Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx

DOCX document 42 KB Posted

Attached to
Fort Gordon MATOC IDIQ for Minor Construction, Repair and Alteration
Solicitation number
W9124920R0020
Issued by

About this file

This document contains a solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for minor construction, repair, and alteration projects at Fort Gordon, Georgia. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis is seeking offers for an IDIQ contract vehicle to complete future task orders for renovations and expansions to Building 29608. Offerors may attend a mandatory site visit on either July 28 or 29, 2020 with a maximum of two people. The solicitation closes on August 14, 2020 at 3:00 PM Eastern Time. Six cost estimate breakdown templates are provided for offerors to complete for the base bid contract line item numbers 001 through 006, which cover general conditions, various construction disciplines, sales tax, markups, and total costs.

View the file

Other files

File Type Posted
ATTACHMENT 38 - CONTRACTOR SUBMITTED QUESTIONS AND GOVERNMENT PROVIDED ANSWERS LAST ROUND OF QUESTIONS.pdf PDF
ATTACHMENT 39 - Consolidated Copy of Solicitation through Amendment 5.pdf PDF
W9124920R0020 AMENDMENT 0006.pdf PDF
Attachment 24- CH50091-2P Attachment 4 Experience Information.doc DOC document
Attachment 27b- CH50091-2P Attachment 5b Conceptual Construction Plans AD.pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW 20Aug20_.pdf PDF
Attachment 25 -CH50091-2P Attachment 5a Conceptual Design Analysis 20Aug....pdf PDF
Attachment 27g- CH50091-2P Attachment 5b Conceptual Construction Plans LS.pdf PDF
Attachment 26-CH50091-2P Attachment 5a Design Analysis 20Aug20.docx DOCX document
Attachment 27e- CH50091-2P Attachment 5b Conceptual Construction Plans I.pdf PDF
Attachment 11- Scope of Work_MATOC 17Aug20.pdf PDF
W9124920R0020 AMENDMENT 0005.pdf PDF
Attachment 27h- CH50091-2P Attachment 5b Conceptual Construction Plans M- (2).pdf PDF
Attachment 27c- CH50091-2P Attachment 5b Conceptual Construction Plans EP.pdf PDF
Attachment 27d- CH50091-2P Attachment 5b Conceptual Construction Plans FA.pdf PDF
Attachment 27i- CH50091-2P Attachment 5b Conceptual Construction Plans M-.pdf PDF
Attachment 36 - MATOC_Contractor Questions and Answers_FINAL.pdf PDF
Attachment 27f- CH50091-2P Attachment 5b Conceptual Construction Plans I-.pdf PDF
Attachment 37 - Site Visit sign in_Redacted.pdf PDF
Attachment 27a- CH50091-2P Attachment 5b Conceptual Construction Plans A.pdf PDF
Attachment 21- CH50091-2P Attachment 1 Task Order Price Schedule Rev1.docx DOCX document
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
W9124920R0020 AMENDMENT 0004.pdf PDF
W9124920R0020 AMENDMENT 0003.pdf PDF
W9124920R0020 AMENDMENT 0002.pdf PDF
Attachment 17 - Past Performance Cover Letter and Assessment Questionnair-REV1.docx DOCX document
W9124920R0020 AMENDMENT 0001.pdf PDF
Attachment 5- Division 01 Specifications_MATOC 10Jun20.pdf PDF
Attachment 16- Example of Package 1.pdf PDF
Attachment 2-Davis-Bacon Act WD GA20200153 Building - Richmond County GA.pdf PDF
Attachment 4-01 33 00 attachment SF1413-13e.pdf PDF
Attachment 6- MATOC QA Plan with Appendices_10Jun20.pdf PDF
Attachment 8- FG Installation Planning Standards_PreFinal 061319.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 29- Draft RTOP Letter.pdf PDF
Attachment 25- CH50091-2P Attachment 5a Conceptual Design Analysis.pdf PDF
Attachment 1-Davis-Bacon Act WD GA20200275 Highway Georgia.pdf PDF
Attachment 3-01 08 00 Weighted Guidelines.xls XLS spreadsheet
Attachment 11- Scope of Work_MATOC 12Jun20.pdf PDF
Attachment 28- CH50091-2P Attachment 6 As-builts.pdf PDF
Attachment 12- Submital Register.pdf PDF
Attachment 10- Pre-Construction Safety Brief (Updated 2020).pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW Rev1.pdf PDF
Attachment 7- FG Storm Water Permitting Requirements.pdf PDF
Attachment 14- ufc_3_740_05_2010_c1 Construction Cost Est.pdf PDF
Attachment 27- CH50091-2P Attachment 5b Conceptual Construction Plans.pdf PDF
Attachment 19 - Consent Form for the Release of Past Performance.docx DOCX document
Attachment 18 - Specific Relevant Contract Reference Sheets.docx DOCX document
W9124920R0020 FORT GORDON MATOC.pdf PDF
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

PROPOSAL FORMAT

CONTRACTOR:

CONTRACT NUMBER:

DESIGN FOR NEW CONSTRUCTION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 001)

Project Description: Renovate & Expand Bldg-29608
Work Location: Fort Gordon
Line #
Master Format Division
Material Costs
Equipment Costs
Labor Costs
Total Costs

01 – General Conditions

Design

Subtotal:

Overhead – Field and Office

Bond

Profit

Other

Total Cost (Base Bid CLIN 001 )

DESIGN FOR RENOVATIONS COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 002)

Project Description: Renovate & Expand Bldg-29608
Work Location: Fort Gordon
Line #
Master Format Division
Material Costs
Equipment Costs
Labor Costs
Total Costs

01 – General Conditions

Design

Subtotal:

Overhead – Field and Office

Bond

Profit

Other

Total Cost (Base Bid CLIN 002)

NEW CONSTRUCTION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 003)

Project Description: Renovate & Expand Bldg-29608
Work Location: Fort Gordon
Line #
Master Format Division
Material Costs
Equipment Costs
Labor Costs
Total Costs

01 – General Conditions

02 – Existing Conditions

03 – Concrete

04 – Masonry

05 – Metals

06 – Wood, Plastics, and Composites

07 – Thermal & Moisture Protection

08 – Openings

09 – Finishes

10 – Specialties

12 – Furnishing

21 – Fire Suppression

22 – Plumbing

23 – HVAC

26 – Electrical

27 – Communication

28 – Electronic Safety and Security

31 – Earthwork

32 – Exterior improvements

33 – Utilities

Subtotal:

Sales Tax

Subcontractor Mark Up

Overhead – Field and Office

Bond

Profit

Other

Total Cost (Base Bid CLIN 003)

RENOVATION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 004)

Project Description: Renovate & Expand Bldg-29608
Work Location: Fort Gordon
Line #
Master Format Division
Material Costs
Equipment Costs
Labor Costs
Total Costs

01 – General Conditions Comment by Gina Kern: Do you need to add Paint for Parking Lot as that is not interior?

Or does that fall under #32?

02 – Existing Conditions

03 – Concrete

04 – Masonry

05 – Metals

06 – Wood, Plastics, and Composites

07 – Thermal & Moisture Protection

08 – Openings

09 – Finishes

10 – Specialties

12 – Furnishing

21 – Fire Suppression

22 – Plumbing

23 – HVAC

26 – Electrical

27 – Communication

28 – Electronic Safety and Security

31 – Earthwork

32 – Exterior improvements

33 – Utilities

Subtotal:

Sales Tax

Subcontractor Mark Up

Overhead – Field and Office

Bond

Profit

Other

Total Cost (Base Bid CLIN 004)

RENOVATION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 005)

Project Description: Renovate & Expand Bldg-29608
Work Location: Fort Gordon
Line #
Master Format Division
Material Costs
Equipment Costs
Labor Costs
Total Costs

01 – General Conditions Comment by Gina Kern: Do you need to add Paint for Parking Lot as that is not interior?

02 – Existing Conditions

03 – Concrete

08 – Openings

26 – Electrical

28 – Electronic Safety and Security

31 – Earthwork

33 – Utilities

Subtotal:

Sales Tax

Subcontractor Mark Up

Overhead – Field and Office

Bond

Profit

Other

Total Cost (Base Bid CLIN 005)

RENOVATION COST ESTIMATE BREAKDOWN CH50091-2P- BASE BID (CLIN 006)

Project Description: Renovate & Expand Bldg-29608
Work Location: Fort Gordon
Line #
Master Format Division
Material Costs
Equipment Costs
Labor Costs
Total Costs

01 – General Conditions Comment by Gina Kern: Do you need to add Paint for Parking Lot as that is not interior?

02 – Existing Conditions

03 – Concrete

08 – Openings

10 – Specialties

12 – Furnishing

31 – Earthwork

33 – Utilities

Subtotal:

Sales Tax

Subcontractor Mark Up

Overhead – Field and Office

Bond

Profit

Other

Total Cost (Base Bid CLIN 006)

File details come from the government source that posted it. Updated .