28_08_00.01_00.pdf

PDF 9 KB Posted

Attached to
LRDR CP#1 Site Infrastructure, MCF, and Substation (CLR039a), Clear AFS, Alaska
Solicitation number
W911KB-17-R-0010
Issued by

About this file

Section 28 08 00.01 00

View the file

Other files

File Type Posted
J&A_17-2_Edwards_EST3_Fire_Panel_Redacted.pdf PDF
J&A_Intrusion_Detection-Vindicator_Redacted.pdf PDF
J&A_Siemans_Apogee_BACnet_Redacted.pdf PDF
W911KB-17-R-0010_AM_14.pdf PDF
W911KB-17-R-0010_AM_13.pdf PDF
W911KB-17-R-0010_AM_12.pdf PDF
13_27_54.01_10_AM_11.pdf PDF
Bidder_Inquiry_Report_W911KB-17-R-0010.pdf PDF
33_20_00.01_00_AM_11.pdf PDF
31_00_00.01_00_AM_11_17y01m25d.pdf PDF
W911KB-17-R-0010_AM_11.pdf PDF
07_42_63.01_00_AM_10.pdf PDF
CLR_LRDR_MCF_S-900549B_AM_10.pdf PDF
09_97_13.01_17.pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900402B.PDF PDF
M-100601A_-_SYSTEM_DIAGRAMS_-TEMPORARY_FUEL_TANK.pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900401B.PDF PDF
CLR_LRDR_LSUB_M-907503H_-_AM10.PDF PDF
01_50_00.01_00.pdf PDF
33_52_80.01_00.pdf PDF
09_97_13.01_27.pdf PDF
M-100502A_-_DETAILS_-_TEMPORARY_FUEL_TANK.pdf PDF
01_91_19.01_00_Amendment_10.pdf PDF
CLR_LRDR_LSUB_M-907600H_-_AM10.PDF PDF
08_34_49.01_20_AM_10_(2).pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900601B.PDF PDF
A-900005B_AM_10.pdf PDF
01_91_00.01_15_attachment_1_-_170123_LRDR_draft_CP-1_Cx_Master_Equipment_List.pdf PDF
CLR_LRDR_MCF_Z-900001B_AM_10.pdf PDF
W911KB-17-R-0010_AM_10.pdf PDF
33_52_10.01_00_-_AM10.pdf PDF
01_91_00.01_15_Amendment_10.pdf PDF
M-100301A_-_SECTIONS_-_TEMPORARY_FUEL_TANK.pdf PDF
A-900005B_AM_9.pdf PDF
23_05_93.01_00_AM_9.pdf PDF
06_20_00.01_00_AM_9.pdf PDF
22_05_48.00_20_AM_9.pdf PDF
Mechanical_Amendment_9_-_Sheet_-_MH900902B.pdf PDF
Revised_Plumbing_Sheets_-_Inquiry__6793897.pdf PDF
Mechanical_Amendment_9_-_Sheet_-_MP900703B.pdf PDF
26_08_01.01_00.pdf PDF
T-100601A_AM_09.pdf PDF
23_09_23.01_29_AM_9.pdf PDF
W911KB-17-R-0010_AM_9.pdf PDF
22_00_00.01_00_AM_9.pdf PDF
27_08_00.01_00.pdf PDF
33_20_01.01_00.pdf PDF
33_11_00.01_00_AM_9_17y01m18d.pdf PDF
09_97_13.01_17.pdf PDF
E-100301A_Amendment__009.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AM#9 READY TO ADVERTISE CLR039a LRDR Construction Package #1 - Clear AFS, Alaska

SECTION 28 08 00.01 00

COMMISSIONING OF ELECTRONIC SAFETY SYSTEMS

PART 1 GENERAL

1.1 SUMMARY

This Section includes commissioning (Cx) process requirements related to the testing and certification of the following electrical components, systems, assemblies, and equipment by non-CxA vendors and certification testers.

a. Fire detection, alarm, and mass notification.

1.2 RELATED REQUIREMENTS

Refer to Sections 01 78 23.01 00 OPERATION AND MAINTENANCE DATA and 01 91 00.01 15 COMMISSIONING for general Cx process requirements, definition of Cx team members, and delineation of responsibilities.

Refer to Section 28 31 76.01 00 INTERIOR FIRE ALARM AND MASS NOTIFICATION for acceptance tests of fire detection, alarm, and mass notification systems.

In lieu of construction checklists, comply with requirements in Section 28 31 76.01 00 INTERIOR FIRE ALARM AND MASS NOTIFICATION specifying execution requirements for electronic safety systems, system components, equipment, and products.

1.3 DEFINITIONS

1.3.1 BoD

Basis-of-Design Document, as defined in Section 01 91 00.01 15

COMMISSIONING.

1.3.2 Cx

Commissioning, as defined in Section 01 91 00.01 15 COMMISSIONING.

1.3.3 CxA

Commissioning Authority, as defined in Section 01 91 00.01 15

COMMISSIONING.

1.3.4 CxC

AM#9... Commissioning Specialist for Construction ...AM#9 , as defined in Section 01 91 00.01 15 COMMISSIONING.

1.3.5 CxG

USACE Commissioning Specialist, as defined in Section 01 91 00.01 15

COMMISSIONING.

SECTION 28 08 00.01 00 Page 1

READY TO ADVERTISE

AM#9 READY TO ADVERTISE CLR039a LRDR Construction Package #1 - Clear AFS, Alaska

1.3.6 CCR

Contractor's Commissioning Representative, as defined in Section

01 91 00.01 15 COMMISSIONING.

1.3.7 OPR

Owner's Project Requirements , as defined in Section 01 91 00.01 15

COMMISSIONING.

1.3.8 Systems, Assemblies, Subsystems, Equipment, and Components

Where these terms are used together or separately, they shall mean "as-built" systems, assemblies, subsystems, equipment, and components.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 SYSTEM FUNCTIONAL PERFORMANCE

In lieu of functional performance tests by the CxA, comply with aceeptance and testing requirements in Section 28 31 76.01 00 INTERIOR FIRE ALARM AND MASS NOTIFICATION specifying inspection and acceptance testing requirements for electronic safety systems, system components, equipment, and products.

3.2 SYSTEM TRAINING PLAN PREPARATION

Prepare and submit training plan for Fire Alarm and Mass Notification System according to the technical requirements in Section 28 31 76.01 00 INTERIOR FIRE ALARM AND MASS NOTIFICATION, and the scheduling, review, and acceptance requirements for training plans in Sections 01 78 23.01 00 OPERATION AND MAINTENANCE DATA and 01 91 00.01 15 COMMISSIONING.

-- End of Section --

SECTION 28 08 00.01 00 Page 2