64 SURFACE COURSE, 1

" THICK. LIMITS MUST BE

A MINIMUM OF 18" BEYOND THE TEMPORARY

CONSTRUCTION FENCE AND AS DEPICTED. 11,000 SF +/-

J C

D P

J K

B A

R B

E R

A

N

B

A

U T

Y

S

H O

P

S

W I N

G

S

P A

C

E

A

P

L A

N

C I V

I L

C-102

N

D A

T E

M A

R K

D E

S C

R I P

T I O

N

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

T

O

S O

L I C

I T

A T

I O

N

N

O

SHEET ID

W D

S F

U S

A

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

US Army Corps of Engineers

N E

W

Y

O R

K

D

I S

T R

I C

T

F

E D

E R

A L

P

L A

Z A

N

W

Y

R

K

N

Y

W D

S D

J U

L

A N

S I

D

W E

I N

T

N

Y

C B

U

E

B

A R

R A

C K

RTA SUBMISSION

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

LEE

A7

SCALE: 1"=40'

A1

BARBER AND BEAUTY SHOP SWING SPACE (BBSSS) SITE IMPROVEMENT PLAN

SCALE: 1"=10'

N

0 10' 20' 40' 80'0

BLDG 745C

BLDG 745 A&B

BLDG 745 A&B

B L D

G

A

B

BLDG 756

BRADLEY BARRACKS

BLDG 756

BRADLEY BARRACKS

BREWERTON ROAD

BLDG 751

PERSHING BKS

BLDG 751

PERSHING BKS

BLDG 747

NININGER HALL

BARBER AND BEAUTY

SHOP SWING SPACE

LOCATION

SHEET KEYNOTES

CURRENT EXISTING CONDITIONS PLAN

BARBER AND BEAUTY SHOP SWING SPACE AREA

SWING

GENERAL SHEET NOTES

AutoCAD SHX Text

GV

V E

R S

C

SITE BENCHMARK

"X" ON BOLT ON HYDRANT

ELEV=162.30'

WH

G

SITE BENCHMARK

"X" ON BOLT ON HYDRANT

ELEV=158.01'

X X

X

STEPS

P L

A N

T E

R

STEPS

S T

E P

S

PAVERS

SALLY PORT

CONCRETE

STEPS

CONCRETE

DUMPSTER

PAVERS

MONUMENT

CLOCK

CONCRETE

PORCH

CONCRETE

BREWERTON ROAD

CONCRETE WALK

CONCRETE WALK

C O

N C

R E

L

K

PLANTER

BLDG 756

BRADLEY BARRACKS

BLDG 756

BRADLEY BARRACKS

BLDG 747

NININGER HALL

BLDG 745C

BLDG 745 A&B

BLDG 745 A&B

B L

G

B

CONCRETE CURB & GUTTER

CONCRETE WALK

C O

N C

R E

T E

R

A

M

P

R

A

M

P

DOCK

CURB CUT

X

X

C

U

T

METAL

PLATE

P A

V E

M E

N T

PAVEMENT

C

O

N

C

R

E

T

E

GRANITE CURB

PAVERS

Pavers

NEW

OLD

GRANITE CURB

GRANITE CURB

P

A

V

E

R

S

SM

D

SM

SM

D

D

D

D

CB

D

CB

CO

D

D

SM

SM

S

S

SM

SM

SM

S

CB

S

S

S

CB

D

CB

S

S

S

D

D

D

S

D

D

D

D

CB

CB

S

CB

S

SM

D

SM

S

D

CB

SM

SM

SM

S

D

CB

S

D

SM

CB

S

S

D

C

BIKE RACK

E

E

S

SM

CB

SM

X

X

X X

Fence

Enclosure with

Gate

T R

E N

C H

D R

A I N

CONCRETE CURB & GUTTER

C

O

N

C

R

E

G

T

T

E

R

CONCRETE CURB & GUTTER

S D x

S D x

S D x S

D x

SD

x

SD

x

BLDG 751

PERSHING BKS

BLDG 751

PERSHING BKS

X X

X X

X X

X X

C

B

D

CB

D

CB

D

S

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X X X X

X

X

X X

X X

X X

X X

X X

X X

X X

X

X

X X

XX

T

W W

W W

W W

W W W

CO

X X

X

X

X

X

X

PHASE I-A, TEMPORARY

CONSTRUCTION FENCE BY

CLP FOR UTILITY

INSTALLATION. REMOVE

UPON COMPLETION OF

UTILITY INSTALLATION

X

X X

X

X

X

X X

PHASE I-A, CIRCULATION

ROUTE

PHASE I-B, TYPICAL

TEMPORARY 6' HIGH

CONSTRUCTION FENCE FOR

BARBER AND BEAUTY SHOP

TEMPORARY SWING SPACE

(C-504/E4)

XX

X X

X X

X

X

X

X

X

PAVEMENT MILL AND

OVERLAY AREA AFTER

BBSSS TRAILERS ARE

REMOVED

12' WIDE TYPICAL 6'

HIGH TEMPORARY

CONSTRUCTION

FENCE GATE

TYPICAL TEMPORARY 6'

HIGH CONSTRUCTION

FENCE (C-504/E4)

TYPICAL TEMPORARY

CONSTRUCTION FENCE

(C-502/D5)

N

1. THE USACE TRAILERS MUST BE INSTALLED DURING

PHASE I. SEE DRAWING CS104 FOR LOCATION OF

USACE TRAILERS.

2. ALL TEMPORARY CONSTRUCTION FENCE SINGLE AND

DOUBLE SWING GATES MUST BE PROVIDED WITH

DOUBLE LOCK WITH INTERLOCKING KEYED SYSTEM.

3. PHASE I MUST BE COMPLETE PRIOR TO ANY

DEMOLITION IN LEE BARRACKS.

4. COMPLETE THE FOLLOWING PHASE I IMPROVEMENTS

PRIOR TO PROCEEDING TO PHASE II:

A. BBSSS TRAILER INSTALLATION.

B. ALL UTILITY CONNECTIONS.

C. RELOCATION OF THE EQUIPMENT/FURNISHINGS

REQUIRED FROM LEE BARRACKS TO THE BBSSS

TRAILERS (SEE SHEET AD100SA). PROVIDE 14

DAYS WRITTEN NOTICE TO GOVERNMENT PRIOR

TO EQUIPMENT/FURNISHINGS RELOCATION.

5. SEE LEE BARRACKS DRAWING C-102 FOR ADDITIONAL

CONSTRUCTION RELATED INFORMATION.

LEE AND SHERMAN BARRACKS

PHASE I CONSTRUCTION

BARBER & BEAUTY SHOP SWING

SPACE TRAILERS

J C

D P

J K

B A

R B

A

U T

Y

S

H O

P

S

W I N

G

S

P A

H A

I

O N

S T

R U

C T

I O

N

E

X H

I B

I T

C I V

I L

CS103

N

D A

T E

M A

R K

D E

S C

R I P

T I O

N

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

I S

S U

E

D

A T

E

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

SHEET ID

W D

S F

U S

A

R M

Y

C

O R

F

E

N G

I N

E E

R S

US Army Corps of Engineers

N E

W

Y

O R

K

D

I S

T R

I C

T

F

E D

E R

A L

P

L A

Z A

N

R

K

N

Y

W D

S D

J U

A N

S I

D

W E

I N

T

N

Y

C B

E

B

A R

R A

C K

RTA SUBMISSION

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

LEE

20' 40'0

A1

PHASE I CONSTRUCTION EXHIBIT - BARBER AND BEAUTY SHOP SWING SPACE AREA

SCALE: 1"=20'

GENERAL SHEET NOTES

SWING

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

DRAWING ABBREVIATIONS

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ABRSV ABRASIVE

ABV ABOVE

ACC ACCESSIBLE

ACIP ARCHITECTURAL CAST IN PLACE CONCRETE

ACOUS ACOUSTIC(AL)

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADH ADHESIVE

ADJ ADJACENT

ADJU ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APCONC ARCHITECTURAL PRECAST CONCRETE

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT(URAL)

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVB AIR & VAPOR BARRIER

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABEL CLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BG BUMPER GUARD

BHMA BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BITUM BITUMINOUS

BKR BACKER

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BLT IN BUILT-IN

BLW BELOW

BM BEAM

BMK BENCHMARK

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BR BEDROOM

BRCG BRACING

BRG BEARING

BRK BRICK

BRKT BRACKET

BS BOTH SIDES

BSMT BASEMENT

BSPL BACKSPLASH

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CATW CATWALK

CAV CAVITY

CB CATCH BASIN

CBB CEMENTITIOUS (BACKER) BOARD

CBO CONTROL BOX

CBP COMPOSITE BUILDING PANEL

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CFCI CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR CLEAR

CLRM CLASSROOM

CMPTR COMPUTER

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONSTR CONSTRUCTION

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPRS COMPRESSIBLE

CPT CARPET

CR CONTROL ROOM

CRA CRASH RAIL

CS CAST STONE

CSK COUNTER SUNK

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CUB CUBICLE

CUH CABINET UNIT HEATER

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABEL CLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DMPF DAMPROOFING

DN DOWN

DO DITTO

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWL DOWEL

DWR DRAWER

DWTR DUMBWAITER

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMBMT EMBEDMENT

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER(ING)

ENTR ENTRANCE

EP ELECTRICAL PANEL(BOARD)

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQUIP EQUIPMENT

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXP EXPANSION

EXP BT EXPANSION BOLT

EXST EXISTING

EXT EXTERIOR

EXT GR EXTERIOR GRADE

EXTR EXTRUDED

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGB FIBERGLASS FACED SILICONE TREATED GYPSUM

CORE SHEATHING BOARD

FGL FIBERGLASS

FH FLAT HEAD

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOW FACE OF WALL

FP FIRE PROTECTION

FPRF FIREPROOF(ED)(ING)

FR FRAME

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSFG FIRE SAFING

FSP FIRE STANDPIPE

FSTNR FASTENER

FT FEET(FOOT)

FTG FOOTING

FTR FINNED TUBE RADIATION

FURG FURRING

FURN FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED INSTALLED BY

GOVERNMENT

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GL GLASS

GLZ GLAZING

GR FL GROUND FLOOR

GRL GRILLE

GRTG GRATING

GSF GROSS SQUARE FEET

GSKT GASKET

GUT GUTTER

GWB GYPSUM WALLBOARD

GYP GYPSUM

GYP PLAS GYPSUM PLASTER

H ---------------------

H HIGH

HB HOSE BIBB

HC HANDICAPPED

HCT HANDICAPPED ACCESSIBLE TOILET

HDBD HARDBOARD

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HFS HALF FULL SIZE

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HNDRL HANDRAIL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IF INSIDE FACE

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

INV INVERT

J ---------------------

JAN JANITOR

J-BOX JUNCTION BOX

JCT JUNCTION

JST JOIST

JT JOINT

K ---------------------

KPD KEYPAD

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ---------------------

LAB LABORATORY

LAM LAMINATE(D)(ION)

LAT TIE LATERAL TIEBACK FOR APC PANEL

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LOC LOCATION

LP LIGHTPROOF

LPT LOW POINT

LT LIGHT

LTG LIGHTING

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH MACHINE

MACH RM MACHINE ROOM

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MBR MEMBER

MC MOISTURE CONTENT

MD METAL DECK

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MEZZ MEZZANINE

MF MILL FINISH

MFR MANUFACTURER

MH MANHOLE

MID MIDDLE

MIFRC MASTIC INTUMESCENT FIRE RESISTIVE COATING

MIL STD MILITARY STANDARD

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MJ MOVEMENT JOINT (IN MASONRY)

MLDG MOLDING (MOULDING)

MLWK MILLWORK

MO MASONRY OPENING

MOD MODIFY

MSCW METAL STUD CURTAIN WALL

MB MOISTURE BARRIER

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MVBL MOVABLE

MWF MEMBRANE WALL FLASHING

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NF NEAR FACE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NS NEAR SIDE

NSF NET SQUARE FEET

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARALLEL

PASS PASSENGER

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PED PEDESTAL

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTIC

PLAT PLATFORM

PLBG PLUMBING

PLG PILING

PLK PLANK

PLYWD PLYWOOD

PNEU PNEUMATIC

PNL PANEL

PNT PAINT

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PRELIM PRELIMINARY

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

R RISER

RAF RAISED ACCESS FLOOR

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOMRECREATION ROOM

RECPT RECEPTACLE

RECT RECTANGULAR

REF REFERENCE

REFR REFRIGERATION

REG REGISTER

REINF REINFORCE(D)(ING)(MENT)

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RET RETURN

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RJ RUSTICATION JOINT

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

RWC RAIN WATER CONDUCTOR

S --------------------

SAFB SOUND ATTENUATION FIRE BLANKET

SAN SANITARY

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SECT SECTION

SF SQUARE FOOT (FEET)

SFRM SPRAYED FIRE-RESISTANT MATERIAL

SFTWD SOFTWOOD

SGL SINGLE

SHR SHOWER

SHT SHEET(ING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SL SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SPF SPRAY FOAM

SPFI SPRAY POLYURETHANE FOAM INSULATION

SPKR SPEAKER

SPR SPRINKLER

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SERVICE SINK

SST STAINLESS STEEL

SSUR SOLID SURFACING

ST STAIRS

STA STATION

STAG STAGGERED

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL STEEL

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SUPT SUPPORT

SURF SURFACE

SUSP SUSPEND

SV SHEET VINYL

SW SIDEWALK

SYM SYMBOL

SYS SYSTEM

T --------------------

T TREAD

T&G TONGUE AND GROOVE

T/S TUB/SHOWER

TA TOILET ACCESSORIES

TB TOWEL BAR

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOB TOP OF BEAM

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF STEEL

TOSL TOP OF SLAB

TOW…