J&A_17-2_Edwards_EST3_Fire_Panel_Redacted.pdf

PDF 121 KB Posted

Attached to
LRDR CP#1 Site Infrastructure, MCF, and Substation (CLR039a), Clear AFS, Alaska
Solicitation number
W911KB-17-R-0010
Issued by

About this file

Edwards EST3 Fire Panel

View the file

Other files

File Type Posted
J&A_Intrusion_Detection-Vindicator_Redacted.pdf PDF
J&A_Siemans_Apogee_BACnet_Redacted.pdf PDF
W911KB-17-R-0010_AM_14.pdf PDF
W911KB-17-R-0010_AM_13.pdf PDF
W911KB-17-R-0010_AM_12.pdf PDF
13_27_54.01_10_AM_11.pdf PDF
Bidder_Inquiry_Report_W911KB-17-R-0010.pdf PDF
33_20_00.01_00_AM_11.pdf PDF
31_00_00.01_00_AM_11_17y01m25d.pdf PDF
W911KB-17-R-0010_AM_11.pdf PDF
07_42_63.01_00_AM_10.pdf PDF
CLR_LRDR_MCF_S-900549B_AM_10.pdf PDF
09_97_13.01_17.pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900402B.PDF PDF
M-100601A_-_SYSTEM_DIAGRAMS_-TEMPORARY_FUEL_TANK.pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900401B.PDF PDF
CLR_LRDR_LSUB_M-907503H_-_AM10.PDF PDF
01_50_00.01_00.pdf PDF
33_52_80.01_00.pdf PDF
09_97_13.01_27.pdf PDF
M-100502A_-_DETAILS_-_TEMPORARY_FUEL_TANK.pdf PDF
01_91_19.01_00_Amendment_10.pdf PDF
CLR_LRDR_LSUB_M-907600H_-_AM10.PDF PDF
08_34_49.01_20_AM_10_(2).pdf PDF
Mechanical_Amendment_10_-_Sheet_-_MP900601B.PDF PDF
A-900005B_AM_10.pdf PDF
01_91_00.01_15_attachment_1_-_170123_LRDR_draft_CP-1_Cx_Master_Equipment_List.pdf PDF
CLR_LRDR_MCF_Z-900001B_AM_10.pdf PDF
W911KB-17-R-0010_AM_10.pdf PDF
33_52_10.01_00_-_AM10.pdf PDF
01_91_00.01_15_Amendment_10.pdf PDF
M-100301A_-_SECTIONS_-_TEMPORARY_FUEL_TANK.pdf PDF
A-900005B_AM_9.pdf PDF
23_05_93.01_00_AM_9.pdf PDF
06_20_00.01_00_AM_9.pdf PDF
22_05_48.00_20_AM_9.pdf PDF
Mechanical_Amendment_9_-_Sheet_-_MH900902B.pdf PDF
Revised_Plumbing_Sheets_-_Inquiry__6793897.pdf PDF
Mechanical_Amendment_9_-_Sheet_-_MP900703B.pdf PDF
26_08_01.01_00.pdf PDF
T-100601A_AM_09.pdf PDF
23_09_23.01_29_AM_9.pdf PDF
W911KB-17-R-0010_AM_9.pdf PDF
22_00_00.01_00_AM_9.pdf PDF
27_08_00.01_00.pdf PDF
33_20_01.01_00.pdf PDF
33_11_00.01_00_AM_9_17y01m18d.pdf PDF
09_97_13.01_17.pdf PDF
28_08_00.01_00.pdf PDF
E-100301A_Amendment__009.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No. _ _

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

1. CONTRACTING AGENCY: U.S. Army Engineer District, Alaska, Contracting Division, P.O. Box 6898, JBER, Alaska 99506-0898.

2. DESCRIPTION OF ACTION: This is a Limited Sources Justification for Other than Full and Open Competition to include a sole source (brand name) specification for the Edwards EST3-Sixty fire alarm panels in solicitation W911KB-17-R-0010. The solicitation will be a competitive Request for Proposal resulting in a new firm-fixed price construction contract to be awarded with FY17 MILCON funds.

3. DESCRIPTION OF SUPPLIES/SERVICES: This Limited Sources Justification is for the inclusion of a brand name specification for Edward’s fire alarm panels in the solicitation and resultant LRDR CP#1 contract for Clear Air Force Station, Alaska (Clear). Clear’s existing fire alarm system is an Edwards system and all new building fire alarm systems require compatibility with the existing system. The estimated cost of the Edward’s panels is $ Approval authority for this Limited Source Justification is the Procuring Contracting Officer.

4. AUTHORITY CITED: Other than Full and Open Competition is authorized pursuant to 10 U.S.C. 2304(c)(1), FAR 6.302-1(a)(2), when only one responsible source and no other supplies or services will satisfy agency requirements.

5. REASON FOR AUTHORITY CITED:

Background: Clear’s existing base wide fire alarm system is Edwards and new facilities are required to be compatable with the existing fire alarm system.

b. Justification: Facilities required to have a fire alarm notification system linked to the to the Clear fire department require system compatability. All new Missile Defense facilities are required to be linked to the installation fire department to protect life and mission critical equipment. Clear’s existing fire alarm system is manufactured by Edwards United Technologies. The LRDR facilites will require Edward fire alarm componets to ensure compatability with Clear’s existing fire alarm system. No other Contractor is proficient nor knowledgeable in the specific Edward system to be able to satisfy compatability with the existing system and satisfy the Government's requirement.

c. Impact: Failure to incorporate the requirement for compatibility with the Clear” existing fire alarm system will result in a failure to protect mission critical assets resulting mission failure.

d. Alternatives: None. Specification of a Edward fire alarm system for the LRDR CP#1 is essential to the Government’s requirements, precluding consideration of a product manufactured by another company.

6. EFFORTS TO OBTAIN COMPETITION: In an attempt to solicit offers from as many potential sources as practical, market research was conducted as described in paragraph 8 below. Effective competition is not anticipated for this system. There are no

File details come from the government source that posted it. Updated .