Attachment 7- FG Storm Water Permitting Requirements.pdf

PDF 3 MB Posted

Attached to
Fort Gordon MATOC IDIQ for Minor Construction, Repair and Alteration
Solicitation number
W9124920R0020
Issued by

About this file

This is a solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for minor construction, repair and alteration projects at Fort Gordon, Georgia. The solicitation seeks to award multiple IDIQ contracts to complete task orders for projects up to $5 million over a five-year period. Site visits are scheduled for July 28-29, 2020 with a maximum of two people per offeror and assignments by the government. The solicitation closes on August 14, 2020 at 3:00 PM Eastern Time. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis is the contracting agency.

View the file

Other files

File Type Posted
ATTACHMENT 38 - CONTRACTOR SUBMITTED QUESTIONS AND GOVERNMENT PROVIDED ANSWERS LAST ROUND OF QUESTIONS.pdf PDF
ATTACHMENT 39 - Consolidated Copy of Solicitation through Amendment 5.pdf PDF
W9124920R0020 AMENDMENT 0006.pdf PDF
Attachment 24- CH50091-2P Attachment 4 Experience Information.doc DOC document
Attachment 27b- CH50091-2P Attachment 5b Conceptual Construction Plans AD.pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW 20Aug20_.pdf PDF
Attachment 25 -CH50091-2P Attachment 5a Conceptual Design Analysis 20Aug....pdf PDF
Attachment 27g- CH50091-2P Attachment 5b Conceptual Construction Plans LS.pdf PDF
Attachment 26-CH50091-2P Attachment 5a Design Analysis 20Aug20.docx DOCX document
Attachment 27e- CH50091-2P Attachment 5b Conceptual Construction Plans I.pdf PDF
Attachment 11- Scope of Work_MATOC 17Aug20.pdf PDF
W9124920R0020 AMENDMENT 0005.pdf PDF
Attachment 27h- CH50091-2P Attachment 5b Conceptual Construction Plans M- (2).pdf PDF
Attachment 27c- CH50091-2P Attachment 5b Conceptual Construction Plans EP.pdf PDF
Attachment 27d- CH50091-2P Attachment 5b Conceptual Construction Plans FA.pdf PDF
Attachment 27i- CH50091-2P Attachment 5b Conceptual Construction Plans M-.pdf PDF
Attachment 36 - MATOC_Contractor Questions and Answers_FINAL.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 27f- CH50091-2P Attachment 5b Conceptual Construction Plans I-.pdf PDF
Attachment 37 - Site Visit sign in_Redacted.pdf PDF
Attachment 27a- CH50091-2P Attachment 5b Conceptual Construction Plans A.pdf PDF
Attachment 21- CH50091-2P Attachment 1 Task Order Price Schedule Rev1.docx DOCX document
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
W9124920R0020 AMENDMENT 0004.pdf PDF
W9124920R0020 AMENDMENT 0003.pdf PDF
W9124920R0020 AMENDMENT 0002.pdf PDF
Attachment 17 - Past Performance Cover Letter and Assessment Questionnair-REV1.docx DOCX document
W9124920R0020 AMENDMENT 0001.pdf PDF
Attachment 5- Division 01 Specifications_MATOC 10Jun20.pdf PDF
Attachment 16- Example of Package 1.pdf PDF
Attachment 2-Davis-Bacon Act WD GA20200153 Building - Richmond County GA.pdf PDF
Attachment 4-01 33 00 attachment SF1413-13e.pdf PDF
Attachment 6- MATOC QA Plan with Appendices_10Jun20.pdf PDF
Attachment 8- FG Installation Planning Standards_PreFinal 061319.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 29- Draft RTOP Letter.pdf PDF
Attachment 25- CH50091-2P Attachment 5a Conceptual Design Analysis.pdf PDF
Attachment 1-Davis-Bacon Act WD GA20200275 Highway Georgia.pdf PDF
Attachment 3-01 08 00 Weighted Guidelines.xls XLS spreadsheet
Attachment 11- Scope of Work_MATOC 12Jun20.pdf PDF
Attachment 28- CH50091-2P Attachment 6 As-builts.pdf PDF
Attachment 12- Submital Register.pdf PDF
Attachment 10- Pre-Construction Safety Brief (Updated 2020).pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW Rev1.pdf PDF
Attachment 14- ufc_3_740_05_2010_c1 Construction Cost Est.pdf PDF
Attachment 27- CH50091-2P Attachment 5b Conceptual Construction Plans.pdf PDF
Attachment 19 - Consent Form for the Release of Past Performance.docx DOCX document
Attachment 18 - Specific Relevant Contract Reference Sheets.docx DOCX document
W9124920R0020 FORT GORDON MATOC.pdf PDF
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT GORDON

STORM WATER QUALITY

CONSTRUCTION SITE

PERMITTING GUIDANCE AND REQUIREMENTS

Storm Water Quality Design Guidance Page 1

CONSTRUCTION STORMWATER SITE PERMITTING

INTRODUCTION:

In accordance with the Federal Clean Water Act, the Georgia Water Quality Control Act, the Georgia Erosion and Sedimentation Control Act, AR 200-1and the approved Fort

Gordon Municipal Separate Storm Sewer System (MS4) Permit, any land disturbing activity on Fort Gordon property must be properly permitted for storm water discharges associated with construction activities.

The Fort Gordon Garrison (Owner) is the responsible permittee for NPDES Construction

Storm Water permits and compliance with the permits. The Directorate of Public Works has been delegated by the Garrison to ensure compliance of all applicable federal, state and local laws, Army Regulations and approved permits.

Obtaining the applicable storm water management permit(s) associated with land disturbance activities is a critical requirement for all Fort Gordon projects. The following information and references provide general guidance and guidelines to help assist project proponents in obtaining the applicable federal, state, local and Fort Gordon permit(s) for projects regulated the GA Erosion and Sedimentation Control Act and the NPDES

Construction Storm Water permit.

CONSTRUCTION CANNOT BEGIN UNTIL ALL APPLICALBE PERMIT COVERAGE

HAS BEEN OBTAINED.

Storm Water Quality Design Guidance Page 2

GENERAL PROVISIONS:

A. Permitting Thresholds:

Project Impact

Permit Required

Fort

Gordon

MS4

Permit

LIA

LDA

Permit

NPDES

NOI

GAEPD

Stream

Buffer

Variance

USACE

Permit

GAEPD

Project

Justification and

Approval

New, additional or replaced impervious area

>/= 5000 sq. ft. and <1

Acre

Disturbed Area >1 Acre but < 50 Acres

Disturbed area >/= 50 acres

Disturbed Area < 1 acre but within 200’ of State

Waters but within 25’ of a Stream

Wetlands impact, dredging or placement of fill material within Waters of the US

Projects requiring an LDA, NPDES NOI and GA EPD Stream Buffer Variance (SBV) permit require a site specific Erosion, Sedimentation and Pollution Control Plan

Storm Water Quality Design Guidance Page 3

(ES&PCP) which shall be prepared by a Georgia Soil and Water Conservation

Commission (GSWCC) Level-II certified design professional.

B. Erosion, Sedimentation & Pollution Control Plan Design:

All plans produced for erosion, sedimentation & pollution control on Fort Gordon shall be generated in accordance with the current edition of the “Manual for Erosion and Sediment Control in Georgia”. The manual can be found on the Georgia Soil and Water Conservation Commission website: www.gaswcc.org

CONSTRUCTION SITE AREA OF DISTURBANCE = LESS THAN 1 ACRE:

Any project that will generate land disturbance that is less than 1 (one) acre will require a plan review and written approval from the Fort Gordon Directorate of Public Works

Environmental Compliance Branch Storm Water Quality Section before the commencement of land disturbance. If the project is less than 1 acre but within 200 feet of state waters, the project must obtain a Land Disturbing Activity Permit from the Local

Issuing Authority.

The Construction Site Plans which show land disturbance less than an acre that are submitted shall be a scaled drawing/ sketch that shall include the following:

1) Date, Revision Number, North Arrow & Scale.

2) Existing conditions including contours, hardscape, drainage features/structures.

3) The proposed project features.

4) The area of disturbance shown graphically w/ acreage denoted.

5) Soil Erosion, Sedimentation and Pollution Control BMPs graphically depicted on the plans per the current “Manual for Erosion & Sediment Control in Georgia”.

Details of BMPs are not required.

6) The following four notes in Bold Print:

http://www.gaswcc.org/

Storm Water Quality Design Guidance Page 4

a. All land disturbance shall be performed in accordance with the current “Manual for Erosion and Sediment Control in Georgia”

b. "The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities."

c. "Erosion control measures will be maintained at all times. If full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."

d. "Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding."

Submitted plans will be reviewed by the Storm Water Quality Section for containing the items enumerated in the list above. A response will be written within 45 days. A non-response from the Storm Water Quality Section within 45 days shall constitute an automatic acknowledgement.

A written waiver for plan submittal may be obtained from the Storm Water Quality Section on a case by case basis for very small projects that would constitute very minor land disturbances. For example: the installation of an air conditioning pad.

Waiver requests must be submitted in writing or email to the Storm Water Quality Section with a complete project description, location and disturbed area computation. Waiver approvals shall be conditional upon the requirements stipulated in the four notes in Item

6 above and shall be so stated in the approved plan submittal waiver.

Storm Water Quality Design Guidance Page 5

Inspections shall be made at the discretion of the DPW Environmental Storm Water

Quality Section. Non-compliance issues will be addressed with the site operator for correction. If corrections are not achieved in a timely manner, the DPW Storm Water

Quality Section will withdraw construction approval based on Item 6.a. (above). Non-compliance of Item 6.a. (above) constitutes a violation of the Clean Water Act and Georgia

Water Quality Control Act which provide procedures for imposing civil penalties for violations. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action or to any other allegation of noncompliance.

Site Conditions. Construction Site Operators must control waste at the construction site such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste.

CONSTRUCTION SITE AREA OF DISTURBANCE = 1 ACRE OR GREATER:

Any site involving land disturbing activity over one (1) acre will require National Pollutant

Discharge Elimination System (NPDES) and Land Disturbing Activity (LDA) permitting that includes a “Erosion Sedimentation & Pollution Control Plan” (ES&PCP) as described in the ‘Manual for Erosion and Sediment Control in Georgia”. The ES&PCP shall be designed by certified personnel as described in the appropriate State of Georgia NPDES

Permit using the current GSWCC checklist.

NPDES/LDA STORM WATER

PERMITTING PROCESS:

1. The requirement for NPDES/LDA permitting for any given project is identified in the Fort Gordon Work Control System (WCS) by Storm Water Quality Section personnel. By policy, all proposed projects on Fort Gordon are reviewed for environmental impacts and permitting requirements in the WCS.

Storm Water Quality Design Guidance Page 6

2. The requirement for NPDES/LDA permitting identified in the WCS is written into the National Environmental Policy Act (NEPA) documentation for project implementation and post project validation. The NEPA document is transmitted to the Project Proponent or his delegate for implementation.

3. Submittals:

There are multiple project proponents residing on Fort Gordon including AFEES, COE, NSA & MRW for example. All project proponents must provide a single point of contact (POC) to the DPW Environmental Compliance Branch for each project submitted. This POC may be a project manager, project engineer or whoever the project proponent designates according to their own policies. All responses, communications and request for information shall be directed to the designated

POC by the DPW Environmental Compliance Branch.

DPW Environmental Compliance Branch provides a government employee as

POC for all Storm Water permitting and submittals from the project proponent. The current POC is the Water Quality Program Manager of the DPW Environmental

Compliance Branch.

Directorate of Public Works Water Quality Program Manager 527 15th Street, Bldg. 14600 Fort Gordon, GA 30905

(706) 791-6129, Office

i) One (1) set of 100% Design “Erosion, Sedimentation & Pollution Control Plans” with one (1) current Plan Review Checklist and one (1) Hydrology Study shall be submitted to Environmental Compliance Storm Water Quality Construction

Section for review. This review is not a subjective review for plan approval but an objective review by the owner’s representative support staff to ensure that

Storm Water Quality Design Guidance Page 7 the plans contain all of the elements listed in the Plan Review Checklist in order to gain approval by the State regulatory agencies and the applicable Local

Issuing Authority (LIA). Plans that are incomplete shall not be submitted by the

Storm Water Quality support staff on behalf of the Primary Permittee to the

Regulatory Agencies for approval. This submittal also serves to inform the

Primary Permittee/Owner, who shares compliance responsibility, of the technical details of the permit by copy.

NOTE: In an effort to consolidate submittals, this 100% Design plan will also be reviewed by the Post-Construction Storm Water Quality Support Staff personnel to confirm that the approved Post-Construction 30% design concept has been implemented. As stated in the Post-Construction Section of this

Design Guidance the 30% Plan is reviewed for LID and MS4 requirements at the conceptual design stage before it can progress to the 100% design Stage.

ii) Upon confirmation of a comprehensive 100% Design per the Plan Checklist for

Construction Sites and 100% conceptual design implementation for Post-

Construction requirements, the Storm Water Quality Section Personnel will issue a consolidated review approval and request additional sets of plans, Hydrology Studies and Plan Checklists be transmitted for submission to the

Local Issuing Authority (LIA) and the Northeast District – Augusta Office. The required amount of Plans, Hydrology Studies & Checklists vary according to the project location in the County where they are submitted:

Richmond County LIA…………………………..…….….seven (7) sets of each

Columbia County LIA………………………………….…twelve (12) sets of each

McDuffie County LIA……………………………………..eight (8) sets of each

Jefferson County LIA…….……………………………….eight (8) sets of each

Storm Water Quality Design Guidance Page 8

iii) A Notice of Intent (NOI) shall be completed and coordinated through the Storm

Water Quality Construction Section Support Staff and will that is submitted to the East Central District – Augusta Office for NPDES permitting.

The NOI is signed by the Garrison Commander as the “Primary Permittee /

Owner” and signed by the site contractor as the “Site Operator” per Part V.G.

of the Georgia NPDES Permit.

iv) Two (2) checks shall be submitted by the Project Proponent or his delegate;

and shall accompany the Plan submittals to the appropriate LIA and the

Northeast District – Augusta Office.

Note: Some Local Issuing Authorities may charge additional review fees.

v) All plan submittals to Regulatory Agencies on behalf of the Garrison

Commander who is the “Owner” and “Primary Permittee” shall be made through his representative, the Directorate of Public Works Environmental Compliance

Branch Storm Water Section Support Staff.

vi) The approved NPDES and LDA Permits require the GSWCC Level II Certified

Design Professional of Record to make an inspection within 7 days after the installation of the initial sediment storage requirements and perimeter control

BMPs which the design professional and write a report of his findings that is to be retained onsite. The Site operator shall submit a copy of that report to the

DPW Environmental Compliance Branch Storm Water Quality Section.

vii) As stated in the NPDES/LDA storm water permits proper inspection, turbidity monitoring and record keeping will be accomplished by certified personnel on site. The results of turbidity monitoring of discharges during qualifying rain events must be provided to the GA-EPD by the 15th of the following month.

Storm Water Quality Design Guidance Page 9

Each Permittee must document in their records any and all known violations of this permit at his or her site within (7) days of his or her knowledge of the violation. A summary of these violations must be submitted to EPD at the addresses shown in part II.C. within fourteen (14) days of his or her discovery of the violation.

It is incumbent upon the Primary Permittee to ensure that all permit requirements are satisfied. The site operator, who co-signs the NOI with the

Primary Permittee, shall provide a copy of the turbidity monitoring reports and all other required documentation transmitted to the GA-EPD concurrently to the

Primary Permittee through the current DPW Environmental Compliance Branch

P.O.C.

Ref: NPDES GAR100001, GAR100002, GAR100003

GA- DNR-EPD Notice of Intent (NOI) for Primary Permittees

viii) A Notice of Termination (NOT) is required to terminate NPDES construction permit and thereby terminating the responsibilities associated with storm water discharge incumbent on the owner and operator that are delineated in the permit. A NOT can be executed when final stabilization is achieved and all storm water discharges associated with construction activity have ceased. The

NOT will be coordinated through the DPW Environmental Compliance Branch

Storm Water Quality Section Staff, signed, and submitted to the GA-EPD after the site is completed, stabilized, and the BMPs removed in accordance with the

NPDES/LDA permits.

The NOT is signed by the Garrison Commander (or assigned delegate) as the

“Primary Permittee / Owner” and signed by the site contractor as the “Site

Operator” per Part V.G. of the Georgia NPDES Permit.

Storm Water Quality Design Guidance Page 10

Submit plans to:

Water Quality Program Manager 527 15th Street, Bldg. 14600 Fort Gordon, GA 30905

(706) 791-6129, Office

REFERENCE DOCUMENTS:

Georgia Soil & Water Conservation Commission: www.gaswcc.org

NPDES Permits: GAR 100001, GAR 100002, GAR 100003

NPDES Fee Form

Notice of Intent (NOI) for Primary Permittees

Notice of Termination (NOT) for Primary Permittees

“The Manual for Erosion and Sediment Control in Georgia”

Plan Review Checklist and Guidance Documents

Certification Rules and Education Requirements for Individuals Involved in

Land Disturbing Activity http://www.gaswcc.org/

Storm Water Permitting Requirements for Construction Projects at Fort Gordon

Obtaining the applicable stormwater management permit(s) associated with land disturbance activities is a critical requirement for all Fort Gordon projects. The following information and references provide general guidance and guidelines to help assist site designers in understanding and meeting the Federal, state, local and Fort Gordon permitting requirements for projects regulated the NPDES Construction Stormwater, Land Disturbance Activity and NPDES MS4 permits.

The Fort Gordon Cantonment area falls under the jurisdiction of the state of Georgia’s Environmental Protection Division (EPD) and the City of Augusta-Richmond County LIA (Local Issuing Authority). The US Environmental Protection Agency (EPA) granted the GA EPD authority to administer its own National Pollutant Discharge Elimination System (NPDES) program and to issue NPDES Construction General Permits under the Federal Clean Water Act. The GA EPD has the authority to certify a county or municipality as a certified LIA under the state’s Erosion and Sedimentation Control Act. As such, the GA EPD has delegated the Augusta-Richmond County as a certified LIA and the authority to administer Land Disturbance Activity (LDA) permits; and to oversee the land disturbance activity permit program with the oversite of the Georgia Soil and Water Conservation Commission (GSWCC). The Augusta-Richmond County LIA reviews ES&PCP for approval, conducts site inspections and enforcement for construction activities which are conducted at Fort Gordon within the LIA’s respective boundaries.

1. Permitting Thresholds:

Project Impact

Permit Required

Fort Gordon

MS4

Permit

LIA

LDA

Permit

NPDES

NOI

GAEPD

Stream Buffer

Variance

USACE

Permit

GAEPD

Project

Justification and

Approval

New, additional or replaced impervious area

>/= 5000 sq ft and <1 Acre

Disturbed Area >1 Acre but < 50 Acres

Disturbed area >/= 50 acres but within 200’ of State

Waters but within 25’ of a Stream

Wetlands impact, dredging or placement of fill material within Waters of the US

Projects requiring an LDA, NPDES NOI and GA EPD Stream Buffer Variance (SBV) permit require a site specific Erosion, Sedimentation and Pollution Control Plan (ES&PCP) which shall be prepared by a Georgia Soil and Water Conservation Commission (GSWCC) Level-II certified design professional.

The Contractor shall hold an initial design meeting that will include the A-E and the Directorate of Public Works (DPW) Engineering and Environmental. Schedules, project specifics and permitting requirements will be discussed in this meeting. The first submittal of the ES&PCP to DPW - Environmental Division (ED) will be with the 60% design submittal. After the preliminary review period, a final 100% ES&PCP will be submitted. Contractor shall schedule and submit the 100% ES&PCP to allow sufficient time for DPW-ED to review the plan and for the designer to make any necessary corrections and resubmit for review if required. The Contractor as a part of their Independent Technical Review shall have a certified Level II design professional independent of the design entity to review the entire package prior to any submissions to DPW-ED.

2. Submittal Requirements The DPW Environmental Division requires the following items to complete the different permitting packages. All project documents should contain the DPW Work Order Number to ensure proper tracking of all documents.

a. Submittal requirements for the Fort Gordon MS4 Permit:

i. Completed MS4 Checklist

ii. ES&PCP (Single Phase)

iii. Completed ES&PCP Checklist

iv. Completed Fort Gordon Land Disturbance Project Hydraulics & Hydrology

Checklist

v. Completed Fort Gordon Land Disturbance Stormwater Quality – LID/GI

Checklist

b. Submittal requirements for the LIA LDA Permit

i. ES&PCP (3 phased) and applicable ES&PCP Checklist

ii. Fort Gordon Land Disturbance Project Hydraulics & Hydrology Checklist

iii. Completed MS4 Checklist

iv. Completed Fort Gordon Land Disturbance Stormwater Quality LID/GI

Checklist

v. LIA ES&PCP review fees

vi. Fort Gordon LDA permit application

vii. LIA LDA permit fees

viii. Seven (7) copies of the ES&PCP

c. Submittal requirements for the NPDES NOI

i. NPDES NOI permit fees

d. Submittal requirements for the GAEPD 50 + Acre Project Justification and Approval

i. A-E’s written request to disturb 50 + contiguous acres at one time and why it’s necessary for the project (addressed to EPD)

ii. A-E’s 50+ acre request package (Contact DPW-ED for package requirements)

e. Submittal requirements for the GAEPD SBV

i. Fort Gordon Land Disturbance State Waters Jurisdictional Determination

Checklist

ii. Written request for State waters jurisdictional determination (addressed to the LIA)

f. Submittal requirements for the USACE 404 Permit

i. A-E’s completed USACE’s Pre-Construction Notification (PCN) form

ii. Supplemental PCN information

iii. Completed wetlands delineation

g. Submittal requirements for Drawings [dwg (AutoCAD) and dgn (Microstation) and pdf with layers turned on]

i. Site Plan

ii. Grade Plan

iii. Utility Plan

iv. Demo and Existing Plan

v. Erosion and Sediment Control Plan

vi. Firm map

vii. Hydrology report

viii. Hydraulic Review check list

ix. PDF of full ESC report

x. Completed site plan checklist and MS4 checklist

Fort 2018 Gordon

GSMM and System Project Review.docx

Storm Water

Quality Checklist-DPW.pdf State Waters JD

Checklist-DPW.pdf

3. Submittal Process

DPW-ED files all required permit submittals. LDA and NPDES permits both require electronic permitting. The A-E should NOT file for permits through the LIA eFile system or through the GAEPD GEOS system for projects on Fort Gordon. Once DPW has approved the design as ready for submission to the LIA, the following steps are followed.

a. Submit a Fort Gordon LDA Permit Application to DPW-ED. Include all digital exhibits required by the application. Ensure that all exhibits are complete and up to date.

b. Submit one full-size (24” x 36”) hard copy set of the designs and CD with final electronic files to:

Delaine Scott DPW Environmental Compliance Branch- Environmental Div.

IMGO-PWE

15th Street, Bldg. 14600 Fort Gordon, Georgia 30905-5040

Main Office: 706-791-8976

c. Submit payment for the LIA review submittal. Projects cannot be submitted to the LIA before this payment is received. A check can be submitted to DPW-ED for the LIA submittal fees and/or paid electronically by contacting the Augusta Richmond County Planning and Development Department directly (POC - Terri Turner 706- 821-1796). Submit a copy of the receipt along with the other required exhibits to

DPW-ED.

d. Once electronic files, hard copies and payment are received and complete, DPW – ED will eFile the LDA Permit Application through the LIA eFile system.

e. If the project is over one acre and requires a NPDES NOI, the DPW will upload the project files into the GAEPD GEOS system to file the NOI. After the NOI has been submitted to GAEPD and the fees have been received, there is a 14-day waiting period prior to commencement of construction activities. The design professional will be responsible to provide a check to DPW-ED made payable to: EPD – Construction Land Disturbance Fees. DPW-ED will provide a copy of the NPDES NOI to the LIA for inclusion in the project review.

f. Projects that encroach within the 25-ft stream buffer, may require an EPD stream buffer variance (SBV) prior to commencement of land disturbance activities. The A-E of record is required to submit a written State waters determination request along with the technical justification and applicable portion(s) of ES&PCP to DPW- ED. DPW-ED will submit the A-E’s written State waters determination request to the LIA. The LIA will conduct a State waters determination. If the LIA determines that a stream buffer variance is required for the project, the LIA will provide written correspondence to the DPW-ED. DPW-ED will complete the EPD stream buffer variance application and submit the stream buffer variance request package to EPD for review and approval.

g. Projects that impact wetlands, conduct dredge and/or fill activities within Waters of the US are required to obtain a USACE 404 permit. The A-E of record is required to complete USACE Pre-Construction Notification (PCN) form, a copy of the wetlands delineation and any additional supplemental information and technical justification to be included in the PCN package and submit to DPW-ED. DPW-ED will review and submit the PCN package to the USACE Savannah District for review and approval.

h. The LIA has 45 days to review the LDA package (can happen concurrently with SBV and 404 permit reviews if the project also requires those permits). The LIA will review the submittal and either approve or deny the package. If the project requires a NPDES NOI, SBV or 404 Permit, the LIA will not give final approval of the project until copies of those items are submitted as part of the full project package. If the LIA denies the package submittal, deficiencies and comments are to be addressed and a revised package re-submitted to the DPW-ED for resubmittal to the LIA (these may be submitted electronically.) Once the package is approved by the LIA, the A-E will submit seven full size hard copies of the drawings to the DPW-ED. DPW-ED will hand carry the hard copies of the entire package to LIA for issuance of the permit.

i. Once ALL required permits have been obtained, DPW-ED will conduct a stormwater pre-construction meeting with the project manager and representatives of the contractor to include the contractor’s certified Level IA (Blue Card) erosion control site personnel prior to DPW remitting the LDA permit.

Helpful Information and Lessons Learned

a. Work with Ft Gordon DPW as early as possible in the design process. The 35% review meeting is not too early.

b. A State of Georgia GSWCC Level II Certified Design Professional licensure is required to design the Erosion & Sediment Control drawings and calculations.

GSWCC (Georgia Soil & Water Conservation Commission).

c. The “Georgia Stormwater Management Manual, Stormwater Quality Site Development Review Tool” spreadsheet is required as part of the calculations.

d. Drawings size to Augusta/Richmond County is 24” x 36”.

e. Use the current erosion & sediment control details from the Georgia Manual for Erosion & Sediment Control (Green Book).

f. Use the latest Georgia Stormwater Management Manual for stormwater design (Blue Book).

g. Provide a narrative of the site in the Hydrology Report. The narrative shall include the following information:

I. Site Information, total project area, total disturbed area, total surface drainage area, pre & post impervious area

II. Downstream Storm Water Network Analysis (simply a paragraph describing the downstream storm water system).

III. Describe how the design provides stormwater storage IV. Describe how the design provides stormwater pre-treatment V. Provide information on any temporary sediment basins

h. A “Water Quality Chart” is required on the cover of the ES&PC plan set that lists the following:

I. Stormwater quality feature number II. Stormwater quality feature location (sheet number) III. Type of stormwater quality feature (basin, check dam, hydrodynamic separator) IV. Manufacture of unit V. Unit model number if applicable VI. Flow capacity (CFS)

i. On the plan view, show all proposed storm piping as two black lines, to scale, with hatch and flow arrows. Label the size and material on plan view. Show all existing storm piping as two gray lines, to scale, with hatch and flow arrows. Label the size and material on plan view. (This is a DPW-ED request to aid in expediting plan reviews)

j. Richmond County / City of Augusta mandate that the minimum storm water piping size is 18” RCP.

k. Provide the GPS coordinates of the proposed Construction Exit (CO) on the cover sheet. Also, ensure the CO layout on the plan view is exactly as shown in the detail.

Show all dimensions on the CO on the plan. They must match the detail exactly.

l. Show design data at all outfalls or tie-in on the plan sheet.

m. Very important to note: All roof run-off must be pre-treated, even if the project is just a renovation and no additional rooftop is added.

n. Be sure to note that the LIA’s requirements for eFile are different than the requirements for Ft Gordon DPW as well as COE CAD standards AEC CAD standards. See the list of items at the bottom of the “Land Disturbance Permit Application_FtGordon.docx”

o. A/E to pay LIA prior to Ft Gordon DPW submittal to LIA. LIA will provide a form to pay with a credit card via a fax transmittal.

p. Upon Permit approval by the LIA, 7 hard copies are to be mailed to DPW with receipt of payment to LIA and EPD (must pay them direct the EPD is not in the LIA fee)

q. These required items are to be uploaded to Ft Gordon DPW. Once approved, Ft Gordon DPW will send package to LIA for review. The list of items are:

I. DWG Files (They prefer one AutoCADD file with all sheets and references in the one file)

II. Complete PDF w/ layers III. Land Disturbance Permit Application form for FG IV. 404 Indemnity Statement (Completed by DPW) V. Site Development Review Tool VI. State Waters Inspection Form VII. Hydrology & Hydraulics Checklist VIII. Current Soil Erosion Checklist (This is typically included in the CG700 of the

Erosion & Sediment Control Plan). For instance, if the submittal is in 2019, but review carries over to 2020, the A/E will be required to provide the 2020 check list.

4. Points of Contact

a. Delaine Scott; Fort Gordon Water Program Manager;

shannon.d.scott20.civ@mail.mil

b. Robert Drumm; Fort Gordon Environmental Division Chief;

Robert.l.drumm6.civ@mail.mil mailto:shannon.d.scott20.civ@mail.mil mailto:Robert.l.drumm6.civ@mail.mil

c. Vacant: Fort Gordon Environmental Compliance Branch Chief

d. Walt Corbin; Augusta Engineering Dept, wcorbin@augustaga.gov

e. Lois Schmidt; Augusta Engineering Dept, lschmidt@augustaga.gov

5. References to be used in the ES&PC Design and Permitting Process

The following references provide guidance with regards to project permitting, design specifications, and certification requirements:

a. GSWCC- Guidance for Designers Level II and Site Operators Level 1A https://gaswcc.georgia.gov/

b. Georgia Stormwater Management Manual (Blue Book) 2016 edition - ARC https://atlantaregional.org/natural-resources/water/georgia-stormwater-management-manual/

c. Manual for Erosion and Sediment Control in Georgia (Green Book) 2016 edition http://gaswcc.georgia.gov/sites/gaswcc.georgia.gov/files/related_files/site_page/ GSWCC-2016-Manual-As-Approved-by-Overview-Council.pdf

d. LIA References - Augusta Richmond County https://www.augustaga.gov/336/Development-Documents

e. https://www.augustaga.gov/1878/Stormwater-Technical-Documents

f. https://www.augustaga.gov/2245/Stormwater-Documents

g. https://forms.augustaga.gov/Forms/developmentplanreview

h. Augusta Permitting Tracking Website:

https://www.augustaga.gov/2697/ePlan-Review i.

GA DOT Stormwater Guidance http://www.gafloods.org/pdf/2014/Concurrent%20Session%201%20GDOT%20St ormwater%20Manual%20GAFM%20Presentation%20Final.pdf

j. www.dot.ga.gov/PartnerSmart/DesignManuals/Drainage/Drainage Manual.pdf

k. http://www.dot.ga.gov/IS/Environment/Stormwater mailto:wcorbin@augustaga.gov mailto:lschmidt@augustaga.gov https://gaswcc.georgia.gov/ https://atlantaregional.org/natural-resources/water/georgia-stormwater-management-manual/ https://atlantaregional.org/natural-resources/water/georgia-stormwater-management-manual/ http://gaswcc.georgia.gov/sites/gaswcc.georgia.gov/files/related_files/site_page/GSWCC-2016-Manual-As-Approved-by-Overview-Council.pdf http://gaswcc.georgia.gov/sites/gaswcc.georgia.gov/files/related_files/site_page/GSWCC-2016-Manual-As-Approved-by-Overview-Council.pdf https://www.augustaga.gov/336/Development-Documents https://www.augustaga.gov/1878/Stormwater-Technical-Documents https://www.augustaga.gov/2245/Stormwater-Documents https://forms.augustaga.gov/Forms/developmentplanreview http://www.gafloods.org/pdf/2014/Concurrent%20Session%201%20GDOT%20Stormwater%20Manual%20GAFM%20Presentation%20Final.pdf http://www.gafloods.org/pdf/2014/Concurrent%20Session%201%20GDOT%20Stormwater%20Manual%20GAFM%20Presentation%20Final.pdf http://www.dot.ga.gov/PartnerSmart/DesignManuals/Drainage/Drainage%20Manual.pdf http://www.dot.ga.gov/IS/Environment/Stormwater

Fort Gordon Permit Process

Project Proponent or Contracting Agency, 4283, or 1391.

Any project disturbing land within 200 feet of State Waters will require Land Disturbance Activity (LDA) permit, projects equal to or over 1 acre require Stormwater Construction (NPDES) permitting and an LDA. At any time in the life of a project the 1 acre threshold is exceeded an NPDES permit is required. Projects disturbing 5000 sq ft or more will also have to address Post Construction Stormwater Management to the (MS4) and Energy Independence Security Act Requirements for Stormwater. All permitting requires an Erosion Sedimentation Pollution Control Plan (ES&PCP), Hydrology Report (HR), NPDES Checklist, and permit fees to both the Local Issuing Authority (LIA) and the GA EPD.

The Director of Public Works is the Permit Authority for all Erosion and Sedimentation Control requirements at Fort Gordon.

**LIA’s perform the State review for Clean Water Act for Erosion and Sediment Control they have been delegated this Authority by the GA EPD and GA Soil and Water Conservation Commission.

1. ES&PCP and HR The ES&PCP and HR must be submitted to DPW/Environmental Division (ED) Bldg 14600 for review (21 days) and approval. DPW/ED unapproved ES&PCPs will be returned to proponent to address DPW-ED review comments, implement necessary ES&PCP revisions and re-submit to DPW/ED for review and approval.

*If the project disturbs 50 acres or greater, the A-E’s technical justification along with a copy of the will be submitted to EPD for review and project approval. Once written approval has been provided by EPD, DPW/ED will conduct the ES&PCP and HR review and approval.

2. DPW-ED ES&PCP Submittal to LIA DPW/ED approved ES&PCPs, HRs and LIA permit fees will be submitted to the applicable LIA (Richmond/Columbia /McDuffie Co.) for review and approval. (45 days) The LIA’s will review and either approve or deny the submittals.

3. LIA Review LIA approved ES&PCPs will be permitted via the LIA’s issuance of an LDA permit. The LIA will notify DPW/ED if ES&PCP submittals have be unapproved/denied. DPW/ED will forward the comments to the POC for denied submittals. The POC must address the comments and/or necessary revisions to the ES&PCP and submit a copy of the revised plans to the DPW/ED with LIA’s required re-submission fee.

The review process will then restart. (21 to 45 days).

4. Submission of NOI DPW/ED will submit a Notice of Intent (NOI) to EPD via the Georgia EPD Online System (GEOS) 14 days prior to work to initiating construction activities/land disturbance.

The LDA permit requires a pre-con meeting prior to work and issuance.

5. Submission of Stormwater Permit Fees Stormwater fees are $80.00 per disturbed acre ($40 per acre to EPD and $40 per acre to the LIA).

Permit fees are to be paid in two separate checks, one to the LIA one to the GA EPD. A third fee and check for the LIA review fee is required also based on size.

6. Stormwater Permit Issuance Once the ES&PCP has been approved, the NOI has been submitted, and all applicable fees have been paid, the LIA issues the (LDA) permit to the DPW/ED. DPW/ED will provide the permit to the POC at the PRECON Meeting.

7. Project Completion For all permitted construction projects a Notice of Termination (NOT) must be submitted to EPD and the LIA once completed. DPW/ED and LIA must perform final site-inspection to determine compliance with all erosion control requirements before NOT is submitted (site inspections, monitoring, etc. must continue until the NOT had been filed and all construction project records must be maintained by the DPW/ED for three years after completion of project). No project will be released until site has achieved final stabilization, copies of records provided to DPW/ED and the DPW submits an NOT.

Stormwater Permitting Process for LDA and NPDES SUBMIT TO DPW/ED DPW/ED submits to LIA LIA approves and issues and NOI to Georgia EPD LDA, Project may commence.

Will wetlands be affected?

DOR prepares 3 phase

ES&PCP

DOR prepares state waters determination request package and DPW-ED submits the package to the LIA1

Project designer completes wetland delineation and PCN package

Contractor ITR Level 2

Reviews

DPW-ED

Reviews

DPW-ED:

Submit NOI to GA EPD

(14 day wait before construction can begin)

DPW-ED

Submits hard copies, NOI and payment to LIA

(JD and SBV also submitted if applicable)

DPW-ED picks up placard and have pre-con with construction contractor DPW-ED prepares and submits stream buffer variance application to GAEPD (app includes

ES&PCP) 2,3 –

30 days for public comment

DPW-ED submits 404 PCN package to USACE – Savannah Regulatory Division 2,3 –

60 day review period

Projects Over 1 Acre (And Less Than 50 Acres) This is the GENERAL process. It can change depending on variables that would be project specific.

Construction begins

– implement design (DPW-ED conducts construction inspections)

Is the project within 25’ of a stream?

Approved

DPW-ED submits design to LIA (45 day review period)

Yes

No

LIA completes site visit and responds to DPW-ED with the state waters determination (defines if a stream buffer variance is required)

Yes

Disapproved

Approved

Disapproved

Approved

Disapproved

Notes:

1 ED requests the state waters determination with input from the designer as to why its required (DOR completes request package to include justification of why project has to be within 200’ of state waters)

2 SBV, 404 permit, and LIA submittal can be done concurrently. If GAEPD requires changes to the ESCP, then changes will be required to the LIA

3 Could require stream buffer credits or wetlands mitigation credits ($) to be paid to mitigation banks

No

YES

NO

Will wetlands be affected?

DOR prepares 3 phase ES&PCP

DOR prepares state waters determination request package and DPW-ED submits the package to the LIA1

Project designer completes wetland delineation

Contractor ITR Level 2 Reviews

DPW-ED Reviews

DPW-ED

Submits hard copies and payment to LIA (JD and SBV also submitted if applicable)

DPW-ED picks up placard and have pre-con with construction contractor

DPW-ED prepares and submits stream buffer variance application to GAEPD (app includes ES&PCP)2,3 –

30 days for public comment

DPW-ED submits 404 PCN package to USACE – Savannah Regulatory Division2,3– 60 day review period

Projects Under 1 Acre This is the GENERAL process. It can change depending on variables that would be project specific.

Construction begins – implement design (DPW-ED conducts construction inspections)

Is the project within 25’ of a stream?

Approved

DPW-ED submits design to LIA (45 day review period)

LIA completes site visit and responds to DPW-ED with the state waters determination (defines if a stream buffer variance is required)

Approved

Disapproved

Approved

Disapproved

Is the project between 5000ft2 and 1 acre?

Install BMPs and move forward – construction begins

Designer prepares single phase ESCP

DPW ED Reviews for compliance with MS4 permit

Pre-con with contractor

(coordinated by

DPW ED)

Construction begins – implement design

(DPW ED

conducts construction inspections)

Disapproved Disapproved

Disapproved

YES

YES

Notes:

1 ED requests the state waters determination with input from the designer as to why its required (DOR completes request package to include justification of why project has to be within 200’ of state waters)

2 SBV, 404 permit, and LIA submittal can be done concurrently. If GAEPD requires changes to the ESCP, then changes will be required to the LIA

3 Could require stream buffer credits or wetlands mitigation credits ($) to be paid to mitigation banks

Is the project within 200’ of state waters?

NO

YES

YES

Revised May 8, 2019

NO

NO

Contractor ITR Level 2 Reviews

REVIEW CHECKLIST for MS4 Development and Redevelopment-Fort Gordon, GA

Project and Location:

Reviewer: Date:

YES NO NA

1. Applicability NPDES Permit GAG480000 Fort Gordon Municipal

Stormwater System. This checklist applies to all projects within the stormwater system.

New development involves creation of at least 5000’ sq New development or redevelopment that involves one (1) acre or more Redevelopment that involves the creation, addition, or replacement of 5000'sq of impervious

Land development activities that are smaller than the minimum applicability standards above, but is part of a larger common plan of development

1. Administrative Information Engineer’s Affidavit and Design Professional Level II GSWCC Floodplain statement referencing the 2006 FEMA FIRM panel The site contains area of special flood hazard.

The site is located within the future conditions floodplain.

Wetlands/state waters statement, both onsite and within 200’ of site, is included Limits of required buffers for both the 50’ undisturbed and 25’ impervious cover buffer are delineated.

The existing total and proposed new amount of impervious surface (in square feet) is provided.

Storm drain pipes from street included and accounted for Stormwater Management Plan Existing conditions. The following are included:

Topographic map of existing site conditions (including lot lines, building footprints, and all impervious areas) with drainage basins delineated.

Acreage, soil type, and land cover of areas for each sub basin affected by the project.

All perennial and intermittent streams and surface water features.

All existing stormwater conveyances and structures.

All existing stormwater conveyances and structures.

Post development. The following are included:

Analysis of runoff provided by the off site areas upstream of the project site.

Methodologies, assumptions, site parameters, and supporting design calculations used in analyzing existing conditions hydrology.

Total area of post-development impervious surfaces and other land cover areas for each sub basin affected by the project.

Calculations for determining the runoff volumes that need to be addressed for each sub basin for the development project to meet post-development stormwater management performance criteria.

Location and boundaries of proposed natural feature protection and conservation areas .

Documentation and calculations for any applicable site design Methodologies, assumptions, site parameters, and supporting design calculations used in analyzing the existing conditions site hydrology.

A downstream peak flow analysis to the point in the drainage basin where the project area is 10% of the total basin area.

Any vegetation to be placed within and adjacent to the stormwater management facilities are described.

Georgia Stormwater Management Manual Requirements Site design preserves the natural drainage and treatment systems and reduces the generation of additional stormwater runoff and pollutants to the fullest extent practicable.

Stormwater management system is sized to capture and treat the water quality treatment volume (1.2" of rainfall)

Appropriate structural stormwater controls and pollution prevention practices have been selected to address and treat runoff.

Channel protection is provided by using all of the following three approaches: (1) 24-hour extended detention of the 1-year storm event; (2) erosion prevention measures such as energy dissipation and velocity control; and (3) preservation of the applicable stream buffer

Erosion and sedimentation control practices are utilized during the construction phase.

Extreme flood protection is provided by controlling and safely passing the unrouted 100 year storm event.

A downstream hydrologic analysis has been performed (at the outlet of the site and downstream at each tributary junction to the point where the area of the site draining into the system is 10% of the total drainage area above that point) to determine if there are any additional impacts in terms of peak flow increase or downstream flooding.

Annual groundwater recharge has been maintained to the extent practicable through the use of nonstructural methods.

Stormwater Quality Site Development Review Tool with at least 80% TSS Removal included.

Hydrology report is based on the 2-year, 30 minute event with a maximum coefficient of 0.30.

Stormwater detention is based upon the 50 year, 30 minute storm using development runoff rate.

Detention capacity must accommodate minimum 30 minute retention for the stormwater runoff greater than the maximum release rate.

stormwater shall be adequately treated prior to discharge Design plans shall show existing drainage ditches (with profiles) Storm structures and flow capacities are required to be shown on plans and included in the hydrology report

Flow calculations for all drainage systems including street sections are to be included

Calculations are made to show maximum in-take of all storm traps Pipe networks shall be designed to carry not less than the rainfall expected to occur on in every 25 years (25 year storm)

Retention Ponds or containment areas shall be designed to the 50 storm with stage releases at 2, 10, 25, and 50 years. Stage releases maybe limited by downstream structure.

downstream structures maybe replaced to accommodate stage release or the capacity of the pond increased; and the retention facility shall include an emergency spillway.

Pipe profiles are included with:

existing and proposed ground surface profiles pipe size (minimum for drainage systems is 18 inches) pipe lengths type slopes invert elevations contributing drainage area design (Q 100 for road x-ing and any off site flows, min. Q-50 ) hgl in pipe Roughness coefficients Run-off coefficients Inlet Tc Culverts Headwalls are provided for all metal culverts RCP is specified for all live streams Pipe diameter is at least 18” Pipe has been checked for inlet and outlet control Culvert is not skewed more than 45 degrees Open Channels Channel identified by name or number Contributing drainage area Conveyance size

Typical cross section Channel slope Calculated flow velocity for V25 Energy Dissipators Energy dissipators are employed flow velocity leaving stormwater management facilities erosive velocity of downstream area

Type of energy dissipator is specified Construction Phase Submittals ESCP Plans, hydrology report, checklist, fees

The following items and exhibits must be provided and attached to a detailed written request for a Jurisdictional Determination of State Waters. Please address the written request to the Local Issuing Authority (Augusta Engineering Department) and copy this office.

Please Note: If the Project H&H Report is complete, it will also satisfy the following requirements.

NARRATIVE

Description of existing project site and proposed improvements

Geodetic Coordinates

Downstream Flooding and Floodplains

Discussion regarding ALL Existing Wetlands

Primary and Secondary Receiving Waterbody and distances.

REQUIRED MAPPING

Location

Aerial

Soils Map

Quad Map

DEPARTMENT OF THE ARMY

Environmental Compliance Branch

Stormwater Section 527 15th Street, Bldg. 14600

Fort Gordon, GA 30905-5050

FT. GORDON LAND

DISTURBANCE

State Waters Jurisdictional

Determination Checklist

Project Name: _________________________________

The following items are all required to be included in all Storm Water Quality - Low Impact Development/Green Infrastructure(LID/GI) designs seeking a Land Disturbance Permit from Ft. Gordon DPW. If this report is incomplete a full review cannot be executed.

PLANS MUST CONTAIN

Storm Water Quality unit(s) or feature(s) must be numbered on the sheet of the plan showing unit to identify the feature.

Design Professional must place a chart on the front sheet of the plan which lists the following items for each storm water quality feature designed in the plan:

Storm water quality feature number (SWQ-1, SWQ-2, etc.), Storm water Quality feature location (Sheet number), Type of storm water quality feature (forebay, filter basket, etc.), Manufacturer of unit or designed by engineer (Contech, DBE, etc.), Unit model number if applicable, and the Design and Maximum Flow capacities (cfs).

REQUIRED EXHIBITS

GA EPD Stormwater Quality Site Development Review Tool Summary Worksheet on 81/2x11” sheets, in full.

An outlined inspection and maintenance schedule for the specific storm water quality unit utilized on the plan. (Must meet or exceed manufacturer’s minimum requirements of specifications.)

Storm water quality calculations.

Completed H&H Report. (See Checklist)

DEPARTMENT OF THE ARMY

Directorate of Public Works Environmental Compliance Branch

Stormwater Section 527 15th Street, Bldg. 14600

Fort Gordon, GA 30905-5050

FT. GORDON LAND

DISTURBANCE

Stormwater Quality -

LID/GI Checklist

Project Name: _________________________________

Construction Site Permitting
Gordon - ESCP Specific Directions to Designers Rev. 6.19.2019
Fort Gordon Permit Process Rev. 6.19.19
Environment Flow Charts_FINAL_5_8_2019
Slide Number 1
Slide Number 2
Fort Gordon 2018 GSMM and System Project Review
State Water Request Checklist
Storm Water Quality Checklist