Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx
DOCX document 35 KB Posted
- Solicitation number
- W9124920R0020
About this file
This document contains cost estimate breakdown templates for a federal construction contract solicitation. The templates provide a work breakdown structure for estimating material, equipment, labor, and total costs for the base bid contract line item numbers 001 through 004. Line items 001 and 002 relate to the design and renovation of an existing building at Fort Gordon, Georgia. Line item 003 covers new construction work. Line item 004 is for additional renovation costs. The cost estimate templates are broken out by Master Format division and request breakdowns by cost type to the line item level.
A related federal contract opportunity is also provided. Solicitation W9124920R0020 from the Department of the Army seeks proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract for minor construction, repair, and alteration projects at Fort Gordon, Georgia. The solicitation will be awarded as an IDIQ MATOC. The closing date for proposals is 14 August 2020. A site visit is scheduled for 28-29 July 2020 with attendance limited to two people per firm on an assigned date and time.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
PROPOSAL FORMAT
CONTRACTOR:
CONTRACT NUMBER:
DESIGN FOR NEW CONSTRUCTION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 001)
| Project Description: Renovate & Expand Bldg-29608 |
| Work Location: Fort Gordon |
| Line # |
| Master Format Division |
| Material Costs |
| Equipment Costs |
| Labor Costs |
| Total Costs |
01 – General Conditions
Design
Subtotal:
Overhead – Field and Office
Bond
Profit
Other
Total Cost (Base Bid CLIN 001 )
DESIGN FOR RENOVATIONS COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 002)
| Project Description: Renovate & Expand Bldg-29608 |
| Work Location: Fort Gordon |
| Line # |
| Master Format Division |
| Material Costs |
| Equipment Costs |
| Labor Costs |
| Total Costs |
01 – General Conditions
Design
Subtotal:
Overhead – Field and Office
Bond
Profit
Other
Total Cost (Base Bid CLIN 002)
NEW CONSTRUCTION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 003)
| Project Description: Renovate & Expand Bldg-29608 |
| Work Location: Fort Gordon |
| Line # |
| Master Format Division |
| Material Costs |
| Equipment Costs |
| Labor Costs |
| Total Costs |
01 – General Conditions
02 – Existing Conditions
03 – Concrete
04 – Masonry
05 – Metals
06 – Wood, Plastics, and Composites
07 – Thermal & Moisture Protection
08 – Openings
09 – Finishes
10 – Specialties
12 – Furnishing
21 – Fire Suppression
22 – Plumbing
23 – HVAC
26 – Electrical
27 – Communication
28 – Electronic Safety and Security
31 – Earthwork
32 – Exterior improvements
33 – Utilities
Subtotal:
Sales Tax
Subcontractor Mark Up
Overhead – Field and Office
Bond
Profit
Other
Total Cost (Base Bid CLIN 003)
RENOVATION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 004)
| Project Description: Renovate & Expand Bldg-29608 |
| Work Location: Fort Gordon |
| Line # |
| Master Format Division |
| Material Costs |
| Equipment Costs |
| Labor Costs |
| Total Costs |
01 – General Conditions Comment by Gina Kern: Do you need to add Paint for Parking Lot as that is not interior?
Or does that fall under #32?
02 – Existing Conditions
03 – Concrete
04 – Masonry
05 – Metals
06 – Wood, Plastics, and Composites
07 – Thermal & Moisture Protection
08 – Openings
09 – Finishes
10 – Specialties
12 – Furnishing
21 – Fire Suppression
22 – Plumbing
23 – HVAC
26 – Electrical
27 – Communication
28 – Electronic Safety and Security
31 – Earthwork
32 – Exterior improvements
33 – Utilities
Subtotal:
Sales Tax
Subcontractor Mark Up
Overhead – Field and Office
Bond
Profit
Other
Total Cost (Base Bid CLIN 004)