20-B-2011 Amend 0004.pdf
PDF 416 KB Posted
- Attached to
- DLA Fitness Center Renovation
- Solicitation number
- W9123620B2011
About this file
This is a pre-solicitation notice for solicitation number W9123620B2011 to renovate the DLA Fitness Center at the Defense Supply Center Richmond in Virginia. The renovation includes offices, wellness areas, racquetball courts, a gymnasium, locker rooms, and storage. The renovation will be awarded as a 100% small business set-aside firm-fixed-price contract not to exceed $10 million under NAICS 236220. The period of performance is 450 days after notice to proceed. Offerors must be registered in SAM and provide payment and performance bonds. The IFB will be issued on April 9, 2020 with proposals due May 7, 2020 and available at beta.sam.gov where any amendments will be posted.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to upload additional draw ings and specs numbers 60 through 64 in response to bidder inquiries from ProjNet and to add RFI responses from ProjNet.
The closing date is not extended.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B2011
X 9B. DATED (SEE ITEM 11)
13-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2020
CODE
USACE NORFOLK DISTRICT OFFICE
803 FRONT ST
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been modified:
RESPONSE TO RFIS
UNCLASSIFIED\\FOR OFFICIAL USE
ONLY
Bid Inquiry Contracting Officers
Report All
Inquiries
Project: DSCR - Fitness Center Review: Inquiry May
2020 (00002) (sorted by CommentID )
Displaying 49 inquiries.
Id Discipline Sheet Detail Spec
8515012 General CU101 Key Note 7
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify type of filter fabric needed for HDPE perforated pipe.
1-1 Government Response. See Amendment 0001 for details specification 33 40 00 is updated to more clearly indicate filter fabric requirements By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8515013 General CU101 Key Note 8
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Key Note 8 on sheet CU101 states "Provide PVC sleeve through foundation wall for 6" HDPE pipe. Please clarify what size sleeve is needed.
1-1 Government Response. This is included in Amendment 1
This is updated in CU101 to show the pipe sleeve. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8515014 General CG100 Legend
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet CG100 under "Legend" list a Stabilized Construction Entrance. No construction entrance is shown on plans.
1-1 Government Response. This is included in Amendment 0001 This is updated in CG100 to show a revised construction entrance. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8515015 General CD101 and CU101
If the 4" sanitary sewer lateral shown on demo plan (CD101) does not meet the required elevations and minimum slope, will the installation of the 6" sewer lateral (Sheet CU101) be handled as an alternate modification to the base bid post award?
1-1 Government Response. CU101 was revised to clarify this requirement.
included in Amendment 0001 By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8531759 Design Team Leader tab 4 FF&E
Comment Classification: UNCLASSIFIED (U) tab 4 is the furniture order data sheet but it is empty
1-1 Government Response. See Amendment 0002
Forthcoming amendment will have Parts 3&4 By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8538905 Architectural A101B
As for connecting the lockers to support, we can not connect plastic lockers to Unistrut or metal lumber as a substitute for an anchor bolt into a wall structure with some form of support mounted into the wall before attachment.
Please explain the bubble on the drawing.
1-1 Government Response. See Amendment 00002
Forthcoming amendment will modify keynote 155. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8539341 Architectural A-101
Comment Classification: UNCLASSIFIED (U)
Please advise What is the standoff for this building? (calls for ballistic framing).
1-1 Government Response. See Amendment 0002 for bid closing
Forthcoming amendment will adjust 08 41 13, 08 11 16, 08 41 13, and CS100 to clarify this requirement.
By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8540010 General N/A N/A N/A
If the Joint Venture is an SBA approved mentor/protégé, do we need to include the teaming agreement with the bid?
1-1 Government Response. Yes, you need to include the teaming agreement with your bid. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 05 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8540030 General N/A N/A N/A
Some of Maryland and Virginia businesses are closed because of the Coronavirus. Would you please consider extending the proposal another two weeks to obtain multiple bids from the subcontracting community that have experience similar to the scope of work.
1-1 Government Response. See Amendment 0002 for new bid closing By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8542219 Architectural I603
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
I can't locate anything in the plans showing me which walls in the 115 and 116 Toilet/ Locker Rm/ Shower area receive wall tile. The Interior Finish Schedule shows wall tile in the restrooms and showers but not in the locker rm. I-603, Detail A3 mentions tiling up to the ceiling in the locker rm. Does the entire 115 and 116 areas receive wall tile or just certain areas?
Forthcoming amendment will clarify I-101B By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8545218 Contracting NA NA SF1442
Kindly clarify the requirements for bid guarantee for this project.
1-1 Government Response. The bid guarantee is in accordance with clause 52.228-1 20% of total price but shall not exceed $3 Million By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 05 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8545994 Architectural A-101C
REF.
NOTES
OPTION 1
Please clarify requirements for option 1. Telescoping stands. Option 4 is retractable bleachers. What are telescoping stands?
1-1 Government Response. Forthcoming amendment will adjust A-101C to match the telescoping stands label which is the more accurate label for bleachers of this type. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546406 Architectural A sheets
Drawing sheets A-101B Floor Plan Area, A-101C Floor Plan area, A111A -A111D Reflected Ceiling Plan, A121 Overall Roof plan, A201 Building Elevations, A512 Roof Details, A521 Miscellaneous Details, ED111A-ED111D Electrical Demolition Plan, Equipment mechanical schedule, I101C, I101D and M503 Mechanical Details were issued along with Drawings H.01.01 Convert B32 Bays F-G for fitness Center RTA Drawings 22NOV19. Why were these sheets issued separately? Does the contractor need to be aware of any specific information on these sheets that may be different than the overall 206 page set?
1-1 Government Response. Most recent amendment takes precedence. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546407 Architectural General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specifications sections 08 14 00 Wood Doors, 09 30 10 Porcelain Tiling, 09 51 00 Acoustical Ceiling, 09 64 66 Wood Athletic flooring, 09 65 00 resilient flooring, 09 65 66 resilient athletic flooring, 09 68 00 carpet tiles, 11 66 23 Gymnasium Equipment and 12 66 00 Telescoping Stands were issued along with H.01.04 convert B32 Bays F+G Fitness Center RTA Specifications 22Nov19. Why were these specifications issued separately? Does the contractor need to be aware of any differences between the singularly issued specs and the full 1,554 page specification?
1-1 Government Response. Most Recent Amendment Takes Prescedence By: Dianne Grimes; CECT- NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546416 Architectural 01 01 11 00.00 50
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Division 1 01 11 00.00 50 paragraph 1.5.1.7 Personnel Escort – Will the government provide the personnel escort for the contractor? Will the contractor be required to pay the government for the escort.
1-1 Government Response. Bid per plans and specs By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
May 04 2020
Current Request Status: Request Closed
8546432 Security Division 1 01 11 00.00 50 paragraph
1.5.1.7 Personnel Escort
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will an escort be required to stay with the contractors sub -contractors throughout the day, every day of the project until completion?
1-1 Government Response. Bid Per plans and specs By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546434 Construction Management
Spec section 01 45 04.00 50 – paragraph 3.4.3
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec section 01 45 04.00 50 – paragraph 3.4.3 CQC personnel – As part of the CQC organization specialized personnel to assist the CQC systems manager: Electrical, mechanical, structural, architectural and submittals clerk.
Can a designated person from each sub -contractors team, act as the specialized personnel to assist the CQC systems manager?
1-1 Government Response. Bid per plans and specs
e. Include Amendment: No By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Information for this report is procurement sensitive.
8546438 Civil C-002 Utility Notes
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
C-002 Utility Notes – The contractor shall coordinate all utility installations and scheduling with the respective utility provider. Please provide the contact information for the water/sewer utility base provider.
1-1 Government Response. Bid per plans and specs. The information requested may be in 01 11 00.00 50 By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546440 Civil C-002
Will the contractor be required to pay the utility provider for any work done on this contract?
1-1 Government Response. Bid per plans and specs. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
8546442 Civil CU101
CU101 – Utility plan – is the contractor required to perform Keynotes 1-9 or will this work be accomplished by the base utility provider?
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546444 Structural SD101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SD101 – Foundation Demolition plan – once the concrete has been removed in the areas outlined in sheet SD101, is the contractor required to retreat these areas with a termite chemical treatment? If so, please provide a chemical termite treatment specification.
1-1 Government Response. Termite treatment is not required. By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546446 Environmental 02 82 00 Asbestos Remediation
Spec section 02 82 00 Asbestos Remediation – paragraph 1.3.1 references an asbestos inspection report. Please provide the asbestos inspection report.
1-1 Government Response. This has been provided with the solicitation By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546447 Architectural A-111A
A-111A – Racquetball Court F114 – Please identify the exact type of ceiling that is needed for this room. Is the ceiling to be Tectum Acoustical panel or is the ceiling type the 4 by 8 T and G Ceiling Panel?
1-1 Government Response. Bid per plans and specs. The information requested may be in A1/A-301, A4/A-414, D1/A-511, etc. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546448 Architectural General
What specification section is associated with the T and G Ceiling Panel?
1-1 Government Response. Bid per plans and specs. The information requested may be in 06 42 00. By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546450 Architectural General
What specification section is associated with the Wood Ceiling?
1-1 Government Response. Bid per plans and specs. The information requested may be included in 13 24
16. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546453 Architectural General
What specification section is associated with the ceramic tile ceiling?
1-2 Government Response. see Amendment 0002
This is actually A-111A - A-111D By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546454 Architectural General
What specification section is associated with the Tectum Acoustical ceiling panels?
1-0 Evaluation For Information Only. Bid per plans and specs. The information requested may be contained in 09 84 20. By: Shawn McDorman; CENAO-EC-ED Engineering Design Management Section;
((757)201-7214) On: May 01 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546456 Architectural A414
A-414 Detail A3 and Detail A5 keynote 151 – 1/8" wide play lines a 1" o.c. and 30" high. Are these play lines painted on material?
Forthcoming amendment to revise 10 23 10. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546462 Architectural A414
Please specify the correct specification to understand the play lines for the racquetball court.
1-1 Government Response. Bid per plans and specs. The information requested may be included in 09 64
66. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546469 Fire Protection/Life
Safety
FX001 12 & 13
FX001 notes 12 and 13 states to paint all sprinkler piping including dry piping, is it acceptable to simply label sprinkler piping with red tape every 2' instead of painting all of the sprinkler piping?
1-1 Government Response. Bid per plans and specs. The information requested may be included in 09 90
00. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546470 Fire Protection/Life
Safety
Sprinkler
Sprinkler - Is all the sprinkler piping to be painted or only the exposed sprinkler piping?
1-1 Government Response. Bid per plans and specs. The information requested may be included in 09 90
00. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546474 Mechanical M401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
M401 Keynote 206 says concrete housekeeping pad – are these pads existing? If these are new pads, please provide a scale to verify measurements on sheets M-401, M-402 and M-403.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546476 Mechanical General
Mechanical - Will temporary heating and cooling be required for this project after we take the chiller down?
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546479 Mechanical M601
M601 – Air Handling Unit Schedule – note 2 Variable Frequency drive, starter and disconnect Switch. Is the VFD, starter and disconnect integral to the AHU units or do these pieces need to be provided separately?
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546495 Contracting General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the large number of unanswered questions, we request that the due date be extended by at least 5 business days from the date questions are answered to allow for contractors to adequately review responses then have subcontractors review and incorporate them into pricing documents.
1-1 Government Response. See Amendment 2 for new bid closing By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8547909 Contracting RFP p. 37 - 38 of 38 ATTACHMENTS
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the Attachments list on pp. 37-38 of the RFP are listed a number of documents that are not available as single files on beta.SAM.gov: Attachments 13, and 33 through 39. Will these be provided?
1-1 Government Response. Attachments are uploaded By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
8547970 Contracting Duplicate Drawings, e.g.
A101B, A101C
The drawings listed in the Attachments (pp. 37-38 of 38 in the RFP) are also included in the overall drawings package, but they seem to be amended. When there are duplicate drawings, which should be used for the project?
1-1 Government Response. All attachments are uploaded. By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8548292 General 01 02 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Typically, for purchasing FF&E projects, we have the vendor, quantities, and specifications of the item needed.
I'm only seeing general information listed.
Can you point me in the direction of these specifications for the FF&E items we are to bid on
Forthcoming amendment to have FF&E binder include Part 3 & 4. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8549267 Mechanical General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the ducting configurations required to be designed off of DOA1 and 2 and AHU-3? Bottom, side, top, ends?.
1-1 Government Response. Bid per plans and specs. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8553325 Architectural FF & E Package
Please confirm there is no FF&E package. Is workout equipment or office furniture is being sourced under this bid or will it be bid in a different package after the construction contract is awarded?
FF&E binder to be re-issued to include Parts 3 & 4. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8553332 Architectural Section 116623
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 116623, paragraph 2.3.1 specifies a rear-braced basketball backstop; however, drawing S-301, detail C1 indicates that the basketball backstop is to be front-braced, forward-folding. Can you please confirm that the (2) basketball backstops in section 116623 are to be ceiling-mounted, forward-folding, front-braced?
Forthcoming amendment will revise 11 66 23. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8553336 Architectural EP111C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing EP111C, Keyed Notes #2 indicates that shot locks are to be provided; however, there is no shot clock specification in section 116623. Are shot clocks to be provided by the section 116623 contractor? If so, please provide a specification.
1-1 Government Response. Shot clocks are Government Furnished, Government Installed. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8554347 Civil CS 100
Drawing CS 100 indicates that the proposed ramp and entry way is to be constructed under the DLA OPS project which is not this project. However the civil drawings show this as new work. Is this work a part of this contract or not?
1-2 Government Response. This is actually A-111A - A-111D By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8569631 Architectural A-401 Toilet Partitions 102113
Keynote S shows the toilet partitions doors to be 6'-6'' tall. The tallest any plastic toilet partition manufacturer will make a plastic doors is a nominal 6' tall. In general the manufactures have a growing concern about the doors warping after 6' tall. Please updated drawings to reflect this.
1-2 Government Response. Keynote S to be amended to show 6'0" doors. By: RAVEN SASSER; CENAO- CT Contracting Office; (757-201-7136) On: May 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8569640 Architectural A-401 Toilet Partitions
On A-401, Keynote R is for the depth panels of the stalls and it shows it being 5'-4'' tall. However, detail A1 on same drawings shows the panel being 4'-10'' tall. Which is correct? If the 5'-4'' tall is what is desired, then please answer this question about the 5'-4'' tall panel. There are only a few manufacturers (several will not) at all that will make this size of panel. The manufacturer that the finish schedule and color has been chosen from is Scranton and they can make that panel 5'-4'' tall but only in a two peice panel where they stack two panels to make it 5'-4'' tall. Please confirm that stacking two depth panels on top of each other to make the 5'-4'' tall height is acceptable.
1-1 Government Response. Will edit keynote R to reflect the 4'-10" dimension By: Dianne Grimes; CECT- NAO-M; (7572017839) On: May 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8569677 Architectural Toilet partitions 102113
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec 102113, page 6 Paragraph 2.4 states the Pilasters for the toilet partitions to be 1-1/4'' thick. 1-1/4'' pilasters are unavailable in a plastic stall. This 1-1/4'' thick pilaster dimension is left over dimension from old metal stalls specs.
Plastic pilasters are 1'' thick like the doors and panels. Please correct specs.
1-1 Government Response. Will edit spec 10 21 13 to reflect the 1" pilaster dimension By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8569731 Architectural S-501 & A-101B A-3 105113
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The drawings S-501 and A-101B (keynote 155) both tell us that the locker bases are to be concrete bases. However, the given specs for the lockers 105113 - page 5, paragraph 2.3.10 asks the lockers to be on a plastic base. Please confirm if concrete or plastic base is required.
1-1 Government Response. Lockers will have concrete base, will edit spec 10 51 13 By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8569738 Architectural 105113 Plastic lockers
Page 2, paragraph 2.1.1 asks for plastic lockers to be class B fire rated. Plastic locker manufacturers do not offer plastic lockers in a fire rated materials. Note: It is only Class B, thus not a high level rated fire class as it is. Please remove this paragraph from specs.
1-1 Government Response. will edit spec 10 51 13 to remove fire rating of lockers By: Dianne
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8569755 Architectural 105113 Plastic lockers
Page 4 of spec, paragraph 2.3.3 asks for Hanger rods - This is simply unpractical, a coat rod in a 12'' deep locker.
Clothes hangars are 18'' deep and would not fit in the locker. Please remove hanger rods from specs. The lockers will still get two coat hooks(one on each side of opening) without a ceiling hook. Ceiling hook is not available in a Z" tier locker. Page 4, paragraph 2.3.2 about hooks are for a double tier locker and not a Z locker. A Z locker can not have a ceiling hook. Please remove ceiling hook from spec as well.
1-1 Government Response. will edit spec 10 51 13 to remove hanger rods and ceiling hook By: Dianne
Current Request Status: Request Closed
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE
ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
ATTACHMENTS
1. Convert B32, Bays F-G for Fitness Center RTA Drawings, dated 23 Dec 2019, 206 pages
2. Convert B32 Bays F&G Fitness Center RTA Specifications, dated 23 Dec 2019, 1554 pages
3. Section 08 14 00 Wood Doors 08/16, 6 pages
4. Section 09 30 10 Porcelain Tiling 08/17, 12 pages
5. Section 09 51 00 Acoustical Ceilings 08/17, 10 pages
6. Section 09 64 66 Wood Athletic Flooring 08/16, 10 pages
7. Section 09 65 00 Resilient Flooring 08/10, 8 pages
8. Section 09 65 66 Resilient Athletic Flooring 08/16, 8 pages
9. Section 09 68 00 Carpet Tiles 11/17, 10 pages
10. Section 11 66 23 Gymnasium Equipment 06/19, 10 pages
11. Section 12 66 00 Telescoping Stands 11/12, 10 pages
12. 118ECE908 RTA FF&E Binder dated 22 Nov 2019, 32 pages
13. 118ECE908 RTA SID Binder dated 22 Nov 2019, 52 pages
14. A-101B Floor Plan – Area B dated 23 Dec 2019, 1 page
15. A-101C Floor Plan – Area C dated 23 Dec 2019, 1 page
16. A-111A Reflected Ceiling Plan -Area A dated 23 Dec 2019, 1 page
17. A-111B Reflected Ceiling Plan -Area B dated 23 Dec 2019, 1 page
18. A-111C Reflected Ceiling Plan -Area C dated 23 Dec 2019, 1 page
19. A-111D Reflected Ceiling Plan -Area D dated 23 Dec 2019, 1 page
20. A-121 Overall Roof Plan dated 23 Dec 2019, 1 page
21. A-201 Building Elevations dated 23 Dec 2019, 1 page
22. A-512 Roof Details dated 23 Dec 2019, 1 page
23. A-521 Miscellaneous Details dated 23 Dec 2019, 1 page
24. Asbestos Re-Inspection Report DSCR Building No. 32 dated 22 May 2018, 15 pages
25. ED111A Electrical Demolition Plan -Area A dated 23 Dec 2019, 1 page
26. ED111B Electrical Demolition Plan -Area B dated 23 Dec 2019, 1 page
27. ED111C Electrical Demolition Plan -Area C dated 23 Dec 2019, 1 page
28. ED111D Electrical Demolition Plan -Area D dated 23 Dec 2019, 1 page
29. I101C Floor Finish Plan -Area C dated 23 Dec 2019, 1 page
30. I101D Floor Finish Plan -Area D dated 23 Dec 2019, 1 page
31. Lead Based Paint Survey Report Building No. 32 dated 13 August 2018, 54 pages
32. M-503 Mechanical Details dated 23 Dec 2019, 1 page
33. S-001 General Structural Notes dated 23 Dec 2019, 1 page
34. S-101 Overall Foundation Plan dated 23 Dec 2019, 1 page
35. S-121C Truss Bottom Chord Plan -Area C dated 23 Dec 2019, 1 page
36. S-201 Framing Elevations & Details dated 23 Dec 2019, 1 page
37. S-301 Sections & Details –I dated 23 Dec 2019, 1 page
38. S-302 Sections & Details –II dated 23 Dec 2019, 1 page
39. S-501 Typical Structural Details –I dated 23 Dec 2019, 1 page
40. 118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages
41. 118ECE908 AMDT 002 33 40 00 dated 022010 11 pages
42. 118ECE908 AMDT 002 CG 100 dated 04292020 1 page
43. 118ECE908 AMDT 002 CG 102 dated 04292020 1 page
44. 118ECE908 AMDT 002 CU 101 dated 04292020 1 page
45. 118ECE908 AMDT 002 GC 002 dated 04292020 1 page
46. 118ECE908 AMDT 002 08 41 13 14 pages
47. 118ECE908 AMDT 002 10 23 10 8 pages
48. 118ECE908 AMDT 002 11 66 23 10 pages
49. 118ECE908 AMDT 002 A002 PARTITION TYPES 1 page
50. 118ECE908 AMDT 002 A101B FLOOR PLAN AREA B 1 page
51. 118ECE908 AMDT 002 A101C FLOOR PLAN AREA C 1 page
52. 118ECE908 AMDT 002 A111A REFLECTED CEILING PLAN AREA A 1 page
53. 118ECE908 AMDT 002 A111B REFLECTED CEILING PLAN AREA B 1 page
54. 118ECE908 AMDT 002 A111C REFLECTED CEILING PLAN AREA C 1 page
55. 118ECE908 AMDT 002 A111D REFLECTED CEILING PLAN AREA D 1 page
56. 118ECE908 AMDT 002 DRAWINGS 05MAY2020 206 pages
57. 118ECE908 AMDT 002 FFANDE BINDER 05MAY2020 77 pages
58. 118ECE908 AMDT 002 I 101B FINISH PLAN AREA B 1 page
59. 118ECE908 AMDT 002 SPECIFICATIONS 05MAY2020 1556 pages
60. 118ECE908 AMDT 004 10 21 13 dated 082017 updated 05142020 10 pages
61. 118ECE908 AMDT 004 10 51 13 dated 05201 updated 05142020 1 6 pages
62. 118ECE908 AMDT 004 A 401 ENLARGED LOCKER ROOM RESTROOM PLANS AND TYPICAL
ELEVATIONS dated 05142020 1 page
63. 118ECE908 AMDT 004 DRAWINGS dated 05142020 1 page
64. 118ECE908 AMDT 004 SPECIFICATIONS dated 05142020 1556 pages
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
1. Convert B32, Bays F-G for Fitness Center RTA Drawings, dated 23 Dec 2019, 206 pages
2. Convert B32 Bays F&G Fitness Center RTA Specifications, dated 23 Dec 2019, 1554 pages
3. Section 08 14 00 Wood Doors 08/16, 6 pages
4. Section 09 30 10 Porcelain Tiling 08/17, 12 pages
5. Section 09 51 00 Acoustical Ceilings 08/17, 10 pages
6. Section 09 64 66 Wood Athletic Flooring 08/16, 10 pages
7. Section 09 65 00 Resilient Flooring 08/10, 8 pages
8. Section 09 65 66 Resilient Athletic Flooring 08/16, 8 pages
9. Section 09 68 00 Carpet Tiles 11/17, 10 pages
10. Section 11 66 23 Gymnasium Equipment 06/19, 10 pages
11. Section 12 66 00 Telescoping Stands 11/12, 10 pages
12. 118ECE908 RTA FF&E Binder dated 22 Nov 2019, 32 pages
13. 118ECE908 RTA SID Binder dated 22 Nov 2019, 52 pages
14. A-101B Floor Plan – Area B dated 23 Dec 2019, 1 page
15. A-101C Floor Plan – Area C dated 23 Dec 2019, 1 page
16. A-111A Reflected Ceiling Plan -Area A dated 23 Dec 2019, 1 page
17. A-111B Reflected Ceiling Plan -Area B dated 23 Dec 2019, 1 page
18. A-111C Reflected Ceiling Plan -Area C dated 23 Dec 2019, 1 page
19. A-111D Reflected Ceiling Plan -Area D dated 23 Dec 2019, 1 page
20. A-121 Overall Roof Plan dated 23 Dec 2019, 1 page
21. A-201 Building Elevations dated 23 Dec 2019, 1 page
22. A-512 Roof Details dated 23 Dec 2019, 1 page
23. A-521 Miscellaneous Details dated 23 Dec 2019, 1 page
24. Asbestos Re-Inspection Report DSCR Building No. 32 dated 22 May 2018, 15 pages
25. ED111A Electrical Demolition Plan -Area A dated 23 Dec 2019, 1 page
26. ED111B Electrical Demolition Plan -Area B dated 23 Dec 2019, 1 page
27. ED111C Electrical Demolition Plan -Area C dated 23 Dec 2019, 1 page
28. ED111D Electrical Demolition Plan -Area D dated 23 Dec 2019, 1 page
29. I101C Floor Finish Plan -Area C dated 23 Dec 2019, 1 page
30. I101D Floor Finish Plan -Area D dated 23 Dec 2019, 1 page
31. Lead Based Paint Survey Report Building No. 32 dated 13 August 2018, 54 pages
32. M-503 Mechanical Details dated 23 Dec 2019, 1 page
33. S-001 General Structural Notes dated 23 Dec 2019, 1 page
34. S-101 Overall Foundation Plan dated 23 Dec 2019, 1 page
35. S-121C Truss Bottom Chord Plan -Area C dated 23 Dec 2019, 1 page
36. S-201 Framing Elevations & Details dated 23 Dec 2019, 1 page
37. S-301 Sections & Details –I dated 23 Dec 2019, 1 page
38. S-302 Sections & Details –II dated 23 Dec 2019, 1 page
39. S-501 Typical Structural Details –I dated 23 Dec 2019, 1 page
40. 118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages
41. 118ECE908 AMDT 002 33 40 00 dated 022010 11 pages
42. 118ECE908 AMDT 002 CG 100 dated 04292020 1 page
43. 118ECE908 AMDT 002 CG 102 dated 04292020 1 page
44. 118ECE908 AMDT 002 CU 101 dated 04292020 1 page
45. 118ECE908 AMDT 002 GC 002 dated 04292020 1 page
46. 118ECE908 AMDT 002 08 41 13 14 pages
47. 118ECE908 AMDT 002 10 23 10 8 pages
48. 118ECE908 AMDT 002 11 66 23 10 pages
49. 118ECE908 AMDT 002 A002 PARTITION TYPES 1 page
50. 118ECE908 AMDT 002 A101B FLOOR PLAN AREA B 1 page
51. 118ECE908 AMDT 002 A101C FLOOR PLAN AREA C 1 page
52. 118ECE908 AMDT 002 A111A REFLECTED CEILING PLAN AREA A 1 page
53. 118ECE908 AMDT 002 A111B REFLECTED CEILING PLAN AREA B 1 page
54. 118ECE908 AMDT 002 A111C REFLECTED CEILING PLAN AREA C 1 page
55. 118ECE908 AMDT 002 A111D REFLECTED CEILING PLAN AREA D 1 page
56. 118ECE908 AMDT 002 DRAWINGS 05MAY2020 206 pages
57. 118ECE908 AMDT 002 FFANDE BINDER 05MAY2020 77 pages
58. 118ECE908 AMDT 002 I 101B FINISH PLAN AREA B 1 page
59. 118ECE908 AMDT 002 SPECIFICATIONS 05MAY2020 1556 pages
60. 118ECE908 AMDT 004 10 21 13 dated 082017 updated 05142020 10 pages
61. 118ECE908 AMDT 004 10 51 13 dated 05201 updated 05142020 1 6 pages
62. 118ECE908 AMDT 004 A 401 ENLARGED LOCKER ROOM RESTROOM PLANS AND TYPICAL
ELEVATIONS dated 05142020 1 page
63. 118ECE908 AMDT 004 DRAWINGS dated 05142020 1 page
64. 118ECE908 AMDT 004 SPECIFICATIONS dated 05142020 1556 pages
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .