This specification covers plastic lockers and benches to be installed at the Defense Supply Center Richmond fitness center renovation project. Lockers will be double-tier plastic with sloped tops, and benches will be plastic-topped aluminum pedestals. Submittals on locker and bench materials, finishes, and assembly are due for approval. Lockers must meet indoor air quality standards and identify plastic resin types. Installation includes assembly, numbering, and anchoring of lockers. Field testing of assembled lockers may be conducted. Repairs and cleaning are specified.

This pre-solicitation notice is for a firm-fixed-price construction contract to renovate Building 32, Bays F-G at Defense Supply Center Richmond into a fitness center. The renovation will include offices, wellness areas, racquetball courts, gymnasium, locker rooms, and storage. The 100% small business set-aside contract will be awarded using sealed bidding procedures. The solicitation is expected to be issued on April 9, 2020 with proposals due May 7, 2020. The construction cost is estimated between $5-10 million. The selected contractor must provide payment and performance bonds. The period of performance is 450 days after notice to proceed. The Army Corps of Engineers Norfolk District will administer the contract.

View the file

Other files

File Type Posted
B.01.02_Abstract of Offers Page 2 Revised (CONST) W9123620B2011 Fitness Center Bid Opening 07012020.pdf PDF
B.01.02_Revised Abstract of Offers Page 1 (CONST) W9123620B2011 Fitness Center Bid Opening 06012020.pdf PDF
B.01.02_Abstract of Offers Page 3 Revised (CONST) W9123620B2011 Fitness Center Bid Opening 07012020.pdf PDF
B.01.02_Abstract of Offers Page 2 (CONST) W9123620B2011 Fitness Center Bid Opening 05282020.pdf PDF
B.01.02_Abstract of Offers Page 1 (CONST) W9123620B2011 Fitness Center Bid Opening 06012020.pdf PDF
B.01.02_Abstract of Offers Page 3 (CONST) W9123620B2011 Fitness Center Bid Opening 05282020.pdf PDF
118ECE908 AMDT 004 DRAWINGS dated 05142020 1 page.pdf PDF
118ECE908 AMDT 004 10 21 13 dated 082017 updated 05142020 10 pages.pdf PDF
20-B-2011 Amend 0004.pdf PDF
118ECE908 AMDT 004 SPECIFICATIONS dated 05142020 1556 pages.pdf PDF
118ECE908 AMDT 004 A 401 ENLARGED LOCKER ROOM RESTROOM PLANS AND TYPICAL ELEVATIONS dated 05142020 1 page.pdf PDF
Typed Site Visit Sign In Sheet for DLA Fitness Center 04222020.pdf PDF
W91236-20-B-2011 Amendment 3.pdf PDF
118ECE908 AMDT 002 11 66 23.pdf PDF
W9123620B0011 Amendment 2.pdf PDF
118ECE908 AMDT 002 DRAWINGS 05MAY2020.pdf PDF
118ECE908 AMDT 002 A111A REFLECTED CEILING PLAN AREA A.pdf PDF
118ECE908 AMDT 002 A111B REFLECTED CEILING PLAN AREA B.pdf PDF
118ECE908 AMDT 002 08 41 13.pdf PDF
118ECE908 AMDT 002 A111C REFLECTED CEILING PLAN AREA C.pdf PDF
118ECE908 AMDT 002 SPECIFICATIONS 05MAY2020.pdf PDF
118ECE908 AMDT 002 A111D REFLECTED CEILING PLAN AREA D.pdf PDF
118ECE908 AMDT 002 FF AND E BINDER 05MAY2020.pdf PDF
118ECE908 AMDT 002 I 101B FINISH PLAN AREA B.pdf PDF
118ECE908 AMDT 002 A002 PARTITION TYPES.pdf PDF
118ECE908 AMDT 002 A101B FLOOR PLAN AREA B.pdf PDF
118ECE908 AMDT 002 10 23 10.pdf PDF
118ECE908 AMDT 002 A101C FLOOR PLAN AREA C.pdf PDF
S-302 SECTIONS AND DETAILS -II.pdf PDF
S-201 FRAMING ELEVATIONS AND DETAILS.pdf PDF
S-301 SECTIONS AND DETAILS -I.pdf PDF
S-501 TYPICAL STRUCTURAL DETAILS -I.pdf PDF
S-001 GENERAL STRUCTURAL NOTES.pdf PDF
118ECE908_RTA_SID Binder_22Nov19.pdf PDF
S-121C TRUSS BOTTOM CHORD PLAN -AREA C.pdf PDF
S-101 OVERALL FOUNDATION PLAN.pdf PDF
A.01.13_118ECE908 AMDT 002 33 40 00 dated 022010 11 pages.pdf PDF
A.01.13_118ECE908 AMDT 002 GC002 dated 04292020 1 page.pdf PDF
A.01.13_118ECE908 AMDT 002 01 11 00.00 50 dated 022013 14 pages.pdf PDF
A.01.13_118ECE908 AMDT 002 CG 100 dated 04292020 1 page.pdf PDF
20-B-2011 Amendment 1.pdf PDF
A.01.13_118ECE908 AMDT 002 CU 101 dated 04292020 1 page.pdf PDF
A.01.13_118ECE908 AMDT 002 CG 102 dated 04292020 1 page.pdf PDF
G.01.47_PreBid Sign In Sheet for Fitness Center 04222020.pdf PDF
M-503 MECHANICAL DETAILS.pdf PDF
I101C FLOOR FINISH PLAN -AREA C.pdf PDF
Asbestos Re-Inspection Report DSCR Building No. 32.pdf PDF
ED111B ELECTRICAL DEMOLITION PLAN -AREA B.pdf PDF
ED111D ELECTRICAL DEMOLITION PLAN -AREA D.pdf PDF
I101D FLOOR FINISH PLAN -AREA D.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONVERT B32, BAYS F-G FOR FITNESS CENTER W91236-19-R-0023

DEFENSE SUPPLY CENTER RICHMOND (DSCR)

SECTION 10 51 13

PLASTIC LOCKERS AND BENCHES

05/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D7611/D7611M (2013; E 2014) Standard Practice for Coding Plastic Manufactured Articles for Resin Identification

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH Standard Method v1.1 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS AA-L-00486 (Rev J) Lockers, Clothing, Steel

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Types; G Location; G Installation Numbering system

SD-03 Product Data

Material Locking Devices Handles Finish Locker components

SECTION 10 51 13 Page 1

READY TO ADVERTISE

Assembly instructions

SD-04 Samples

Color chips; G

1.3 CERTIFICATIONS

1.3.1 Indoor Air Quality

1.3.1.1 Laminated Plastic and Solid Phenolic Products

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of CDPH Standard Method v1.1 . Provide current product certification documentation from certification body.

1.4 DELIVERY, HANDLING, AND STORAGE

Deliver lockers and associated materials in their original packages, containers, or bundles bearing the manufacturer's name and the name of the material. Protect from weather, soil, and damage during delivery, storage, and construction.

1.5 FIELD MEASUREMENTS

To ensure proper fits, make field measurements prior to the preparation of drawings and fabrication. Verify correct location

1.6 QUALITY ASSURANCE

1.6.1 Color Chips

Provide a minimum of three color chips, not less than 3 inches square, of each color indicated.

Government may request performance-characteristic tests on assembled lockers. Tests and results must conform to FS AA-L-00486 . Lockers not conforming will be rejected.

PART 2 PRODUCTS

2.1 TYPES

Locker must have the following type and size in the location and quantities indicated. Locker finish colors will be as indicated.

Amendment 004* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

2.1.1 Plastic Identification

Ver i f y t hat pl ast i c pr oduct s t o be i ncor por at ed i nt o t he pr oj ect ar e l abel ed i n accor dance wi t h ASTM D7611/ D7611M. Where products are not labeled, provide product data indicating polymeric information in the Operation and Maintenance Manual.

SECTION 10 51 13 Page 2

Type 1 Polyethylene Terephthalate (PET, PETE)

Type 2 High Density Polyethylene (HDPE)

Type 3 Vinyl (Polyvinyl Chloride or PVC)

Type 4 Low Density Polyethylene (LDPE)

Type 5 Polypropylene (PP)

Type 6 Polystrene (PS)

Type 7 Other. Use of this code indicates that the package in question is made with a resin other than the six listed above, or is made of more than one resin listed above, and used in a multi-layer combination.

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 004

2.1.2 Double-Tier

Double-tier lockers must be as follows:

Zee-shaped Type: Double-tier locker 12 inches wide, 12 inches deep, and 72 inches high, with sloped top, attached to a 4-inch high closed base

2.2 MATERIAL

2.2.1 Standard Duty High Impact, High Density Polyethylene (HDPE)

2.2.1.1 Components

High Density polyethylene (HDPE) sheet.

a. Doors shall be constructed of 1/2 inch (13 mm) water resistant and non-absorbing HDPE. Color as scheduled. Doors shall be fitted with a flush handle, number plate, padlock hasp, and locking device. Door latches shall be mounted inside of the locker. Hasps shall be mounted within each handle and will accept standard padlock styles. Doors shall be mounted to door frame using Piano style hinge and Steel Fasteners.

b. End Cover Panels shall be constructed of 1/2 inch (13 mm) water resistant and non-absorbing HDPE. Color as scheduled.

c. Side Panels shall be constructed of 1/2 inch (13 mm) water resistant and non-absorbing HDPE. Color as scheduled.

d. Tops, Bottoms, and Shelves shall be constructed of 1/2 inch (13 mm) water resistant and non-absorbing HDPE. Color as scheduled.

e. Slope Tops, Filler Panels and Recessed Locker Trim shall be constructed of 1/2 inch (13 mm) water resistant and non-absorbing HDPE. Provide where scheduled or indicated. Color as scheduled.

SECTION 10 51 13 Page 3

2.2.1.2 Color

As selected.

2.3 COMPONENTS

2.3.1 Built-In Locks

Provide locking devices as a padlock eye in the door latching mechanism.

Amendment 004****************************************************************

2.3.2 Coat Hooks

FS AA- L- 00486, Doubl e Ti er l ocker s shal l have t wo wal l hooks zi nc pl at ed.

****************************************************************Amendment 004

2.3.3 Door Handles

FS AA-L-00486 . Provide zinc alloy or steel handles with a chromium coating.

2.3.4 Doors

CNC machine locker frames from single piece of solid HDPE material.

Machine locker doors from solid HDPE sheets without using limited door insert area. Provice CNC machined ventilation ports positioned in an array pattern. Mount door handle to interal latch mechanism.

2.3.4.1 Hinges

Continuous full length zinc plated, powder coated black color.

2.3.4.2 Latching Mechanisms

Securely attach to the door, continuous in design and be capable of accepting various locking mechanisms. Mount door handle to interal latch mechanism.

2.3.5 Silencers

FS AA-L-00486 .

2.3.6 Back and Side Panels, Tops, and Bottoms

Assembly Units: Group of no more than three adjacent lockers. Single unit construction. Locker components to be square rigid, and free of scratches. Assemble locker box enclosure by means of machined joints, pins and tamper resistant mechanical fasteners. Locate mechanical fasteners internal to locker box enclosure or on rear of unit.

2.3.7 Sloping Locker Tops

Provide sloping locker tops in addition to the locker-section flat tops.

Sloping tops must be continuous in length. Provide fillers or closures at the exposed end of sloping tops. Slope Tops: 5 inches (127 mm) for 15 inches (381 mm) deep lockers.

SECTION 10 51 13 Page 4

2.3.8 Shelves

FS AA-L-00486 . Fabricate from not less than 0.0598 inch thick steel sheet.

Amendment 004* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

2.3.9 Base Mount

Mount i ng: 4 i nches ( 102 mm) base mount i ng, mount l ocker s on concr et e base as i ndi cat ed on dr awi ngs.

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Amendment 004

2.3.10 Legs

Provide lockers without legs, as indicated.

2.3.11 Number Plates

FS AA-L-00486 . Aluminum. Provide consecutive numbers.

2.4 PEDESTAL BENCH

2.4.1 Pedestal Bench Dimensions

Lengh: as indicated Width: 12 inches Height: 18 1/2 inches

2.4.2 Materials

Bench top: 1 1/2 inch thick HDPE plastic, 30 percent recycled material, with matte texture finish.

Pedestal: Black anodized aluminum with welded aluminum flanges top and bottom.

2.4.3 Color

As selected by Architect from manufacturer's full range.

PART 3 EXECUTION

3.1 ASSEMBLY AND INSTALLATION

Assemble lockers according to the locker manufacturer's instructions.

Align lockers horizontally and vertically. Secure lockers to wall and base with screws as indicated. Bolt adjacent lockers together. Adjust doors to operate freely without sticking or binding and to ensure they close tightly.

3.2 NUMBERING SYSTEM

Install number plates on lockers consecutively with odd numbers on top and even numbers on bottom.

SECTION 10 51 13 Page 5

3.3 FIELD QUALITY CONTROL

3.3.1 Testing

Government may request performance-characteristic tests on assembled lockers in accordance with FS AA-L-00486 . Lockers not conforming will be rejected.

3.3.2 Repairing

Remove and replace damaged and unacceptable portions of completed work with new.

3.3.3 Cleaning

Clean surfaces of the work, and adjacent surfaces soiled as a result of the work, in an approved manner. Remove equipment, surplus materials, and rubbish from the site.

-- End of Section --

SECTION 10 51 13 Page 6

10 51 13 - PLASTIC LOCKERS AND BENCHES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality
1.3.1.1 Laminated Plastic and Solid Phenolic Products
1.4 DELIVERY, HANDLING, AND STORAGE
1.5 FIELD MEASUREMENTS
1.6 QUALITY ASSURANCE
1.6.1 Color Chips
PART 2 PRODUCTS
2.1 TYPES
2.1.1 Plastic Identification
2.1.2 Double-Tier
2.2 MATERIAL
2.2.1 Standard Duty High Impact, High Density Polyethylene HDPE
2.2.1.1 Components
2.2.1.2 Color
2.3 COMPONENTS
2.3.1 Built-In Locks
2.3.2 Coat Hooks
2.3.3 Door Handles
2.3.4 Doors
2.3.4.1 Hinges
2.3.4.2 Latching Mechanisms
2.3.5 Silencers
2.3.6 Back and Side Panels, Tops, and Bottoms
2.3.7 Sloping Locker Tops
2.3.8 Shelves
2.3.9 Base Mount
2.3.10 Legs
2.3.11 Number Plates
2.4 PEDESTAL BENCH
2.4.1 Pedestal Bench Dimensions
2.4.2 Materials
2.4.3 Color
PART 3 EXECUTION
3.1 ASSEMBLY AND INSTALLATION
3.2 NUMBERING SYSTEM
3.3 FIELD QUALITY CONTROL
3.3.1 Testing
3.3.2 Repairing
3.3.3 Cleaning

File details come from the government source that posted it. Updated .