W519TC23R0102-0007.pdf
PDF 24 KB Posted
- Attached to
- EAGLE Fort Cavazos, TX W519TC-23-R-0102
- Solicitation number
- W519TC23R0102
About this file
This document is an amendment to Solicitation W519TC-23-R-0102 for maintenance, supply, and transportation services at Fort Cavazos, TX. The key details are:
The amendment updates the solicitation by 1) revising the capped indirect rate and fee rate language, 2) incorporating a new attachment with Q&A responses, and 3) extending the proposal due date from August 27 to September 13, 2024. The solicitation is for a firm-fixed price, service contract to be awarded by the Army Contracting Command - Rock Island. The solicitation includes a Statement of Work and other standard contract documents. Offerors must provide detailed budgetary and historical indirect rate data to support their proposed indirect rates, which may be capped by the government if not fully supported. The fee rates proposed will also be capped for the life of the contract.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0007 2024AUG23
W519TC
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
MARK MILES
EMAIL: MARK.A.MILES8.CIV@ARMY.MIL
W519TC-23-R-0102
2024MAY14
X
X 2024SEP13 01:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 9
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MARK MILES
Buyer Office Symbol/Telephone Number: CCRI-VAC/(520)693-0569
Type of Contract 1: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
The purposes of Amendment 0007 to Solicitation W519TC-23-R-0102 are:
1. Update RFP Capped Rates language in Section C.5 Cost/Price Contract Execution, Section L.5.4.2.13 Indirect Expense Rates, and Section
M.5.3.3 Capped Rates.
2. Incorporate Attachment 0037- Ft. Cavazos Q&A responses round 3, dated 22 August 2024. Please see Section J for additional details.
3. To correct the Amendment 0002 Section A narrative:
FROM:
1. Provide responses to industry questions (Attachment 0035 - Ft. Cavazos Q&A Responses Round 2, dated 26Jun2024).
TO:
1. Provide responses to industry questions (Attachment 0036 - Ft. Cavazos Q&A Responses Round 2, dated 26Jun2024).
NOTE: The above attachment number change will also be updated in SAM.gov, under Solicitation W519TC-23-R-0102 Amendment 0007.
4. The due date for proposal submissions is extended from 1:00PM CT on 27 August 2024 to 1:00PM CT on 13 September 2024.
5. All other terms and conditions of solicitation W519TC-23-R-0102 remain in effect.
*** END OF NARRATIVE A0007 ***
2 9
W519TC-23-R-0102
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Amendment 0007
Update Section C.5 COST/PRICE CONTRACT EXECUTION
FROM:
C.5 COST/PRICE CONTRACT EXECUTION
If the Offerors and/or Subcontractors proposals include indirect expense rate(s) which were determined by the Government to be not fully supported, those rates will be capped at the proposed rates for evaluation purposes and for the life of the task order contract, including any additional workload outside the original estimate pursuant to the Requirements clause FAR 52.216-21. In the event a rate(s) is capped, the following statements will be included in the award document, as applicable.
CAPPED RATES:
INDIRECT RATE(s):
PRIME: KTR NAME
KTR NAME proposal dated XXX included indirect rates which were determined by the Government to be not fully supported. As such, the following rates are hereby CAPPED for the life of this requirements task order (52.216-21) in accordance with M.5.3.3(a) of the solicitation:
#% for CAPPED RATE(S) by period
Example: update accordingly if applicable
Overhead = Base - 3%, OY1 3.25%, OY2- 3.5%, OY3 3.75% OY4 4%, and
G&A = Base - 3%, OY1 3.25%, OY2- 3.5%, OY3 3.75% OY4 4%, SUBCONTRACTOR: KTR NAME
The Cost/Price proposal dated XXX independently submitted by Subcontractor, KTR NAME, included indirect rates which were determined by the Government to be not fully supported. As such, the following rates are hereby CAPPED for the life of this requirements task order
(52.216-21) in accordance with M.5.3.3(a) of the solicitation:
#% for CAPPED RATE(S) by period
Example: update accordingly if applicable
Overhead = Base - 3%, OY1 3.25%, OY2- 3.5%, OY3 3.75% OY4 4%, and
G&A = Base - 3%, OY1 3.25%, OY2- 3.5%, OY3 3.75% OY4 4%, FEE RATE(s):
This is a Cost Plus Fixed Fee contract and thus, by definition, the fee is fixed at the DOLLAR amount proposed in the Cost/Price proposal. If, at any time during the life of this requirements task order (52.216-21), a change order is necessary for modification of the requirements, the subsequent fee amount will be subject to a CAP based on the following fee RATES proposed in KTR NAME proposal dated XXX, in accordance with M.5.3.3(b) of the solicitation:
#% for all work self- performed, #% for subcontract work
b. Fee Rates: Contractor name proposal dated XXX included a fee rate(s) of XX% which is hereby capped as proposed for the life of this task order in accordance with M.5.3.3(b) of the Solicitation.
TO:
FEE RATE(s):
This is a Cost Plus Fixed Fee contract and thus, by definition, the fee is fixed at the DOLLAR amount proposed in the Cost/Price proposal. If, at any time during the life of this requirements task order (52.216-21), a change order is necessary for modification of the requirements, the subsequent fee amount will be subject to a CAP based on the following fee RATES proposed in KTR NAME proposal dated XXX, in accordance with M.5.3.3(b) of the solicitation:
3 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
#% for all work self- performed, #% for subcontract work
Fee Rates: Contractor name proposal dated XXX included a fee rate(s) of XX% which is hereby capped as proposed for the life of this task order in accordance with M.5.3.3(b) of the Solicitation.
*** END OF NARRATIVE C0003 ***
4 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
Amendment 0007
1. Incorporate Attachment 0037- Ft. Cavazos Q&A responses round 3, dated 22 August 2024.
*** END OF NARRATIVE J0003 ***
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0037 FT. CAVAZOS Q&A RESPONSES ROUND 3 22-AUG-2024 001
5 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Amendment 0007
Update Section L.5.4.2.13 - L.5.4.2.13(a)(5):
FROM:
L.5.4.2.13 Indirect Expense Rates.
L.5.4.2.13(a) Indirect rates allocate indirect costs such as overhead, general & administrative (G&A) expense, and fringe benefit costs.
The Offeror shall provide the pool and base costs or FPRAs for all proposed indirect expense rates for itself and all Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the
Government, then that Subcontractor shall also provide the pool and base costs for all proposed indirect expense rates. Offerors shall provide a detailed explanation for indirect expense rates proposed that are not fully supported by the budgetary indirect expense rates and the corresponding supporting pool and base data or FPRA.
Offerors shall provide a narrative to crosswalk the variances between the proposed and budgetary information. Additionally, Offerors shall provide a narrative to crosswalk the variances between the historical and budgetary information (i.e., pool - L.5.4.2.13(a)(3) & base - L.5.4.2.13(a)(4)), to include an explanation of how the current proposal is incorporated into the indirect rate pools and bases.
Proposals also shall include an appropriately detailed description of how proposed indirect rates have been applied to proposed direct costs. All numerical data shall be provided in a Microsoft Excel file with accompanying explanatory notes in Word or PDF.
L.5.4.2.13(a)(1) When proposing Indirect Expense Rates, compliance with the Service Contract Act (SCA) (Attachment 0007, Wage
Determination) is required. For evaluation and proposal submission purposes only, Offerors should assume a 14 February 2024 NTP date.
Offerors (including Subcontractors) shall use the fringe benefit(s) included with the solicitation (Attachment 0007, Wage Determination) and shall not include any escalation for the entire period of performance.
L.5.4.2.13(a)(2) Indirect Cost Rate = Indirect Cost Pool divided by Indirect Cost Allocation Base
L.5.4.2.13(a)(3) Pool: A descriptive summary of the costs proposed in each pool, including the details for each pool in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the Government, then that Subcontractor shall also provide a descriptive summary of the costs proposed in each pool. An indirect cost pool is a logical grouping of indirect costs with a similar relationship to the cost objectives. For example, maintenance overhead pools include indirect costs that are associated with maintenance effort. Proposals also shall include an appropriately detailed description of how proposed indirect rates have been applied to proposed direct costs.
L.5.4.2.13(a)(4) Base: A descriptive summary of the costs proposed in each indirect cost allocation base, including the details for each base in both account/line-item name and dollar value, is required to be submitted in the Offerors proposal for itself and all
Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the Government, then that Subcontractor shall describe the indirect cost allocation base. The indirect cost allocation base for overhead rates is usually labor dollars; for G&A rates, the base is usually Total Cost Input or Value Added; and for fringe benefit rates the base is labor dollars.
TO:
L.5.4.2.13 Indirect Expense Rates.
L.5.4.2.13(a) Indirect rates allocate indirect costs such as overhead, general & administrative (G&A) expense, and fringe benefit costs.
The Offeror shall provide the pool and base costs or FPRAs for all proposed indirect expense rates for itself and all Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the
Government, then that Subcontractor shall also provide the pool and base costs for all proposed indirect expense rates. Offerors shall provide a detailed explanation for indirect expense rates proposed that are not fully supported by the budgetary indirect expense rates and the corresponding supporting pool and base data or FPRA.
L.5.4.2.13(a)(1) Offerors shall provide a narrative to crosswalk the variances between the proposed and budgetary information.
Additionally, Offerors shall provide a narrative to crosswalk the variances between the historical and budgetary information (i.e., pool
- L.5.4.2.13(a)(3)(4) & base - L.5.4.2.13(a)(4)(5)), to include an explanation of how the current proposal is incorporated into the indirect rate pools and bases. Proposals also shall include an appropriately detailed description of how proposed indirect rates have been applied to proposed direct costs. All numerical data shall be provided in a Microsoft Excel file with accompanying explanatory notes in Word or PDF.
L.5.4.2.13(a)(1)(2) When proposing Indirect Expense Rates, compliance with the Service Contract Act (SCA) (Attachment 0007, Wage
Determination) is required. For evaluation and proposal submission purposes only, Offerors should assume a 31 May 2024 NTP date.
Offerors (including Subcontractors) shall use the fringe benefit(s) included with the solicitation (Attachment 0007, Wage Determination)
6 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
and shall not include any escalation for the entire period of performance.
L.5.4.2.13(a)(2)(3) Indirect Cost Rate = Indirect Cost Pool divided by Indirect Cost Allocation Base
L.5.4.2.13(a)(3)(4) Pool: A descriptive summary of the costs proposed in each pool, including the details for each pool in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the Government, then that Subcontractor shall also provide a descriptive summary of the costs proposed in each pool. An indirect cost pool is a logical grouping of indirect costs with a similar relationship to the cost objectives. For example, maintenance overhead pools include indirect costs that are associated with maintenance effort. Proposals also shall include an appropriately detailed description of how proposed indirect rates have been applied to proposed direct costs.
L.5.4.2.13(a)(4)(5) Base: A descriptive summary of the costs proposed in each indirect cost allocation base, including the details for each base in both account/line-item name and dollar value, is required to be submitted in the Offerors proposal for itself and all
Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the Government, then that Subcontractor shall describe the indirect cost allocation base. The indirect cost allocation base for overhead rates is usually labor dollars; for G&A rates, the base is usually Total Cost Input or Value Added; and for fringe benefit rates the base is labor dollars.
Update Section L.5.4.2.13(b) - L.5.4.2.13(b)(5):
FROM:
L.5.4.2.13(b) The Offerors proposal shall include Budgetary and Historical Cost Data.
L.5.4.2.13(b)(1) Budgetary Data.
L.5.4.2.13(b)(1)(i) The Offeror shall provide budgetary rate data for 2023 through 2028 depending upon availability for itself and all
Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal directly to the Government, then that Subcontractor shall also provide budgetary rate data for 2023 through 2028 depending upon availability. The data provided shall be the costs for the pools and bases used to calculate the proposed indirect cost rates.
Appropriately detailed explanations and calculations, to include the fringe benefit(s) compensation required to be in compliance with
Attachment 0007, Wage Determination shall be provided for the basis of 2023 through 2028 forecasted indirect rates. If budgetary data for 2022 has been used to estimate proposed 2023 through 2028 rates, provide that explanation. If any portion of the proposed 2023 through 2028 forecasted rates is a discrete estimate, an explanation and supporting data shall be provided. The budgetary data shall include the pool and base summary information as explained in L.5.4.2.13(a) through L.5.4.2.13(a)(4). If the data is not available, the
Offeror shall provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(1)(ii) If a Subcontractor is submitting a Cost/Price proposal directly to the Government and the data is not available, then that Subcontractor shall also provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(2) Historical Cost Data (Historical Rates). The Offeror shall provide historical cost data for 2020, 2021, and 2022. If a
Subcontractor is submitting a Cost/Price proposal directly to the Government, then that Subcontractor shall provide historical actual cost data for 2020, 2021, and 2022. The historical data shall be provided in the same format as proposed rates and include detailed actual pool and base costs. If the data is not available, the Offeror shall provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(3) If a Subcontractor is submitting a Cost/Price proposal directly to the Government and the data is not available, then that Subcontractor shall provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(4) Sales Volume Data. The Offeror/Subcontractors shall also provide the Historical and Budgetary sales volume data (total revenue dollars); this data shall be provided for the business segment associated with the indirect rates included in the proposal. The
Offeror/Subcontractors shall provide historical sales volume data for 2020, 2021, and 2022 and shall provide the budgetary sales volume data for 2023-2028, segregated between Government and non-Government work. The Offeror/Subcontractors shall also provide an explanation of the calculations and the assumptions used in developing the budgetary data; at a minimum the budgetary data must include the value of this proposal.
TO:
L.5.4.2.13(b) The Offerors proposal shall include Budgetary and Historical Cost Data.
L.5.4.2.13(b)(1) Budgetary Data.
L.5.4.2.13(b)(1)(i) The Offeror shall provide budgetary rate data for 2024 through 2029 depending upon availability for itself and all
Subcontractor(s) who do not submit a proposal directly to the Government. If a Subcontractor is submitting a Cost/Price proposal
7 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
directly to the Government, then that Subcontractor shall also provide budgetary rate data for 2024 through 2029 depending upon availability. The data provided shall be the costs for the pools and bases used to calculate the proposed indirect cost rates.
Appropriately detailed explanations and calculations, to include the fringe benefit(s) compensation required to be in compliance with
Attachment 0007, Wage Determination shall be provided for the basis of 2024 through 2029 forecasted indirect rates. If budgetary data for 2023 has been used to estimate proposed 2024 through 2029 rates, provide that explanation. If any portion of the proposed 2024 through 2029 forecasted rates is a discrete estimate, an explanation and supporting data shall be provided. The budgetary data shall include the pool and base summary information as explained in L.5.4.2.13(a) through L.5.4.2.13(a)(4) and narrative cross-walk information required in L.5.4.2.13(a)(1). For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities budgetary data as well as the budgetary data of each individual JV partner. If the data is not available, the Offeror shall provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(1)(ii) If a Subcontractor is submitting a Cost/Price proposal directly to the Government and the data is not available, then that Subcontractor shall also provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(2) Historical Cost Data (Historical Rates). The Offeror shall provide historical cost data for 2021, 2022, and 2023. For
Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities budgetary data as well as the budgetary data of each individual JV partner. If a Subcontractor is submitting a Cost/Price proposal directly to the Government, then that
Subcontractor shall provide historical actual cost data for 2021, 2022, and 2023. The historical data shall be provided in the same format as proposed rates and include detailed actual pool and base costs. If the data is not available, the Offeror shall provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(3) If a Subcontractor is submitting a Cost/Price proposal directly to the Government and the data is not available, then that Subcontractor shall provide an explanation why the data cannot be provided.
L.5.4.2.13(b)(4) Sales Volume Data. The Offeror/Subcontractors shall also provide the Historical and Budgetary sales volume data (total revenue dollars); this data shall be provided for the business segment associated with the indirect rates included in the proposal. The
Offeror/Subcontractors shall provide historical sales volume data for 2021, 2022, and 2023 and shall provide the budgetary sales volume data for 2024-2029, segregated between Government and non-Government work. The Offeror/Subcontractors shall also provide an explanation of the calculations and the assumptions used in developing the budgetary data; at a minimum the budgetary data must include the value of this proposal.
L.5.4.2.13(b)(5) Capping or Discounted Indirect Rates. Offerors, or its subcontractors shall not be permitted to voluntarily cap or offer discounted indirect rates that are not supported by the data required by paragraphs L.5.4.2.13(a)(1) through L.5.4.2.13(b)(4)).
Offerors proposing capped or discounted indirect rates will not be evaluated and will not be further considered for award.
*** END OF NARRATIVE L0004 ***
8 9
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
Amendment 0007
Update Section M, Paragraph M.5.3.3 Capped Rates.
FROM:
M.5.3.3 Capped Rates.
M.5.3.3(a) Indirect Rates: If the Offeror's or Subcontractor(s)' proposals include indirect expense rates not fully supported IAW
L.5.4.2.13, those rates will be capped at the proposed rates for evaluation purposes and for the life of the requirements task order
(52.216-21). By submitting a proposal for this task order, the Offeror and Subcontractor(s) understand and accept that the Government will cap any indirect expense rates not fully supported at the proposed rates. As stated in L.4.1.2, an Offeror or Subcontractor that takes exception to this requirement will be deemed unacceptable and will not be further considered for award. The Offeror and
Subcontractor capped rates will be included in the contract award for the life of the requirements task order (52.216-21).
M.5.3.3(b) Fee Rates: The Offeror's and Subcontractor(s)' fee rate(s) will be capped as proposed for the life of this task order contract, including any additional workload outside the original estimate pursuant to the Requirements clause FAR 52.216-21. The
Offerors and Subcontractor(s)' FEE rates will be CAPPED as proposed and included in the contract award terms and conditions for implementation any time during the life of this requirements task order (52.216-21) when a change order is necessary for modification of the requirements.
TO:
M.5.3.3
Fee Rates: The Offeror's and Subcontractor(s)' fee rate(s) will be capped as proposed for the life of this task order contract, including any additional workload outside the original estimate pursuant to the Requirements clause FAR 52.216-21. The Offerors and
Subcontractor(s)' FEE rates will be CAPPED as proposed and included in the contract award terms and conditions for implementation any time during the life of this requirements task order (52.216-21) when a change order is necessary for modification of the requirements.
*** END OF NARRATIVE M0004 ***
9 9
| SECTION A |
| SECTION C |
| SECTION J |
| SECTION L |
| SECTION M |
File details come from the government source that posted it. Updated .