01_91_00.01_15_attachment_1_-_170123_LRDR_draft_CP-1_Cx_Master_Equipment_List.pdf

PDF 795 KB Posted

Attached to
LRDR CP#1 Site Infrastructure, MCF, and Substation (CLR039a), Clear AFS, Alaska
Solicitation number
W911KB-17-R-0010
Issued by

About this file

Section 01 91 00.01 15 Attachment 1

View the file

Other files

File Type Posted
J&A_17-2_Edwards_EST3_Fire_Panel_Redacted.pdf PDF
J&A_Intrusion_Detection-Vindicator_Redacted.pdf PDF
J&A_Siemans_Apogee_BACnet_Redacted.pdf PDF
W911KB-17-R-0010_AM_14.pdf PDF
W911KB-17-R-0010_AM_13.pdf PDF
W911KB-17-R-0010_AM_12.pdf PDF
13_27_54.01_10_AM_11.pdf PDF
Bidder_Inquiry_Report_W911KB-17-R-0010.pdf PDF
33_20_00.01_00_AM_11.pdf PDF
31_00_00.01_00_AM_11_17y01m25d.pdf PDF
W911KB-17-R-0010_AM_11.pdf PDF
07_42_63.01_00_AM_10.pdf PDF
CLR_LRDR_MCF_S-900549B_AM_10.pdf PDF
09_97_13.01_17.pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900402B.PDF PDF
M-100601A_-_SYSTEM_DIAGRAMS_-TEMPORARY_FUEL_TANK.pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900401B.PDF PDF
CLR_LRDR_LSUB_M-907503H_-_AM10.PDF PDF
01_50_00.01_00.pdf PDF
33_52_80.01_00.pdf PDF
09_97_13.01_27.pdf PDF
M-100502A_-_DETAILS_-_TEMPORARY_FUEL_TANK.pdf PDF
01_91_19.01_00_Amendment_10.pdf PDF
CLR_LRDR_LSUB_M-907600H_-_AM10.PDF PDF
08_34_49.01_20_AM_10_(2).pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900601B.PDF PDF
A-900005B_AM_10.pdf PDF
CLR_LRDR_MCF_Z-900001B_AM_10.pdf PDF
W911KB-17-R-0010_AM_10.pdf PDF
33_52_10.01_00_-_AM10.pdf PDF
01_91_00.01_15_Amendment_10.pdf PDF
M-100301A_-_SECTIONS_-_TEMPORARY_FUEL_TANK.pdf PDF
A-900005B_AM_9.pdf PDF
23_05_93.01_00_AM_9.pdf PDF
06_20_00.01_00_AM_9.pdf PDF
22_05_48.00_20_AM_9.pdf PDF
Mechanical_Amendment_9_-_Sheet_-_MH900902B.pdf PDF
Revised_Plumbing_Sheets_-_Inquiry__6793897.pdf PDF
Mechanical_Amendment_9_-_Sheet_-_MP900703B.pdf PDF
26_08_01.01_00.pdf PDF
T-100601A_AM_09.pdf PDF
23_09_23.01_29_AM_9.pdf PDF
W911KB-17-R-0010_AM_9.pdf PDF
22_00_00.01_00_AM_9.pdf PDF
27_08_00.01_00.pdf PDF
33_20_01.01_00.pdf PDF
33_11_00.01_00_AM_9_17y01m18d.pdf PDF
09_97_13.01_17.pdf PDF
28_08_00.01_00.pdf PDF
E-100301A_Amendment__009.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updated: 9/28/2016

Cx System /

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct io n

C h ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

Division 01 - Building Envelope

Thermal and Moisture Integrity

Air-tightness

Shading control

Division 01 -Integrated System testing

Battleshort Mode

Utility Power Failure

Radar call for Power

Radar call for Cooling

Water well system modes

Division 11 - Equipment NOTHING FOUND AS OF 2016-08-19

Division 13 - Special Construction

EMI shielding

HEMP

LP-XXX HEMP: Lower Plate

ESWP-XXX HEMP: Stem Wall Plate

NWP-XXX HEMP: North Wall Plate

EWP-XXX HEMP: East Wall Plate

SWP-XXX HEMP: South Wall Plate

WWP-XXX HEMP: West Wall Plate

LD-WP-XXX HEMP: Loading Dock Wall Plate

L-WP-XXX HEMP: LES Link Wall Plate

IP-XXX HEMP: Interior Pedestal Plate

VEWP-XXX HEMP: Vestibule Wall Plate

UP-XXX HEMP: Upper Plate

H900001 HEMP Penetration: Boiler Rm 127

H900002 HEMP Penetration: Boiler Rm 127

H900003 HEMP Penetration: Loading Dock 137

H900004 HEMP Penetration: Mechanical Room 3 139

H900005 HEMP Penetration: Mechanical Room 3 139

H900006 HEMP Penetration: Attic Zone A 201

H900007 HEMP Penetration: Attic Zone A 201

H900008 HEMP Penetration: Attic Zone A 201

H900009 HEMP Penetration: Attic Zone A 201

H900010 HEMP Penetration: Attic Zone A 201

H900011 HEMP Penetration: Attic Zone A 201

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

CP-1: MCF / Temporary Fuel (Phase 1, FY2017)

170123 LRDR draft CP-1 Cx Master Equipment List page 1 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 1

FOR OFFICIAL USE ONLY

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

H900012 HEMP Penetration: Attic Zone A 201

H900013 HEMP Penetration: Attic Zone B 201

H900014 HEMP Penetration: Attic Zone B 201

H900015 HEMP Penetration: Attic Zone B 201

H900016 HEMP Penetration: Attic Zone C 201

H900017 HEMP Penetration: Attic Zone C 201

H900018 HEMP Penetration: Attic Zone C 201

H900019 HEMP Penetration: Attic Zone C 201

H900020 HEMP Penetration: Attic Zone C 201

H900021 HEMP Penetration: Attic Zone C 201

H900022 HEMP Penetration: Attic Zone C 201

Seismic

Division 21 - Fire Suppression

52 Fire Protection System: MCF

52 FP-1/2 Fire Pumps: MCF

52 HX-90052001A Hot Water/Fire Water (crosscheck with HX-90003001A)

52 HX-90052001B Hot Water/Fire Water (crosscheck with HX-90003001B)

52 FWP-90052001A Fire Loop Pump (crosscheck with FWP-90054001A)

52 FWP-90052001B Fire Loop Pump (crosscheck with FWP-90054001B)

54 FWP-90054001A Fire Loop Pump

54 FWP-90054001B Fire Loop Pump

Division 22 - Compressed Air and Plumbing Systems

11 AC-90011001A Air Compressor

11 AC-90011001B Air Compressor

11 F-90011001 Compressed Air Filter

11 AR-90011001 Compressed Air Receiver

12 WC-90012001 Toilets - Water Closet

12 WC-90012002 Toilets - Water Closet

12 UR-90012001 Toilets - Urinal

12 UR-90012002 Toilets - Urinal

12 L-90012001 Sinks - Lavatory

12 S-90012001 Sinks - Breakroom

12 S-9001200 Sinks - Maintenance

12 SS-90012001 Sinks - Service

12 SH-90012001 Shower - Accessible

12 TP-90012001 Trap Primer

12 WHA-90012001 Water Hammer Arrester

170123 LRDR draft CP-1 Cx Master Equipment List page 2 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 2

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

12 ES-90012001 Emergency Eyewash Shower

12 ES-90012002 Emergency Eyewash

12 HB-90012001 Hose Bib

12 MV-90012001 Thermostatic Mixing Valve

12 EWC-90012001 Electric Water Cooler

12 IMB-90012001 Ice Machine Box

12 BFP-90012001 Backflow Preventer

12 ET-90012001 Expansion Tank

12 RCP-90012001 Domestic Hot Water Recirculation Pump

12 WH-90012001 Domestic Water Heater

12 IWH-90012002 Emergency Eyewash/Shower Water Heater, tankless

12 DWP-90012001 Domestic Water Loop Circulation Pump

12 HX-90012001 Heat Exchanger - Hot Water/Potable Water

Potable Water Treatment: Brine, Backwash, Cold Water, Drain, NaOCL

Sodium Hypochlorite, NaOH Sodium Hydroxide, Well Water Cooling

13 P-90013001A NaOCL Sodium Hypchlorite Metering Pump

13 P-90013002A NaOH Sodium Hydroxide Metering Pump

16 Non-Potable Water

16 BFP-90016001 Backflow Preventer

Building Waste (Sanitary, Oil Waste, Roof Drains, Floor Drain, Trench

Drain, Floor Sink, Floor Cleanout, Wall Cleanout, Downspout, Etc.)

17 FD-90017001 Building Waste - Floor Drain

17 FD-90017002 Building Waste - Floor Drain

17 FD-90017003 Building Waste - Floor Drain

17 TD-90012001 Building Waste - Trench Drain

17 FCO-90017001 Building Waste - Floor Clean Out

17 FCO-90017002 Building Waste - Floor Clean Out

17 FCO-90017003 Building Waste - Floor Clean Out

17 FS-90017001 Building Waste - Floor Sink

17 FS-90017002 Building Waste - Floor Sink

17 WCO-90017001 Building Waste - Wall Clean Out

17 WCO-90017002 Building Waste - Wall Clean Out

17 RD-90017001 Building Waste - Roof Drain

17 OD-90017001 Building Waste - Overflow Roof Drain

17 DN-90017001 Building Waste - Downspout Nozzle

18 Hazardous Fluid Containment

Division 23 - HVAC Heating Systems

21 Site Low-Temperature Hot Water Generation & Distribution

21 Heating Control Valves (Boilers, AHU Heating coils, CRAC, FCU, VAV, UH, CUH)

170123 LRDR draft CP-1 Cx Master Equipment List page 3 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 3

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

21 GHP-90021001A Glycol Heating Pump

22 Building Low-Temperature Hot Water System

22 AS-90022001 Air Separator - Building Hot Water System

22 B-90022001A Boiler 6000 MBH

22 B-90022001B Boiler 6000 MBH

22 B-90022001C Boiler 6000 MBH

22 B-90022002A Boiler 3000 MBH

22 B-90022002B Boiler 3000 MBH

22 CSF-90022001 Chemical Shot Feeder

22 ET-90022001 Expansion Tank - Building Hot Water

22 ET-90022002 Expansion Tank - Heat Trace Glycol

22 GHP-90022001A Building Heat Pump Yes

22 GHP-90022001B Building Heat Pump Yes

22 GHP-90022001C Building Heat Pump Yes

22 GHP-90022002A Boiler Pump (Boilers 9022001A, 90022001B, 90022001C)

22 GHP-90022002B Boiler Pump (Boilers 9022001A, 90022001B, 90022001C)

22 GHP-90022002C Boiler Pump (Boilers 9022001A, 90022001B, 90022001C)

22 GHP-90022003A Boiler Pump (Boilers 9022002A, 90022002B)

22 GHP-90022003B Boiler Pump (Boilers 9022002A, 90022002B)

22 GHP-90022004A Building Hot Water Circulation (50% PG) Yes

22 GHP-90022004B Building Hot Water Circulation (50% PG) Yes

22 GHP-90022004C Building Hot Water Circulation (50% PG) Yes

31 GMP-90022001A Glycol Injection Pump (Serves GMU-90022001)

31 GMP-90022001B Glycol Injection Pump (Serves GMU-90022001)

22 GMU-90022002 Glycol Injection Pump & Tank Unit

22 HP-90022001 Water to Water Heat Pump

22 HP-90022002 Water to Water Heat Pump

22 HTP-90022005A Heat Trace Pump

22 HX-90022001 Heat Exchanger - Hot Water/Heat Trace

23 FF-90023001A Flue gas Fan: Boiler 1A Yes

23 FF-90023001B Flue gas Fan: Boiler 1B Yes

23 FF-90023001C Flue gas Fan: Boiler 1C Yes

23 FF-90023002A Flue gas Fan: Boiler 2A Yes

23 FF-90023002B Flue gas Fan: Boiler 2B Yes

Division 23 - HVAC Cooling Systems

31 Control Valves (Well Water, CRAC, FCU)

31 Chilled Water (Filters)

31 AS-90031001 Air Separator - Building Chilled Water

170123 LRDR draft CP-1 Cx Master Equipment List page 4 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 4

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

31 ET-90031001 Expansion Tank Building Chilled Water

31 CSF-90031001 Chemical Shot Feeder

31 GCP-90031001A LPP Cooling Pump Yes

31 GCP-90031001B LPP Cooling Pump Yes

31 GCP-90031001C LPP Cooling Pump Yes

31 GCP-90031002A MCF & LES Cooling Pump Yes

31 GCP-90031002B MCF & LES Cooling Pump Yes

31 GMP-90031001A Glycol Injection Pump (Serves GMU-90031001)

31 GMP-90031001B Glycol Injection Pump (Serves GMU-90031001)

31 GMU-90031001 Glycol Injection Pump & Tank Unit

31 HX-90031001A Chilled Water/Well Water HX

31 HX-90031001B Chilled Water/Well Water HX

31 HX-90031001C Chilled Water/Well Water HX

31 WWF-90031001 Well Water Filter Schedule

32 Condenser Water

32 CWP-90032001A

32 CWP-90032001B

32 CWP-90032001C

33 Refrigeration

34 Cooling Fluid (Radar Face)

34 CWP-90034001A Antenna Cooling System Pump Yes

34 CWP-90034001B Antenna Cooling System Pump Yes

34 CWP-90034001C Antenna Cooling System Pump Yes

35 P-90035001A Cooling Water Well Pump

35 P-90035001B Cooling Water Well Pump

35 P-90035001C Cooling Water Well Pump

35 P-90035001D Cooling Water Well Pump

35 P-90035001E Cooling Water Well Pump

35 P-90035001F Cooling Water Well Pump

35 HST-90035001A Cooling Water Pump Removal Hoist

35 HST-90035001B Cooling Water Pump Removal Hoist

Division 23 - HVAC Air Side Systems

41 Air Supply, Exhaust, and Ventilation

41 Air Outlets (Diffusers, Registers, Grilles)

41 AHU-90041001 Ventilation System 1: Ducts, fans, coils, filters, dampers Yes

41 AHU-90041002 Ventilation System 2: Ducts, fans, coils, filters, dampers, ERV HX Yes

41 F-1 Filter - 2" Throwaway

41 F-2 Filter - High Capacity V Bank

170123 LRDR draft CP-1 Cx Master Equipment List page 5 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 5

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

41 OAF-90041001 Filter - 2" Throwaway

41 OAF-90041002 Filter - 2" Throwaway

41 OAF-90041003 Filter - 2" Throwaway

41 OAF-90041004 Filter - 2" Throwaway

41 ST-90041001 Sound Trap

41 ST-90041002 Sound Trap

41 CRAC-90041001A Computer Room Air Conditioning: Radar Processing Room 153

41 CRAC-90041001B Computer Room Air Conditioning: Radar Processing Room 153

41 CRAC-90041001C Computer Room Air Conditioning: Radar Processing Room 153

41 CRAC-90041002A Computer Room Air Conditioning: Comm CMC 150

41 CRAC-90041002B Computer Room Air Conditioning: Comm CMC 150

41 CRAC-90041003A Computer Room Air Conditioning: MDCR 151

41 CRAC-90041003B Computer Room Air Conditioning: MDCR 151

41 CRAC-90041004A Computer Room Air Conditioning: Radar Maintenance 121

41 CRAC-90041004B Computer Room Air Conditioning: Radar Maintenance 121

41 HRU-90041001 Heat Recovery Unit: Paired with AHU-90041001

41 FCU-90041001 Fan Coil Unit: Maintenance Shop 132

41 FCU-90041002 Fan Coil Unit: Water Treatment Plant Room 117

41 FCU-90041003 Fan Coil Unit: Fire Pump Rm 116

41 FCU-90041004A Fan Coil Unit: Antenna Rm 125

41 FCU-90041004B Fan Coil Unit: Antenna Rm 125

41 FCU-90041004C Fan Coil Unit: Antenna Rm 125

41 FCU-90041004D Fan Coil Unit: Antenna Rm 125

41 FCU-90041004E Fan Coil Unit: Antenna Rm 125

41 FCU-90041005 Fan Coil Unit: EOC & CVTC Conf Rm

41 FCU-90041006A Fan Coil Unit: SSUPS Rm 158

41 FCU-90041006B Fan Coil Unit: SSUPS Rm 158

41 FCU-90041007A Fan Coil Unit: Substation 159

41 FCU-90041007B Fan Coil Unit: Substation 159

41 FCU-90041007C Fan Coil Unit: Substation 159

41 FCU-90041008 Fan Coil Unit: Mech Room 129

41 FCU-90041009 Fan Coil Unit: Electrical Room 140

41 FCU-90041010 Fan Coil Unit: Electrical Room 156

41 FTRH-90041001 Finned Tube Radiation Heater

41 FTRH-90041002 Finned Tube Radiation Heater

41 FTRH-90041003 Finned Tube Radiation Heater

41 FTRH-90041004 Finned Tube Radiation Heater

41 FTRH-90041005 Finned Tube Radiation Heater

41 FTRH-90041006 Finned Tube Radiation Heater

41 FTRH-90041007A Finned Tube Radiation Heater

41 FTRH-90041007B Finned Tube Radiation Heater

170123 LRDR draft CP-1 Cx Master Equipment List page 6 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 6

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

41 FTRH-90041008 Finned Tube Radiation Heater

41 FTRH-90041009 Finned Tube Radiation Heater

41 FTRH-90041010 Finned Tube Radiation Heater

41 FTRH-90041011 Finned Tube Radiation Heater

41 FTRH-90041012 Finned Tube Radiation Heater

41 FTRH-90041013 Finned Tube Radiation Heater

41 FTRH-90041014 Finned Tube Radiation Heater

FTRH-90041015 Finned Tube Radiation Heater

41 VAV-90041001 VAV Terminal Unit: Rm 133, 134, 163

41 VAV-90041002 VAV Terminal Unit: Rm 135

41 VAV-90041003 VAV Terminal Unit: Rm 138, 162

41 VAV-90041004 VAV Terminal Unit: Rm 104, 105, 141, 142, 143, 139

41 VAV-90041005 VAV Terminal Unit: Rm 114

41 VAV-90041006 VAV Terminal Unit: Rm 106

41 VAV-90041007 VAV Terminal Unit: Rm 108, 109, 110, 111, 112

41 VAV-90041008 VAV Terminal Unit: Rm 107

41 VAV-90041009 VAV Terminal Unit: Rm 103

41 VAV-90041010 VAV Terminal Unit: Rm 149

41 VAV-90041011 VAV Terminal Unit: Rm 147, 148

41 VAV-90041012 VAV Terminal Unit: Rm 113

41 VAV-90041013 VAV Terminal Unit: Rm 146, 160

41 UH-90041001 Unit Heater, Hydronic: Mech Rm 1 129

41 UH-90041002 Unit Heater, Hydronic: Mech Rm 1 129

41 UH-90041003 Unit Heater, Hydronic: Mech Rm 1 129

41 UH-90041004 Unit Heater, Hydronic: Boiler Room 127

41 UH-90041005 Unit Heater, Hydronic: Boiler Room 127

41 UH-90041006 Unit Heater, Hydronic: Boiler Room 127

41 UH-90041007 Unit Heater, Hydronic: Dock Vestibule 136

41 UH-90041008 Unit Heater, Hydronic: Loading Dock 137

41 UH-90041009 Unit Heater, Hydronic: Pipe Entry 3 128

41 UH-90041010 Unit Heater, Hydronic: Pipe Entry 2 130

41 UH-90041011 Unit Heater, Hydronic: Pipe Entry 1B 120

41 UH-90041012 Unit Heater, Hydronic: Pipe Entry 1A 119

41 UH-90041013 Unit Heater, Hydronic: Attic Space 201

41 UH-90041014 Unit Heater, Hydronic: Attic Space 201

41 UH-90041015 Unit Heater, Hydronic: Attic Space 201

41 UH-90041016 Unit Heater, Hydronic: Attic Space 201

41 UH-90041017 Unit Heater, Hydronic: Attic Space 201

41 UH-90041018 Unit Heater, Hydronic: Attic Space 201

41 UH-90041019 Unit Heater, Hydronic: Attic Space 201

41 UH-90041020 Unit Heater, Hydronic: Mech Rm 3 139

170123 LRDR draft CP-1 Cx Master Equipment List page 7 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 7

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

41 CUH-90041001A Cabinet Unit Heater, Hydronic: LES Link 126

41 CUH-90041001B Cabinet Unit Heater, Hydronic: LES Link 126

41 CUH-90041002 Cabinet Unit Heater, Hydronic: LPP Link 131

41 CUH-90041003 Cabinet Unit Heater, Hydronic: Weather Vestibule 101

41 CUH-90041004 Cabinet Unit Heater, Hydronic: HEMP Vestibule 102

41 CUH-90041005 Cabinet Unit Heater, Hydronic: Weather Vestibule 124

41 CUH-90041006 Cabinet Unit Heater, Hydronic: SEC Vestibule 100

41 EF-90041001A Exhaust Fan: SSUPS 158 & Battery Rm 157

41 EF-90041001B Exhaust Fan: SSUPS 158 & Battery Rm 157

41 EF-90041002 Exhaust Fan: Boiler Room 127 Yes

41 SEF-90041001 Smoke Exhaust Fan: Radar Processing Room 153

41 SEF-90041002 Smoke Exhaust Fan: MDCR 151

41 SEF-90041003 Smoke Exhaust Fan: Comm CMC 150

41 SF-90041001A Supply Fan: Boiler Room 127 Yes

41 SF-90041001B Supply Fan: Boiler Room 127 Yes

41 HC-90041001 Heating Coil: AHU-1 OA Duct

41 HC-90041002 Heating Coil: AHU-2 OA Duct

41 HC-90041003A Heating Coil: Boiler Room Combustion Air Louver

41 HC-90041003B Heating Coil: Boiler Room Combustion Air Louver

41 HC-90041004A Heating Coil: CRAC-90041004A

41 HC-90041004B Heating Coil: CRAC-90041004B

51 Monitoring (O2, CO, N2 Purge, Etc.)

65 BMS (in Div 23 specs)

65 VFD-90065401A/B/C Variable Frequency Drive: FF-90023401A/B/C

65 VFD-90065402A/B Variable Frequency Drive: FF-90023402A/B

65 VFD-90065403A/B Variable Frequency Drive: SF-90041001A/B

65 VFD-90065404 Variable Frequency Drive: EF-90041002

65 BMS LAN - MCF BMS: LAN Backbone, switches, & workstations

65 BMS Interface to LES BMS: Secure Gateway between MCF and LES

65 BMS Interface to ECF BMS: Gateway between MCF and ECF

65 BMS Interface to CMOC BMS: Gateway between MCF and Bldg 800 CMOC

Division 25 -Integrated Automation

69 PCMS/PQMS

69 PCMS-90069001A Power Control and Monitoring System

69 PCMS-90069001B Power Control and Monitoring System

69 PCMS-90069203A Power Control and Monitoring System

69 PCMS-90069203B Power Control and Monitoring System

69 PCMS-90069002A Power Control and Monitoring System

69 PCMS-90069002B Power Control and Monitoring System

170123 LRDR draft CP-1 Cx Master Equipment List page 8 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 8

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

Division 26 - Diesel Generator Systems

01 Diesel Generator Air Intake / Exhaust

02 Diesel Engine Cooling

Division 26 - Electrical Systems

ATS-90061001 Automatic Transfer Switch

ATS-90061005A Automatic Transfer Switch

ATS-90061006 Automatic Transfer Switch

UPS-900610042B Uninterruptible Power Supply

UPS-90061002A Uninterruptible Power Supply

UPS-90061001a Uninterruptible Power Supply

MTS-90061001 Manual Transfer Switch

STS-90061001 Standby Tranfer switch?

ATS-90061007 Automatic Transfer Switch

ATS-90061008 Automatic Transfer Switch

CRAC-90041003A Computer Room Air Conditioning

Heat Tracing Control Panel See E900121B

BC-90061001A Battery Charger

DCP90061001A DC Panelboard

BC-90061001B Battery Charger

DCP90061001B DC Panelboard

450A Encl CB In SSUPS room 158 See E900121B

800A Load Bank CB 800A Enclosed CB for Load Bank in bldg 900 rm 130

ATS-90061002 Automatic Transfer Switch

ATS-90061004 Automatic Transfer Switch

LP-90061001 Lighting Panel

ATS-90061003 Automatic Transfer Switch

EPP-90061002 Emergency Power Panel

CRAC-90041001C Computer Room Air Conditioning

UPP-90061001B UPS Power Panel

UPP-90061001A UPS Power Panel

BLDG 900 EPO IN RM 153 Emergency Power off

Heat Tracing Control Panel See E900122B

SUS-90061001A Secondary Unit Substation

TR-90061001A Transformer

170123 LRDR draft CP-1 Cx Master Equipment List page 9 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 9

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

52-R1A Breaker Relay - Associated with SUS-90061001A

52-R2A Breaker Relay - Associated with SUS-90061001A

52-R3A Breaker Relay - Associated with SUS-90061001A

52-R4A Breaker Relay - Associated with SUS-90061001A

52-R5A Breaker Relay - Associated with SUS-90061001A

52-R6A Breaker Relay - Associated with SUS-90061001A

52-R7A Breaker Relay - Associated with SUS-90061001A

52-R8A Breaker Relay - Associated with SUS-90061001A

52-RMA Breaker Relay - Associated with SUS-90061001A

52-RTA Breaker Relay - Associated with SUS-90061001A

PCMS-90061001A Power Control Monitoring system

PQM-90061008 Power Quality Meter

SPD Surge Protection Device for SUS-90061001A

SUS-90061001B Secondary Unit Substation

PCMS-90061001B Power Control Monitoring system

52-RTB Breaker Relay - Associated with SUS-90061001B

52-R5B Breaker Relay - Associated with SUS-90061001B

52-R1B Breaker Relay - Associated with SUS-90061001B

52-R2B Breaker Relay - Associated with SUS-90061001B

52-R3B Breaker Relay - Associated with SUS-90061001B

52-R4B Breaker Relay - Associated with SUS-90061001B

52-RMB Breaker Relay - Associated with SUS-90061001B

TR-90061001B Transformer

SPD Surge Protection device for SUS-90061001B

SUS-90061002A Secondary Unit Substation

52-RTA Breaker Relay - Associated with SUS-90061002A

52-R1B Breaker Relay - Associated with SUS-90061002A

52-RMA Breaker Relay - Associated with SUS-90061002A

TR-90061002A Transformer

SPD Surge Protection device for SUS-90061002a

PCMS-90069203A Power Control Monitoring system

UPS-90061001A Uninturruptible Power Supply

PQM-90061008 Power Quality Meter

PCMS-90069203B Power Control Monitoring system

170123 LRDR draft CP-1 Cx Master Equipment List page 10 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 10

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

DCP-90061001A DC Panelboard

DCP-90061001B DC Panelboard

SUS-90061002B Secondary Unit Substation

PCMS-90061002B Power Control Monitoring system

52-RTB Breaker Relay - Associated with SUS-90061002B

52-R1B Breaker Relay - Associated with SUS-90061002B

52-R2B Breaker Relay - Associated with SUS-90061002B

52-RMB Breaker Relay - Associated with SUS-90061002B

TR-90061001B Transformer

EMCC-90061001A Motor Control Center

EMCC-90061001B Motor Control Center

EMCC-90061001C Motor Control Center

PCMS-90069203B Power Control Monitoring system

EMCC-90061001A Motor Control Center

EMCC-90061001B Motor Control Center

EMCC-90061001C Motor Control Center

PCMS-90169203A Power Control Monitoring system

CRAC-90041004A Computer Room Air Conditioning

CRAC-90041004B Computer Room Air Conditioning

UPP-90061002 UPS Power Panel

VTR HEAT TRACE CONTROLLERSEE E-900131B

LP-90061002 Lighting Panel

LC-90061001 Lighting Controls

EP-90061001 Emergency Panelboard

ATS-90061007 Automatic Transfer Switch

BC-90061001B Battery Charger

BC-90061001A Battery Charger

EP-90061002 Emergency Panelboard

UPS-90061001A Uninturruptible Power Supply

UP-90061001A UPS Panelboard

UP-90061001B UPS Panelboard

MTS-90061001 Manual Transfer Switch

170123 LRDR draft CP-1 Cx Master Equipment List page 11 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 11

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

ENCL CB FOR TR-90061008 Enclosed Circuit Breaker for TR-9061008

UPP-90061001A UPS Panelboard

UPP-90061001B UPS Panelboard

UPP-90061001C UPS Panelboard

UPS-90061001B Uninturruptible Power Supply

ENCL CB FOR TR-90061009 Enclosed Circuit Breaker downstream of T-90061009

UP-90061001B UPS Panelboard

STS-90061001 Standby Transfer Switch

ENCL CB FOR TR-90061010 Enclosed Circuit Breaker downstream of T-90061010

UPP-90061001B UPS Panelboard

UPP-90061002 UPS Panelboard

UPS-90061002A Uninturruptible Power Supply

UPS-90061002B Uninturruptible Power Supply

UP-90061002A UPS Panelboard

UP-90061003A UPS Panelboard

UP-90061002B UPS Panelboard

UP-90061003B UPS Panelboard

EPP-90061001 Emergency Power Panel

EPP-90061002 Emergency Power Panel

LC-90061001 Lighting Contactor

UPP-90061001A UPS Panelboard

UPP-90061001B UPS Panelboard

RPR ROOM EMERGENCY POWER OFFEmergeny Power off for RPR Room, see E900617B

61 DP-90061001 Distribution Panel:

61 DP-90061002 Distribution Panel:

61 DP-90061003 Distribution Panel:

61 DP-90061004 Distribution Panel:

170123 LRDR draft CP-1 Cx Master Equipment List page 12 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 12

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

61 DP-90061005 Distribution Panel:

61 DP-90061008 Distribution Panel:

61 DP-90061009 Distribution Panel:

61 MCC-90061001A Motor Control Center:

61 MCC-90061001B Motor Control Center:

61 PP-90061001 thru 1010 Branch Panel:

61 PCMS-90061001A Power Control and Monitoring System

61 PCMS-90061001B Power Control and Monitoring System

61 PQM-90061008 Power Quality Meter

61 PQM-90061009 Power Quality Meter

61 SUS-90061001A Secondary Unit Substation

61 TR-90061001 Transformer

61 UPS-90061001 Uninterruptible Power Supply: Radar SSUPS 1

61 UPS-90061002 Uninterruptible Power Supply: Radar SSUPS 2

61 UPS-90061003 Uninterruptible Power Supply: Comm SSUPS 1

61 UPS-90061004 Uninterruptible Power Supply: Comm SSUPS 2

61 UP-90061001 Distribution Panel: SSUPS 1

61 UP-90061002 Distribution Panel: SSUPS 2

61 UP-90061003 thru 1006 UPS Branch Panel:

61 MVS-90261001A Medium Voltage Switchgear

61 MVS-90261001B Medium Voltage Switchgear

61 PCMS-90261001A Power Control and Monitoring System

61 PCMS-90261001B Power Control and Monitoring System

61 BATT-90761001 Battery Pack

61 BC-90761001 Battery Charger

61 BKR-90761001 Breakers

61 DCP-90761001 DC Panelboard

61 CCVT-90761001 Coupling Capacity Voltage Transformer

61 CCVT-90761002 Coupling Capacity Voltage Transformer

61 CCVT-90761003 Coupling Capacity Voltage Transformer

61 CPT-90761001 Control Power Transformer

61 CPT-90761002 Control Power Transformer

61 DG-90761001 Diesel Generator

61 DS-90761001 Disconnect Switch

61 BKR-9076101 Breaker - Relay 52-1

61 DS-90761002 Disconnect Switch

61 138KV Relay Panel A See sheet E-907641H

61 MVS-90761001 Medium Voltage Switchgear

170123 LRDR draft CP-1 Cx Master Equipment List page 13 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 13

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

ZOP-90761002 52-M Breaker Relay associated with ZOP-90761002

ZOP-90761004 52-1 Breaker Relay associated with ZOP-90761004

ZOP-90761072 52-2 Breaker Relay associated with ZOP-90761072

ZOP-90761073 52-3 Breaker Relay associated with ZOP-90761073

ZOP-90761078 52-4 Breaker Relay associated with ZOP-90761078

ZOP-90761074 52-5 Breaker Relay associated with ZOP-90761074

ZOP-90761075 52-6 Breaker Relay associated with ZOP-90761075

ZOP-90761076 52-7 Breaker Relay associated with ZOP-90761076

ZOP-90761077 52-8 Breaker Relay associated with ZOP-90761077

61 MVS-90261001A Medium Voltage Switchgear

61 52-LMA Breaker Relay Associated with MVS-90761001A

PCMS-90261001A Power Control and Monitoring System

52-LTA Break Relay associated with MBS-90261001A

MVS-90261001B Medium Voltage Switchgear

52-LMB Break Relay associated with MBS-90261001B

PCMS-90261001B Power Control and Monitoring System

52-LTB Break Relay associated with MBS-90261001B

61 MVS-90761002B Medium Voltage Switchgear

69 PCMS-90769001 Power Control and Monitoring System

69 PCW-90769001 PCMS Workstation

61 PP-90761001 Power Panel

61 TR-90761001A Transformer

61 Substation Grounding Grounding system for Substation

61 907 - Lighting controls Building 907 Lighting Controls

61 Generator Lighting Controls Generator Enclosure Lighting Controls

907- Egress ltg Building 907 Egress Lighting

TCB-90761001 Transformer Control Box

NGR-906001

DG-90761001 Diesel Generator

T-90703001 Transformer

LS-90769001

CP-10012001 Controls for Heat trace (Located in MCF Room 120)

CP-10017001 Controls for Heat trace (Located in MCF Room 136)

CP-10017002 Controls for Heat trace (Located in MCF Room 136)

EP-90061002 Emergency Panel

FA LTG Integration Lighting shall come on during a fire alarm event (See E-900101B)

LP-90061001 Lighting Panel

LP-90061002 Lighting Panel

900 Ltg Controls Building 900 Lighting Controls

170123 LRDR draft CP-1 Cx Master Equipment List page 14 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 14

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

900 Egress Ltg Building 900 Egress Lighting

EP-90061001 Emergency Panel

LC-90061001 Lighting Contactor

BLDG 900 Grounding Building 900 Grounding System

69 PCMS-90069001A Power Control and Monitoring System

69 PCMS-90069001B Power Control and Monitoring System

69 PCMS-90261001A Power Control and Monitoring System

69 PCMS-90261001B Power Control and Monitoring System

PCMS-90761001

69 PCLS-90769001 PCMS LAN Switch

69 PCMS-90769001 Power Control and Monitoring System

69 PCMS-90769100A Power Control and Monitoring System

Division 27 - Communications

63 Communications

63 Backbone OSP Cable (copper & FO)

63 FOP-90763001 Fiber Optic Patch Panel

63 CC-90763001 Control Cabinet

63 Category Cable

Division 28 - Electronic Safety and Security

53 Fire Detection and Alarm

53 FACP-907520XX Fire alarm control panel

53 LOC BLDG 900 LOCAL OPERATING CONSOLE - RM 162

53 LOC BLDG 900 LOCAL OPERATING CONSOLE - RM 160

ASP BLDG 900 AIR AISPERATING SYSTEM in radar processing 153

FMCP BLDG 900 Fire alarm/mass notification system

FAWS BLDG 900 Fireworks stations

RT BLDG 900 Radio transmitter outside rm 103

Control Modules for SD Control modules for smoke dampers in Bldg 900 rm 150

ASP Air Aisperating System bldg 900 rm 151

FSCP Bldg 900 rm 147 Clean agent system control panel

BMS interface to Access Control?

Division 32 - Door and Gate Operators

56 Door Operators

56 Gate Operators

Division 33 - Utilities

03 POL Systems

03 T-10003001 Temporary Fuel Storage

03 P-10003001A Temporary Fuel Transfer Pump

03 P-10003001B Temporary Fuel Transfer Pump

170123 LRDR draft CP-1 Cx Master Equipment List page 15 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 15

Form # System / Mark System/Equipment Description V

FD

Ye s/ N o

Su b m it ta l A p p ro ve d

I/ O

M

A p p ro ve d

C o n st ru ct ec kl is t

A p p ro ve d

Fu n ct io n al

T es t

C h ec kl is t

A p p ro ve d

Tr ai n in g Sy lla b u s

A p p ro ve d

C C

C o m p le te d

FC

C o m p le te d

Tr ai n in g C o m p le te d

Sp ec

R ef er en ce

Notes / Comments

LRDR Projects (DRAFT CP-1) Commissioning MASTER EQUIPMENT & SYSTEMS LOG

03 T-03001 Fuel Storate Tank

03 P-03001 Fuel Transfer Pump

03 P-03002 Fuel Transfer Pump

03 DT-90003001A Fuel Day Tank

03 DT-90003001B Fuel Day Tank

03 FOP-900003001A Fuel Oil

03 FOP-900003001B Fuel Oil

03 HX-90003001A Hot Water/Fire Water

03 HX-90003001B Hot Water/Fire Water

03 T-10003001 Fuel Storage Tank, Temporary

04 Diesel Exhaust Fluid

05 Lube Oil System

XXX Water Distribution

XXX Water Wells

XXX Potable Water Wells

XXX Electrical Ground Wells

XXX Sanitary Sewers

XXX Septic Tank

XXX Industrial Waste Collection Tank

XXX Leach Field

XXX Storm Drainage

XXX POL Piping

170123 LRDR draft CP-1 Cx Master Equipment List page 16 of 16 CP-1

AM#10

READY TO ADVERTISE

LRDR Construction Package #1 - Clear AFS, Alaska CLR039a

01 91 00.01 15 Attachment 1 - Page 16

File details come from the government source that posted it. Updated .