Attachment 27f- CH50091-2P Attachment 5b Conceptual Construction Plans I-.pdf

PDF 151 KB Posted

Attached to
Fort Gordon MATOC IDIQ for Minor Construction, Repair and Alteration
Solicitation number
W9124920R0020
Issued by

About this file

This document contains a solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for minor construction, repair, and alteration services at Fort Gordon, Georgia. The solicitation was released by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis for construction services including site visits scheduled for July 28-29, 2020 with a maximum of two people per company. Offerors must attend one of the dates assigned by the Government. The solicitation closes on August 14, 2020 at 3:00 PM Eastern Time.

View the file

Other files

File Type Posted
ATTACHMENT 38 - CONTRACTOR SUBMITTED QUESTIONS AND GOVERNMENT PROVIDED ANSWERS LAST ROUND OF QUESTIONS.pdf PDF
ATTACHMENT 39 - Consolidated Copy of Solicitation through Amendment 5.pdf PDF
W9124920R0020 AMENDMENT 0006.pdf PDF
Attachment 24- CH50091-2P Attachment 4 Experience Information.doc DOC document
Attachment 27b- CH50091-2P Attachment 5b Conceptual Construction Plans AD.pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW 20Aug20_.pdf PDF
Attachment 25 -CH50091-2P Attachment 5a Conceptual Design Analysis 20Aug....pdf PDF
Attachment 27g- CH50091-2P Attachment 5b Conceptual Construction Plans LS.pdf PDF
Attachment 26-CH50091-2P Attachment 5a Design Analysis 20Aug20.docx DOCX document
Attachment 27e- CH50091-2P Attachment 5b Conceptual Construction Plans I.pdf PDF
Attachment 11- Scope of Work_MATOC 17Aug20.pdf PDF
W9124920R0020 AMENDMENT 0005.pdf PDF
Attachment 27h- CH50091-2P Attachment 5b Conceptual Construction Plans M- (2).pdf PDF
Attachment 27c- CH50091-2P Attachment 5b Conceptual Construction Plans EP.pdf PDF
Attachment 27d- CH50091-2P Attachment 5b Conceptual Construction Plans FA.pdf PDF
Attachment 27i- CH50091-2P Attachment 5b Conceptual Construction Plans M-.pdf PDF
Attachment 36 - MATOC_Contractor Questions and Answers_FINAL.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 37 - Site Visit sign in_Redacted.pdf PDF
Attachment 27a- CH50091-2P Attachment 5b Conceptual Construction Plans A.pdf PDF
Attachment 21- CH50091-2P Attachment 1 Task Order Price Schedule Rev1.docx DOCX document
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
W9124920R0020 AMENDMENT 0004.pdf PDF
W9124920R0020 AMENDMENT 0003.pdf PDF
W9124920R0020 AMENDMENT 0002.pdf PDF
Attachment 17 - Past Performance Cover Letter and Assessment Questionnair-REV1.docx DOCX document
W9124920R0020 AMENDMENT 0001.pdf PDF
Attachment 5- Division 01 Specifications_MATOC 10Jun20.pdf PDF
Attachment 16- Example of Package 1.pdf PDF
Attachment 2-Davis-Bacon Act WD GA20200153 Building - Richmond County GA.pdf PDF
Attachment 4-01 33 00 attachment SF1413-13e.pdf PDF
Attachment 6- MATOC QA Plan with Appendices_10Jun20.pdf PDF
Attachment 8- FG Installation Planning Standards_PreFinal 061319.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 29- Draft RTOP Letter.pdf PDF
Attachment 25- CH50091-2P Attachment 5a Conceptual Design Analysis.pdf PDF
Attachment 1-Davis-Bacon Act WD GA20200275 Highway Georgia.pdf PDF
Attachment 3-01 08 00 Weighted Guidelines.xls XLS spreadsheet
Attachment 11- Scope of Work_MATOC 12Jun20.pdf PDF
Attachment 28- CH50091-2P Attachment 6 As-builts.pdf PDF
Attachment 12- Submital Register.pdf PDF
Attachment 10- Pre-Construction Safety Brief (Updated 2020).pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW Rev1.pdf PDF
Attachment 7- FG Storm Water Permitting Requirements.pdf PDF
Attachment 14- ufc_3_740_05_2010_c1 Construction Cost Est.pdf PDF
Attachment 27- CH50091-2P Attachment 5b Conceptual Construction Plans.pdf PDF
Attachment 19 - Consent Form for the Release of Past Performance.docx DOCX document
Attachment 18 - Specific Relevant Contract Reference Sheets.docx DOCX document
W9124920R0020 FORT GORDON MATOC.pdf PDF
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINISH SCHEDULE

ROOM NO. ROOM NAME FLOORING WALL BASE WALL FINISH CEILING MAT CASEWORK/

MILLWORK MISC. REMARKS

North South East West

101 FELLOWSHIP

HALL

VCT1/VCT2

/ VCT3 RB1 P1 P1 P1 P1 ACT1 SEE I-701 FOR

PATTERN

102 BREAKROOM L1/L2 RB1 P1 P1 P1 P1 ACT1 PL1/Q1 SEE I-701 FOR

PATTERN

103 MECHANICAL

ROOM SC RB1 P1 P1 P1 P1 ACT1

104 STORAGE

ROOM SC RB1 P1 P1 P1 P1 ACT1

105 COMM

CLOSET SC RB1 P1 P1 P1 P1 ACT1

106 JANITOR

CLOSET SC RB1 P1 P1 P1 P1 ACT1

107 CORRIDOR VCT1/VCT2 RB1 P1 P1 P1 P1 ACT1 SEE I-701 FOR

PATTERN

108 CORRIDOR VCT1/VCT2

/ VCT3 RB1 P1 P1 P1 P1 ACT1 SEE I-701 FOR

PATTERN

109 CORRIDOR VCT1/VCT2 RB1 P1 P1 P1 P1 ACT1 SEE I-701 FOR

PATTERN

110 MEN'S

RESTROOM CT1 RB1 P4 P1 CTW1 CTW1 P2 SS1 TP1

111 WOMEN'S

RESTROOM CT1 RB1 P4 P1 CTW1 CTW1 P2 SS1 TP1

112 OFFICE CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

113 OFFICE CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

114 OFFICE CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

115 BLESSED

SACRAMENT CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

116 OFFICE CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

117 SACRISTY CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

118 VESTIBULE VCT1/ VCT3 RB1 N/A N/A N/A N/A N/A N/A N/A SEE I-701 FOR

PATTERN

119 SANCTUARY CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

120 CHANCEL CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

121 NAVE CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

122 NARTHEX CPT-1 RB1 N/A N/A N/A N/A N/A N/A N/A

SHEPERD CHAPEL INTERIOR FINISH LEGEND

MATERIAL CODE MFR SPECIFICATIONS NOTES

FLOORING

VINYL

COMPOSITE TILE VCT1

ARMSTRONG

DIAMOND 10 TECH. #:

Z9238 (SAFARI TAN)

VINYL

COMPOSITE TILE VCT2

ARMSTRONG

DIAMOND 10 TECH. #:

H5307 (ROCK DUST

LIGHT)

VINYL

COMPOSITE TILE VCT3

ARMSTRONG

DIAMOND 10 TECH. #:

Z1858 (SANDRIFT

WHITE)

CARPET/WALK-

OFF MAT

C3 KADEE

INDUSTRIES.

MATCLEAN TREAD

MODEL #: KDCM,

KDVM.

CERAMIC/

PORCELAN TILE

CT1

MOSA

TERRA MAESTICHT.

#201 (WHITE) 24”X24”

SEALED

CONCRETE SC BENJAMIN

MOORE #:M43-M44

GROUT - DOR TO SELECT COMPLIMENT TILE

CARPET CPT-1 MOHAWK

BLUE (MATCH

REPLACED COLOR)

WALL BASE:

RUBBER BASE

RB1 ROPPE

RUBBER COVE BASE

4"HIGH & LENGTHS

OF 120' "THICK ,

COLOR:#140 FAWN"

CERAMIC TILE

BASE

CTB1

MOSA

TERRA MAESTICHT.

PORCELAIN

BULLNOSE TILE BASE

#201 (WHITE) 4”X24”

WALL FINISHES:

PAINT P1 SHERWIN

WILLIAMS

COLOR:#SW7512 "

PAVILLION BAGE"

TYPICAL

PAINT

PAINT

P2 SHERWIN

WILLIAMS

EGGSHELL.

COLOR #: SW

6098(PACER WHITE)

TYPICAL

CEILING/

SOFIT PAINT

PAINT

P4 SHERWIN

WILLIAMS

COLOR:#SW7153"

SANDERLING

ENAMEL"

METAL

DOOR/

WINDOW

TRIM

PAINT

EPT1 SHERWIN

WILLIAMS

COLOR:#SW7512 "

PAVILLION BAGE"

EPOXY PAINT-

TYP

RESTROOM

CERAMIC/

PORCELAN TILE

CTW1 MOSA

TERRA MAESTICHT.

#200 (PORCELAIN

WHITE) 12”X24”

TYPICAL

WALL TILE

CEILINGS:

ACOUSTICAL

CEILINGS

ACT1 ARMSTRONG OPTIMA LAY-IN AND

TEGULAR. 15/16 GRID.

24”X24”x3/4” THICK.

MISCELLANEUS

FINISHES:

SOLID SURFACE

SS1

CORIAN

TYP RESTROOM

COUNTER AND

WINDOW STOOLS AT

NEW WIDOWS

SOLID SURFACE Q1 ZODIAQ KITCHEN COUNTER

PLASTIC

LAMINATE PL1 NEVEMAR

RESTROOM

PARTITIONS TPL1 SCRANTON

PRODUCTS

TYP. RESTROOM

PARTITION

SHEPERD CHAPEL INTERIOR FINISH LEGEND

MATERIAL CODE MFR SPECIFICATIONS NOTES

FLOORING

VINYL

COMPOSITE TILE VCT1

ARMSTRONG

DIAMOND 10 TECH. #:

Z9238 (SAFARI TAN)

VINYL

COMPOSITE TILE VCT2

ARMSTRONG

DIAMOND 10 TECH. #:

H5307 (ROCK DUST

LIGHT)

VINYL

COMPOSITE TILE VCT3

ARMSTRONG

DIAMOND 10 TECH. #:

Z1858 (SANDRIFT

WHITE)

CARPET/WALK-

OFF MAT

C3 KADEE

INDUSTRIES.

MATCLEAN TREAD

MODEL #: KDCM,

KDVM.

CERAMIC/

PORCELAN TILE

CT1

MOSA

TERRA MAESTICHT.

#201 (WHITE) 24”X24”

SEALED

CONCRETE SC BENJAMIN

MOORE #:M43-M44

GROUT - DOR TO SELECT COMPLIMENT TILE

CARPET CPT-1 MOHAWK

BLUE (MATCH

REPLACED COLOR)

WALL BASE:

RUBBER BASE

RB1 ROPPE

RUBBER COVE BASE

4"HIGH & LENGTHS

OF 120' "THICK ,

COLOR:#140 FAWN"

CERAMIC TILE

BASE

CTB1

MOSA

TERRA MAESTICHT.

PORCELAIN

BULLNOSE TILE BASE

#201 (WHITE) 4”X24”

WALL FINISHES:

PAINT P1 SHERWIN

WILLIAMS

COLOR:#SW7512 "

PAVILLION BAGE"

TYPICAL

PAINT

PAINT

P2 SHERWIN

WILLIAMS

EGGSHELL.

COLOR #: SW

6098(PACER WHITE)

TYPICAL

CEILING/

SOFIT PAINT

PAINT

P4 SHERWIN

WILLIAMS

COLOR:#SW7153"

SANDERLING

ENAMEL"

METAL

DOOR/

WINDOW

TRIM

PAINT

EPT1 SHERWIN

WILLIAMS

COLOR:#SW7512 "

PAVILLION BAGE"

EPOXY PAINT-

TYP

RESTROOM

CERAMIC/

PORCELAN TILE

CTW1 MOSA

TERRA MAESTICHT.

#200 (PORCELAIN

WHITE) 12”X24”

TYPICAL

WALL TILE

CEILINGS:

ACOUSTICAL

CEILINGS

ACT1 ARMSTRONG OPTIMA LAY-IN AND

TEGULAR. 15/16 GRID.

24”X24”x3/4” THICK.

MISCELLANEUS

FINISHES:

SOLID SURFACE

SS1

CORIAN

TYP RESTROOM

COUNTER AND

WINDOW STOOLS AT

NEW WIDOWS

SOLID SURFACE Q1 ZODIAQ KITCHEN COUNTER

PLASTIC

LAMINATE PL1 NEVEMAR

RESTROOM

PARTITIONS TPL1 SCRANTON

PRODUCTS

TYP. RESTROOM

PARTITION

File details come from the government source that posted it. Updated .