Attachment 21- CH50091-2P Attachment 1 Task Order Price Schedule Rev1.docx

DOCX document 22 KB Posted

Attached to
Fort Gordon MATOC IDIQ for Minor Construction, Repair and Alteration
Solicitation number
W9124920R0020
Issued by

About this file

This document contains a pricing schedule for a task order solicitation to renovate and expand Building 29608 at Fort Gordon, Georgia. The solicitation includes six contract line item numbers for design and construction services. CLIN 001 requests pricing for new construction design, CLIN 002 for renovation design, CLIN 003 for new construction work, and CLIN 004 for renovation work. CLIN 005 provides the contractor quote only for repairs by Georgia Power, while CLIN 006 similarly provides the quote only for repairs by the Augusta Utilities Department. Offerors must provide pricing for all CLINs, and the total proposed price is requested. The performance period is a maximum of 585 days from notice to proceed. Proposals must allow at least 180 days for government acceptance after the proposal due date.

View the file

Other files

File Type Posted
ATTACHMENT 38 - CONTRACTOR SUBMITTED QUESTIONS AND GOVERNMENT PROVIDED ANSWERS LAST ROUND OF QUESTIONS.pdf PDF
ATTACHMENT 39 - Consolidated Copy of Solicitation through Amendment 5.pdf PDF
W9124920R0020 AMENDMENT 0006.pdf PDF
Attachment 24- CH50091-2P Attachment 4 Experience Information.doc DOC document
Attachment 27b- CH50091-2P Attachment 5b Conceptual Construction Plans AD.pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW 20Aug20_.pdf PDF
Attachment 25 -CH50091-2P Attachment 5a Conceptual Design Analysis 20Aug....pdf PDF
Attachment 27g- CH50091-2P Attachment 5b Conceptual Construction Plans LS.pdf PDF
Attachment 26-CH50091-2P Attachment 5a Design Analysis 20Aug20.docx DOCX document
Attachment 27e- CH50091-2P Attachment 5b Conceptual Construction Plans I.pdf PDF
Attachment 11- Scope of Work_MATOC 17Aug20.pdf PDF
W9124920R0020 AMENDMENT 0005.pdf PDF
Attachment 27h- CH50091-2P Attachment 5b Conceptual Construction Plans M- (2).pdf PDF
Attachment 27c- CH50091-2P Attachment 5b Conceptual Construction Plans EP.pdf PDF
Attachment 27d- CH50091-2P Attachment 5b Conceptual Construction Plans FA.pdf PDF
Attachment 27i- CH50091-2P Attachment 5b Conceptual Construction Plans M-.pdf PDF
Attachment 36 - MATOC_Contractor Questions and Answers_FINAL.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 27f- CH50091-2P Attachment 5b Conceptual Construction Plans I-.pdf PDF
Attachment 37 - Site Visit sign in_Redacted.pdf PDF
Attachment 27a- CH50091-2P Attachment 5b Conceptual Construction Plans A.pdf PDF
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
W9124920R0020 AMENDMENT 0004.pdf PDF
W9124920R0020 AMENDMENT 0003.pdf PDF
W9124920R0020 AMENDMENT 0002.pdf PDF
Attachment 17 - Past Performance Cover Letter and Assessment Questionnair-REV1.docx DOCX document
W9124920R0020 AMENDMENT 0001.pdf PDF
Attachment 5- Division 01 Specifications_MATOC 10Jun20.pdf PDF
Attachment 16- Example of Package 1.pdf PDF
Attachment 2-Davis-Bacon Act WD GA20200153 Building - Richmond County GA.pdf PDF
Attachment 4-01 33 00 attachment SF1413-13e.pdf PDF
Attachment 6- MATOC QA Plan with Appendices_10Jun20.pdf PDF
Attachment 8- FG Installation Planning Standards_PreFinal 061319.pdf PDF
Attachment 22-CH50091-2P Attachment 2 Proposal Format.docx DOCX document
Attachment 29- Draft RTOP Letter.pdf PDF
Attachment 25- CH50091-2P Attachment 5a Conceptual Design Analysis.pdf PDF
Attachment 1-Davis-Bacon Act WD GA20200275 Highway Georgia.pdf PDF
Attachment 3-01 08 00 Weighted Guidelines.xls XLS spreadsheet
Attachment 11- Scope of Work_MATOC 12Jun20.pdf PDF
Attachment 28- CH50091-2P Attachment 6 As-builts.pdf PDF
Attachment 12- Submital Register.pdf PDF
Attachment 10- Pre-Construction Safety Brief (Updated 2020).pdf PDF
Attachment 20- CH50091-2P Renovate Expand Bldg-29608 SOW Rev1.pdf PDF
Attachment 7- FG Storm Water Permitting Requirements.pdf PDF
Attachment 14- ufc_3_740_05_2010_c1 Construction Cost Est.pdf PDF
Attachment 27- CH50091-2P Attachment 5b Conceptual Construction Plans.pdf PDF
Attachment 19 - Consent Form for the Release of Past Performance.docx DOCX document
Attachment 18 - Specific Relevant Contract Reference Sheets.docx DOCX document
W9124920R0020 FORT GORDON MATOC.pdf PDF
Attachment 23- CH50091-2P Attachment 3 Experience Overview.doc DOC document
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 21- CH50091-2P

ATTACHMENT 1

TASK ORDER PRICING SCHEDULE

CONTRACTOR:

CONTRACT NUMBER:

CH50091-2P RENOVATE AND EXPAND BLDG 29608

SUMMARY SHEET (Total with Mark-ups)

CLIN 001 BASE BID - Design for new construction
$________________
CLIN 002 BASE BID - Design for renovations
$________________
CLIN 003 BASE BID – New Construction work
$________________

CLIN 004 BASE BID – Renovations work

CLIN 005 BASE BID - Georgia Power (GP) Repair (GP - Contractor Quote Only) $___28,000.00 ____

CLIN 006 BASE BID - Augusta Utilities Department (AUD) – Repair ( AUD - Contractor Quote Only) $___465,428.00____

TOTAL PROPOSAL:

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the Request for Task Order Proposal (RTOP) or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors shall state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so will disqualify the Offeror.

NOTE NO. 3. Proposal Format – Contractor shall provide pricing summarized into the 50 divisions according to the Master Format system of classification and numbering. Each division shall provide the following breakdown of 1) materials; 2) equipment; 3) labor. Each proposal shall also include contractor’s markup on subcontractor, contractor’s office overhead and profit, and sales tax on materials and equipment. See Attachment 2 for required Proposal Format. The Government has the right to request additional information for clarification and validation.

NOTE NO. 4. Contract performance time is a maximum of 585 calendar days after receipt of Notice to Proceed.

NOTE NO.6. Offers providing less than 180 calendar days for Government acceptance after the date offers are due, will not be considered for award and will be rejected.