W91236-20-B-2011 Amendment 3.pdf
PDF 232 KB Posted
- Attached to
- DLA Fitness Center Renovation
- Solicitation number
- W9123620B2011
About this file
This pre-solicitation notice is for a firm-fixed-price design-bid-build contract to renovate the Defense Supply Center Richmond's existing fitness center and relocate it to Building 32, Bays F-G. The renovation will include offices, wellness areas, racquetball courts, fitness rooms, a gymnasium with an NCAA regulation basketball court and retractable bleacher seating, his and hers locker rooms with lockers and showers, and storage and utility rooms. The period of performance is 450 days from notice to proceed. The contract value is estimated between $5-10 million. This will be a 100% small business set-aside utilizing sealed bids in accordance with FAR Part 14. The NAICS code is 236220 and size standard is $39.5 million. Bids are due on approximately May 7, 2020. The Army Corps of Engineers Norfolk District will award a single firm-fixed-price contract. Payment and performance bonds or a 10% performance guarantee will be required.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to add the responses for the RFI's to the soliicitation.
The closing date is not extended.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B2011
X 9B. DATED (SEE ITEM 11)
13-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-May-2020
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
RESPONSE TO RFIS
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contracting Officers Report All Inquiries
Project: DSCR - Fitness Center Review: Inquiry April 2020 (00002) (sorted by CommentID ) Displaying 43 inquiries.
Id Discipline Sheet Detail Spec 8515012 General CU101 Key Note 7
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify type of filter fabric needed for HDPE perforated pipe.
1-1Government Response. See Amendment 0001 for details specification 33 40 00 is updated to more clearly indicate filter fabric requirements By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8515013 General CU101 Key Note 8
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Key Note 8 on sheet CU101 states "Provide PVC sleeve through foundation wall for 6" HDPE pipe. Please clarify what size sleeve is needed.
1-1Government Response. This is included in Amendment 1
This is updated in CU101 to show the pipe sleeve. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
May 04 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8515014 General CG100 Legend Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Sheet CG100 under "Legend" list a Stabilized Construction Entrance. No construction entrance is shown on plans.
1-1Government Response. This is included in Amendment 0001 This is updated in CG100 to show a revised construction entrance. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 04 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8515015 General CD101 and CU101
If the 4" sanitary sewer lateral shown on demo plan (CD101) does not meet the required elevations and minimum slope, will the installation of the 6" sewer lateral (Sheet CU101) be handled as an alternate modification to the base bid post award?
1-1Government Response. CU101 was revised to clarify this requirement.
included in Amendment 0001 By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8531759 Design Team Leader tab 4 FF&E
Comment Classification: UNCLASSIFIED (U) tab 4 is the furniture order data sheet but it is empty
1-1Government Response. See Amendment 0002
Forthcoming amendment will have Parts 3&4 By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8538905 Architectural A101B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
As for connecting the lockers to support, we can not connect plastic lockers to Unistrut or metal lumber as a substitute for an anchor bolt into a wall structure with some form of support mounted into the wall before attachment.
Please explain the bubble on the drawing.
1-1Government Response. See Amendment 00002
Forthcoming amendment will modify keynote 155. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8539341 Architectural A-101
Comment Classification: UNCLASSIFIED (U)
Please advise What is the standoff for this building? (calls for ballistic framing).
1-1Government Response. See Amendment 0002 for bid closing
Forthcoming amendment will adjust 08 41 13, 08 11 16, 08 41 13, and CS100 to clarify this requirement.
By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8540010 General N/A N/A N/A
If the Joint Venture is an SBA approved mentor/protégé, do we need to include the teaming agreement with the bid?
1-1Government Response. Yes, you need to include the teaming agreement with your bid. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 05 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8540030 General N/A N/A N/A Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Some of Maryland and Virginia businesses are closed because of the Coronavirus. Would you please consider extending the proposal another two weeks to obtain multiple bids from the subcontracting community that have experience similar to the scope of work.
1-1Government Response. See Amendment 0002 for new bid closing By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8542219 Architectural I603
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
I can't locate anything in the plans showing me which walls in the 115 and 116 Toilet/ Locker Rm/ Shower area receive wall tile. The Interior Finish Schedule shows wall tile in the restrooms and showers but not in the locker rm. I-603, Detail A3 mentions tiling up to the ceiling in the locker rm. Does the entire 115 and 116 areas receive wall tile or just certain areas?
1-1Government Response. See Amendment 0002
Forthcoming amendment will clarify I-101B By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Information for this report is procurement sensitive.
8545218 Contracting NA NA SF1442
Kindly clarify the requirements for bid guarantee for this project.
1-1Government Response. The bid guarantee is in accordance with clause 52.228-1 20% of total price but shall not exceed $3 Million By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 05 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8545994 Architectural A-101C REF.
NOTES
OPTION 1
Please clarify requirements for option 1. Telescoping stands. Option 4 is retractable bleachers. What are telescoping stands?
1-1Government Response. Forthcoming amendment will adjust A-101C to match the telescoping stands label which is the more accurate label for bleachers of this type. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8546406 Architectural A sheets
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing sheets A-101B Floor Plan Area, A-101C Floor Plan area, A111A -A111D Reflected Ceiling Plan, A121 Overall Roof plan, A201 Building Elevations, A512 Roof Details, A521 Miscellaneous Details, ED111A-ED111D Electrical Demolition Plan, Equipment mechanical schedule, I101C, I101D and M503 Mechanical Details were issued along with Drawings H.01.01 Convert B32 Bays F-G for fitness Center RTA Drawings 22NOV19. Why were these sheets issued separately? Does the contractor need to be aware of any specific information on these sheets that may be different than the overall 206 page set?
1-1Government Response. Most recent amendment takes precedence. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546407 Architectural General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specifications sections 08 14 00 Wood Doors, 09 30 10 Porcelain Tiling, 09 51 00 Acoustical Ceiling, 09 64 66 Wood Athletic flooring, 09 65 00 resilient flooring, 09 65 66 resilient athletic flooring, 09 68 00 carpet tiles, 11 66 23 Gymnasium Equipment and 12 66 00 Telescoping Stands were issued along with H.01.04 convert B32 Bays F+G Fitness Center RTA Specifications 22Nov19. Why were these specifications issued separately? Does the contractor need to be aware of any differences between the singularly issued specs and the full 1,554 page specification?
1-1Government Response. Most Recent Amendment Takes Prescedence By: Dianne Grimes; CECT-
NAO-M; (7572017839) On: May 06 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546416 Architectural 01 01 11 00.00 50
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Division 1 01 11 00.00 50 paragraph 1.5.1.7 Personnel Escort – Will the government provide the personnel escort for the contractor? Will the contractor be required to pay the government for the escort.
1-1Government Response. Bid per plans and specs By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
8546432 Security Division 1 01 11 00.00 50 paragraph
1.5.1.7 Personnel Escort
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will an escort be required to stay with the contractors sub -contractors throughout the day, every day of the project until completion?
1-1Government Response. Bid Per plans and specs By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546434 Construction Management
Spec section 01 45 04.00 50 – paragraph 3.4.3
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec section 01 45 04.00 50 – paragraph 3.4.3 CQC personnel – As part of the CQC organization specialized personnel to assist the CQC systems manager: Electrical, mechanical, structural, architectural and submittals clerk.
Can a designated person from each sub -contractors team, act as the specialized personnel to assist the CQC systems manager?
1-1Government Response. Bid per plans and specs
e. Include Amendment: No By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Information for this report is procurement sensitive.
8546438 Civil C-002 Utility Notes
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
C-002 Utility Notes – The contractor shall coordinate all utility installations and scheduling with the respective utility provider. Please provide the contact information for the water/sewer utility base provider.
1-1Government Response. Bid per plans and specs. The information requested may be in 01 11 00.00 50
By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546440 Civil C-002
Will the contractor be required to pay the utility provider for any work done on this contract?
1-1Government Response. Bid per plans and specs. By: Dianne Grimes; CECT-NAO-M; (7572017839)
On: May 04 2020 Current Request Status: Request Closed
8546442 Civil CU101
CU101 – Utility plan – is the contractor required to perform Keynotes 1-9 or will this work be accomplished by the base utility provider?
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546444 Structural SD101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SD101 – Foundation Demolition plan – once the concrete has been removed in the areas outlined in sheet SD101, is the contractor required to retreat these areas with a termite chemical treatment? If so, please provide a chemical termite treatment specification.
1-1Government Response. Termite treatment is not required. By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546446 Environmental 02 82 00 Asbestos Remediation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec section 02 82 00 Asbestos Remediation – paragraph 1.3.1 references an asbestos inspection report. Please provide the asbestos inspection report.
1-1Government Response. This has been provided with the solicitation By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546447 Architectural A-111A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
A-111A – Racquetball Court F114 – Please identify the exact type of ceiling that is needed for this room. Is the ceiling to be Tectum Acoustical panel or is the ceiling type the 4 by 8 T and G Ceiling Panel?
1-1Government Response. Bid per plans and specs. The information requested may be in A1/A-301, A4/A-414, D1/A-511, etc. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546448 Architectural General
What specification section is associated with the T and G Ceiling Panel?
1-1Government Response. Bid per plans and specs. The information requested may be in 06 42 00. By:
Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546450 Architectural General
What specification section is associated with the Wood Ceiling?
1-1Government Response. Bid per plans and specs. The information requested may be included in 13 24
16. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546453 Architectural General
What specification section is associated with the ceramic tile ceiling?
1-2Government Response. see Amendment 0002
This is actually A-111A - A-111D By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Information for this report is procurement sensitive.
8546454 Architectural General
What specification section is associated with the Tectum Acoustical ceiling panels?
1-1Government Response. Bid per plans and specs. The information requested may be contained in 09 84
20. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546456 Architectural A414
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
A-414 Detail A3 and Detail A5 keynote 151 – 1/8" wide play lines a 1" o.c. and 30" high. Are these play lines painted on material?
Forthcoming amendment to revise 10 23 10. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8546462 Architectural A414
Please specify the correct specification to understand the play lines for the racquetball court.
l.
1-1Government Response. Bid per plans and specs. The information requested may be included in 09 64
66. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546469 Fire Protection/Life
Safety
FX001 12 & 13
FX001 notes 12 and 13 states to paint all sprinkler piping including dry piping, is it acceptable to simply label sprinkler piping with red tape every 2' instead of painting all of the sprinkler piping?
1-1Government Response. Bid per plans and specs. The information requested may be included in 09 90
00. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546470 Fire Protection/Life Safety
Sprinkler
Sprinkler - Is all the sprinkler piping to be painted or only the exposed sprinkler piping?
1-1Government Response. Bid per plans and specs. The information requested may be included in 09 90
00. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546474 Mechanical M401
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
M401 Keynote 206 says concrete housekeeping pad – are these pads existing? If these are new pads, please provide a scale to verify measurements on sheets M-401, M-402 and M-403.
Current Request Status: Request Closed Information for this report is procurement sensitive.
8546476 Mechanical General
Mechanical - Will temporary heating and cooling be required for this project after we take the chiller down?
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546479 Mechanical M601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
M601 – Air Handling Unit Schedule – note 2 Variable Frequency drive, starter and disconnect Switch. Is the VFD, starter and disconnect integral to the AHU units or do these pieces need to be provided separately?
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8546495 Contracting General
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the large number of unanswered questions, we request that the due date be extended by at least 5 business days from the date questions are answered to allow for contractors to adequately review responses then have subcontractors review and incorporate them into pricing documents.
1-1Government Response. See Amendment 2 for new bid closing By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8547909 Contracting RFP p. 37 - 38 of 38 ATTACHMENTS
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the Attachments list on pp. 37-38 of the RFP are listed a number of documents that are not available as single files on beta.SAM.gov: Attachments 13, and 33 through 39. Will these be provided?
1-1 Government Response. Attachments are uploaded By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
8547970 Contracting Duplicate Drawings, e.g.
A101B, A101C
The drawings listed in the Attachments (pp. 37-38 of 38 in the RFP) are also included in the overall drawings package, but they seem to be amended. When there are duplicate drawings, which should be used for the project?
1-1Government Response. All attachments are uploaded. By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed Information for this report is procurement sensitive.
8548292 General 01 02 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Typically, for purchasing FF&E projects, we have the vendor, quantities, and specifications of the item needed.
I'm only seeing general information listed.
Can you point me in the direction of these specifications for the FF&E items we are to bid on
Forthcoming amendment to have FF&E binder include Part 3 & 4. By: Dianne Grimes; CECT-NAO-M;
(7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8549267 Mechanical General Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) What is the ducting configurations required to be designed off of DOA1 and 2 and AHU-3? Bottom, side, top, ends?
1-1Government Response. Bid per plans and specs. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 04 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8553325 Architectural FF & E Package Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm there is no FF&E package. Is workout equipment or office furniture is being sourced under this bid or will it be bid in a different package after the construction contract is awarded?
FF&E binder to be re-issued to include Parts 3 & 4. By: Dianne Grimes; CECT-NAO-M; (7572017839) On:
May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8553332 Architectural Section 116623 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 116623, paragraph 2.3.1 specifies a rear-braced basketball backstop; however, drawing S-301, detail C1 indicates that the basketball backstop is to be front-braced, forward-folding. Can you please confirm that the (2) basketball backstops in section 116623 are to be ceiling-mounted, forward-folding, front-braced?
Forthcoming amendment will revise 11 66 23. By: Dianne Grimes; CECT-NAO-M; (7572017839) On: May 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8553336 Architectural EP111C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing EP111C, Keyed Notes #2 indicates that shot locks are to be provided; however, there is no shot clock specification in section 116623. Are shot clocks to be provided by the section 116623 contractor? If so, please provide a specification.
1-1Government Response. Shot clocks are Government Furnished, Government Installed. By: Dianne
Grimes; CECT-NAO-M; (7572017839) On: May 06 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8554347 Civil CS 100
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing CS 100 indicates that the proposed ramp and entry way is to be constructed under the DLA OPS project which is not this project. However the civil drawings show this as new work. Is this work a part of this contract or not?
1-2Government Response. This is actually A-111A - A-111D By: Dianne Grimes; CECT-NAO-M;
Current Request Status: Request Closed
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
SECTION 00 10 00 - SOLICITATION
The following have been modified:
NOTES FOR CONTRACT LINE ITEMS
NOTE NO. 1. Bidders must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so will result in the bid being non-responsive.
NOTE NO. 2. The Bidders’ Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate bids for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
NOTE NO. 3. OPTIONS may be exercised up to ninety (90) days after award.
(End of Summary of Changes)