W9123620B0011 Amendment 2.pdf
PDF 208 KB Posted
- Attached to
- DLA Fitness Center Renovation
- Solicitation number
- W9123620B2011
About this file
This solicitation notice is for the renovation of Building 32 at the Defense Supply Center in Richmond, Virginia to relocate an existing fitness center. The scope of work includes offices, wellness facilities, racquetball courts, gymnasium space with regulation basketball court and bleachers, locker rooms with showers and steam room/sauna, exercise and storage areas.
The solicitation will be issued on April 9, 2020 as a sealed bid construction contract for small businesses with a size standard of $39.5 million. Bids are due on May 7, 2020 and award will follow. The performance period is 450 days from notice to proceed. The work is valued between $5-10 million and will require payment and performance bonds. The solicitation and any amendments will be posted to beta.SAM.gov and it is the offeror's responsibility to check the site regularly for updates.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to upload additional draw ings and specs in response to bidder inquiries.
Bid Closing has been changed to 27 MAY 2020 5pm.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B2011
X 9B. DATED (SEE ITEM 11)
13-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-May-2020
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 13-May-2020 05:00 PM to 27-May-2020 05:00 PM.
The following have been modified:
NOTICE TO BIDDERS
1. SPECIAL BID SUBMISSION INSTRUCTIONS DUE TO COVID-19
The Norfolk District anticipates the possibility that its building will be closed during the time for bid submission due to the evolving requirements arising in response to COVID-19. Accordingly, the Norfolk District will NOT accept bids my mail, hand-carry, or commercial courier (that is, no physical bids will be accepted in response to this solicitation). All bids must be submitted by electronic commerce only (that is, by submission via DoD SAFE, as discussed below, only).
Electronic Bid Submission in DoD SAFE
In accordance with (IAW) FAR 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS, all bids must be received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. Eastern Day Time (EDT) on May 27, 2020. Bids will be submitted through DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). DoD SAFE is the Government infrastructure utilized to secure bid proposals and IAW FAR 14.202-8, citing FAR 4.5, and as limited by the requirements of the AFARS, 5104.502-90.
All bid proposals must be uploaded into DoD SAFE infrastructure not earlier than May 14, 2020, and not later than (NLT) May 27, 2020, at 5:00 p.m. Eastern Day Time (EDT). Bidders will require a unique “request code” to upload bid proposals into DoD SAFE, which must obtained by email only to POC: Raven D. Sasser at Raven.D.Sasser@usace.army.mil and cc: PPMDContracts@usace.army.mil. The POC must receive the email for the “request code” NLT May 25, 2020, at 5:00 p.m. EDT. The electronic bid submittal contents shall conform to the details of the solicitation and subsequent amendments.
Electronic Bid Opening
There will be a “public” bid opening conducted by the Government via teleconference on May 28, 2020, at 10:00 a.m. EDT for participating bidders. The teleconference phone number, and access codes will be emailed to participants once bid submission due date and time have lapsed. Bidders will be able to participate in the reading of the bids through this teleconference.
In the event the Norfolk District building is closed at the time of bid opening, a bid abstract containing bid results will be distributed to participating bidders within twenty-fours (24) hours of the bid opening. Upon request, the Norfolk District will make the opened bids available for examination.
A copy of the duly executed Bid Guarantee (signed by principal and surety with raised seal) must also be included in the attachment labeled “Bid.20B2011_”Bidder Name”.” A physical copy of the Bid Guarantee in proper form with evident raised seal must be submitted within seventy-two (72) hours to the Government upon request from the apparent low bidder. Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments.
Electronic Bid Uploading https://safe.apps.mil/ mailto:Raven.D.Sasser@usace.army.mil mailto:PPMDContracts@usace.army.mil
Bidders are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before upload into DoD SAFE. Electronic copies shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite (Excel and Project) 2010. The electronic copies shall be in Adobe Acrobat (except for Microsoft Excel documents) portable document file (pdf) searchable text format. Electronic files shall be clearly identified for each section and item as detailed in the solicitation. It is the Bidders’s responsibility to obtain written confirmation of receipt of all electronic files of the bid submitted into DoD SAFE.
Any questions regarding bid submission should be directed to Mrs. Raven Sasser in ProjNet.
2. AWARD TO RESPONSIBLE BIDDER
Responsibility will be determined, prior to award, by the Contracting Officer, either by performing a pre-award survey or conclusions based on a previous pre-award survey and/or any performance data available. A pre-award survey maybe performed in determining the bidders responsibility in accordance with FAR 9.104 and 9.106. The bidder will be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant or other resources to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified. If the bidder is unable to comply with the request for preaward survey, the bidder will no longer be considered for award.
To be determined responsible, a bidder must demonstrate the following –
a. Have adequate financial resources to perform the contract, or the ability to obtain them;
b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
c. Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history;
d. Have a satisfactory record of integrity and business ethics;
e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors);
f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them;
and
g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations
**NOTE - The Government is not liable for any costs incurred by the bidder submitting an offer in response to this solicitation.
Additionally, in accordance with FAR Part 9.1, prior to awarding a contract, the Government will conduct a Responsibility Determination of the firm selected for award. The below information will be requested of the apparent low bidder. This information is not required to be responsive to the invitation for bid. Too efficiently and expeditious award the resultant contract, it is HIGHLY recommended that bidders provide the below information with their bid. If bidders wish to shield this information from public view at the bid opening, the information may be placed in an envelope with the following legend:
PRE-AWARD SURVEY INFORMATION
SOLICITATION NO. W91236-20-B-2011
This information is not required to be responsive to the invitation for bid.
a) Current commitments and expected dates of completion.
b) One (1) signed bank reference demonstrating adequate financial resources. If bidder’s firm has a line of credit – provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
c) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder.
d) IMPORTANT NOTE, this solicitation requires apparent low bidder to submit DRC criteria as defined below:
Definitive Responsibility Criteria (DRC) DSCR Fitness Center
The apparent low bidder will be required to submit project information to establish that it meets the DRC within 24 hours of bid opening. Failure to provide the DRC information may result in a negative responsibility determination that will render the bidder ineligible for award. The low bidder must submit two “qualifying” projects to be deemed responsible as measured against these definitive responsibility criteria. The project submission shall describe the owner name, contract number (if applicable), contract value, a desription of the work performed which should address the mandatory project elements set out below, and a point of contact for the owner. A qualifying project, and the contract description submitted for it, must demonstrate experience with the following elements:
a. Renovation of a fully enclosed building with more than 10,000 square feet of space.
b. The project must have a magnitude greater than $5M.
c. Projects must have been performed within the eight (8) years preceding the date of this solicitation.
d. The contract must have been performed by the bidder as a prime contractor.
e. The Government may also consider prior experience on a contract where the bidder served as a key subcontractor and the scope of the subcontract otherwise meets the elements set out above.
3. BASIS OF AWARD
In order to be considered responsive all pricing on the CLINS must be filled out. A single award will be made to the lowest responsible, responsive bidder on the basis of the total price bid. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Prior to making an award, a pre-award survey will be made and the low bidder will be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified.
Prospective bidders shall be registered in the System for Award Management (SAM) database as required by FAR 52.204-7, System for Award Management (Oct 2018).
Note that the SAM is required for all bidders; including Joint Ventures (JV) (registration must state the NAME of the JV). Bidders not currently registered in SAM must obtain a DUN & Bradstreet (DUNS) number and a CAGE prior to registering in SAM.
All bidders, including JV bidders, must submit with their proposal a DUNS number. In addition to the DUNS number required for JV bidders, JV bidders must submit with their proposal a DUNS number for each member comprising the JV. DUNS numbers can be obtained at http;://fedgov.dnb.com/web form. The DUNS number is required in order to register in SAM (see above).
4. EVIDENCE OF AUTHORITY TO SIGN BID
Evidence of the authority of individuals signing bids to submit firm bids on behalf of the bidder is required except where the bid is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated bidder; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the bid satisfactory evidence of the authority of all other persons may be cause for rejection of the bid as invalid or nonresponsive.
5. PREAWARD SAFETY CONFERENCE
a. Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such bidder, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof.
b. Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in a preaward survey, in determining the bidder's responsibility.
c. The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the bidder and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the bidder, along with all other safety and accident prevention requirements of the contract, if award is made to him.
6. INSPECTION OF THE SITE
Prospective bidders are invited to visit the site of the work in order to acquaint themselves as to site conditions and other problems incident to the prosecution of the work. Arrangements for inspection of the site shall be made through the Office the Area Engineer identified in the clause 52.236-27, entitled "SITE VISIT
(CONSTRUCTION)."
7. INCURRING COSTS
The Government is not liable for any costs incurred by the bidder submitting a bid in response to this solicitation.
8. AGENTS
Bids signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent’s authority to act on behalf of its Principal.
9. UNBALANCED BIDS
Any bid which is materially unbalanced as to prices for the Contract Line Item Schedule (as defined in FAR 14.408) may be rejected as non-responsive or otherwise not considered for award. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
10. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. A copy of the Designation of Authority letter will be furnished to the contractor at time of contract award.
11. MAGNITUDE OF CONSTRUCTION
The magnitude of construction is between $5,000,000 to $10,000,000, FAR 236.204.
12. BIDDER'S QUESTIONS AND COMMENTS
1.5.1 Bidder Inquiry
1.5.1.1 Technical inquiries and questions relating to bid procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
http://www.projnet.org/projnet
1.5.1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.5.1.1.2 From this page you may view all bidder inquiries or add inquiry.
1.5.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.5.1.1.4 The Solicitation Number is: W91236-20-B-2011
1.5.1.1.5 The Bidder Inquiry Key is: XF45MC-57R24J
1.5.1.2 The Bidder Inquiry System will be unavailable for new inquires 10 days prior to bid submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.5.1.3 Bidders are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.5.1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
ATTACHMENTS
1. Convert B32, Bays F-G for Fitness Center RTA Drawings, dated 23 Dec 2019, 206 pages
2. Convert B32 Bays F&G Fitness Center RTA Specifications, dated 23 Dec 2019, 1554 pages
3. Section 08 14 00 Wood Doors 08/16, 6 pages
4. Section 09 30 10 Porcelain Tiling 08/17, 12 pages
5. Section 09 51 00 Acoustical Ceilings 08/17, 10 pages
6. Section 09 64 66 Wood Athletic Flooring 08/16, 10 pages
7. Section 09 65 00 Resilient Flooring 08/10, 8 pages
8. Section 09 65 66 Resilient Athletic Flooring 08/16, 8 pages
9. Section 09 68 00 Carpet Tiles 11/17, 10 pages
10. Section 11 66 23 Gymnasium Equipment 06/19, 10 pages
11. Section 12 66 00 Telescoping Stands 11/12, 10 pages
12. 118ECE908 RTA FF&E Binder dated 22 Nov 2019, 32 pages
13. 118ECE908 RTA SID Binder dated 22 Nov 2019, 52 pages
14. A-101B Floor Plan – Area B dated 23 Dec 2019, 1 page
15. A-101C Floor Plan – Area C dated 23 Dec 2019, 1 page
16. A-111A Reflected Ceiling Plan -Area A dated 23 Dec 2019, 1 page
17. A-111B Reflected Ceiling Plan -Area B dated 23 Dec 2019, 1 page
18. A-111C Reflected Ceiling Plan -Area C dated 23 Dec 2019, 1 page
19. A-111D Reflected Ceiling Plan -Area D dated 23 Dec 2019, 1 page
20. A-121 Overall Roof Plan dated 23 Dec 2019, 1 page
21. A-201 Building Elevations dated 23 Dec 2019, 1 page
22. A-512 Roof Details dated 23 Dec 2019, 1 page
23. A-521 Miscellaneous Details dated 23 Dec 2019, 1 page
24. Asbestos Re-Inspection Report DSCR Building No. 32 dated 22 May 2018, 15 pages
25. ED111A Electrical Demolition Plan -Area A dated 23 Dec 2019, 1 page
26. ED111B Electrical Demolition Plan -Area B dated 23 Dec 2019, 1 page
27. ED111C Electrical Demolition Plan -Area C dated 23 Dec 2019, 1 page
28. ED111D Electrical Demolition Plan -Area D dated 23 Dec 2019, 1 page
29. I101C Floor Finish Plan -Area C dated 23 Dec 2019, 1 page
30. I101D Floor Finish Plan -Area D dated 23 Dec 2019, 1 page
31. Lead Based Paint Survey Report Building No. 32 dated 13 August 2018, 54 pages
32. M-503 Mechanical Details dated 23 Dec 2019, 1 page
33. S-001 General Structural Notes dated 23 Dec 2019, 1 page
34. S-101 Overall Foundation Plan dated 23 Dec 2019, 1 page
35. S-121C Truss Bottom Chord Plan -Area C dated 23 Dec 2019, 1 page
36. S-201 Framing Elevations & Details dated 23 Dec 2019, 1 page
37. S-301 Sections & Details –I dated 23 Dec 2019, 1 page
38. S-302 Sections & Details –II dated 23 Dec 2019, 1 page
39. S-501 Typical Structural Details –I dated 23 Dec 2019, 1 page
40. 118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages
41. 118ECE908 AMDT 002 33 40 00 dated 022010 11 pages
42. 118ECE908 AMDT 002 CG 100 dated 04292020 1 page
43. 118ECE908 AMDT 002 CG 102 dated 04292020 1 page
44. 118ECE908 AMDT 002 CU 101 dated 04292020 1 page
45. 118ECE908 AMDT 002 GC 002 dated 04292020 1 page
46. 118ECE908 AMDT 002 08 41 13 14 pages
47. 118ECE908 AMDT 002 10 23 10 8 pages
48. 118ECE908 AMDT 002 11 66 23 10 pages
49. 118ECE908 AMDT 002 A002 PARTITION TYPES 1 page
50. 118ECE908 AMDT 002 A101B FLOOR PLAN AREA B 1 page
51. 118ECE908 AMDT 002 A101C FLOOR PLAN AREA C 1 page
52. 118ECE908 AMDT 002 A111A REFLECTED CEILING PLAN AREA A 1 page
53. 118ECE908 AMDT 002 A111B REFLECTED CEILING PLAN AREA B 1 page
54. 118ECE908 AMDT 002 A111C REFLECTED CEILING PLAN AREA C 1 page
55. 118ECE908 AMDT 002 A111D REFLECTED CEILING PLAN AREA D 1 page
56. 118ECE908 AMDT 002 DRAWINGS 05MAY2020 206 pages
57. 118ECE908 AMDT 002 FFANDE BINDER 05MAY2020 77 pages
58. 118ECE908 AMDT 002 I 101B FINISH PLAN AREA B 1 page
59. 118ECE908 AMDT 002 SPECIFICATIONS 05MAY2020 1556 pages
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
1. Convert B32, Bays F-G for Fitness Center RTA Drawings, dated 23 Dec 2019, 206 pages
2. Convert B32 Bays F&G Fitness Center RTA Specifications, dated 23 Dec 2019, 1554 pages
3. Section 08 14 00 Wood Doors 08/16, 6 pages
4. Section 09 30 10 Porcelain Tiling 08/17, 12 pages
5. Section 09 51 00 Acoustical Ceilings 08/17, 10 pages
6. Section 09 64 66 Wood Athletic Flooring 08/16, 10 pages
7. Section 09 65 00 Resilient Flooring 08/10, 8 pages
8. Section 09 65 66 Resilient Athletic Flooring 08/16, 8 pages
9. Section 09 68 00 Carpet Tiles 11/17, 10 pages
10. Section 11 66 23 Gymnasium Equipment 06/19, 10 pages
11. Section 12 66 00 Telescoping Stands 11/12, 10 pages
12. 118ECE908 RTA FF&E Binder dated 22 Nov 2019, 32 pages
13. 118ECE908 RTA SID Binder dated 22 Nov 2019, 52 pages
14. A-101B Floor Plan – Area B dated 23 Dec 2019, 1 page
15. A-101C Floor Plan – Area C dated 23 Dec 2019, 1 page
16. A-111A Reflected Ceiling Plan -Area A dated 23 Dec 2019, 1 page
17. A-111B Reflected Ceiling Plan -Area B dated 23 Dec 2019, 1 page
18. A-111C Reflected Ceiling Plan -Area C dated 23 Dec 2019, 1 page
19. A-111D Reflected Ceiling Plan -Area D dated 23 Dec 2019, 1 page
20. A-121 Overall Roof Plan dated 23 Dec 2019, 1 page
21. A-201 Building Elevations dated 23 Dec 2019, 1 page
22. A-512 Roof Details dated 23 Dec 2019, 1 page
23. A-521 Miscellaneous Details dated 23 Dec 2019, 1 page
24. Asbestos Re-Inspection Report DSCR Building No. 32 dated 22 May 2018, 15 pages
25. ED111A Electrical Demolition Plan -Area A dated 23 Dec 2019, 1 page
26. ED111B Electrical Demolition Plan -Area B dated 23 Dec 2019, 1 page
27. ED111C Electrical Demolition Plan -Area C dated 23 Dec 2019, 1 page
28. ED111D Electrical Demolition Plan -Area D dated 23 Dec 2019, 1 page
29. I101C Floor Finish Plan -Area C dated 23 Dec 2019, 1 page
30. I101D Floor Finish Plan -Area D dated 23 Dec 2019, 1 page
31. Lead Based Paint Survey Report Building No. 32 dated 13 August 2018, 54 pages
32. M-503 Mechanical Details dated 23 Dec 2019, 1 page
33. S-001 General Structural Notes dated 23 Dec 2019, 1 page
34. S-101 Overall Foundation Plan dated 23 Dec 2019, 1 page
35. S-121C Truss Bottom Chord Plan -Area C dated 23 Dec 2019, 1 page
36. S-201 Framing Elevations & Details dated 23 Dec 2019, 1 page
37. S-301 Sections & Details –I dated 23 Dec 2019, 1 page
38. S-302 Sections & Details –II dated 23 Dec 2019, 1 page
39. S-501 Typical Structural Details –I dated 23 Dec 2019, 1 page
40. 118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages
41. 118ECE908 AMDT 002 33 40 00 dated 022010 11 pages
42. 118ECE908 AMDT 002 CG 100 dated 04292020 1 page
43. 118ECE908 AMDT 002 CG 102 dated 04292020 1 page
44. 118ECE908 AMDT 002 CU 101 dated 04292020 1 page
45. 118ECE908 AMDT 002 GC 002 dated 04292020 1 page
46. 118ECE908 AMDT 002 08 41 13 14 pages
47. 118ECE908 AMDT 002 10 23 10 8 pages
48. 118ECE908 AMDT 002 11 66 23 10 pages
49. 118ECE908 AMDT 002 A002 PARTITION TYPES 1 page
50. 118ECE908 AMDT 002 A101B FLOOR PLAN AREA B 1 page
51. 118ECE908 AMDT 002 A101C FLOOR PLAN AREA C 1 page
52. 118ECE908 AMDT 002 A111A REFLECTED CEILING PLAN AREA A 1 page
53. 118ECE908 AMDT 002 A111B REFLECTED CEILING PLAN AREA B 1 page
54. 118ECE908 AMDT 002 A111C REFLECTED CEILING PLAN AREA C 1 page
55. 118ECE908 AMDT 002 A111D REFLECTED CEILING PLAN AREA D 1 page
56. 118ECE908 AMDT 002 DRAWINGS 05MAY2020 206 pages
57. 118ECE908 AMDT 002 FFANDE BINDER 05MAY2020 77 pages
58. 118ECE908 AMDT 002 I 101B FINISH PLAN AREA B 1 page
59. 118ECE908 AMDT 002 SPECIFICATIONS 05MAY2020 1556 pages
(End of clause)
(End of Summary of Changes)