20-B-2011 Amendment 1.pdf
PDF 134 KB Posted
- Attached to
- DLA Fitness Center Renovation
- Solicitation number
- W9123620B2011
About this file
This amendment modifies a solicitation for a firm-fixed-price construction contract to renovate a fitness center at a Defense Logistics Agency facility in Richmond, Virginia. The scope of work includes offices, wellness areas, racquetball courts, gymnasium, locker rooms, and support spaces. The pre-solicitation notice estimates the project budget between $5-10 million. Interested offerors must register in SAM and submit bids through beta.sam.gov. The solicitation will be issued on April 9th, 2020 with bids due May 7th, 2020. The contract will be a 100% small business set-aside awarded using definitive responsibility criteria and will require payment and performance bonds.
View the file
Other files
Show 40 more
Latest 50 of 76 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this Amendment is to include by text and update clause 252.236-7001: Contract Draw ings and Sepcifications and to attach updated Draw ings and Specifications--numbers 40 through 45.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B2011
X 9B. DATED (SEE ITEM 11)
13-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2020
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123620B2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510
to
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1011
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been deleted:
252.236-7001
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
ATTACHMENTS
1. Convert B32, Bays F-G for Fitness Center RTA Drawings, dated 23 Dec 2019, 206 pages
2. Convert B32 Bays F&G Fitness Center RTA Specifications, dated 23 Dec 2019, 1554 pages
3. Section 08 14 00 Wood Doors 08/16, 6 pages
4. Section 09 30 10 Porcelain Tiling 08/17, 12 pages
5. Section 09 51 00 Acoustical Ceilings 08/17, 10 pages
6. Section 09 64 66 Wood Athletic Flooring 08/16, 10 pages
7. Section 09 65 00 Resilient Flooring 08/10, 8 pages
8. Section 09 65 66 Resilient Athletic Flooring 08/16, 8 pages
9. Section 09 68 00 Carpet Tiles 11/17, 10 pages
10. Section 11 66 23 Gymnasium Equipment 06/19, 10 pages
11. Section 12 66 00 Telescoping Stands 11/12, 10 pages
12. 118ECE908 RTA FF&E Binder dated 22 Nov 2019, 32 pages
13. 118ECE908 RTA SID Binder dated 22 Nov 2019, 52 pages
14. A-101B Floor Plan – Area B dated 23 Dec 2019, 1 page
15. A-101C Floor Plan – Area C dated 23 Dec 2019, 1 page
16. A-111A Reflected Ceiling Plan -Area A dated 23 Dec 2019, 1 page
17. A-111B Reflected Ceiling Plan -Area B dated 23 Dec 2019, 1 page
18. A-111C Reflected Ceiling Plan -Area C dated 23 Dec 2019, 1 page
19. A-111D Reflected Ceiling Plan -Area D dated 23 Dec 2019, 1 page
20. A-121 Overall Roof Plan dated 23 Dec 2019, 1 page
21. A-201 Building Elevations dated 23 Dec 2019, 1 page
22. A-512 Roof Details dated 23 Dec 2019, 1 page
23. A-521 Miscellaneous Details dated 23 Dec 2019, 1 page
24. Asbestos Re-Inspection Report DSCR Building No. 32 dated 22 May 2018, 15 pages
25. ED111A Electrical Demolition Plan -Area A dated 23 Dec 2019, 1 page
26. ED111B Electrical Demolition Plan -Area B dated 23 Dec 2019, 1 page
27. ED111C Electrical Demolition Plan -Area C dated 23 Dec 2019, 1 page
28. ED111D Electrical Demolition Plan -Area D dated 23 Dec 2019, 1 page
29. I101C Floor Finish Plan -Area C dated 23 Dec 2019, 1 page
30. I101D Floor Finish Plan -Area D dated 23 Dec 2019, 1 page
31. Lead Based Paint Survey Report Building No. 32 dated 13 August 2018, 54 pages
32. M-503 Mechanical Details dated 23 Dec 2019, 1 page
33. S-001 General Structural Notes dated 23 Dec 2019, 1 page
34. S-101 Overall Foundation Plan dated 23 Dec 2019, 1 page
35. S-121C Truss Bottom Chord Plan -Area C dated 23 Dec 2019, 1 page
36. S-201 Framing Elevations & Details dated 23 Dec 2019, 1 page
37. S-301 Sections & Details –I dated 23 Dec 2019, 1 page
38. S-302 Sections & Details –II dated 23 Dec 2019, 1 page
39. S-501 Typical Structural Details –I dated 23 Dec 2019, 1 page
40. 118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages
41. 118ECE908 AMDT 002 33 40 00 dated 022010 11 pages
42. 118ECE908 AMDT 002 CG 100 dated 04292020 1 page
43. 118ECE908 AMDT 002 CG 102 dated 04292020 1 page
44. 118ECE908 AMDT 002 CU 101 dated 04292020 1 page
45. 118ECE908 AMDT 002 GC 002 dated 04292020 1 page
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
1. Convert B32, Bays F-G for Fitness Center RTA Drawings, dated 23 Dec 2019, 206 pages
2. Convert B32 Bays F&G Fitness Center RTA Specifications, dated 23 Dec 2019, 1554 pages
3. Section 08 14 00 Wood Doors 08/16, 6 pages
4. Section 09 30 10 Porcelain Tiling 08/17, 12 pages
5. Section 09 51 00 Acoustical Ceilings 08/17, 10 pages
6. Section 09 64 66 Wood Athletic Flooring 08/16, 10 pages
7. Section 09 65 00 Resilient Flooring 08/10, 8 pages
8. Section 09 65 66 Resilient Athletic Flooring 08/16, 8 pages
9. Section 09 68 00 Carpet Tiles 11/17, 10 pages
10. Section 11 66 23 Gymnasium Equipment 06/19, 10 pages
11. Section 12 66 00 Telescoping Stands 11/12, 10 pages
12. 118ECE908 RTA FF&E Binder dated 22 Nov 2019, 32 pages
13. 118ECE908 RTA SID Binder dated 22 Nov 2019, 52 pages
14. A-101B Floor Plan – Area B dated 23 Dec 2019, 1 page
15. A-101C Floor Plan – Area C dated 23 Dec 2019, 1 page
16. A-111A Reflected Ceiling Plan -Area A dated 23 Dec 2019, 1 page
17. A-111B Reflected Ceiling Plan -Area B dated 23 Dec 2019, 1 page
18. A-111C Reflected Ceiling Plan -Area C dated 23 Dec 2019, 1 page
19. A-111D Reflected Ceiling Plan -Area D dated 23 Dec 2019, 1 page
20. A-121 Overall Roof Plan dated 23 Dec 2019, 1 page
21. A-201 Building Elevations dated 23 Dec 2019, 1 page
22. A-512 Roof Details dated 23 Dec 2019, 1 page
23. A-521 Miscellaneous Details dated 23 Dec 2019, 1 page
24. Asbestos Re-Inspection Report DSCR Building No. 32 dated 22 May 2018, 15 pages
25. ED111A Electrical Demolition Plan -Area A dated 23 Dec 2019, 1 page
26. ED111B Electrical Demolition Plan -Area B dated 23 Dec 2019, 1 page
27. ED111C Electrical Demolition Plan -Area C dated 23 Dec 2019, 1 page
28. ED111D Electrical Demolition Plan -Area D dated 23 Dec 2019, 1 page
29. I101C Floor Finish Plan -Area C dated 23 Dec 2019, 1 page
30. I101D Floor Finish Plan -Area D dated 23 Dec 2019, 1 page
31. Lead Based Paint Survey Report Building No. 32 dated 13 August 2018, 54 pages
32. M-503 Mechanical Details dated 23 Dec 2019, 1 page
33. S-001 General Structural Notes dated 23 Dec 2019, 1 page
34. S-101 Overall Foundation Plan dated 23 Dec 2019, 1 page
35. S-121C Truss Bottom Chord Plan -Area C dated 23 Dec 2019, 1 page
36. S-201 Framing Elevations & Details dated 23 Dec 2019, 1 page
37. S-301 Sections & Details –I dated 23 Dec 2019, 1 page
38. S-302 Sections & Details –II dated 23 Dec 2019, 1 page
39. S-501 Typical Structural Details –I dated 23 Dec 2019, 1 page
40. 118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages
41. 118ECE908 AMDT 002 33 40 00 dated 022010 11 pages
42. 118ECE908 AMDT 002 CG 100 dated 04292020 1 page
43. 118ECE908 AMDT 002 CG 102 dated 04292020 1 page
44. 118ECE908 AMDT 002 CU 101 dated 04292020 1 page
45. 118ECE908 AMDT 002 GC 002 dated 04292020 1 page
(End of clause)
(End of Summary of Changes)