M-100601A_-_SYSTEM_DIAGRAMS_-TEMPORARY_FUEL_TANK.pdf
PDF 82 KB Posted
- Solicitation number
- W911KB-17-R-0010
About this file
M-100601A
View the file
Other files
Show 40 more
Latest 50 of 128 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-1/4" FOR TO FUTURE CONNECTION
PRESSURE RELIEF VALVE, TYP
P-10003001A
PRESSURE GAUGE, TYP
STAINER, TYP
SKID MOUNTED PUMP PACKAGE, WITH
DRIP PAN
ANTI-SIPHON VALVE
FUSIBLE VALVE
1-1/4" FOS, FOR
FLEX CONNECTION,
TYP
T-10003001
1-1/4" FOS TO FUTURE CONNECTION
CP1-A
CP1-B
SLOPE 1%
ISOLATION VALVE, TYP
INTERIOR EXTERIOR
HOUSEKEEPING PAD,
TYP. 4" TALL AND 8"
LARGER THAN
SUPPORTED EQUIPMENT
PUMP PACKAGE CONTROL
PANEL WITH CONTROL
SIGNALS RECEIVED FROM
BUILDING MANAGEMENT
SYSTEM SKID MOUNTED TANK ON SUPPORT
PAD, SEE STRUCTURAL
SEE CP1-B FOR HEMP
PENETRATION DETAIL
WORK PER
CP1-B
PIPE SUPPORT, TYP
P-10003001B
CONCRETE SUPPORT PAD
FOS ISOLATION VALVES AT TANK,
PROTECTED BY 1/4" BALLISTIC COLLAR
TANK LEVEL ALARM PANEL WITH
ANNUNCIATOR AND VISUAL INDICATORS
TANK LEAK DETECTION ALARM PANEL
1-1/4" FOS, FOR PIPING INSULATED FROM EXTERIOR
WALL TO FUEL PUMP ASSEMBLY
FUEL STORAGE AND FORWARDING
PERFORMANCE REQUIREMENTS
a. PROVIDE CONTROL SYSTEMS THAT FORWARD FUEL FROM THE
TEMPORARY FUEL STORAGE TANK TO THE MCF DAYTANKS BY
PERFORMING THE FUNCTIONS AND SEQUENCES OF OPERATIONS
INDICATED.
SEQUENCE OF OPERATION CONTROLLER
a. EQUIPMENT SHALL BE CONTROLLED BY THE MCF BMS SYSTEM AND
SHALL BE COORDINATED WITH DEVICE IDENTIFIERS ON CONTROL
SYSTEM DIAGRAMS. THIS SECTION INCLUDES SEQUENCE OF
OPERATION FOR THE FOLLOWING.
FUEL TRANSFER OPERATIONS
a. TRANSFER PUMPS (P-10003001A AND P-10003001B)
TEMPORARY FUEL TANK MONITORING AND ALARMS
a. BULK STORAGE TANK (T-10003001)
SEQUENCE OF OPERATION
BMS GENERAL
a. THE CONTRACTOR SHALL COLLABORATE WITH THE CONTRACTING
OFFICER DIRECTLY TO DETERMINE THE CONTRACTING OFFICER'S
PREFERENCE FOR NAMING CONVENTIONS, ETC. BEFORE ENTERING
THE DATA INTO THE MCF BMS SYSTEM. ALL SUGGESTED SET POINTS
AND SETTINGS ARE ADJUSTABLE.
b. ALL POINTS OUTLINED SHALL BE ADDRESSABLE THROUGH THE BMS
SYSTEM. ALL POINTS SHALL BE PROGRAMMED AT THE HOST
COMPUTER AND GRAPHICS SHALL BE PREPARED.
c. ALL WORK OUTLINED HERE SHALL BE CONTROLLED BY THE BMS
UNLESS OTHERWISE NOTED.
d. THE BMS SHALL DISPALY, RECORD AND CONTINUOUSLY MONITOR
THE FUEL OIL SYSTEM AND BOILERS TO ESTABLISH A TRENDING LOG.
LOGGING RATE SHALL BE ONCE EVERY MINUTE (ADJUSTABLE),
REMAIN ACCESSIBLE FOR TWO MONTHS, AND HAVE THE ABILITY TO
BE LEGIBLY PRINTED AND SAVED TO CD. THIS WILL INCLUDE BUT NOT
LIMITED TO:
1. FUEL OIL STORAGE TANK LEVELS AND VOLUMES.
2. BOILER RUN TIME.
TEMPORARY FUEL TANK MONITORING AND ALARMS
a. THE BMS SHALL PROVIDE AUDIBLE AND/OR VISUAL ALARM
POINTS TO REPORT BACK TO MCF BMS AND MAKE VISABLE
AT OPERATOR'S WORKSTATION. THE FOLLOWING POINTS
SHALL BE MONITORED FOR SEQUENCE OF OPERATIONS:
1. FUEL OIL STORAGE TANK LEVELS, ALARMED LEVEL VALUES.
* LLAL = LOW-LOW ALARM LEVEL 10%
* LAL = LOW ALARM LEVEL 15%
* HAL = HIGH ALARM LEVEL 90%
* HHAL = HIGH-HIGH ALARM LEVEL 95%
2. *FUEL OIL STORAGE TANK LEAK DETECTION (DETECTED
WITHIN PRIMARY AND EXTERIOR TANK TANK CHAMBERS)
3. *TANK LEVEL SHALL BE CONTINUOUSLY MONITORED VIA
PRODUCT LEVEL GAUGE AND REPORTED TO THE MCF.
4. *AN ACKNOWLEDGE/SILENCE BUTTON SHALL BE PROVIDED TO
SILENCE ANY AUDIBLE ALARMS FOR THE LEAK DETECTION OR
TANK LEVEL MONITORING SYSTEMS, HOWEVER THE VISUAL
ALARM SHALL REMAIN ENERGIZED UNTIL THE RESPECTIVE
INSTRUMENT NO LONGER MEASURES AN ALARM CONDITION.
SEQUENCE OF OPERATION
TRUCK OFFLOADING
a. WHEN A FUEL TRUCK ARRIVES, A TRUCK-MOUNTED PUMP SHALL
PROVIDE ADEQUATE FLOW AND PRESSURE TO FILL THE STORAGE
TANK (T-10003001) THROUGH THE TANK-TOP MOUNTED SPILL FILL
CONTAINER.
CONTROL PANELS
THE BMS AND LOCAL FUEL UNLOADING PANEL SHALL MONITOR THE BULK
FUEL OIL STORAGE TANK LEVEL. AT 90%, A VISUAL ALARM SHALL
ANNUNCIATE AT THE LOCAL PANEL AND THE BMS. WHENEVER THE FUEL OIL
STORAGE TANK IS AT A HIGH-HIGH LEVEL OF 95%, AN AUDIBLE AND VISUAL
ALARM SHALL BE ANNUNCIATED AT THE LOCAL PANEL AND THE BMS AND A
NORMALLY OPEN MECHANICAL OVERFLOW PEVENTION VALVE SHALL CLOSE
UNTIL THE FUEL OIL STORAGE TANK LEVEL DECREASES. WHENEVER THE
FUEL OIL STORAGE TANK IS AT A LOW LEVEL OF 15%, A VISUAL ALARM
SHALL BE INDICATED AT THE BMS. WHEVER THE FUEL OIL STORAGE TANK IS
AT A LOW-LOW LEVEL OF 10%, A VISUAL AND AUDIBLE ALARM SHALL BE
INDICATED AT THE BMS. AN ACKNOWLEDGE/SILENCE BUTTON SHALL BE
PROVIDED TO SILENCE ANY AUDIBLE ALARM AT THE LOCAL PANEL AND BMS.
HOWEVER, THE VISUAL ALARM SHALL REMAIN ENERGIZED UNTIL THE
RESPECTIVE INSTRUMENT NO LONGER MEASURES AN ALARM CONDITION.
AN ELECTRIC LEAK DETECTION MODULE SHALL BE LOCATED AS INDICATED
ON THE DRAWINGS. THE INTERSTITIAL SPACE OF THE FUEL OIL STORAGE
TANK SHALL BE MONITORED FOR LEAKS BY ELECTRONIC LEAK DETECTORS
TIED INTO THE LEAK DETECTION MODULE. WHENEVER THE MODULE SENSES
A LEAK, AN AUDIBLE ALARM SHALL BE ANNUNCIATED AND THE LEAK'S
LOCATION SHALL BE DISPLAYED/MAPPED AT THE FUEL OIL UNLOADING
PANEL. THE MODULE SHALL ALSO SEND A LEAK SIGNAL TO THE BMS WHERE
AN AUDIBLE AND VISUAL ALARM SHALL BE ANNUNCIATED. WHENEVER THE
INTERSTITIAL SPACE OF A FUEL OIL STORAGE TANK IS EXPERIENCING A
LEAK, AN AUDIBLE AND VISUAL ALARM SHALL BE ANNUNCIATED AT THE
LOCAL PANEL.
M
FLOW SWITCH
FUEL METER
TRANSFER PUMP OPERATIONS AND ALARMS
a. FUEL OIL TRANSFER PUMPS (P-10003001A & P-10003001B) TRANSFER
FUEL FROM BULK FUEL OIL STORAGE TANK. (T-10003001) TO THE
BOILER DAY TANKS. THE BOILER DAY TANKS THEN DELIVER FUEL TO
THE HEATING BOILERS.
b. *A FUEL OIL METER LOCATED AFTER THE TRANSFER PUMP SHALL
DISPLAY THE TOTAL VOLUME SUPPLIED TO BOILER DAY TANKS. THE
MCF BMS SHALL MONITOR AND RECORD THE TOTAL VOLUME
PUMPED EACH DAY, WEEK, AND MONTH.
c. *THE FUEL OIL FORWARDING PUMP SHALL BE PROVIDED WITH A
"MANUAL/OFF/AUTO" SELECTOR SWITCH AT THE LOCAL PUMP SKID.
WHEN THE SWITCH IS IN "MANUAL" POSITION, PUMP SHALL BE
ENERGIZED. WHEN SWITCH IS IN "OFF" POSITION, PUMP SHALL BE DE-
ENERGIZED. WHEN THE SWITCH IS IN "AUTO" POSITION, THE PUMP
SHALL BE ENERGIZED THROUGH THE MCF BMS PER THE FOLLOWING
SEQUENCE:
d. THE FUEL OIL PUMPS (P-10003001A & P-10003001B) SHALL OPERATE
IN A LEAD/STANDBY CONFIGURATION. PUMPS SHALL ALTERNATE
OPERATION ON ONE MONTH INTERVALS.
e. *EACH PUMP SHALL RECIEVE A PUMP RUN COMMAND.
f. *EACH PUMP SHALL REPORT TO THE BMS A PUMP RUN-STATUS.
h. FLOW SWITCH SHALL CONTINUOUSLY MONITOR THE FUEL OIL FLOW
TO THE FUEL OIL FORWARDING PUMP. IF THE FUEL OIL FORWARDING
PUMP IS NOT PROVEN ENERGIZED THROUGH THE FLOW SWITCH FOR
30 SECONDS FOLLOWING COMMAND TO RUN, THE PUMP SHALL BE
DE-ENERGIZED, AN AUDIBLE AND VISUAL NON-ENERGIZED ALARM
SHALL BE ANNUNCIATED AT THE BMS. WHENEVER THE FUEL OIL
FORWARDING PUMP IS ENERGIZED, IT SHALL CONTINUOUSLY BE
PROVEN ENERGIZED BY THE FLOW SWITCH, UNLESS THE FLOW
SWITCH DE-ENERGIZES THE PUMP.
1 1
DEPA
R
T M
E N
T O
F D
E F
E
NSE
MISSILE
DE
F E
N S
E
AGENCY
D ra w in g
Fi le
N am e:
D w g Sc al e:
P lo t S ca le
D at e:
D ra w n:
R
ES
I D
EN
T
EN
G
IN
E
ER
P R
IM
E
C O
N
TR
AC
TO
R
S ub m itt ed
D es ig ne d:
R ev ie w ed
U .S
. A R
M Y
E N
G
IN
EE
R
D
IS
TR
IC
T
A N
C H
O R
AG
E, A
LA
SK
A
C O
R
PS
O F
EN
G
IN
EE
R S
D at e:
S
TA
TE
C
IT
Y
C O
N T R
A C
TO
R
C O
N T R
A C
T N
O
R ec om m en de d:
A pp ro ve d:
Reference number:
HGFEDCBA
A S
N O
TE
D
PL
O
TT
ED
O N
US Army Corps of Engineers ®
Alaska District
M D
A6
C
LR
9a
N O
T F O
R C
O N
ST
R
U C
TI
O
N
P D
C
IN
C . E
N G
IN
E E
R S
G
AM
B
EL
L S
T S U
IT
E
A N
C H
O R
AG
E, A K
A
N C
-7
-3
| A
EC
C
1/
/2
1:
:3
PM
C :\U se rs
\m ic ha el ba rte ll\ D oc um en ts
\C
LR
_L R
D R
_F
SV
_M -D
M
_m ic ha el ba rte ll.
rv t
AM #10 M-100601A
SY
ST
EM
D
IA
G
R
AM
S -T
EM
P O
R
AR
Y
FU
EL
T
A N K
LO
N
G R
AN
G
E D
IS
C
R
IM
IN
AT
I O N
R A D
AR
C
LE
AR
A
FS
, A
LA
SK
A R
SW
1:
CL
R_
L R
DR
_F
SV
_M -D
M2
M
EB
M
JL
W
1K B-
-R
-0
.1 1.
C O
N
ST
R U
C
TI
O N
P
AC
KA
G
E
- V O
LU
M
E
SM
T
AF
-1
-3
- 0
NO SCALEM-100601A
1 FUEL OIL SYSTEM DIAGRAM
SHEET NOTES
1 FOR TEMPORARY FUEL TANK DETAIL, SEE M-100501A
FUEL PIPE PENETRATIONS THROUGH EXTERIOR WALL, SEE
CP-1B, 3/A900502B. FOR HEMP PENETRATION DETAIL SEE
3/MP-900504B.
SEE CP-1B FOR PUMP CONTROLS FROM BMS CONTROL SYSTEM.
GENERAL NOTES
FOR MECHANICAL NOTES, LEGEND, AND
ABBREVIATIONS SEE SHEETS M1000001A, M1000002A,
& M1000003A.
1.
Sy m
A ct io n D es cr ip tio n D at e
A pp vd
A M
A M
M
EN
D M
EN
T
.0 1.
M
JL
| Sheets |
| M-100301A - SECTIONS - TEMPORARY FUEL TANK |
| M-100502A - DETAILS - TEMPORARY FUEL TANK |
| M-100601A - SYSTEM DIAGRAMS -TEMPORARY FUEL TANK |
File details come from the government source that posted it. Updated .