This pre-solicitation notice and related documents outline requirements for the renovation of a fitness center at the Defense Supply Center Richmond in Virginia. The project includes offices, wellness facilities, courts, gymnasium, locker rooms, and storage. The Army Corps of Engineers Norfolk District will award a single firm-fixed-price contract valued between $5-10 million under solicitation number W91236-20-B-2011. The renovation work must be completed within 450 days of the notice to proceed. The solicitation will be issued on April 9th, 2020 via beta.sam.gov as a 100% small business set-aside using sealed bids. Final proposals are due May 7th, 2020. The successful contractor must secure payment and performance bonds or provide a 10% performance guarantee.

View the file

Other files

File Type Posted
B.01.02_Abstract of Offers Page 2 Revised (CONST) W9123620B2011 Fitness Center Bid Opening 07012020.pdf PDF
B.01.02_Revised Abstract of Offers Page 1 (CONST) W9123620B2011 Fitness Center Bid Opening 06012020.pdf PDF
B.01.02_Abstract of Offers Page 3 Revised (CONST) W9123620B2011 Fitness Center Bid Opening 07012020.pdf PDF
B.01.02_Abstract of Offers Page 2 (CONST) W9123620B2011 Fitness Center Bid Opening 05282020.pdf PDF
B.01.02_Abstract of Offers Page 1 (CONST) W9123620B2011 Fitness Center Bid Opening 06012020.pdf PDF
B.01.02_Abstract of Offers Page 3 (CONST) W9123620B2011 Fitness Center Bid Opening 05282020.pdf PDF
118ECE908 AMDT 004 DRAWINGS dated 05142020 1 page.pdf PDF
118ECE908 AMDT 004 10 21 13 dated 082017 updated 05142020 10 pages.pdf PDF
20-B-2011 Amend 0004.pdf PDF
118ECE908 AMDT 004 SPECIFICATIONS dated 05142020 1556 pages.pdf PDF
118ECE908 AMDT 004 A 401 ENLARGED LOCKER ROOM RESTROOM PLANS AND TYPICAL ELEVATIONS dated 05142020 1 page.pdf PDF
118ECE908 AMDT 004 10 51 13 dated 05201 updated 05142020 1 6 pages.pdf PDF
Typed Site Visit Sign In Sheet for DLA Fitness Center 04222020.pdf PDF
W91236-20-B-2011 Amendment 3.pdf PDF
118ECE908 AMDT 002 11 66 23.pdf PDF
W9123620B0011 Amendment 2.pdf PDF
118ECE908 AMDT 002 DRAWINGS 05MAY2020.pdf PDF
118ECE908 AMDT 002 A111A REFLECTED CEILING PLAN AREA A.pdf PDF
118ECE908 AMDT 002 A111B REFLECTED CEILING PLAN AREA B.pdf PDF
118ECE908 AMDT 002 08 41 13.pdf PDF
118ECE908 AMDT 002 A111C REFLECTED CEILING PLAN AREA C.pdf PDF
118ECE908 AMDT 002 SPECIFICATIONS 05MAY2020.pdf PDF
118ECE908 AMDT 002 A111D REFLECTED CEILING PLAN AREA D.pdf PDF
118ECE908 AMDT 002 FF AND E BINDER 05MAY2020.pdf PDF
118ECE908 AMDT 002 I 101B FINISH PLAN AREA B.pdf PDF
118ECE908 AMDT 002 A002 PARTITION TYPES.pdf PDF
118ECE908 AMDT 002 A101B FLOOR PLAN AREA B.pdf PDF
118ECE908 AMDT 002 10 23 10.pdf PDF
118ECE908 AMDT 002 A101C FLOOR PLAN AREA C.pdf PDF
S-302 SECTIONS AND DETAILS -II.pdf PDF
S-201 FRAMING ELEVATIONS AND DETAILS.pdf PDF
S-301 SECTIONS AND DETAILS -I.pdf PDF
S-001 GENERAL STRUCTURAL NOTES.pdf PDF
118ECE908_RTA_SID Binder_22Nov19.pdf PDF
S-121C TRUSS BOTTOM CHORD PLAN -AREA C.pdf PDF
S-101 OVERALL FOUNDATION PLAN.pdf PDF
A.01.13_118ECE908 AMDT 002 33 40 00 dated 022010 11 pages.pdf PDF
A.01.13_118ECE908 AMDT 002 GC002 dated 04292020 1 page.pdf PDF
A.01.13_118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages.pdf PDF
A.01.13_118ECE908 AMDT 002 CG 100 dated 04292020 1 page.pdf PDF
20-B-2011 Amendment 1.pdf PDF
A.01.13_118ECE908 AMDT 002 CU 101 dated 04292020 1 page.pdf PDF
A.01.13_118ECE908 AMDT 002 CG 102 dated 04292020 1 page.pdf PDF
G.01.47_PreBid Sign In Sheet for Fitness Center 04222020.pdf PDF
M-503 MECHANICAL DETAILS.pdf PDF
I101C FLOOR FINISH PLAN -AREA C.pdf PDF
Asbestos Re-Inspection Report DSCR Building No. 32.pdf PDF
ED111B ELECTRICAL DEMOLITION PLAN -AREA B.pdf PDF
ED111D ELECTRICAL DEMOLITION PLAN -AREA D.pdf PDF
I101D FLOOR FINISH PLAN -AREA D.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/8

T /4

T T T

1/2" PREMOLDED

EXPANSION JOINT

MATERIAL

CRACK CONTROL JOINT

(CCJ)

*CONSTRUCTION JOINT

(CJ)

EXPANSION JOINT AT WALL

(EJ)

NOTES:

1. CCJ. SHALL BE PREFORMED OR SAWED. IF SAWED, SAWING MUST

TAKE PLACE WITHIN 12 HRS OF SLAB PLACEMENT.

2. * USE INSTEAD OF CRACK CONTROL JOINT WHEREVER

CONSTRUCTION IS STOPPED OR WHERE CALLED FOR ON PLAN.

SAWCUT JOINT

#4 SMOOTH DOWEL BAR AT 1'-0" O.C.

COAT ONE END TO PREVENT BOND.

6" 6"

8"

S E

E P

L A

N

CONC. SLAB

SEE PLAN

VAPOR BARRIER

CAPILLARY WATER

BARRIER

COMPACTED FILL

USE FOR SLAB RECESS < 4"

CONC. SLAB

SEE PLAN

VAPOR BARRIER

CAPILLARY WATER

BARRIER

COMPACTED FILL

USE FOR SLAB RECESS > 4"

#4@12" O.C.

P L A

N

S E

E

6"

#4 CONT.

DOWEL BARS

SAME SIZE

AND NUMBER AS

HORIZ. REINF.

TYP HORIZ REINF

STD. HOOK

OUTSIDE

CORNER BARS

SAME SIZE AND

NUMBER

AS HORIZ.

REINF.

PLAN

TYP HORIZ REINF

PLAN

TYP. HORIZ. REINFORCING

AT CONCRETE FTG. CORNERS

TYP. HORIZ. REINFORCING AT

CONCRETE FTG. INTERSECTIONS

T E

N S

IO

N

L A

P

C L A

S S

B

T E

N S

IO

N

L A

P

C L A

S S

B

TENSION LAP

CLASS B

TENSION LAP

CLASS B

ANCHOR 4" INTO CENTER

OF EXIST. SLAB W/ HILTI

HIT-HY200, O.A.E. BACKFILL W/ COMPACTED

GRANULAR MATERIAL

#4 AT 1'-0" O.C. (2 MIN.)

VAPOR BARRIER

EXIST. SLAB

SAW CUT EXIST. SLAB. SEE PLAN

NEW CONC. SLAB,

MATCH EXIST.

THICKNESS

#4 @ 18" O.C.

PIPE LINES, SEE M/E/P DWG'S

T/PIER OR

PIER CAP

ANCHOR ROD

S E

E B

P D

E T

A

IL

S

E M

B E

D

BASE PLATE

1 1/2" NON-SHRINK

GROUT

TACK WELD

NUT TO SHAFT

OVERSIZED HOLE

IN BASE PL TYP.

ANCHOR 4" INTO CENTER

OF EXIST. SLAB W/ HILTI

HIT-HY200, TYP.

VAPOR BARRIER

SAW CUT EXIST. SLAB

CONC. THICKENED SLAB

#4 CONT

8" NON-LOAD-BRG. CMU

WALL. SEE PLAN FOR

LOCATION, SEE GEN

NOTES, S-001 FOR REINF.

COMPACTED FILL

CAPILLARY WATER BARRIER

1' - 4"

1' - 2"

EQ EQ

WALL

SLAB REINF SEE PLAN

S E

E P

L A

N

S L A

B R

E C

E S

S

2-#4 BOTT

#4 SMOOTH BAR @ 2'-0" OC

/2

SLAB ON GRADE,

SEE PLAN EXIST. SLAB

ON GRADE

VAPOR BARRIER ON

COMPACTED FILL

#4 SMOOTH DOWEL@ 1'-0"

O.C. IN HILTI HIT-HY 200

ADHESIVE SYSTEM O.A.E.

1' - 0"

EMBED.

4"

TOOL JOINT.

SEE D1/S-501

COAT END OF BAR TO

PREVENT BOND

SEE ELECTRICAL,

MECHANICAL & PLUMBING

#4 AT 12" O.C. EA. WAY

1/2" EXP. JT. AT

PAVEMENT

APRON, SEE

CIVIL

3/4" CHAMFER

TYP.

EQUIPMENT

SEE ELECTRICAL,

MECHANICAL &

PLUMBING

SLAB ON GRADE, SEE

PLAN (REINF. NOT

SHOWN FOR CLARITY)

3/4" CHAMFER TYP.

EQUIPMENT

CONC. PAD W/ #4 TIES

FOR EA. 12" OF HEIGHT

(1 MIN)

#4 DOWEL SET IN HILTI HIT-HY 200 W/

HOOK, (W/ 2" EMBED) AT 1'-0" OC AT

PAD PERIMETER (MIN 4 LOC'S)

TYP OUTDOOR EQUIPMENT PAD TYP INDOOR EQUIPMENT HOUSEKEEPING PAD

M

IN

MIN.

6"

MIN.

6"

1' - 0"

#4 CONT. TOP & BOTT.

C L

R

N O

T E

M

IN

NOTE 1: PROVIDE HOUSEKEEPING PADS FOR ALL INTERIOR

GROUND-SUPPORTED EQUIPMENT.

M

IN

EXP. JOINT

COMPACTED FILL

#4 AT 12" O.C.

#4 AT 12" O.C.

#3 NOSING

REINF TYP.

CONC SLAB

SEE CIVIL

8"

PAVEMENT,

SEE CIVIL

C L R

STAIR TREAD & RISER

DIM'S, SEE ARCH.

CORE-DRILLED HOLES

FOR GUARDRAIL POSTS,

SEE ARCH.

ACI LAP

FOOTING REINFORCEMENT,

SEE PLAN

ACI LAP

T/FTG. EL.

SEE PLAN

#4 TYP.

#5 Z-BAR TO MATCH

QUANTITY OF FTG. REINF.

SEE SCHEDULE

M

A X

M

IN

ACI LAP 1' - 0"3

C L R

ACI LAP

DIA

1' - 6"

CONCRETE FILLED 6" DIA

SCH. 40 PIPE, PAINTED

SAFETY YELLOW

PATCH EXISTING

CONCRETE TO MATCH

SLAB ON GRADE, SEE

PLAN (REINF. NOT

SHOWN FOR CLARITY)

LOCKER

CONC. PAD W/ #4 HORIZ

CENTERED AT EDGES, TYP

#4 DOWEL SET IN HILTI HIT-HY 200

OAE W/ HOOK, (W/ 2" EMBED) AT 2'-0"

OC AT PAD PERIMETER (MIN 4

LOCATIONS AT CORNERS)

N O

T E

M

IN

NOTE 1: PROVIDE PADS WHERE NOTED ON ARCH. FLOOR PLANS

US Army Corps of Engineers ®

SHEET

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

N O

R F

O L K

D

IS

T

R

IC

T N

O R

F O

L K

V

IR

G

IN

IA

READY TO ADVERTISE

D E

F E

N S

E S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

V

IR

G

IN

IA

C O

N V

E R

T B

B

A Y

S F

G

F

IT

N

E S

S C

E N

T E

R P

R O

J E

C T

E

C E

N O

V E

M B

E R

W -1

-R

-0

W -1

-R

-0

S-501

T Y

P

IC

A L S

T R

U C

T U

R A

L D

E T

A

IL

S

I

F

IL

E N

U M

B E

R

P G

IE

S

S E

L

K P

E R

E Z

P M

U L L

P M

U L L

SCALE: N.T.S.

D1

TYP SLAB ON GRADE JOINT DETAILS

SCALE: N.T.S.

C1

TYP RECESSED SLAB EDGE DETAIL

SCALE: N.T.S.

C2

TYP REINF BAR LAP AT INTERSECTIONS

SCALE: N.T.S.

D2

TYP SLAB TRENCH

SCALE: N.T.S.

B2

TYP ANCHOR EMBEDMENT DETAIL

SCALE: N.T.S.

C4

TYP. SLAB THICKENING AT INTERIOR NON-LOAD

BEARING CMU WALL

SCALE: N.T.S.

B1

TYP NEW SLAB ON GRADE DETAIL

SCALE: N.T.S.

D4

EQUIPMENT PAD DETAILS

SCALE: N.T.S.

A1

TYP CONCRETE STAIR DETAIL

SCALE: N.T.S.

B3

TYP STEPPED WALL FDN. DETAIL

SCALE: N.T.S.

A2

TYP BOLLARD DETAIL

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A

M E

N D

M E

N T

-2

-2

SCALE: N.T.S.

A3

TYP CONCRETE LOCKER BASE DETAIL

File details come from the government source that posted it. Updated .